Local Guide · Residential solar installers · Los Angeles, CA

Going solar in Los Angeles: LADBS permits and LADWP interconnection

Los Angeles homes need an LADBS permit and an LADWP solar inspection before a system can run. Here is how the city process works.

In the City of Los Angeles, a rooftop solar system on a one- or two-family home needs a Department of Building and Safety permit, and smaller systems that meet set criteria can get an online express permit pulled by a contractor. LADWP, the city-owned utility, must inspect the system, and it may stay locked until inspections pass, any interconnection agreement is signed and a net meter is installed. The installer still needs a CSLB license in C-46, C-10 or B.

Key facts for Los Angeles, CA

  • LADBS issues online express permits, for contractors only, for rooftop solar on a one- or two-family home when the system is 10 kW or less and meets other listed criteria.
  • The LADBS express route requires 120/240-volt single-phase power and a service panel rated no higher than 225 amperes, among other limits.
  • Hybrid systems, building-integrated photovoltaics and photovoltaic roll roofing do not qualify for the LADBS online solar express permit.
  • LADBS also offers online express permits for AC-coupled battery systems up to 10 kW-AC tied to solar on a one- or two-family home.
  • LADWP's net metering guidelines say all grid-tied solar systems in its territory must meet LADWP interconnection requirements and have any necessary LADBS permits.
  • LADWP says a solar system may not be operated, and may be locked, until inspections are complete, any interconnection agreement is signed and a net meter is installed.

What permit does a Los Angeles solar system need?

The Los Angeles Department of Building and Safety (LADBS) lists photovoltaic systems among its express permits, available online for contractors only. The installation must match the approved plans generated through the online system.

To qualify, the system must be on the roof of a one- or two-family home and total 10 kW or less. The AC power must be 120/240-volt single phase, the service panel must be rated 225 amperes or less, and inverters are limited to two central or string units with up to four strings, or microinverter systems with up to four branch circuits. Hybrid systems, building-integrated panels and solar roll roofing are excluded. LADBS notes a separate building permit may be needed for the structural support of the array.

Can I add a battery in Los Angeles with an express permit?

Sometimes. LADBS offers online express permits, again for contractors only, for energy storage systems connected to solar. The battery system must be installed on a one- or two-family home with the solar system, be AC coupled and not exceed 10 kW-AC.

It must connect to the load side of a single-phase 120/240-volt service panel rated 225 amperes or less. Larger or more complex systems go through plan check. LADBS also lists electric vehicle charging in single-family homes, including any service upgrade, as an express electrical permit up to 400 amps of service. If your installer proposes a panel upgrade, ask which permit it will be under.

How does LADWP inspect and connect a home solar system?

Los Angeles homes buy power from LADWP, the city's Department of Water and Power. Its net metering guidelines say every grid-tied solar system in its territory must meet LADWP interconnection requirements, whether or not the customer joins net metering.

Systems must have any necessary LADBS permits and a disconnect device that meets LADWP's Electric Service Requirements. LADWP may lock a system and bar operation until all inspections are done, the customer signs an interconnection agreement where one applies, and a net meter is installed. Only the LADWP net meter installer may unlock it. Systems that do not comply with LADWP rules, local ordinances or electrical codes fail the solar inspection. LADWP allows self-installed systems or installation by a licensed contractor.

Which state consumer rules still apply in Los Angeles?

State contracting law applies everywhere in California. The installer needs a CSLB license in the C-46 Solar, C-10 Electrical or B General Building class, and a door-to-door seller needs a Home Improvement Salesperson registration. CSLB requires the Solar Energy System Disclosure Document on the contract's cover page.

The CPUC's signed consumer guide requirement is written for customers of the investor-owned utilities it lists, and LADWP is not on that list. The CPUC still publishes the guide for anyone, and its warnings about free solar claims, tablet signatures and inflated savings estimates apply. Your three-business-day right to cancel, or five days if you are 65 or older, comes from state home solicitation rules that CSLB describes.

How to choose a provider in Los Angeles, CA

  • Confirm a CSLB license in C-46, C-10 or B and check the HIS registration of any salesperson.
  • Ask whether your system qualifies for the LADBS online express permit or needs plan check.
  • Ask whether a separate building permit is needed for the roof structure.
  • Confirm the installer will handle the LADWP interconnection application and inspection.
  • Do not turn the system on until LADWP has inspected it and installed the net meter.
  • Get the CSLB Solar Energy System Disclosure Document on the contract cover page.
  • Read the CPUC consumer guide on your own time, even though LADWP customers are not required to sign it.

Questions people ask

Do I need a permit for solar panels in Los Angeles?

Yes. LADBS issues solar permits, and rooftop systems of 10 kW or less on one- or two-family homes that meet its criteria can get an online express permit. Only contractors can use the online route, and larger systems need plan check.

Who connects my solar system to the grid in Los Angeles?

LADWP, the city's Department of Water and Power, handles interconnection. Its guidelines say systems may stay locked until inspections are complete, any interconnection agreement is signed and a net meter is installed.

Can I install solar myself in Los Angeles?

LADWP's net metering guidelines say systems may be self-installed by the customer or installed by a licensed contractor. The system still needs LADBS permits and must pass LADWP's solar inspection. The online express permit is open to contractors only.

Do I sign the CPUC solar guide as an LADWP customer?

The CPUC's signature requirement covers customers of the investor-owned utilities it lists, and LADWP is not among them. The guide is still free on the CPUC website and explains common scams and your cancellation rights.

Can I add a home battery with an express permit in Los Angeles?

Possibly. LADBS offers online express permits for AC-coupled storage up to 10 kW-AC paired with solar on a one- or two-family home, connected to a single-phase panel of 225 amps or less.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration