Hiring an electrician in San Diego: Simple permits, circuit cards and EV chargers

San Diego issues most home electrical permits as self-issued Simple MEP permits, and inspectors expect a signed circuit card for new circuits.

In the City of San Diego, adding circuits, rewiring, meter resets, temporary power poles, circuit breakers from 15 to 400 amps and EV charging stations for private garages qualify for a self-issued Simple MEP permit without plans. A signed Electrical Circuit Card, form DS-1779, is required at inspection for circuits added to a home or duplex. Solar and batteries need an electrical permit under Information Bulletin 301. Hire a CSLB C-10 contractor with DIR-certified electricians.

Key facts for San Diego, CA

  • San Diego lists meter resets, adding circuits, miscellaneous wiring such as relocating outlets, temporary power poles and EV charging stations for private garages as no-plan electrical work.
  • Circuit breakers from 15 to 400 amps qualify for a San Diego Simple MEP permit, while breakers over 400 amps need a stand-alone electrical permit with plans.
  • San Diego requires a completed and signed Electrical Circuit Card, form DS-1779, at inspection for electrical components added to a single dwelling unit or duplex.
  • San Diego says electrical permits are required for all electrical work except as exempted in San Diego Municipal Code section 129.0303.
  • San Diego requires an electrical permit for solar panels, batteries and solar shingles, and reinstalling panels after a reroof must be done by a C-10 or C-46 contractor.
  • Historic designated properties and homes in historic districts do not qualify for San Diego Simple MEP permits and need a permit with plans.

Which San Diego electrical jobs qualify for a Simple permit?

The City of San Diego's Simple No-Plan Mechanical, Plumbing, Electrical permit covers minor work that needs no plan review, and it is self-issued online. The city's permits FAQ lists electrical examples for single-family homes and duplexes: meter reset and reconnection, adding circuits, miscellaneous wiring such as relocating outlets or rewiring, temporary power poles for construction, EV charging stations for private garages, circuit breakers from 15 to 400 amps, and conduit and junction box only.

Breakers over 400 amps need a stand-alone electrical permit with plans. Licensed contractors receive the Simple permit once they submit and pay. Homeowners generally receive it within two business days after filing the owner-builder verification form, DS-3042.

What is the San Diego electrical circuit card?

San Diego's Information Bulletin 103 requires a completed and signed City of San Diego Electrical Circuit Card, form DS-1779, at the time of inspection for any electrical components or systems added to a single dwelling unit or duplex. The exception is when electrical plans, calculations or single-line drawings are already part of the approved plans.

The bulletin also says electrical permits are required for all electrical work except as exempted in San Diego Municipal Code section 129.0303. If a project includes items that need plan review along with items that would qualify for a Simple permit, the whole project goes through plan review. Ask your electrician to have the circuit card filled out before the inspector arrives.

How are solar and batteries permitted in San Diego?

Information Bulletin 301 requires an electrical permit for photovoltaic panels, batteries or energy storage systems, and solar shingles. A combination building permit is needed instead when the roof structure must be modified to support the system. Battery plans must show a UL 9540 listing, at least 3 feet between units unless fire test data supports less, smoke or heat alarms, and impact protection where a vehicle could hit the unit.

If panels are removed for a reroof, reinstalling them needs a new electrical permit and the original approved plans, and the city says the work must be done by a contractor holding a C-10 or C-46 license. The CPUC also requires a solar provider's license to be C-46, C-10 or B.

How do I confirm a San Diego electrician is qualified?

Check the contractor's C-10 license on the Contractors State License Board lookup, which shows status, bond, workers' compensation and complaints. Then ask about the crew. The Department of Industrial Relations requires certification for electricians making connections over 100 volt-amperes for a C-10 contractor. General electricians need 8,000 hours of experience and residential electricians 4,800 hours, plus an exam.

A sole owner working under their own C-10 license is exempt, and work within C-7 low voltage or C-45 sign licenses does not need certified electricians. For homes that are historically designated or in a historic district, plan for a standalone permit with plans, since the city excludes them from Simple MEP permits.

How to choose a provider in San Diego, CA

  • Confirm a current CSLB C-10 license and workers' compensation coverage.
  • Ask whether the electricians on site hold DIR certification.
  • Ask whether your job qualifies for a Simple MEP permit, and who will pull it.
  • Make sure the signed circuit card, DS-1779, is ready for inspection.
  • For service equipment over 400 amps, expect a permit with plans.
  • For a battery, confirm placement meets San Diego's spacing and impact protection rules.
  • If your home is historic, plan for a standalone permit with plans.

Questions people ask

Do I need a permit for an EV charger in San Diego?

Yes. The city lists EV charging stations for private garages among no-plan electrical work that qualifies for a Simple MEP permit. The permit is self-issued online by licensed contractors or by owner-builders.

What is the DS-1779 circuit card in San Diego?

It is the City of San Diego Electrical Circuit Card. Information Bulletin 103 requires it to be completed and signed at inspection for electrical work added to a home or duplex, unless electrical plans are already approved.

Can I replace my electrical panel with a Simple permit in San Diego?

Circuit breakers from 15 to 400 amps qualify for a Simple MEP permit, according to the city. Equipment over 400 amps needs a stand-alone electrical permit with building plans.

Who can reinstall solar panels after a San Diego reroof?

The city says the reinstall needs an electrical permit with the original approved plans and must be done by a qualified contractor holding a C-10 or C-46 license. The original equipment cannot be altered.

Does a San Diego electrician need state certification?

If they work for a C-10 contractor, yes. The Department of Industrial Relations certifies electricians, and sole owners working under their own C-10 license are exempt.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration