What Can You Do If Your New Texas Home's Foundation Is Cracking? Builder Warranties and the RCLA

A step-by-step guide to Texas Property Code chapter 27 (the Residential Construction Liability Act): the 60-day certified-mail notice, the builder's inspection and offer deadlines, warranties, arbitration and the 10-year statute of repose.

If a new Texas home's foundation shows a defect, document it, get an engineer's opinion, and send the builder written notice by certified mail, return receipt requested, at least 60 days before you sue or start arbitration (Property Code 27.004). The builder may inspect up to three times in the 35 days after notice and may make a written settlement offer within 60 days. You then have 25 days to explain why an offer is unreasonable. Most suits must be filed within 10 years of substantial completion.

Key facts

  • The RCLA covers defects in the design, construction or repair of a new residence, an alteration, repair or addition, or an appurtenance (Prop. Code 27.001(3)).
  • Where chapter 27 conflicts with other law, including the DTPA or common law, chapter 27 prevails (27.002(b)).
  • Notice must go by certified mail, return receipt requested, at least 60 days before filing suit or arbitration, with evidence such as expert reports and photos (27.004(a)).
  • The builder may inspect up to three times during the 35 days after receiving notice (27.004(a)) and may make a written settlement offer within 60 days (27.004(b)).
  • A homeowner who finds an offer unreasonable must say why in writing within 25 days; an offer not accepted within 25 days is considered rejected (27.004(b), (i)).
  • Rejecting a reasonable offer can cap recovery at the fair market value of the builder's last offer (27.004(e)).
  • Builders are not liable for normal shrinkage cracking within the tolerance of building standards (27.003(a)(2)(D)).
  • Suits against those who build or repair improvements generally must be filed within 10 years of substantial completion, or 6 years if the builder gave a written warranty meeting the 1/2/6-year minimums (CPRC 16.009(a-2), (a-3)).
  • Since 2023, any attempted contract waiver of chapter 27 is void (27.009), and arbitration counts as filing for limitations (27.008).
  • Texas engineering law requires a licensed engineer for design of a residential slab on IRC-classified expansive soil unless the work meets the IRC as applied locally (Occ. Code 1001.056(c)(2)).

Is my new home's foundation crack a defect?

Not every crack is a defect. Concrete shrinks as it cures, and fine cracks in a new slab are common. The RCLA itself says a builder is not liable for "normal cracking or shrinkage cracking due to drying or settlement of construction components within the tolerance of building standards" (Prop. Code 27.003(a)(2)(D)). Builders are also not liable for damage caused by someone else's negligence, the owner's failure to maintain the home or mitigate damage, normal wear and tear, or the owner's failure to timely notify the builder.

Signs that point past normal shrinkage, especially in the first years in a new subdivision near Dallas-Fort Worth, Austin, San Antonio or Houston:

  • Cracks in brick veneer that step or widen, or brick pulling away from window frames
  • Doors that start sticking or will not latch, and gaps at the tops of door frames
  • Diagonal drywall cracks from the corners of doors and windows
  • Floor tile cracking in a line across a room
  • Measurable floor slope that grows between seasons
  • A crack in the slab with vertical offset (one side higher)

The builder is liable only to the extent the defect causes actual physical damage, a failure of a component to perform, or a verifiable safety danger (27.003(a)(1)). That is why measured evidence matters. For how to read cracks, see foundation crack types and settling vs structural damage.

Are post-tensioned slab cracks normal in new homes?

Many new Texas homes on clay use post-tensioned slabs, where steel tendons are tensioned after the concrete cures to squeeze the slab together. Fine surface cracks are common in any slab. The Texas Section ASCE residential foundation guidelines list tendon stressing as a repair when tests show tendon forces below those in the original design, so under-stressed tendons are a recognized problem. Cracks with offset, rust staining at the slab edge, or exposed tendon ends are worth an engineer's look.

Design matters too. Texas Occupations Code 1001.056 lets non-engineers design some private dwellings, but under 1001.056(c)(2) that exemption does not cover engineering design for a residential slab on expansive soil that meets the International Residential Code's expansive-soil classification as applied locally, unless the work meets the IRC requirements there. For comparison, Florida's building code names the PTI DC 10.5 standard and WRI/CRSI methods for slab-on-ground design on expansive soil (FBC 1808.6). Ask the builder for the sealed foundation design and the soil report for your lot. See new-home foundation design on clay.

What is the Texas Residential Construction Liability Act?

The RCLA is chapter 27 of the Texas Property Code. It sets the rules for claims against a "contractor" over construction defects in a "residence." Key definitions in 27.001:

  • Construction defect: a deficiency in the design, construction or repair of a new residence, an alteration, repair or addition to an existing residence, or an appurtenance, on which a person has a complaint against a contractor. So it covers foundation repair contractors as well as builders.
  • Contractor: includes a builder contracting with an owner, anyone selling a new home they built, and their owners, officers and employees.
  • Residence: a one- or two-family home, a townhouse up to three stories above grade with a separate exit, an accessory structure, a duplex, triplex or quadruplex, or a condo or co-op unit and its common elements.
  • Appurtenance: a garage, outbuilding, retaining wall or similar structure built with the home.
  • Action: a court case or an arbitration.

The act applies to any action over a construction defect except personal injury, wrongful death or damage to goods, and it applies to later buyers of the home (27.002(a)). It prevails over the DTPA and common law where they conflict (27.002(b)). It does not apply to claims for violations of Business and Commerce Code 27.01 (fraud in real estate), wrongful abandonment of a project, or violations of the construction trust fund law in Property Code chapter 162 (27.002(d)). The act does not create a cause of action or extend a limitations period (27.005).

Step by step: how to give your builder RCLA notice

  1. Document first. Date-stamped photos and video of every crack with a tape or coin for scale. A crack log with widths. Note doors that stick and when.
  2. Get an engineer. A Texas PE can do an evaluation with a floor elevation survey. The ASCE Texas guidelines describe Level B (relative floor elevations, plotted, with deflection and tilt compared to tolerances) as the common middle step. This Old House (October 2026, Angi data) lists engineer reports at about $500 to $1,000.
  3. Write the notice. Describe the defects "in reasonable detail." Refer to Chapter 27 of the Texas Property Code (the statutory contract notice in 27.007 says the notice must refer to chapter 27 and describe the defect).
  4. Include the evidence. Section 27.004(a) says to provide evidence showing the nature and cause of the defect and the repairs needed, including expert reports, photos, and video or audio recordings, if discoverable.
  5. Send it the right way. Certified mail, return receipt requested, to the contractor's last known address. If the builder told you in writing it has a lawyer, send it to the lawyer (27.004(o)).
  6. Calendar the dates from the day the builder receives it (see the table below).
  7. Keep the home accessible for inspections, and do not have someone else repair the defect first unless it is an emergency. Refusing a reasonable chance to inspect or repair can cut your recovery.

Also read your warranty booklet and purchase contract. Many have their own claim-notice steps and deadlines that run alongside chapter 27. Do both.

RCLA deadlines at a glance

StepDeadlineStatute
Homeowner sends written noticeAt least 60 days before filing suit or arbitration27.004(a)
Builder inspects (on written request)Up to 3 inspections during the 35 days after it receives notice27.004(a)
Builder's written settlement offerWithin 60 days after it receives notice, by certified mail27.004(b)
Homeowner says why offer is unreasonableOn or before day 25 after receiving the offer27.004(b)(1)
Offer not acceptedConsidered rejected if not accepted before day 2527.004(i)
Builder's supplemental offerWithin 10 days after receiving the homeowner's reasons27.004(b)(2)
Repairs under accepted offerWithin 60 days after builder receives acceptance, unless delayed by owner or events beyond builder's control27.004(b)
Motion to compel mediationWithin 90 days after suit is filed, if the claim is over $7,50027.0041

Some older guides say the builder has 45 days to make an offer. The current statute says 60 days. The parties may agree in writing to extend any chapter 27 deadline (27.004(h)). If giving 60 days' notice is impossible because the limitations period is about to run, you may file first, but the suit must describe each defect and the builder then gets 75 days after service to inspect and 60 days to offer (27.004(c)).

What happens after the builder's offer?

The offer can be to repair (by the builder or an independent contractor, fully or partly at the builder's expense), to pay money, or to buy the home back (27.004(b), (n)). It must describe the repairs in reasonable detail and the completion time if more than 60 days.

Your choiceWhat the statute says
AcceptRepairs within 60 days of acceptance; the builder may document the repair and have it inspected (27.004(k)). If the builder refuses to start repairs, the damage caps do not apply (27.004(q)).
Reject a reasonable offerRecovery limited to the fair market value of the builder's last offer (or a reasonable money or purchase offer), plus reasonable costs and attorney's fees incurred before rejection (27.004(e)).
Builder makes no reasonable offerThe caps in 27.004(e) do not apply (27.004(f)).

A judge or arbitrator decides whether the final offer was reasonable (27.004(j)). That is why your engineer's repair scope matters. If the builder offers "patch and paint" for a slab with measured deflection, your written explanation within 25 days should point to the engineer's findings.

What damages can be recovered

Unless the caps apply, 27.004(g) limits recovery to economic damages caused by the defect: reasonable repair costs; replacement or repair of damaged goods in the home; reasonable engineering and consulting fees; temporary housing during repairs; reduction in market value after repair if the defect is a structural failure; reasonable attorney's fees; and arbitration fees and the claimant's share of arbitrator pay. A structural failure means actual physical damage to the load-bearing part of the home caused by its failure (27.001(7)). You must prove the defect existed when construction was completed and caused the damage (27.006).

Emergencies and builder buyback clauses

If a defect creates an imminent threat to health or safety, the builder must take reasonable steps to cure it as soon as practicable after written notice. If it does not cure in a reasonable time, the owner may have it cured and recover the reasonable cost plus attorney's fees and costs (27.004(m)).

Some purchase contracts include a conditional sale clause under 27.0042: if repair costs exceed an agreed percentage of the home's value, the builder may elect to buy the home back for the original price plus closing costs, transfer costs, reasonable attorney and expert fees, reimbursement for permanent improvements, and moving costs. A compliant offer to purchase is presumed reasonable absent clear and convincing evidence otherwise. Check whether your contract has one before you send notice.

What warranty does a Texas builder give on a foundation?

Texas has no single state-issued new-home warranty. What you have depends on your contract and warranty documents. Look for three layers:

  • Builder's express limited warranty. Often tiers like workmanship, systems and major structural components. The statute of repose in CPRC 16.009(a-3) sets minimums a written warranty must meet to qualify the builder for a shorter repose period: 1 year for workmanship and materials, 2 years for plumbing, electrical, heating and air-conditioning delivery systems, and 6 years for major structural components.
  • Third-party structural warranty. Many builders enroll homes with an outside warranty company that backs structural defects for a stated term. Names like "2-10" usually signal 2 years of systems coverage and 10 years of structural coverage, but the booklet controls. Read the definition of "structural defect," which is often much narrower than "cracks," the deductible, the claim deadline, and whether the builder or the warranty company pays in years 3 to 10.
  • Implied warranty of habitability. Under 27.003(c), to claim breach of this warranty the defect must have been latent when the home was completed or title passed to the first buyer and must have made the home unsuitable for use as a home.

Warranty claims and RCLA notice are separate tracks. File the warranty claim the way the booklet says, and send chapter 27 notice if you may need to sue or arbitrate. For repair warranties on existing homes, see lifetime and transferable foundation warranties.

What is the Texas statute of repose for construction defects?

A statute of repose is an outer deadline that runs from completion, whether or not you knew about the defect.

Who you sueDeadlineStatute
Person who built or repaired the improvement10 years after substantial completionCPRC 16.009(a)
Contractor on a residence who gave a written warranty meeting the 1/2/6-year minimums6 years after substantial completionCPRC 16.009(a-2), (a-3)
Licensed engineer or architect who designed, planned or inspected10 years after substantial completionCPRC 16.008

Under 16.009(c), presenting a written claim during the period extends it by one year for residential claims under (a-2). If the damage occurs in the last year, you may sue within two years after the claim accrues (16.009(d)). The repose statute does not bar actions on a written warranty with a longer period, or claims based on willful misconduct or fraudulent concealment (16.009(e)).

Repose is not the only clock. Shorter limitations periods also apply. For example, DTPA claims generally must be filed within two years after the act or its discovery (Bus. and Com. Code 17.565). Because chapter 27 does not extend any limitations period (27.005), send notice early and talk to a lawyer well before any deadline.

What does an arbitration clause in my builder contract mean?

Many builder contracts require disputes to go to binding arbitration instead of court. Under chapter 27, "action" includes arbitration, so the 60-day notice applies before you start one too (27.001(1), 27.007). Changes effective in 2023 added two protections: an attempted waiver of chapter 27 in a contract is void (27.009), and submitting the dispute to arbitration has the same effect on limitations as filing in court (27.008). Arbitration filing fees and your share of arbitrator compensation are recoverable damages (27.004(g)(7)).

The contract must also contain a 10-point boldface notice that it is subject to chapter 27, describing the certified-mail notice. If it does not, the claimant may recover a $500 civil penalty (27.007(b)). Read your contract's dispute section with a Texas construction attorney before you file. Arbitration rules, fees and venue are set by the contract.

Can I sue my builder for a foundation defect?

Yes, after the notice process, subject to arbitration clauses, the damage caps and deadlines. A court or arbitrator must abate (pause) a case if the homeowner skipped the notice or did not allow a reasonable chance to inspect, and abatement is automatic 11 days after a verified motion that is not contested by affidavit (27.004(d)). A suit that is groundless and brought in bad faith or to harass makes the filer liable for the defendant's fees and costs (27.0031).

Before you hire anyone to fix it yourself, know this: if an assignee or insurer that steps into your shoes repairs without giving the builder notice and a chance to inspect and offer, the builder is not liable for those repair costs (27.003(a)(3)). Keep the builder in the loop.

Buying a newly built home that someone else owned first

Chapter 27 applies to later buyers who file a claim against a contractor (27.002(a)(2)). If you buy a five-year-old home in a newer Dallas or Austin subdivision, ask for the warranty booklet, any claim history, and whether a third-party structural warranty transfers. A never-occupied new home is exempt from the Texas Seller's Disclosure Notice (Prop. Code 5.008(e)(10)), so inspections matter more. See Texas foundation disclosures and inspections and buying a house with foundation problems.

How to choose a provider

  • Photograph and measure every crack monthly; keep a dated log.
  • Find your purchase contract, warranty booklet and any third-party warranty enrollment.
  • Note the substantial completion date and calculate the 6- and 10-year repose dates.
  • File any warranty claim exactly as the booklet requires.
  • Hire a Texas PE for an evaluation with a floor elevation survey.
  • Ask the builder for the sealed foundation design and lot soil report.
  • Send chapter 27 notice by certified mail, return receipt requested, with the engineer report and photos.
  • Allow up to three builder inspections in the 35 days after notice.
  • Respond in writing within 25 days if the offer is unreasonable, citing the engineer's findings.
  • Do not let others repair before the builder's chance to inspect and offer, unless it is an emergency.
  • Talk to a Texas construction attorney about arbitration, damages and deadlines.

Related foundation repair contractors guides

Foundation repair contractors by state and city

Questions people ask

How long does the builder have to respond to an RCLA notice?

Under Property Code 27.004, the builder may request inspections and must be given a reasonable chance to inspect up to three times during the 35 days after it receives your notice. It may make a written settlement offer within 60 days after receiving notice. Some older articles say 45 days; the current statute says 60. The deadlines can be extended by written agreement.

Does the RCLA notice have to be sent by certified mail?

Yes. Section 27.004(a) and (o) require written notice by certified mail, return receipt requested, to the contractor's last known address, or to its attorney if you were told in writing it has one. Email alone does not meet the statute. Keep the green card or electronic return receipt as proof of the date the builder received it.

What if my builder ignores my notice?

If the builder makes no reasonable offer, the damage caps in 27.004(e) do not apply. After the 60-day period you can file suit or start arbitration, depending on your contract. If the defect is an imminent safety threat and the builder does not cure it in reasonable time, 27.004(m) lets you have it cured and recover the cost plus attorney's fees.

Do I lose my rights if I reject the builder's repair offer?

Not automatically. If the offer was reasonable and you reject it, your recovery is capped at the fair market value of the builder's last offer plus fees incurred before rejection. If the offer was not reasonable, the cap does not apply. A judge or arbitrator decides reasonableness, so explain your reasons in writing within 25 days, backed by an engineer's report.

Is a hairline crack in my new garage slab a defect?

Usually not by itself. Chapter 27 excludes normal cracking or shrinkage within building standards' tolerances. Garage slabs often have control joints meant to direct those cracks. Watch for widening, vertical offset or cracks that line up with problems inside the house. For garage and driveway slabs, see our guide to garage, driveway, patio and pool slabs.

Does the RCLA apply to foundation repair companies, not just builders?

Yes. The definition of construction defect includes deficiencies in the repair of an existing residence, and contractor includes a builder contracting to repair or alter an existing residence. A homeowner with a failed pier job generally follows the same 60-day certified-mail notice process. The repair contract should contain the chapter 27 notice; if it does not, a $500 civil penalty may apply.

Can a builder make me waive the RCLA in the contract?

No. Section 27.009, added in 2023, says an attempted waiver of chapter 27 in a contract subject to it is void. Builders can still require arbitration, and the RCLA itself limits damages in some situations. Read the dispute resolution section of your contract and warranty with a Texas construction attorney.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration