Which Electrical Code Applies? NEC Adoption in Texas, Florida and Their Major Cities

Texas switched to the 2026 National Electrical Code on September 1, 2026. Florida uses the 2020 NEC until its 9th Edition building code brings in the 2023 NEC at the end of 2026. Here is how each state adopts the code, what cities can change, what applies in unincorporated Texas, and where to read the NEC free.

Texas enforces the 2026 National Electrical Code statewide for all non-exempt electrical work started on or after September 1, 2026, under TDLR rule 16 TAC 73.100, with one Texas amendment removing GFCI requirements for outdoor dwelling HVAC outlets. Florida enforces the 2020 NEC through the 8th Edition Florida Building Code; the 9th Edition, based on the 2023 NEC, takes effect December 31, 2026 under state materials, while Tampa says January 1, 2027. Your permit application date decides which edition applies.

Key facts

  • Texas Occupations Code 1305.101(a)(2) requires TDLR to adopt each revised NEC as the state electrical code after NFPA publishes it every three years.
  • TDLR's commission voted July 28, 2026 to adopt the 2026 NEC effective September 1, 2026, published in the August 28, 2026 Texas Register (51 TexReg 5776), with an amendment to 210.8(F).
  • Before that, Texas enforced the 2023 NEC from September 1, 2023; some TDLR and city pages still show 2023 and are out of date.
  • Texas state electrician exams moved to the 2026 NEC on September 1, 2026.
  • Houston reviews all permit applications submitted on or after September 1, 2026 to the 2026 NEC adopted by the state.
  • Austin's building technical codes table lists the NEC at 2023 with "2026 Effective September 1, 2026," and its I-codes at the 2024 editions.
  • Florida law requires the Florida Building Commission to adopt an updated Florida Building Code every 3 years, reviewing the latest International Codes and the NEC (s. 553.73(7)(a)).
  • Florida's 7th Edition FBC used the 2017 NEC (December 31, 2020 to December 30, 2023); the 8th Edition uses the 2020 NEC (December 31, 2023 to present).
  • The 9th Edition FBC (2026) is based on the 2024 International Building Code and the 2023 NEC; the Florida Building Commission lists December 31, 2026 as its effective date, and Tampa announced January 1, 2027.
  • In unincorporated Texas with no permit required, TDLR says the state code in effect on the day the electrician begins installing applies, and a state license is still required.

The short answer, as of November 2026

JurisdictionNEC edition enforcedEffectiveNext change
Texas (statewide, cities and counties)2026 NEC, with Texas amendment to 210.8(F)September 1, 2026Next NEC cycle
Florida (statewide, through the Florida Building Code)2020 NEC (8th Edition FBC, 2023)December 31, 20232023 NEC with the 9th Edition FBC (2026): December 31, 2026 per the state; January 1, 2027 per Tampa

That means Texas is now one NEC edition ahead of where Florida will be even after its 9th Edition takes effect. Contractors who work in both states, and homeowners comparing advice online, should check which edition a rule comes from.

What is the NEC cycle?

The National Electrical Code (NFPA 70) is published by the National Fire Protection Association every three years: 2017, 2020, 2023, 2026. States and cities then decide when to adopt each edition, sometimes with amendments. Texas law ties its adoption to each new edition (Occ. Code 1305.101). Florida reviews the NEC as part of its three-year building code update (s. 553.73(7)), so it typically lags the newest NEC by one or two editions.

What edition of the NEC does Texas use?

The 2026 NEC, since September 1, 2026.

How it happened

  • The law. Texas Occupations Code 1305.101(a)(2) requires TDLR to adopt the revised NEC as the state electrical code after NFPA publishes a new edition.
  • The vote. On July 28, 2026, the Texas Commission of Licensing and Regulation voted unanimously to adopt the 2026 NEC for all non-exempt electrical work starting September 1, 2026, according to TDLR's newsletter "The Texas Circuit."
  • The rule. TDLR amended 16 Texas Administrative Code 73.100. The adoption justification was published in the August 28, 2026 Texas Register (51 TexReg 5776), effective September 1, 2026.
  • The amendment. The commission approved an amendment to NEC 210.8(F) so that GFCI protection is not required on outdoor dwelling HVAC outlets. See GFCI and AFCI requirements.
  • Exams. State electrician exams switched to the 2026 NEC on September 1, 2026. TDLR's exam page says candidates may reference the 2026 edition.

Watch out for stale pages

Several official pages still show the 2023 NEC: TDLR's own Compliance Guide, a copy of 16 TAC 73.100 on Cornell's Legal Information Institute site, and Houston's code-development page, which lists the 2023 NEC administrative provisions in the 2021 Houston Construction Code. Before September 1, 2026, those were correct: TDLR enforced the 2023 NEC from September 1, 2023. For current work, rely on TDLR's September 1, 2026 rulemaking notice.

Which edition applies to a specific job?

When TDLR adopted the 2023 NEC, it explained that the "start" of electrical work is the day the electrician begins installing electrical materials or equipment. Its Compliance Guide says that in an unincorporated area with no permit required, the code in effect on the day installation begins applies, and if a permit was required, the code in effect when the permit was obtained applies. Inside city limits, cities apply their own permit rules: Houston reviews all permit applications submitted on or after September 1, 2026 to the 2026 NEC.

Can a Texas city adopt an older NEC or its own amendments?

Cities can amend, but TDLR says they cannot go below the state minimum.

  • The statute. Occupations Code 1305.201 lets cities and regions require inspections, offer exams and issue municipal licenses, and says electrical work inside city limits must follow applicable local ordinances. It also bars cities from making state license holders take a municipal exam, and from charging them a permit, registration or other fee other than building permit fees (Sec. 1305.201(f)).
  • TDLR's interpretation. TDLR's chief inspectors wrote in July 2026 that the statute does not let a municipality "adopt" its own code; a city has the right to amend the state-adopted code, but amendments must be as stringent or more stringent than the NEC, consistent with NEC 90.4. In TDLR's words, a city cannot make a state-licensed contractor perform an installation that is a direct code violation or substandard to the 2026 NEC.
  • A new exception for batteries. Under SB 1252, effective September 1, 2025, a city may not adopt or enforce an NEC amendment or other measure that regulates the installation or inspection of residential energy backup systems (up to 50 kW or 100 kWh), though city-owned utilities may, according to TDLR. See home battery backup.

So, in practice: a Texas city may still be in the middle of adopting local amendments to the 2026 NEC, but the 2026 NEC is the floor. If a city requirement seems to conflict with the state code, ask the city and TDLR in writing.

Texas city-by-city table

CityWhat we confirmedStatus of local amendmentsWho to call
HoustonCity says the 2026 NEC adopted by the state became effective September 1, 2026, and permit applications on or after that date are reviewed to itHouston's code-development page still lists 2023 NEC administrative provisions in the 2021 Houston Construction Code (effective January 1, 2024); ask about updatesHouston Permitting Center
AustinCity code table lists the NEC as 2023 with "2026 Effective September 1, 2026"; building, residential, fire and other I-codes at 2024 editionsCheck the city's local amendments pageAustin Development Services
DallasStatewide 2026 NEC applies per TDLRDallas's former construction codes page says its content moved to a new City Codes and Ordinances page; we could not confirm current local electrical amendmentsDallas Building Inspection
San AntonioStatewide 2026 NEC applies per TDLRNot verified; we could not load the city's code adoption pageSan Antonio Development Services Department
Fort WorthStatewide 2026 NEC applies per TDLRThe city has posted a document titled "2026 NEC amendments draft"; we could not open it, so its contents are unverifiedFort Worth Development Services
El PasoStatewide 2026 NEC applies per TDLRNot verifiedCity of El Paso building permits
Unincorporated countiesState code and state license applyOften no permit or inspection programTDLR (800-803-9202)

We will update this table as cities publish their 2026 amendments. If you are a contractor, check each city's local amendments before you bid.

Who enforces the electrical code in rural and unincorporated Texas?

Many unincorporated areas of Texas have no electrical permit or inspection program; TDLR's Compliance Guide addresses work "in an unincorporated area (i.e. no permits required)." That does not mean anything goes:

  • The state code still applies. Occupations Code 1305.201(e) says electrical work in unincorporated areas must meet standards at least as stringent as the state-adopted electrical code.
  • A state license is still required. TDLR's FAQ says a state electrician license is required even for work in unincorporated areas.
  • TDLR enforces licensing. TDLR can impose administrative penalties and cease-and-desist orders, and unlicensed electrical work is a Class C misdemeanor (Secs. 1305.301 to 1305.303). TDLR says local licensing or inspecting authorities, not TDLR, perform inspections required for local permits.
  • Utilities may have requirements before connecting a new service. Ask your electric co-op or utility.
  • Exemptions exist, such as work on agricultural buildings other than processing an agricultural commodity (Sec. 1305.003(a)(18)) and an owner-occupant's work on their own home not regulated by a city ordinance (Sec. 1305.003(a)(6)).

For a rural build, ask your electrician to follow the 2026 NEC and give you a written statement of what was installed. Some owners hire a third-party inspector for peace of mind or for their insurer. See Texas electrical permits.

Does the IRC electrical chapter apply in Texas?

Many Texas cities adopt the International Residential Code (IRC) for one- and two-family homes; Austin, for example, lists its residential code at the 2024 edition. The IRC contains electrical chapters drawn from the NEC. For electrical work, though, Texas law and TDLR's position make the state-adopted NEC the governing electrical code for all non-exempt work in Texas. If a city's IRC electrical chapters and the 2026 NEC differ, ask the building official which controls; TDLR says local amendments cannot fall below the state-adopted NEC.

What edition of the NEC does Florida use, and how does the Florida Building Code include it?

Florida does not adopt the NEC on its own schedule. It is part of the Florida Building Code (FBC), a single statewide code that the Florida Building Commission updates every three years.

How the FBC includes the NEC

  • Section 553.73(7)(a), Florida Statutes, requires the commission to adopt an updated FBC every 3 years after reviewing the latest International Building, Residential, Plumbing, Mechanical, Fuel Gas and Existing Building codes, and the National Electrical Code.
  • The NEC is adopted into the FBC as a referenced standard, with Florida amendments where the commission decides they are needed.
  • The commission may adopt an updated NEC edition outside the normal cycle if delay causes undue hardship or threatens public health, safety and welfare (s. 553.73(7)).

Edition history

FBC editionNEC editionEffective
7th Edition (2020)2017 NECDecember 31, 2020 to December 30, 2023
8th Edition (2023)2020 NECDecember 31, 2023 to present
9th Edition (2026)2023 NECDecember 31, 2026 (state); January 1, 2027 (Tampa announcement)

Dates for the 7th and 8th Editions are from Charlotte County's code page; Miami-Dade's summary of 8th Edition electrical changes is titled "Electrical Changes for the 2020 National Electrical Code, NFPA-70."

When will Florida adopt NEC 2023?

With the 9th Edition (2026) Florida Building Code. The Florida Building Commission's course materials say the 9th Edition is based on the 2024 International Building Code and the 2023 NEC and becomes effective December 31, 2026 under s. 553.73(7)(e), and the commission's October 2026 workplan lists December 31, 2026.

The City of Tampa has announced that the 9th Edition "will go into effect January 1, 2027," and that to vest under the 8th Edition, building plans must be submitted and the permit application accepted by December 31, 2026. The practical takeaway is the same everywhere: if your permit application is accepted by December 31, 2026, ask your building department whether it vests under the 8th Edition (2020 NEC); applications after the changeover use the 9th Edition (2023 NEC).

Open questions in the 9th Edition

During 2026 glitch review, the commission received comments on the electrical volume, including a proposal to adopt the 2023 NEC "as published September 1, 2022," which would affect whether later NFPA Tentative Interim Amendments (such as TIA 23-9) apply, and a proposed Florida amendment to 210.8(F) on GFCI protection for outdoor outlets. We could not confirm the final outcome. Contractors should check the final 9th Edition text before bidding work that will be permitted after the changeover.

Florida counties and cities: can they change the code?

Florida's code is statewide, enforced locally. Section 553.73(4) lets local governments adopt amendments to the administrative provisions of the FBC, and, not more than once every 6 months and subject to conditions, technical amendments that apply only within their jurisdiction and are more stringent than the FBC. Local amendments must be sent to the commission.

County or cityCode in forceNotes
Miami-Dade8th Edition FBC (2020 NEC)Ask about local amendments
Broward8th Edition FBC (2020 NEC)Ask about local amendments and product approvals
Orange (Orlando)8th Edition FBC (2020 NEC)Ask about local amendments
Hillsborough and City of Tampa8th Edition FBC (2020 NEC)Tampa announced the 9th Edition takes effect January 1, 2027, with vesting for applications accepted by December 31, 2026
Duval (Jacksonville)8th Edition FBC (2020 NEC)Ask about local amendments

Florida counties and cities also keep the power to regulate electrical work through permits, fees and inspections, require plan approval, and require a bond of up to $5,000 per electrical contractor tied to FBC compliance (s. 489.537(3)). See Florida electrical permits.

Key code changes homeowners notice, by edition

ChangeFirst appearedIn force in Texas now (2026)?In force in Florida now (2020)?
Surge-protective device required at dwelling services (230.67), including when service equipment is replaced2020 NECYesYes
Outdoor emergency disconnect for one- and two-family homes (230.85)2020 NECYesYes
GFCI on 125-volt through 250-volt receptacles in listed dwelling locations2020 NECYesYes
GFCI for outdoor outlets, including hardwired equipment (210.8(F))2020 NECYes, except outdoor HVAC outlets (Texas amendment)Yes
Listed Class A GFCI (5 mA) wording throughout 210.82023 NECYesNot until 9th Edition
GFCI on all kitchen receptacles, not just countertops2023 NECYesNot until 9th Edition
GFCI for outlets supplying ranges, wall ovens, cooktops, dryers and microwaves (210.8(D))2023 NECYesNot until 9th Edition
AFCI extended to 10-amp branch circuits2023 NECYesNot until 9th Edition

Sources: Miami-Dade's summary of 2020 NEC changes and Mike Holt's analysis of 2023 NEC changes. We did not review every 2026 NEC change for this table; ask your electrician about 2026-specific rules.

Where can I read the NEC for free?

NFPA offers free online access to its codes and standards, including NFPA 70 (the NEC), through its Free Access page. Free access is for reading online; check NFPA's terms for account and printing limits. Remember that it is the base code, without Texas or Florida amendments.

  • Texas: read the 2026 NEC, then check TDLR's rule 16 TAC 73.100 for the 210.8(F) amendment, and your city's local amendments.
  • Florida: read the 2020 NEC for current work (or the 2023 NEC for 9th Edition work), then check the Florida Building Code for Florida amendments. The Florida Building Commission's site has code information and code development records.

For plain-language summaries of what changed, Miami-Dade County publishes a guide to 2020 NEC changes adopted in the 8th Edition, and Mike Holt publishes free articles on recent code changes.

What this means for your project

  • Hiring: ask your electrician which edition they are designing to and whether your city has local amendments. A good contractor will know.
  • Buying a house: an older home is not "illegal" because it does not meet the newest code. Code changes apply to new work. See electrical inspections when buying or selling.
  • Remodels near a changeover: in Florida, applying before December 31, 2026 may let your project vest under the 8th Edition. Ask your building department.
  • Advice online: national articles often quote the newest NEC. Texas follows the 2026 NEC; Florida is still on 2020 for now.
  • Licensing: code adoption and licensing are separate. See TDLR licensing and Florida ECLB licensing.

How to choose a provider

  • Confirm your jurisdiction: city limits, county, or unincorporated area.
  • Texas: use the 2026 NEC plus TDLR's 210.8(F) amendment and any local amendments.
  • Florida: use the 2020 NEC (8th Edition FBC) until the 9th Edition applies to your permit.
  • If your Florida project is near the changeover, ask whether an application accepted by December 31, 2026 vests under the 8th Edition.
  • Ask your building department for any local electrical amendments in writing.
  • Ignore pages that still list the 2023 NEC as Texas's current code.
  • Read the NEC free through NFPA's Free Access page before you plan work.
  • Verify your electrician's license on TDLR or DBPR.

Related electricians guides

Electricians by state and city

Questions people ask

Does Houston use the 2023 NEC or the 2026 NEC?

The 2026 NEC. The City of Houston says the 2026 NEC adopted by the State of Texas became effective September 1, 2026, and that all permit applications submitted on or after that date are reviewed for compliance with it. Some Houston code-development pages still list the 2023 NEC administrative provisions from the 2021 Houston Construction Code, which took effect January 1, 2024, so check with the Houston Permitting Center about any updated local amendments.

Does Dallas have local electrical amendments?

We could not confirm Dallas's current local electrical amendments for the 2026 NEC; its old construction codes page now redirects to a new City Codes and Ordinances page. Under TDLR's position, the 2026 NEC applies statewide from September 1, 2026, and city amendments may not go below it. Call Dallas Building Inspection for the current local amendments before you plan work.

Is Florida behind on the electrical code?

Florida typically adopts the NEC through its three-year Florida Building Code cycle, so it lags the newest NEC. It moved to the 2020 NEC on December 31, 2023 and moves to the 2023 NEC with the 9th Edition at the end of 2026. Texas, by statute, adopts each new NEC, and has used the 2026 NEC since September 1, 2026. Florida law lets the commission adopt a newer NEC out of cycle for hardship or safety reasons.

Which code applies if my permit was issued before the change?

Generally the code in effect when your permit application was accepted or the permit was issued. TDLR's guidance ties the code to when the permit was obtained, or to the day installation began where no permit is required. Tampa's announcement says applications accepted by December 31, 2026 vest under the 8th Edition. If your project spans a changeover, ask the building department which edition your plans will be reviewed and inspected under.

Do I have to update my house when a new code is adopted?

No. New code editions apply to new work and permitted alterations, not to existing installations that met the code in force when they were installed. Some changes are triggered by work you do, such as AFCI protection when circuits in living areas are extended or replaced, or surge protection and an outdoor emergency disconnect when service equipment is replaced. Insurers and buyers may still ask about older equipment.

Who decides how the code is interpreted on my job?

The authority having jurisdiction, usually your city or county building official and inspector. In Texas, TDLR enforces licensing and has said local amendments cannot fall below the state-adopted NEC; local authorities perform inspections for local permits. In Florida, local building departments enforce the statewide Florida Building Code. If you disagree with an inspector, ask for the code section in writing and follow the department's appeal process.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration