Fixr's January 2025 guide puts in-ground pool removal at $5,000 to $10,000, with a national average of $7,500. A partial fill-in, where the shell is broken up and buried, runs about $3,000 to $7,000. A full removal, where all pool material is hauled away, runs about $5,000 to $15,000. Expect a demolition or building permit, utility disconnects and inspections. If you ever want to build on the spot, choose full removal with engineered, tested compaction. Sellers should disclose a former pool.
Key facts
- Fixr (updated January 31, 2025): pool fill-in or removal costs $5,000 to $10,000, national average $7,500, low $3,000, high $15,000.
- Fixr (2025): partial fill-in $3,000 to $7,000; full removal $5,000 to $15,000.
- Fixr (2025): fiberglass pools and vinyl pools with metal walls must be fully removed.
- Fixr (2025): partial fill-ins take about 2 to 5 days; full removals about 5 to 7 days.
- Florida Statutes 553.79 makes it unlawful to demolish a building without first getting a permit from the local enforcing agency.
- The Florida Building Code lists demolition inspections: one after utilities are disconnected and secured, and a final after demolition is complete.
- Texas Property Code 5.008 requires a seller's disclosure that includes checkboxes for Pool, Pool Equipment and Pool Heater, plus conditions like Landfill, Settling and Soil Movement.
- Florida Statutes 193.155(5): when homestead property is destroyed or removed and not replaced, the assessed value is reduced by the value attributable to it.
- Florida's licensing law defines 'demolish' for contractor licensing as covering buildings, residences and structures over 50 feet tall.
How much does pool removal cost?
The most detailed dated national source is Fixr's fill-in cost guide, updated January 31, 2025. Its numbers:
| Fixr 2025 benchmark | Cost |
|---|---|
| National average | $7,500 (full removal of a 12 by 24 foot fiberglass shell cut into pieces) |
| Typical range | $5,000 to $10,000 |
| Low-end example | $3,000 (partial removal of a 12 by 24 foot concrete pool) |
| High-end example | $15,000 (full removal of an 18 by 24 foot concrete pool with moderate landscaping) |
| Above-ground pool removal | From about $500; up to about $2,000 with landscaping underneath |
Those are national figures, not Texas or Florida quotes. Local prices depend on access for equipment, haul distance to a disposal site, fill dirt prices, permit fees, and whether a geotechnical engineer must test the fill. A pool behind a house with a narrow side yard can cost much more than one with open alley access.
Cost by pool material
| Pool type | Fixr 2025 range | What usually happens |
|---|---|---|
| In-ground concrete (gunite or shotcrete) | $3,000 to $15,000 | Partial fill is common; full removal if you want to build |
| In-ground vinyl | $3,000 to $10,000 | Liner removed; metal-wall pools must be fully removed |
| In-ground fiberglass | $5,000 to $10,000 | Must be fully removed, lifted whole or cut up |
Cost by size
| Pool size | Fixr 2025 range |
|---|---|
| 10 by 20 feet | $2,000 to $10,000 |
| 12 by 24 feet | $2,500 to $10,000 |
| 14 by 28 feet | $3,000 to $12,000 |
| 15 by 30 feet | $4,000 to $15,000 |
| 18 by 36 feet | $5,000 to $16,000 |
| 20 by 40 feet | $7,000 to $18,000 |
Fixr explains that depth drives a lot of the spread. A 12 by 24 foot pool that is 6 feet deep needs far less fill than one that is 12 feet deep at the diving end.
Line-item breakdown
Fixr breaks a small fill-in into parts. Use this to check that a bid covers everything:
| Item | Fixr 2025 range |
|---|---|
| Permit | $50 to $250 |
| Fill material | $1,020 to $1,275 |
| Labor | $1,000 to $4,000 |
| Dumpster rental | $200 to $550 |
| Cleanup | $320 to $800 |
| Landscaping | $450 to $5,000 |
Missing from many cheap bids: engineering and compaction testing, utility disconnects by licensed trades, hauling the pool water, removing the screen enclosure, fence changes, and sod or irrigation repair.
What is the difference between a partial fill-in and a full pool removal?
This choice affects cost, what you can build later, how you disclose it when you sell, and how a future buyer's appraiser or inspector sees the yard.
| Partial fill-in (abandonment) | Full removal | |
|---|---|---|
| What happens | Holes are drilled in the floor for drainage, the top part of the walls and the deck are broken into the pool, and the hole is filled | All shell material, steel, plumbing and decking is broken out and hauled away, then the hole is filled in compacted layers |
| Fixr 2025 cost | $3,000 to $7,000 | $5,000 to $15,000 |
| Time (Fixr) | 2 to 5 days | 5 to 7 days |
| Works for | Concrete pools and some vinyl pools with concrete or wood walls | All types; required for fiberglass and metal-wall vinyl |
| Build on it later? | Fixr says no structure should be built on a partial fill | Possible, with engineered fill and compaction testing |
| Resale | Old shell stays buried; should be disclosed | Cleaner story, still disclose that a pool existed |
| Put a pool back later? | Old shell must be dug out first | Like new construction |
Fixr describes the partial method in detail: the deck and the top third to half of the walls are broken into the pool, holes are drilled about 3 feet into the bottom to drain, and the space is filled. Done poorly, partial fills can settle and leave a pool-shaped dip in the lawn.
Rule of thumb: if there is any chance you, or a buyer, will want to build a room addition, garage, guest house, slab or second pool there, pay for full removal now. It costs more today but avoids digging out a buried shell later.
What fill material and compaction does a pool removal need?
Fixr's 2025 guide lists installed fill material costs per cubic yard:
| Material | Fixr 2025 cost per cubic yard (installed) | Use |
|---|---|---|
| Gravel | $5 to $8 | Drainage base; Fixr warns it is hard to compact and should not fill the whole space |
| Dirt (fill soil) | $8 to $12 | Main fill; mix of soil and gravel that compacts well |
| Topsoil | $12 to $15 | Top 18 to 36 inches for grass or plantings |
| Concrete | $104 to $144 | Only for a 4 to 6 inch patio slab on top, not as fill |
Fixr suggests roughly 80 percent fill and 20 percent good topsoil, with 18 inches of topsoil for grass and 36 inches for heavier landscaping. Trees need more.
Why compaction is the whole ballgame
Loose fill settles over time. When it settles, the lawn dips, patios crack and anything built on top can move. Good contractors place fill in layers (called lifts) and compact each one before adding the next, rather than dumping all the dirt at once.
Compaction testing means a geotechnical engineer or testing lab checks the density of the fill as it goes in. The result is a written compaction report. Whether you need one is set by your building department and by what you plan to build:
- Lawn or garden only: many jurisdictions do not require testing, though some require it for any pool demolition permit.
- Any future structure, slab or addition: plan on engineered fill and a compaction report. A building official reviewing a future addition permit may ask for it, and a buyer's inspector or engineer may too.
We could not find a single statewide Texas or Florida rule that sets compaction requirements for residential pool fill. Requirements are local. Ask your building department, in writing, whether a compaction report or engineer's letter is required to close the permit.
Texas clay and Florida groundwater
- Texas: Expansive clay across much of Dallas, Austin and San Antonio swells and shrinks with moisture. Clay that is dug out and dumped back can behave badly as fill. Bids should say what fill will be imported and how drainage will be handled so water does not collect in the old pool hole.
- Florida: High groundwater in South and Central Florida, and sandy soils statewide, change the work. An empty pool can float. Drainage holes in the floor matter. Ask how the crew will handle water that rises into the hole during the job.
Do you need a permit to remove or fill in a pool?
In most Texas and Florida cities and counties, yes. Fixr's 2025 guide says you will need a permit for this project and puts permit fees at about $50 to $250, though some cities charge more.
Florida
Florida Statutes 553.79 makes it unlawful to demolish any building in Florida without first getting a permit from the enforcing agency, and Florida Building Code, Building section 105.1 requires a permit to demolish a building or structure. The code's inspection list includes demolition inspections: the first after all utility connections are disconnected and secured, and a final after the demolition is complete. Your county or city will add its own requirements. Common ones include:
- A site plan showing the pool, deck and any enclosure to be removed
- Proof that electrical, gas and water lines to the pool equipment were disconnected by licensed trades
- A fill and compaction plan or engineer's letter in some jurisdictions
- A final inspection of the filled and graded area
- Separate permits if a screen enclosure is removed
Texas
Texas cities that regulate pools adopt the International Swimming Pool and Spa Code under Local Government Code 214.103, and large cities such as Houston, Dallas, San Antonio and Austin run their own permit offices with their own rules for demolition and pool removal. Check the city permit office before demolition starts; we did not confirm each city's exact pool-removal permit type. In unincorporated county areas, there may be no building permit, but an electrician should still disconnect the pool circuits, and HOA rules may still apply.
The Dallas Central Appraisal District's valuation guide notes that it receives building permit copies from the 31 cities it serves and treats permits for pools, remodeling, repairs and demolitions as miscellaneous permits it reviews. That means a permitted removal helps your appraisal record get updated, too.
Why skipping the permit backfires
- A buyer's title, survey or inspection may reveal a filled pool with no permit history, which can stall a sale.
- A future addition permit may be refused or require digging test pits to prove the fill is sound.
- An unpermitted job leaves you with no inspection record to show a buyer or insurer.
For more on the permit process, see our pool permits and inspections guide.
Who can legally demolish a pool in Florida or Texas?
Florida
Florida's contractor licensing law is less clear on pool removal than many owners expect. Section 489.105(3) defines a contractor as someone who will construct, repair, alter, remodel, add to, demolish or improve a building or structure for others for pay. But for licensing purposes, it says the term "demolish" applies only to demolition of steel tanks, towers and other structures more than 50 feet tall, and to all buildings or residences. An in-ground pool is not a building or residence, so whether state licensing applies to a pool-only demolition is not spelled out in the statute.
What that means in practice:
- The residential pool/spa contractor scope in 489.105 covers construction, repair and servicing of residential pools. Many pool contractors offer removal.
- Counties and cities can require local licenses or registrations for demolition and set who may pull a demolition permit. Requirements differ by county.
- Electrical disconnects need a licensed electrical contractor. Gas line caps need the appropriate licensed trade.
- Florida's owner-builder exemption (s. 489.103(7)) lets you act as your own contractor on your own one- or two-family home that is not for sale or lease. Section 489.103(7) requires the owner to sign the owner-builder disclosure statement set out in that section, and selling within 1 year creates a presumption the work was for sale.
Before hiring, ask the building department which license types can pull a pool demolition permit in your county, then verify that license on the DBPR license search. We could not confirm one statewide answer, so treat any bidder's claim that no license is needed as something to check.
Texas
Texas has no statewide pool contractor or demolition contractor license through TDLR. Cities may require contractor registration to pull permits. Electrical work, including disconnecting pool circuits, generally requires a TDLR-licensed electrician working for a licensed electrical contractor unless a homeowner exemption applies. Check insurance and references, and get a written contract. See our Texas contractor guide and Florida license guide.
How does a pool removal work, step by step?
- Decide partial or full. Base it on what you want the space for, now and later.
- Get bids and an engineer if needed. Bids should list method, fill type, compaction method, testing, haul-off, utility disconnects, permits, landscaping and timeline.
- Permits and HOA. Apply for the demolition or removal permit and any HOA approval.
- Disconnect utilities. An electrician disconnects pool circuits; gas and water lines are capped by the right trades. Florida's demolition inspection checks this first.
- Drain the pool. Fixr notes chlorinated water should not be dumped into the sewer system or nearby environment without the right handling. Check local rules on where pool water may go. Let the chlorine drop before draining if you can.
- Remove equipment. Pump, filter, heater, salt cell and controls come out. Some can be resold.
- Drill drainage holes (partial fills) or break out the entire shell (full removal).
- Break up deck and walls. In a partial fill, rubble goes into the pool. In a full removal, it is hauled away.
- Fill in lifts and compact. Testing happens here if required.
- Topsoil and grade. Grade so water drains away from the house and the old pool area.
- Final inspection. Close the permit and keep the paperwork.
- Landscape or build. Sod, garden, patio, or later a permitted structure.
Fixr's timeline: partial fills take about 2 to 5 days and full removals about 5 to 7 days of work. Add time for permits, inspections, testing and weather.
Can you build on top of a filled-in pool?
Only with care. Fixr says plainly that you cannot build any structure on a pool that was partially filled in. For structures, it says the pool must be completely removed first.
To build on a former pool site, you generally need:
- A full removal of the shell, steel and plumbing
- Engineered fill placed in compacted lifts
- Compaction test results from a testing lab or geotechnical engineer
- A foundation design that accounts for the fill, which your engineer and building department will review
Fixr's conversion ideas give a sense of total cost when you include both removal and the new use:
| New use | Fixr 2025 range (including removal) |
|---|---|
| Garden | $8,000 to $20,000 |
| Deck | $10,000 to $25,000 |
| Pond | $10,000 to $35,000 |
| Greenhouse | $10,000 to $35,000 |
| Sunken patio | $10,000 to $35,000 |
A light patio or a lawn is the safest use for a partial fill. Ask a structural or geotechnical engineer before putting anything heavier there.
Do you have to disclose a filled-in pool when you sell?
In practice, yes. This is general information, not legal advice. Talk with a real estate attorney or your agent about your situation.
Texas: the seller's disclosure notice
Texas Property Code 5.008 requires most sellers of a single-dwelling residential property to give the buyer a written disclosure notice. The statutory form includes:
- Checkboxes for Pool, Spa, Hot Tub, Pool Equipment and Pool Heater
- A question asking whether the seller is aware of items not in working condition, with defects, or needing repair
- A list of conditions including Landfill, Settling, Soil Movement, Previous Structural or Roof Repair, and a Single Blockable Main Drain in Pool/Hot Tub/Spa
- A question about any item, equipment or system on the property in need of repair
A filled-in pool is a fact that touches several of those items, especially fill and settling. Under 5.008(d), the seller completes the notice to the best of the seller's belief and knowledge as of the date signed. Under 5.008(f), the notice must be delivered on or before the effective date of the contract; if it is not, the buyer may terminate for any reason within seven days after receiving it. Section 5.008(e) lists transfers that are exempt, such as foreclosure sales and transfers between co-owners or spouses. Many Texas sellers use the Texas Real Estate Commission's seller's disclosure form, which follows the statute. Ask your agent for the current version.
The safest practice: say that a pool was filled, whether it was partial or full, the year, whether it was permitted, and attach the permit, final inspection and any compaction report.
Florida: no statutory form, but a duty to disclose
Florida does not have a statutory seller's disclosure form like Texas's. Two things still apply:
- Licensed agents. Florida Statutes 475.278 lists, among the duties of real estate licensees, disclosing all known facts that materially affect the value of residential real property and are not readily observable to the buyer. A buried pool shell is not readily observable.
- Seller duty under case law. Florida courts have recognized a seller's duty to disclose known facts that materially affect a home's value and are not readily observable. We were not able to load the court opinion itself to quote it, so ask a Florida real estate attorney how it applies to your sale.
Florida also now requires a separate flood disclosure under section 689.302, to be given at or before the contract, covering known flooding, flood insurance claims and FEMA assistance. That form does not ask about pools, but if your removed pool area floods or holds water, that may be relevant.
Bottom line in both states: disclose the former pool, and keep the permit and inspection paperwork in your house file for buyers. For buyers, our buying a home with a pool guide covers what to ask.
Does removing a pool lower home value, insurance or property taxes?
Home value
It depends on the market and the pool's condition. A worn-out pool that needs a big repair can be a negative for many buyers, and removing it can widen your pool of buyers. In neighborhoods where most homes have pools, a yard without one may stand out the wrong way. Fixr's guide notes that a partial fill can make a home harder to sell because it limits what can be built there, while a full removal avoids that problem. The National Association of Realtors' 2023 outdoor remodeling report estimated that a new in-ground pool recovers about 56 percent of its cost at sale, which shows how hard it is to predict what a pool adds or subtracts. For more, see does a pool add home value.
Insurance
Removing a pool removes a liability exposure, and some insurers price that in, but not all do. Call your insurer with the completion date and permit, and ask them to update your policy and rerate it. Do not cancel any umbrella coverage just because the pool is gone; umbrella policies cover much more than pools. See our pool insurance and liability guide.
Property taxes
- Florida: Section 193.155(5) says that when homestead property is destroyed or removed and not replaced, the assessed value is reduced by the assessed value attributable to the removed property. Notify your county property appraiser and keep the permit.
- Texas: Property is appraised at market value as of January 1 under Tax Code 23.01. If the pool is gone by January 1, the next appraisal should reflect it. If your notice still shows the pool, you can protest by May 15 or 30 days after the notice, whichever is later.
See our pool property tax guide for the steps.
Should you remove the pool or keep it?
| Reason to remove | Reason to keep or repair |
|---|---|
| No one swims and upkeep runs hundreds a month in season | The shell is sound and only the finish or equipment is worn |
| Big structural repair is coming | Most homes nearby have pools and buyers expect one |
| You want the yard for a garden, play area or addition | You may sell soon in a hot market where pools are common |
| Safety worries with young children or guests | A safety cover or barrier upgrade would solve the safety concern |
Fixr's January 2025 maintenance guide puts professional pool service at about $350 to $1,050, with most owners paying around $500 a month in summer, and annual maintenance at $350 to $2,600 depending on visit frequency. Add electricity, water, chemicals and repairs. If you never use the pool, those costs can cover a removal within a few years. If you only need a resurface and new pump, compare that price with removal first. Our remodel guide and is a pool worth it can help you compare.
What should you ask a pool removal contractor?
Bring this list to every bid meeting. Ask for the answers in the written bid, not just out loud.
- Method: Is this a partial fill-in or a full removal? If partial, how far down will the walls be broken, and how many drainage holes will be drilled in the floor?
- Haul-off: Where does the broken concrete, steel and liner go? Is disposal included in the price?
- Fill: What material will be imported, how many cubic yards, and how deep will the topsoil layer be?
- Compaction: How thick is each compacted layer? What equipment is used? Who does the testing, and do I get a written report?
- Permits: Who pulls the demolition permit, and does the price include inspections and any engineer's letter?
- License and insurance: What license do you hold, and can I see your liability and workers' compensation certificates?
- Utilities: Who disconnects electrical, gas and water lines, and are they licensed for that work?
- Access and damage: How will equipment get to the backyard? Who pays to fix a broken driveway, fence, sprinkler line or sod?
- Water: How and where will the pool water be drained, and how will you handle groundwater or rain during the job?
- Schedule: How many working days, and what is the payment schedule? Avoid paying most of the price before work starts.
- Warranty: What happens if the area settles in the first year? Will you return to add and compact fill?
If one bid is far below the others, it usually leaves out testing, haul-off or landscaping, or assumes a partial fill when you asked for full removal.
Can you remove a pool yourself?
Fixr's advice is not to try it. Pool removal involves heavy demolition equipment, concrete breaking, electrical and gas disconnects, drainage, water disposal rules and compaction. Mistakes can lead to sinkholes in the yard, damage to the house foundation or utilities, or a failed inspection.
If you are set on doing part of the work, the safer split is: hire a licensed electrician for disconnects, hire a demolition or pool contractor for breakout and fill, and do the landscaping yourself. In Florida, an owner-builder permit makes you responsible for meeting code and supervising the work. In Texas, check your city's permit rules for homeowners.
Removing a screen enclosure, fence or barrier with the pool
When the pool goes, the pool barrier rules generally stop applying, because the barrier laws apply to pools. Florida's chapter 515 applies to pools with water over 24 inches deep; Texas chapter 757 applies to apartment and HOA pools over 18 inches deep.
- Screen enclosures (Florida): Taking down an aluminum cage is often a separate demolition permit. Some owners keep the cage as a screened patio over the new deck or garden. If you keep it, it still has to be maintained for wind, and screens may need replacing. See our screen enclosure guide.
- Door alarms: You can usually remove or disable pool door alarms once the pool is gone, but do not remove them until the pool is fully drained and filled.
- HOA fences: Your HOA may still have rules on fence type and height even after the pool is gone.
Keep the pool fully secured until the hole is filled. A half-demolished pool with a few feet of rainwater in it is one of the most dangerous stages of the job for children and pets.
Draining safely and keeping the site secure during removal
The riskiest part of a removal is the stretch between draining the pool and finishing the fill. Plan for three problems.
- Groundwater. An empty concrete shell in high groundwater can crack or lift. That is why the Florida Building Code requires an approved hydrostatic relief device on pools in areas of anticipated water table (FBC Residential R4501.21.4). In much of Florida, and in Houston after heavy rain, ask the contractor to drain only when demolition can start right away, and to open the relief valve or drill drainage holes promptly.
- Where the water goes. In Florida, pool/spa contractors may drain a pool as part of their scope, but none of the pool license categories may make direct connections to a sanitary sewer system or to potable water lines (s. 489.105); that is plumber work. Check your city's discharge rules before draining.
- Utilities. In Texas, disconnecting pool circuits is electrical work that needs a TDLR license unless the homeowner exemption for your own dwelling applies (Occupations Code ch. 1305).
Keep the barrier in place until the hole is filled. In Texas, apartment and HOA owners must keep inspecting pool yard enclosures and gates at least every 31 days while chapter 757 applies, and a city may secure a hazardous pool fence after notice and a hearing, placing a lien for the cost on non-homestead property (Local Government Code ch. 214).
How to choose a provider
- Decide on partial fill or full removal based on how you might use the space for the next 20 years.
- Ask the building department what permit, inspections and compaction documents are required.
- Get at least three written bids that list method, fill, compaction, testing, haul-off and landscaping.
- Verify licenses: Florida DBPR license search; in Texas, city registration and a TDLR-licensed electrician.
- Have licensed trades disconnect and cap electrical, gas and water lines before demolition.
- Check local rules for draining chlorinated pool water.
- Keep the site fenced and secured until the hole is filled.
- Get the compaction report if you might ever build there.
- Close the permit with a final inspection and keep all paperwork for resale.
- Tell your insurer and property appraiser or appraisal district once the pool is gone.
- Disclose the former pool, method and permit history when you sell.
Related swimming pool builders and contractors guides
- How Much Does a Pool Remodel Cost, and What Can You Change on an Existing Pool?
- Do You Need a Permit to Build a Pool in Texas or Florida? Permits, Inspections and Who Pulls Them
- Does a Pool Add Value to a Home in Texas or Florida?
- Will a Pool Raise My Property Taxes in Texas or Florida?
- Pool Insurance and Liability: Does a Pool Raise Homeowners Insurance, and When Are You Liable in Texas or Florida?
- Buying a Home With a Pool: Inspection Checklist, Permits, Barriers and Red Flags
- Is a Pool Worth It? A Full-Cost, Lifestyle and Risk Checklist for Texas and Florida
Swimming pool builders and contractors by state and city
Questions people ask
How long does it take to fill in a pool?
Fixr's 2025 guide says partial fill-ins take about 2 to 5 days and complete removals about 5 to 7 days of work. Add time for permit approval, inspections, compaction testing, weather and landscaping. In practice, plan on several weeks from first call to final inspection.
What is the cheapest way to get rid of a pool?
A partial fill-in on a concrete pool is usually cheapest, about $3,000 to $7,000 per Fixr's 2025 guide. It limits future building on the spot and should be disclosed when you sell. A deck-over, where a deck is built over the pool, is another option Fixr prices at $6,000 to $18,000 in its remodeling guide, but it keeps the pool structure under the deck.
Is a partial fill-in a problem when selling?
It can be. Fixr notes a partial fill can make a home harder to sell because it limits what can be built there. Buyers and their inspectors may ask for the permit and any compaction report. Disclose it in writing. In Texas the statutory disclosure form asks about fill, settling and soil movement; in Florida licensees must disclose known material facts that are not readily observable.
Does pool removal need an engineer?
Not always. For a lawn or garden, many jurisdictions only require a demolition permit and inspection. If you might build a structure there, or your building department requires it, a geotechnical engineer should oversee the fill and provide a compaction report. Ask the building department before work starts.
What happens to the pool equipment?
Pumps, filters, heaters and salt systems are removed before demolition. Some contractors credit you for reusable equipment, and Fixr notes a fiberglass shell in good condition can sometimes be lifted out whole and reused, which may earn a discount. Electrical and gas lines must be properly disconnected and capped by licensed trades.
Can I put a new pool where an old one was removed?
Yes, if the old pool was fully removed. Costs are then similar to new construction. If the old pool was partially filled, the buried shell has to be dug out first, which adds cost. Fixr's 2024 build guide puts a new pool at $32,175 to $58,541 nationally.
Will my yard sink after a pool is filled in?
It can if fill was dumped in without compaction or if drainage holes were not drilled in a partial fill. Proper work places fill in compacted layers, uses soil that compacts well rather than all gravel, and grades the surface so water drains away. Some settling of topsoil is normal and can be topped off.
Do I need to tell my HOA?
Usually yes. Most HOAs require architectural approval for exterior changes, including removing a pool, fence or screen enclosure, and for new landscaping or patios. Get written approval before work starts. See our HOA pool approval guide.
Does homeowners insurance pay to remove a damaged pool?
Insurance pays for covered damage under your policy terms, not for removing a pool you no longer want. If a covered event damaged the pool, the claim may pay toward repair, and you may decide to use that toward removal instead. Ask your adjuster how that would be handled before you decide.
Can the city make me remove an abandoned pool?
Cities can act on unsafe or unsanitary pools. In Texas, Local Government Code chapter 214 lets cities require owners to repair or secure a pool fence that violates local standards after notice and hearing, and charge the cost as a lien on non-homestead property. A green, unfenced pool also draws mosquito and code complaints. Removal or proper securing ends that risk.
Sources
- Fixr, Cost to Fill In a Pool (updated January 31, 2025)
- Fixr, Pool Remodel Cost (updated January 31, 2025)
- Fixr, Pool Maintenance Cost (updated January 31, 2025)
- Fixr, Cost to Build a Swimming Pool (updated January 25, 2024)
- Fla. Stat. 553.79 Permits; applications; issuance; inspections (2026)
- Florida Building Code, Building (2023) Chapter 1, Scope and Administration
- Fla. Stat. 489.105 Definitions (2026)
- Fla. Stat. 489.103 Exemptions (2026)
- Fla. Stat. 475.278 Brokerage relationship disclosure (2026)
- Fla. Stat. 689.302 Disclosure of flood risks to prospective purchaser (2026)
- Fla. Stat. 193.155 Homestead assessments (2026)
- Florida Statutes Chapter 515 (2026)
- Texas Property Code Chapter 5 (Sec. 5.008 Seller's Disclosure)
- Texas Tax Code Chapter 23 (Sec. 23.01 market value as of January 1)
- Texas Tax Code Chapter 41 (Sec. 41.44 protest deadline)
- Texas Local Government Code Chapter 214
- Texas Health and Safety Code Chapter 757
- Texas Occupations Code Chapter 1305
- Dallas Central Appraisal District, Valuation Process
- National Association of Realtors, 2023 Remodeling Impact Report: Outdoor Features
- Texas Department of Licensing and Regulation
- Florida Building Code, Residential 2023, Chapter 45 Private Swimming Pools
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.