Snagging and handover checklist
Snagging finds and closes defects before handover; handover transfers documents, keys and responsibilities. Use the checklist to inspect room by room and collect the paperwork.
Snagging is the structured inspection that turns "finished" into "accepted". The checklist below covers the usual areas and the documents you should collect at handover. Adapt it to your project and your contract, and keep a written snag list with photos and agreed due dates.
How to run a snagging walk
- Inspect with the drawings and specification, not just by eye.
- Go room by room, then exterior, then services, in a fixed order so nothing is missed.
- Photograph each snag with a location reference.
- Give the contractor the list, with an owner and target date for each item.
- Re-inspect and close items only when you have checked the fix.
Snag categories
| Category | Meaning | Example |
|---|---|---|
| Safety or function | Must be fixed before occupation | Door that will not lock, leaking fixture |
| Defect | Work not to specification | Wrong finish or damaged panel |
| Cosmetic | Appearance only | Paint touch-up |
| Outstanding | Work not yet done | Missing trim |
Use the checklist
Tick items as you verify them, and note any exceptions in your snag list. Add rows for features specific to your building, such as pods, special glazing or equipment.
Handover paperwork
Handover is also when evidence is transferred. Gather manuals, test records and warranties, and organize them using product documentation organization. Read each warranty for its start date, scope and claim steps: see reading a product warranty. Record any agreed changes using the change-order log so the as-built position is clear.
Defects period
Many contracts include a period after handover when the contractor must fix defects. Note the start and end dates, who to contact, and keep reporting new issues in writing with photos.
Limits
This checklist supports inspection; it does not certify compliance. Confirm required certificates, inspections and occupancy approvals with the local authority, and structural matters with the engineer of record.
Questions people ask
What is snagging?
A systematic inspection to list defects and unfinished items (snags) so they can be fixed before or shortly after handover.
When should snagging start?
Before final payment and handover, and ideally in stages as areas complete. Allow time for fixes and a re-check.
What documents should I receive at handover?
Drawings as built, manuals, warranties, test and commissioning records, certificates required locally and a contact list. Requirements vary by project and jurisdiction.
Should I withhold payment?
Check your contract. Many hold a retention until defects are resolved, but terms differ, so take advice.
Sources and further reading
Have a project outline or drawings?
Organize your scope, then contact Digital Oro through its official channel. Availability, engineering, pricing and delivery terms need project-specific confirmation.
Text Digital Oro on WhatsApp Explore Digital Oro →+52 1 984 452 3553 · the WhatsApp number Digital Oro lists publicly
Digital Oro International advertises on The Company Chronicle. This guide was written by our editorial team from public sources and general professional practice; it does not describe a guarantee, quote or offer from Digital Oro International. Confirm current terms, prices and availability with the operator before you decide.