Foundation Repair Contracts, Deposits and Mechanic's Liens in Texas and Florida

A foundation repair contract decides what you get, when you pay and whether someone can later put a lien on your house. Texas and Florida protect homeowners in very different ways. This guide walks through each state's rules, forms and deadlines, from the deposit to the final release.

Yes, an unpaid foundation contractor, subcontractor or supplier can file a lien on your house in both states, but only by following strict rules. In Texas, a lien on a homestead needs a written contract signed before work starts, by both spouses if married, and filed with the county clerk. In Florida, you protect yourself by recording a Notice of Commencement, tracking every Notice to Owner, and collecting lien releases and a final payment affidavit before you pay in full.

Key facts

  • Texas Prop. Code 53.254: to fix a lien on a homestead, a written contract must be signed before work begins, by both spouses if married, and filed with the county clerk.
  • Texas Prop. Code 53.101: the owner must hold back 10 percent of the contract price during the work and for 30 days after completion.
  • Texas Prop. Code 53.052: an original contractor on a residential project must file its lien affidavit by the 15th day of the third month after the month work was completed, terminated or abandoned.
  • Texas Prop. Code 162.001-.002: money paid to a contractor to improve Texas real property is held in trust for those who supplied labor and materials.
  • Fla. Stat. 713.13: an owner must record a Notice of Commencement before work starts; it is void if work does not begin within 90 days.
  • Fla. Stat. 713.08(5): a Florida claim of lien must be recorded within 90 days after the lienor's final furnishing of labor or materials.
  • Fla. Stat. 713.22: a Florida lien expires after 1 year unless a suit is filed, and an owner's Notice of Contest of Lien cuts that to 60 days.
  • Fla. Stat. 489.126: a Florida contractor who takes more than a 10 percent deposit on residential work must apply for permits within 30 days and start within 90 days after permits issue.
  • Fla. Stat. 713.015: direct residential contracts over $2,500 must include the statutory construction lien warning in 12-point bold capitals, signed and dated by the owner.

What a foundation repair contract should include

A foundation contract should let a stranger read it and know exactly what will be built, where, by whom, for how much and on what schedule. Texas law spells out the minimum: the Texas "Know Your Rights and Responsibilities" disclosure (Prop. Code 53.255) tells owners to get a written agreement covering (1) a description of the work, (2) the required or estimated time for completion, (3) the cost or how cost will be determined, and (4) the payment procedure, including the statutory reservation of funds and conditions for final payment. It also says any promise, warranty or representation should be written into the agreement.

For foundation work, add the details below. Most disputes start where one of these is missing.

ItemWhat to look for
Engineer's planName and license number of the engineer, plan date, and a statement that work follows the sealed plan. Houston and Fort Worth require engineered plans for slab repair permits.
Pier or pile count and typeExact number, type (pressed concrete, steel push, helical, drilled), locations on a drawing, and target depth or refusal criteria
Elevation surveysA before-and-after floor elevation survey, which the Texas Section ASCE guidelines call for after repair
Plumbing testWho tests supply and sewer lines before and after lifting, and who pays for leaks found
PermitWho pulls it and pays for it, and that final inspection is required before final payment
Payment scheduleAmounts tied to milestones, not dates; a holdback until final inspection and lien releases
Change ordersWritten and priced before extra piers or work are done
WarrantyLength, what it covers (piers only or the whole slab), transfer rules and fees, and what voids it
Site restorationLandscaping, concrete breakout patching, interior access holes, debris removal
Statutory noticesThe notices each state requires (next table)

Required notices by state

NoticeStateRule
"Know Your Rights and Responsibilities" disclosure, before the owner signsTXProp. Code 53.255
List of subcontractors and suppliers; disbursement statement with payment requestsTXProp. Code 53.256, 53.258
10-point bold notice that the contract is subject to Chapter 27 (RCLA)TXProp. Code 27.007; $500 civil penalty if omitted
Three-day cancellation notice for sales made at your homeTX and FLBus. and Com. Code ch. 601; Fla. Stat. 501.031; FTC 16 CFR 429
Construction lien law warning, signed and dated by owner, for contracts over $2,500FLFla. Stat. 713.015
Florida Homeowners' Construction Recovery Fund notice, contracts over $2,500FLFla. Stat. 489.1425

Deposits: how much, and is it refundable if work never starts?

Texas

The Texas statutes reviewed for this guide do not set a cap on foundation repair deposits. What Texas does provide is the construction trust fund law: money you pay a contractor to improve Texas real property is a trust fund, and the contractor is a trustee (Prop. Code 162.001-.002). A contractor who intentionally or knowingly diverts that money without paying current or past-due obligations to the subs and suppliers it owes has misapplied trust funds (162.031). That gives you leverage, but it is not a refund guarantee. Practical rule: keep the deposit small and tie the next payment to a visible milestone, such as permit issued or piers installed.

Florida

Florida is specific. Under Fla. Stat. 489.126(2)(a), a contractor who receives an initial payment of more than 10 percent of the contract price for residential work must apply for permits within 30 days and start work within 90 days after permits issue, unless there is just cause or a written agreement for longer. If not, send a certified-mail demand. If the contractor still fails to apply, start or refund within 30 days, that supports an inference of no just cause (489.126(2)(b)). Violations are crimes scaled to the money: a first-degree misdemeanor under $1,000, a third-degree felony from $1,000 to under $20,000, a second-degree felony from $20,000 to under $200,000, and a first-degree felony at $200,000 or more. A contractor holding more money than the value of work done also may not stop work for 90 days without just cause (489.126(3)).

The three-day window

If you signed at your kitchen table after an in-home sales visit, federal and state home solicitation laws usually let you cancel until midnight of the third business day. The seller must refund payments within 10 business days of your notice (16 CFR 429.1(g); Tex. Bus. and Com. Code 601.154). In Texas, a merchant is not entitled to pay for services performed under a contract canceled this way (601.101). Florida's required notice says the seller may not keep all or part of any cash down payment (Fla. Stat. 501.031). See foundation repair scams for when these rules apply.

What is a mechanic's lien in Texas?

A mechanic's lien is a legal claim against your property for unpaid labor or materials. In Texas it is governed by Property Code Chapter 53, which was rewritten by H.B. 2237 effective January 1, 2022. Liens are filed as an affidavit with the county clerk where the house is located.

Who can file and when

ClaimantResidential deadlineStatute
Original contractor (the company you hired)File lien affidavit by the 15th day of the 3rd month after the month work was completed, terminated or abandoned53.052(a)(2)
Subcontractor or supplier: notice to owner and contractorSend notice of claim by the 15th day of the 2nd month after the month labor or materials were provided53.056(a-1)(2)
Subcontractor or supplier: lien affidavitFile by the 15th day of the 3rd month after the month it last provided labor or materials53.052(c)
Subcontractor claiming retainageNotice within 30 days after its contract or the original contract ends; affidavit by the 15th day of the 3rd month after the original contract ends53.057, 53.052(d)

Example: your repair finishes in March. The contractor has until June 15 to file. A pier supplier who delivered in February must have sent you its notice by April 15.

The 10 percent retainage rule

During the work and for 30 days after it is completed, you must hold back 10 percent of the contract price, or of the value of the work done (53.101). Subcontractors and suppliers who give proper notices have a lien on that reserved money. If you skip the holdback, claimants who followed the rules can have a lien on your property at least up to the amount you should have reserved (53.105). If you receive a notice of claim and keep paying the contractor, you can become liable for those later payments once the claim is secured and reduced to judgment (53.084). If 30 days pass after completion with no notice of claim and no lien filed against the reserved funds, owners generally release the 10 percent; confirm with an attorney if any notice arrived.

How Texas homestead protection affects foundation liens

Texas protects a family homestead from forced sale for most debts. The Texas Constitution, article XVI, section 50(a)(5), allows an exception for work and material used to repair or renovate existing improvements only if the requirements below are met. Foundation repair is repair of an existing improvement.

  • The work and material are contracted for in writing.
  • For a family homestead, both spouses consent in the same manner required to sell the homestead.
  • The contract expressly lets the owner rescind without penalty within three days after everyone signs, unless the work is needed for immediate repairs to conditions that materially affect health or safety and the owner acknowledges that in writing.
  • The contract is signed by the owner and spouse only at one of the offices the constitution lists, which include an attorney's office or a title company.

The Property Code adds its own homestead steps (53.254): the written contract must be signed before material is furnished or labor is performed, both spouses must sign if married, and the contract must be filed with the county clerk. A lien affidavit on a homestead must carry, at the top in at least 10-point bold, the notice: "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN." The notice of claim sent to the owner must also include a statement explaining the owner's withholding and 10 percent reservation duties.

What this means for you: if a contractor asks you and your spouse to sign at a title company or an attorney's office, that is likely to preserve its homestead lien rights, which is lawful. If the contractor never did these steps, a later lien on your homestead may be challengeable. Missing a homestead contract or the required notice is one of the grounds for a summary motion to remove a lien (53.160(b)(6)). Whether a lien is valid is a legal question for a Texas real estate or construction attorney.

Texas paperwork that protects you from paying twice

  1. Disclosure statement before signing (53.255).
  2. List of subcontractors and suppliers from the original contractor (53.256). This tells you who might later send a notice.
  3. Disbursement statement with each payment request (53.258).
  4. Hold 10 percent until 30 days after completion (53.101).
  5. Statutory lien waivers with each payment (next section).
  6. Final bills-paid affidavit at final payment. Under 53.259, the original contractor must swear it has paid everyone in full, or list who is owed. A knowingly or recklessly false affidavit is a misdemeanor punishable by a fine up to $4,000, up to one year in jail, or both.
  7. Any person who furnished labor or materials must give you a bills-paid affidavit on request as a condition of payment (53.085).

Keep copies of every notice you receive by certified mail. The date it arrives starts your withholding duty.

Lien waivers and releases: conditional vs unconditional

A lien waiver (also called a release) is a signed statement that a contractor, subcontractor or supplier gives up lien rights for an amount already paid. Getting the right form at the right time is how you avoid paying twice.

TypeWhen to useEffect
Conditional, progress paymentExchanged for a progress checkEffective only once the check clears
Unconditional, progress paymentAfter the progress payment has clearedReleases rights through a date, whether or not paid
Conditional, final paymentExchanged for the final checkEffective only once the final check clears
Unconditional, final paymentAfter final payment has clearedReleases all remaining rights

Texas

Texas lists four statutory forms in Prop. Code 53.284, using these four names. A waiver is enforceable only if it substantially complies with one of those forms, is signed by the claimant, and, for a conditional release, evidence of payment exists (53.281). A statement in some other form generally does not waive lien rights unless the claimant was actually paid in full (53.282). One exception matters for houses: a waiver written into an original contract or subcontract for repair of a single-family house, townhouse or duplex, made before work starts, can be effective against a party who provides labor (53.282(a)(3)); it does not apply to material-only suppliers (53.282(c)).

Florida

Florida's forms are in Fla. Stat. 713.20: "Waiver and Release of Lien upon Progress Payment" and "Waiver and Release of Lien upon Final Payment." A lien right may not be waived in advance; a waiver covers only labor and materials already furnished (713.20(2)). No one may require a lienor to use a different form (713.20(6)). A lienor may condition a waiver on its check clearing, and without a payment bond the owner may hold back that amount from the contractor until the check clears (713.20(7)).

Tip: collect waivers not just from the contractor but from every subcontractor or supplier who sent you a notice.

Florida's Construction Lien Law, step by step

Florida's lien law (Chapter 713, Part I) works through a chain of recorded and served documents. Here is how it runs on a typical foundation job.

  1. Contract warning. Direct contracts over $2,500 for one- to four-unit homes must include the statutory lien warning, which begins "ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW..." in 12-point bold capitals, signed and dated by you (713.015). Jobs with a direct contract price of $2,500 or less are exempt from most of the lien law (713.02(5)).
  2. Permit card warning. Every permit card must warn in 14-point bold that failing to record a Notice of Commencement may result in paying twice (713.135(1)(a)).
  3. Notice of Commencement (NOC). You, the owner, record it with the county clerk before work begins and post a copy at the site (713.13). It is void if work doesn't start within 90 days of recording and generally expires one year after recording unless it says otherwise. For direct contracts over $5,000, a copy must be filed with the permitting office before the first inspection, or later inspections will not be approved (713.135(1)(e)). Orlando, for example, lists "File a Recorded Notice of Commencement" among its permit services.
  4. Notice to Owner (NTO). Subcontractors and suppliers who don't contract with you directly must serve you a Notice to Owner before starting, or no later than 45 days after starting, and in any event before your final payment after the contractor's final affidavit (713.06(2)). The NTO form begins "WARNING! FLORIDA'S CONSTRUCTION LIEN LAW ALLOWS SOME UNPAID CONTRACTORS, SUBCONTRACTORS, AND MATERIAL SUPPLIERS TO FILE LIENS AGAINST YOUR PROPERTY EVEN IF YOU HAVE MADE PAYMENT IN FULL." Failing to serve it on time is a complete defense to that party's lien.
  5. Progress payments. Before each payment, get releases from every lienor who served an NTO. You may require the contractor's affidavit with each payment (713.06(3)(c)).
  6. Contractor's Final Payment Affidavit. When final payment is due, the contractor must give you a sworn affidavit that every lienor who timely served an NTO has been paid, or list who is unpaid and how much (713.06(3)(d)). The contractor has no lien rights while in default on this affidavit, and must deliver it at least 5 days before suing to enforce a lien. If the affidavit lists unpaid bills, you may, after 10 days' written notice to the contractor, pay those bills directly and deduct them.
  7. Claim of lien deadline. A lienor must record its claim within 90 days after its final furnishing of labor or materials (713.08(5)).

Unlicensed contractors are shut out: a contract entered by an unlicensed Florida contractor is unenforceable by that contractor, and it has no lien or bond rights for the work (489.128). See Florida foundation repair licensing.

Should you record a Notice of Commencement in Florida?

For almost any foundation job over $2,500, yes. The NOC fixes the start date for lien priorities, names who must receive notices, and is required before inspections proceed on contracts over $5,000. Without one, you lose a key tool for knowing who has lien rights, and the permit card itself warns you may pay twice.

Watch the clock. If the contractor delays and work does not start within 90 days of recording, the NOC is void and you need a new one. If the project will run past a year, state a later expiration date in the NOC. When the job ends, ask your contractor or an attorney about recording a notice of termination so later work isn't tied to this NOC. This guide did not review the notice of termination statute, so confirm the steps with the county clerk or an attorney.

Tip: if you plan to use any outside money for the project, the permit card warning itself says to consult your lender or an attorney before recording the NOC.

What if a contractor files a lien you dispute?

Texas

  • Check the deadline. A suit to foreclose a lien must be brought by the first anniversary of the last day the claimant could file its lien affidavit, extendable to two years only by a recorded written agreement with the owner (53.158).
  • Summary motion to remove. In a suit, you may file a verified motion to remove a lien on limited grounds, including untimely notices, a late or defective affidavit, retainage already properly paid, and, for homesteads, no contract executed or filed under 53.254 or the affidavit missing the required notice (53.160).
  • Ways a lien is discharged include a recorded release, failure to sue in time, a court judgment, or a bond (53.157).
  • Fees. Courts award costs and reasonable attorney's fees as are equitable and just in lien suits, but on a residential construction contract the court is not required to order the owner to pay them (53.156).

Florida

  • One-year life. A lien lasts no longer than one year after recording unless the lienor sues (713.22(1)).
  • Notice of Contest of Lien. You or your attorney can record this notice; the lienor then has 60 days from service to sue or the lien is extinguished automatically (713.22(2)).
  • Order to show cause. You can file a complaint; the lienor gets 20 days after service of the summons to show why the lien should not be canceled (713.21(4)).
  • Fraudulent liens. A lien willfully exaggerated, or claiming work not performed, is a fraudulent lien and unenforceable; the owner can recover damages including attorney's fees and punitive damages, and willfully filing one is a third-degree felony (713.31). A good faith dispute over the amount or a minor mistake is not fraud.
  • Fees. The prevailing party in an action to enforce a lien recovers reasonable attorney's fees (713.29), which cuts both ways.

After the repair: warranty and defect claims

If the repair fails, liens are no longer the issue. Defect claims follow pre-suit notice laws.

StepTexasFlorida
Pre-suit noticeCertified mail at least 60 days before suing, describing defects with evidence (Prop. Code 27.004)Written notice of claim at least 60 days before suing (Fla. Stat. 558.004)
Contractor inspectionUp to 3 inspections within 35 days of noticeWithin 30 days of service
Contractor responseWritten offer within 60 daysWritten response within 45 days
Outer time limitGenerally 10 years after substantial completion (CPRC 16.009)7 years statute of repose (Fla. Stat. 95.11(3)(b), cut from 10 in 2023)

Texas DTPA claims generally must be brought within two years of discovery (Bus. and Com. Code 17.565). Read more in lifetime transferable warranties and foundation repair disputes and complaints.

When to call an attorney

This guide is general information, not legal advice. Talk to a Texas or Florida construction or real estate attorney if: a lien affidavit or claim of lien has been recorded on your property; you receive a notice of claim or Notice to Owner and the contractor says not to worry; a contractor took a large deposit and stopped responding; you are about to sell and a lien or open permit shows on a title search; or you want a contract reviewed before signing a large repair. For licensing complaints, use Florida DBPR at myfloridalicense.com; Texas has no statewide foundation contractor license, so complaints go to the Texas Attorney General's consumer protection division.

How to choose a provider

  • Get the engineer's sealed plan and attach it to the contract.
  • Confirm the contract lists pier count, type, locations and depth criteria.
  • Make sure every state-required notice is in the contract before you sign.
  • Keep the deposit small and tie payments to milestones.
  • Texas: hold back 10 percent until 30 days after completion.
  • Texas homestead: expect a written contract signed by both spouses before work starts.
  • Florida: record a Notice of Commencement and post it at the site.
  • Log every notice of claim or Notice to Owner by date received.
  • Collect statutory lien waivers from the contractor and every noticed sub or supplier with each payment.
  • Get the final bills-paid affidavit (TX) or Contractor's Final Payment Affidavit (FL) before final payment.
  • Pay the final amount only after final permit inspection.
  • Check the county records for any lien 90 days after the job ends.

Related foundation repair contractors guides

Foundation repair contractors by state and city

Questions people ask

Can a foundation contractor put a lien on my house?

Yes, if you don't pay and the contractor follows state rules. In Texas, the contractor files a lien affidavit with the county clerk, and for a homestead the contract must be in writing, signed before work by both spouses and filed with the clerk. In Florida, the contractor records a claim of lien within 90 days of its last work. Subcontractors and suppliers can also lien if they give the required notices, even if you paid the contractor.

What is a Notice to Owner in Florida?

It is a notice served on you by a subcontractor or supplier you didn't hire directly, saying it is working on your property and may claim a lien if not paid. Under Fla. Stat. 713.06 it must be served before starting or within 45 days after starting. When you get one, collect a lien release from that company before each payment to your contractor. Late or missing notice is a complete defense to that company's lien.

How do I avoid paying twice if a subcontractor isn't paid?

Know who works on your job and get releases from each of them. In Texas, get the subcontractor list, hold back 10 percent for 30 days after completion, stop paying after any notice of claim until it is resolved, and get statutory waivers and a final bills-paid affidavit. In Florida, record a Notice of Commencement, track every Notice to Owner, get 713.20 releases with each payment and the Contractor's Final Payment Affidavit before final payment.

Is a foundation repair deposit refundable if work never starts?

It depends on the state and the contract. If you signed during an in-home sales visit, you can usually cancel by midnight of the third business day and get a refund within 10 business days. In Florida, a contractor taking more than 10 percent must apply for permits in 30 days and start within 90 days after permits issue; a certified-mail demand starts a 30-day clock. In Texas, payments are trust funds under Property Code Chapter 162.

What is retainage in Texas?

Retainage is the 10 percent of the contract price, or of the value of the work, that Texas Property Code 53.101 requires the owner to hold back during the work and for 30 days after completion. It secures payment to subcontractors and suppliers who give proper notice. If you skip it, claimants may be able to lien your property up to the amount you should have reserved.

What lien waiver should I ask for?

Ask for a conditional waiver when you hand over a check, and an unconditional waiver once it clears. Texas requires the four statutory forms in Prop. Code 53.284. Florida provides progress and final payment forms in Fla. Stat. 713.20 and bars advance waivers. Get waivers from the contractor and from every subcontractor or supplier who sent you a notice.

How long does a lien stay on my property?

In Florida, a lien expires after one year unless the lienor files suit, and you can shorten that to 60 days by recording a Notice of Contest of Lien. In Texas, a suit to foreclose must be filed by the first anniversary of the last day the lien affidavit could have been filed, or up to two years with a recorded agreement. After that, the lien can be discharged of record.

Do I need a lawyer to review a foundation contract?

Not always, but it is worth it for large jobs, homestead contracts that must be signed at a title company or attorney's office, or contracts with unusual warranty, arbitration or payment terms. A short review costs far less than a lien dispute. This guide is general information, not legal advice.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration