New ebook: Before You Borrow, how lenders decide and how to get your business loan approved. Get it for $7.99 →
New ebookHow to Research Like a Wall Street AnalystFind original sources, analyze trends, build your own insightsGet it now →
Markets
Real businesses. Bigger perspective. · Thu, Nov 19, 2026News. Tools. Scores. Games. Free.The Morning Chronicle
Donate BTCOpen dDashboard

Local Guide · Foundation repair contractors

How Do You Compare Foundation Repair Quotes Line by Line?

Why bids differ, what a complete quote must include, how to read pier counts, fair deposits and payment schedules under Texas and Florida law, red flags, and a copy-ready comparison worksheet.

Compare foundation repair quotes by making every company bid the same scope, ideally an independent engineer's plan, and listing each bid's diagnosis, method, pier count and pier map, depth criteria, permit, plumbing tests, breakout, landscaping, final survey and engineer letter, warranty, cosmetic damage clause and payment schedule. Get at least three written bids. In Florida, deposits over 10 percent trigger 30-day permit and 90-day start deadlines under Fla. Stat. 489.126.

Key facts

  • The Texas Attorney General advises getting several detailed written bids and notes most legitimate bids fall into a fairly close range.
  • ASCE Texas guidelines say repair plans should show each underpinning element's location, size, depth and material.
  • ASCE Texas guidelines say partial underpinning will not improve performance of areas not underpinned.
  • Houston requires slab-on-grade repair plans from a Texas-licensed engineer showing pier location, quantity and type.
  • Florida contractors receiving more than 10% up front must apply for permits within 30 days and start within 90 days after issuance (Fla. Stat. 489.126).
  • Texas owners must retain 10% of the contract price during work and for 30 days after completion (Tex. Prop. Code 53.101).
  • Texas construction payments are trust funds held by the contractor (Tex. Prop. Code 162.001-.002).
  • Texas (Bus. & Com. Code 601.051) and Florida (Fla. Stat. 501.025) give three business days to cancel many home solicitation sales.
  • Florida contracts with unlicensed contractors are unenforceable by the contractor (Fla. Stat. 489.128).

Why are foundation repair quotes so different?

Three companies can look at the same cracked slab in Houston or Tampa and hand you bids thousands of dollars apart. That does not always mean someone is cheating. It usually means they are not bidding the same job. The main reasons:

  • Different diagnoses. One salesperson sees a settling corner; another sees whole-house movement; a third blames a plumbing leak.
  • Different scope. Pier count, pier locations, interior versus exterior piers, and depth all change the price.
  • Different methods. Pressed concrete piles, steel push piers, helical piers and drilled piers have different material and labor costs.
  • Different inclusions. Engineering, permits, plumbing tests, interior breakout, landscaping, backfill, cleanup and the post-repair survey may be in one bid and missing from the next.
  • Different warranties. Some cover only the piers installed; others cover adjustments for a period; some can be transferred for a fee.
  • Different sales models. Some firms send a commissioned salesperson; others send an estimator who works from an engineer's plan.

In Texas there is no statewide foundation repair contractor license, so the quality and detail of bids vary a lot. The engineer's plan is your main yardstick. In Florida, structural work on a foundation generally falls to a certified or registered general, building or residential contractor under Fla. Stat. 489.113, and the permit process forces some consistency. See Texas licensing and Florida licensing.

How many foundation repair quotes should I get?

Get at least three written bids on the same scope. The Texas Attorney General's home improvement guidance advises getting several detailed written bids and being wary of a very low bidder, noting that most legitimate bids fall into a fairly close range. If one bid is far below the rest, ask what it leaves out.

The best way to make three bids comparable is to have an independent structural engineer evaluate the house first and produce a repair plan, then ask each contractor to bid that plan. This Old House (October 2026) puts structural engineer reports at $500 to $1,000. The ASCE Texas Section guidelines say repair plans should show the specific locations of underpinning elements and their sizes, depths, materials and required strengths. With that in hand, you are comparing prices, not opinions.

If you skip the engineer, at least require every bidder to provide a written pier map and a written explanation of what moved and why. See foundation inspections and structural engineers.

What should a foundation repair quote include? A line-by-line checklist

Line itemWhat a complete quote saysWhy it matters
DiagnosisWhat moved, where, and the likely causeA repair that ignores the cause (a leak, drainage, trees) may not last
EngineerWhose plan the bid follows, or whether an engineer will design and seal the repairHouston requires Texas-licensed engineer plans for slab-on-grade repair; Fort Worth requires engineered plans and a structural letter
Method and pier typePressed concrete, steel push, helical, drilled, or other; material specsPrices and performance differ by method and soil
Pier count and mapNumber of exterior and interior piers and a drawing showing each oneThe single biggest cost driver; lets you compare bids
Depth or refusal criteriaHow deep, or to what resistance, each pier will be driven; price for extra depthHouston's 2026 permit training says plans should include a pile note on refusal criteria or PSI
Lift targetWhether the plan is to stabilize only or to lift, and to what toleranceASCE says a fully level result is unlikely; avoid promises of "perfectly level"
PermitWho pulls it and whether the fee is includedUnpermitted work can surface at resale on the Texas seller's disclosure (item 9 on the 5.008 notice)
Plumbing testsTests of supply and drain lines before and after lifting, and who pays for repairs foundASCE Texas says lines should be tested if lifting is part of the repair
Interior breakoutWhether interior piers are reached by breaking the slab or tunneling; who restores flooringFlooring is often excluded
Landscaping and flatworkWhat gets removed and replaced, and who paysFixr notes build-back can significantly raise totals
Backfill and cleanupCompaction of excavations, haul-off, clean fillPoor backfill settles and ponds water by the foundation
Post-repair survey and letterFinal floor elevation survey and engineer's letter of substantial completionASCE calls for both; you will want them at resale
WarrantyTerm, what is covered (piers only or the area), adjustments, transfer rules and fee, exclusions"Lifetime" means very different things
Cosmetic damageWho pays for drywall, tile, brick and door issues caused by the liftUsually excluded; know in advance
ScheduleStart date, duration, and what happens on delayFlorida sets permit and start deadlines when deposits exceed 10 percent
Price and paymentsTotal, deposit, milestone payments, unit prices for extrasProtects you from front-loaded payments and change-order surprises

Why does one company recommend 8 piers and another 22?

Different pier counts usually come from different answers to three questions:

  1. What area actually moved? A bid that treats only the low corner will have fewer piers than one that treats a whole side. The ASCE Texas guidelines say construction documents should state that partial underpinning will not improve the performance of areas not underpinned. A low count can be correct, but you should understand what is left unsupported.
  2. How far apart are the piers? Spacing depends on the loads, the beam design and the method. Wider spacing means fewer piers, but each carries more load.
  3. Interior piers or not? Some plans support interior beams; others treat only the perimeter.

Neither number is automatically right. Ask each contractor to mark every pier on a drawing of your house and explain the reasoning. If two layouts differ widely, pay an independent engineer to say which matches the actual movement shown on a floor elevation survey. See foundation elevation surveys.

Should the quote match the engineer's plan?

Yes. If an engineer designed your repair, every bid should follow that plan exactly or list each deviation in writing. The ASCE Texas guidelines say the engineer who seals remediation documents is the engineer of record and has approval authority over changes. They also note that Texas rules prohibit "plan stamping," where an engineer seals plans he or she did not actually prepare or supervise.

Watch for these mismatches:

  • Fewer piers than the plan calls for, or piers moved without explanation.
  • A different pier type ("our piers are just as good").
  • Shallower depth or different refusal criteria.
  • No plumbing test, post-repair survey or final letter, even though the plan requires them.

Some contractors include an engineer they hire. That can work, but ask who the engineer works for, whether the engineer visits the house, and whether you will receive sealed plans and a final letter in your name. Under Tex. Occ. Code 1001.401, plans and reports issued by a license holder must carry the engineer's seal.

What deposit is normal, and what payment schedule is fair?

No Texas or Florida statute sets a "normal" deposit for foundation work, but Florida puts strong conditions on large ones, and both states give owners tools to protect their money.

Florida

  • If a contractor receives an initial payment of more than 10 percent of the contract price for residential work, it must apply for permits within 30 days and start work within 90 days after permits issue, unless there is just cause or you agreed in writing to longer periods (Fla. Stat. 489.126(2)(a)).
  • If the contractor does not, send a certified-mail demand. Failing to apply for permits, start work or refund within 30 days of the demand supports an inference of no just cause (489.126(2)(b)).
  • A contractor holding more money than the value of work done may not stop work for 90 days (or a contract-specified period) without just cause (489.126(3)). Violations carry criminal penalties that rise with the amount, from a first-degree misdemeanor under $1,000 to a first-degree felony at $200,000 or more.

Texas

  • Construction payments are trust funds; the contractor holds them for subcontractors and suppliers and misapplies them if it diverts them without paying those obligations (Tex. Prop. Code 162.001-.002, 162.031).
  • The owner must retain 10 percent of the contract price during the work and for 30 days after completion (Tex. Prop. Code 53.101).
  • The contractor must give you a "Know Your Rights and Responsibilities Under the Law" disclosure before you sign (53.255), a list of subcontractors and suppliers (53.256), and a disbursement statement when requesting payment (53.258).

A fair milestone schedule

MilestoneWhy pay here
Contract signed (small deposit)Covers scheduling; keep it modest
Permit issued and materials on siteShows the job is real and lawful
Piers installed and inspectedMain work done
Lift complete, plumbing retested, backfill and cleanup doneConfirms no hidden damage
Final survey, engineer letter, final inspection and lien releases delivered (Texas retainage released 30 days after completion)The documents you need for resale and warranty

See contracts and liens.

What exclusions should I watch for?

Read the "not included" and warranty exclusion sections as carefully as the price. Common exclusions:

  • Cosmetic damage: drywall, paint, tile, brick, trim, doors and windows.
  • Plumbing repairs, even if a test finds a leak caused by the lift.
  • Flooring removal and replacement over interior piers.
  • Landscaping, sprinklers, fences, decks and flatwork removed for access.
  • Areas of the foundation not underpinned.
  • Damage from "acts of God," floods, tree roots, or failure to water or maintain drainage.
  • Engineering, permits and the final letter.
  • Extra depth beyond a set footage per pier.

An exclusion is not a dealbreaker; it is a cost you need to price. Ask each bidder to quote the excluded items separately so you can compare full costs. For warranty fine print, see lifetime transferable warranties.

Red flags in foundation repair quotes

  • "Today only" pricing or big same-day discounts. In both states, many contracts signed at your home can be canceled within three business days: Texas Bus. & Com. Code 601.051 for home solicitation sales over $25, and Fla. Stat. 501.025 for home solicitation sales (Florida excludes sales that result from your own request for specific services). The federal FTC Cooling-Off Rule also requires a written cancellation notice for door-to-door sales of $25 or more at your home (16 CFR 429.1).
  • No written pier map. You can't compare or enforce what isn't drawn.
  • Scare talk. Texas's Deceptive Trade Practices Act lists knowingly false or misleading statements about the need for repairs (Tex. Bus. & Com. Code 17.46(b)(13)) and misrepresenting warranty terms (17.46(b)(20)) as deceptive acts.
  • Large cash deposits or payment to a person instead of the company.
  • Blank spaces in the contract. The Texas AG warns never to sign a contract with blanks.
  • Offers to cover your deductible. The Texas Department of Insurance says contractors may not waive or absorb your deductible. In Florida, accepting a rebate from a sinkhole repair contractor voids coverage (Fla. Stat. 627.707(5)(f)), and a contractor may not advise you on insurance coverage or adjust a claim without a public adjuster license (Fla. Stat. 489.147).
  • No permit "to save you money." Florida law requires a permit to repair a building (Fla. Stat. 553.79), and Houston, Fort Worth and San Antonio list foundation repair permits.
  • Unlicensed in Florida. A contract with an unlicensed contractor is unenforceable by that contractor, and the contractor has no lien or bond claim (Fla. Stat. 489.128), but you also lose access to protections like the Homeowners' Construction Recovery Fund, which does not pay claims against unlicensed contractors.

See foundation repair scams.

Can I negotiate a foundation repair price?

Yes, and the best leverage is scope clarity, not haggling. Ways to negotiate well:

  • Show a competing bid on the same plan. Ask the higher bidder to explain the difference line by line.
  • Negotiate inclusions. Ask for plumbing tests, permit, post-repair survey or landscaping restoration to be included.
  • Lock unit prices. Agree in advance on the price per extra pier, per extra foot of depth, and per foot of rot repair on pier-and-beam homes.
  • Negotiate the payment schedule, not just the total. A lower deposit and a larger final payment tied to the engineer's letter is worth real money in protection.
  • Do not trade away the engineer. A discount for skipping an engineer's plan or final letter is usually a bad deal, and in Houston, Fort Worth and other cities the permit requires engineering anyway.

A sample comparison worksheet

Copy this table and fill it in for each bid. A blank cell is a question.

ItemBid ABid BBid C
Company legal name, address, years in business
Florida license number (verify with DBPR) / Texas city registration if required
Insurance certificates (general liability, workers' comp)
Diagnosis and cause
Engineer of record
Method / pier type
Exterior piers / interior piers
Pier map attached
Depth or refusal criteria; extra-depth price
Permit and fees
Plumbing test before / after
Breakout, tunneling, flooring
Landscaping, backfill, cleanup
Post-repair survey and engineer letter
Warranty term / coverage / adjustments / transfer fee
Cosmetic damage clause
Start date and duration
Deposit and payment milestones
Unit prices for extras
Total price
Full cost including priced exclusions

For price benchmarks by method and per pier, see foundation repair cost.

Required notices that should be in the contract

A missing statutory notice can be a sign of a careless contractor. Check for these:

StateNoticeRule
Texas"Know Your Rights and Responsibilities Under the Law" disclosure, before you signTex. Prop. Code 53.255
Texas10-point boldface notice that the contract is subject to Chapter 27 (the Residential Construction Liability Act)Tex. Prop. Code 27.007; omission exposes the contractor to a $500 civil penalty
TexasFor a lien on a homestead: written contract signed before work begins, by both spouses if married, filed with the county clerkTex. Prop. Code 53.254
Texas (home solicitation)Bold notice of the three-day right to cancelTex. Bus. & Com. Code 601.052
FloridaStatutory construction lien notice, signed and dated by the owner, for direct contracts over $2,500 on one- to four-unit dwellingsFla. Stat. 713.015
FloridaHomeowners' Construction Recovery Fund notice for residential contracts over $2,500Fla. Stat. 489.1425
FloridaNotice of commencement recorded by the owner, and filed with the permitting authority before the first inspection for contracts over $5,000Fla. Stat. 713.13, 713.135

This is general information, not legal advice. For a large or disputed contract, talk with a construction attorney.

How to choose a provider

  • Hire an independent engineer for an evaluation and repair plan.
  • Ask at least three contractors to bid that plan in writing.
  • Require a pier map with exterior and interior counts on every bid.
  • Fill in the comparison worksheet; treat every blank as a question.
  • Ask each bidder to price its exclusions separately.
  • Confirm permit, plumbing tests, final survey and engineer letter are included.
  • Check licenses (Florida DBPR) and insurance certificates.
  • Keep the deposit small and tie payments to milestones.
  • In Texas, hold the 10 percent retainage for 30 days after completion.
  • Check the contract for required statutory notices.
  • Never sign a contract with blanks or under same-day pressure.
  • Get warranty terms, transfer rules and exclusions in writing.

Related foundation repair contractors guides

Foundation repair contractors by state and city

Questions people ask

Why are foundation repair quotes so different?

Bids differ because contractors diagnose differently and propose different scopes: pier counts, locations, interior versus exterior piers, depth and method. They also include different items, such as engineering, permits, plumbing tests, breakout, landscaping and final survey, and offer different warranties. Make every bidder price the same engineer's plan and compare line by line, and the gap usually narrows or becomes explainable.

How many foundation repair quotes should I get?

At least three written bids on the same scope. The Texas Attorney General recommends several detailed written bids and warns that a very low bid can be a red flag, since legitimate bids tend to fall in a fairly close range. Having an independent engineer's plan first makes those bids comparable. Without one, require a written pier map and diagnosis from each bidder.

What should a foundation repair quote include?

A complete quote names the diagnosis and cause, the engineer whose plan it follows, the method and pier type, exterior and interior pier counts with a map, depth or refusal criteria, permit, plumbing tests before and after, interior breakout and flooring, landscaping and backfill, post-repair survey and engineer letter, warranty terms, cosmetic damage responsibility, schedule, deposit and milestone payments, and unit prices for extras.

Why does one company recommend 8 piers and another 22?

They are usually treating different areas, using different spacing, or disagreeing about interior piers. The ASCE Texas guidelines note that partial underpinning does not improve areas left unsupported, so a low count may leave part of the house exposed, while a high count may be oversold. Ask each company to mark every pier on a drawing and explain why, and have an independent engineer compare layouts against a floor elevation survey.

Should the quote match the engineer's plan?

Yes. If an engineer designed the repair, bids should follow it exactly or list each deviation in writing. The ASCE Texas guidelines say the engineer of record has approval authority over changes. Watch for fewer piers, a different pier type, shallower depth, or missing plumbing tests and final letters. In Houston, slab-on-grade repairs need Texas-licensed engineer plans for the permit anyway.

What is a deposit and how much is normal?

A deposit is the up-front payment when you sign. Neither state sets a standard amount for foundation work, but in Florida a deposit above 10 percent of the contract price obligates the contractor to apply for permits within 30 days and start within 90 days after permits issue, under Fla. Stat. 489.126. Keep deposits modest, never pay cash to an individual, and tie the rest to milestones.

What payment schedule is fair?

A fair schedule pays for completed, verifiable steps: a small deposit at signing, then payments when the permit issues, when piers are installed and inspected, when the lift and plumbing retests are done, and a final payment when you receive the final survey, engineer letter and lien releases. In Texas, the owner must retain 10 percent for 30 days after completion under Prop. Code 53.101.

What exclusions should I watch for?

Common exclusions are cosmetic damage, plumbing repairs, flooring over interior piers, landscaping and flatwork, areas not underpinned, damage from floods or tree roots, failure to maintain drainage or watering, engineering and permits, and extra pier depth. Ask each bidder to price excluded items separately so you can compare the full cost, not just the headline number.

Can I negotiate a foundation repair price?

Yes. The strongest tool is a competing bid on the same plan. Negotiate inclusions such as plumbing tests, permits, landscaping and the final engineer letter, lock unit prices for extra piers and depth, and negotiate a smaller deposit with a larger final payment. Avoid discounts that remove the engineer or permit; they usually cost more later and may violate local rules.

What does 'lifetime warranty' in the quote really mean?

It means whatever the warranty document says, and terms vary widely. Some cover only the piers installed, not the rest of the foundation; some cover adjustments for a limited time; many exclude cosmetic damage, plumbing and damage from poor drainage; transfer may require notice and a fee. Get the full warranty text before you sign and compare it across bids. See our warranty guide for a clause-by-clause checklist.

Can I cancel a foundation contract I signed at home?

Often, yes, within three business days. Texas Bus. and Com. Code 601.051 lets consumers cancel home solicitation sales over $25 until midnight of the third business day, and Florida Stat. 501.025 gives the same window for home solicitation sales, with exceptions such as Florida's exclusion for sales resulting from your own request for specific services. The federal FTC rule requires a written cancellation notice. Cancel in writing and keep proof.

Does an insurance-funded job change how I compare quotes?

Yes. In Florida sinkhole claims, repairs must follow the insurer's engineer's recommendations, and the insurer pays as work is performed once you sign a repair contract (Fla. Stat. 627.707). In Florida, a contractor may not advise you on coverage or adjust a claim without a public adjuster license (489.147). In Texas, contractors may not waive or absorb your deductible. Compare bids on the engineer's scope, not on offers to cover your out-of-pocket costs.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration