What Does Florida Law Say About EV Charging Stations? Section 366.94, FDACS Rule 5J-28 and Local Preemption

How Florida Statutes 366.94 and FDACS Rule Chapter 5J-28 work: state preemption, annual registration, weights and measures permits, penalties and parking rules.

Florida Statutes 366.94 says regulation of EV charging stations is preempted to the state, so a city or county may not enact or enforce its own charging-station ordinance. Chargers open to the public must be registered with the Florida Department of Agriculture and Consumer Services (FDACS) under Rule 5J-28. Cities still issue permits using state standards. General information, not legal advice.

Key facts

  • Section 366.94(1) says providing EV charging to the public by a nonutility is not the retail sale of electricity under Chapter 366, and the section does not affect anyone's ability to acquire, install or use a charger for their own vehicles.
  • Section 366.94(2) preempts regulation of EV charging stations to the state; a local governmental entity may not enact or enforce an ordinance or regulation related to charging stations. A "station" includes the equipment, supporting equipment and associated parking spaces.
  • Section 366.94(3)(c) requires local governments to issue permits for charging stations based solely on standards in FDACS rules and other applicable state law, and FDACS sets the time to approve or deny permit applications by rule.
  • FDACS says owners or operators of charging stations available for public use must register annually, whether or not there is a fee (FDACS EV charging page; Rule 5J-28).
  • Under sections 531.60 to 531.66, each EV charging device that requires a fee for public use must also have a valid Weighing and Measuring (WAM) device permit from FDACS.
  • Florida Administrative Code Chapter 5J-28 has eight rules, from 5J-28.001 Definitions to 5J-28.008 Enforcement, effective May 1, 2025 (with a technical change on July 31, 2025 to 5J-28.001).
  • FDACS may issue a warning letter, impose a Class II administrative fine per violation, issue an immediate final order against a threatening station, and seek an injunction without bond (366.94(3)(e) to (g)).
  • Parking a vehicle that cannot use a charging station in a space designated for EV charging is unlawful and a noncriminal traffic infraction (366.94(4)).
  • The 9th Edition (2026) Florida Building Code takes effect December 31, 2026, and the edition in effect on the permit application date governs the work.

What does Section 366.94 actually say?

Florida's main EV charging law is Section 366.94 of the Florida Statutes, titled "Electric vehicle charging." It sits in Chapter 366, the public utilities chapter, and the 2026 version lists its history through chapter 2024-137, chapter 2024-186 and chapter 2025-22. Here it is in plain English, piece by piece. This is general information, not legal advice.

SubsectionWhat it does
(1)Charging offered to the public by a nonutility is not a retail sale of electricity under Chapter 366. The Public Service Commission does not regulate its rates, terms or conditions. The section does not affect the ability of individuals, businesses or governments to acquire, install or use a charger for their own vehicles.
(2)Defines an "electric vehicle charging station," preempts its regulation to the state, and bars local ordinances.
(3)Gives FDACS rulemaking, permitting-standard, registration, inspection, penalty and injunction powers.
(4)Makes it unlawful for a vehicle that cannot use a charger to park in a space designated for EV charging.
(5)Lets the Public Service Commission approve voluntary utility charging programs starting in 2025 if the general body of ratepayers will not pay to support them by the end of the assets' useful life.

The Florida Statutes page we loaded was the 2026 version, viewed on November 19, 2026. Always check the current statute before you rely on any subsection, because the Legislature can amend it.

Can a Florida city or county regulate EV chargers?

This is the question people get wrong most often. The honest answer has two halves.

What cities cannot do

Section 366.94(2)(b) says a local governmental entity "may not enact or enforce an ordinance or regulation related to electric vehicle charging stations." The statute defines a charging station as the area in the immediate vicinity of the equipment, including the equipment, supporting equipment and associated parking spaces. So a city cannot, for example, write its own rule on how many charging spaces a parking lot must have or how a charger must be marked. Those topics belong to the state.

What cities still do

Section 366.94(3)(c) says local governments "shall issue permits for electric vehicle charging stations based solely upon standards established by department rule and other applicable provisions of state law." In other words, cities still run permitting. FDACS Rule 5J-28.002, titled "Local Government Entities," was adopted to address this. We could not load the body text of Rule 5J-28.002, so we cannot state the approval deadline it sets. The statute says only that FDACS prescribes by rule the time period for approving or denying permit applications. Ask your building department for the current deadline.

Do not read the preemption as "no permit needed." For a home charger, the city or county building department still issues the electrical permit and inspects the work under the Florida Building Code and the electrical code it references. Orlando, Tampa, Jacksonville and Miami-Dade all publish permit and inspection pages for this. Subsection (1) protects your ability to install a charger for your own car, but the building and electrical codes are "other applicable provisions of state law." See EV charger permits in Florida for the home owner's version of this question.

What is FDACS Rule Chapter 5J-28?

FDACS adopted Chapter 5J-28 of the Florida Administrative Code, "Electric Vehicle Supply Equipment," to carry out the 2024 law (chapter 2024-137, Laws of Florida). FDACS says the rules cover safety, design, required signage, permitting, zoning, registration and enforcement of prohibited uses. The rule chapter lists eight rules, all effective May 1, 2025:

RuleTitle
5J-28.001Definitions
5J-28.002Local Government Entities
5J-28.003Safety
5J-28.004Installation and Design
5J-28.005Signage
5J-28.006Registration
5J-28.007Prohibitions
5J-28.008Enforcement

Rule 5J-28.001 shows its rulemaking authority as section 366.94(3)(a) and (b), a history of "New 5-1-25, Technical Change 7-31-25," and a rulemaking record that began in July 2024, with proposed rules published November 25, 2024 and a hearing request in January 2025.

What we could and could not confirm

The Florida Administrative Code site we used lists the rules and their effective dates, but the full body text of rules 5J-28.002 through 5J-28.008 would not load for us (the text is in linked Word files). That means we have not confirmed rule-level details such as signage wording, design dimensions, parking time limits, or the permit approval deadline. Those are marked "verify" in our research. We will not guess at them. Before you build or sign a lease, read the rule text on the Florida Department of State's rules site (flrules.org) or call FDACS at 1-800-435-7352.

Do I have to register my charger with FDACS?

Section 366.94(3)(d) says that "before a charger at an electric vehicle charging station is placed into service for use by the public, the charger must be registered with the department on a form prescribed by department rule." FDACS adds on its EV page that owners or operators of charging stations that are available for public use must register annually, and that the requirement applies "regardless of whether there is a fee or cost associated with the use of the charger."

That last sentence is different from Texas, where free charging is exempt. In Florida, FDACS's page treats a free public charger the same as a paid one for registration. A purely private home charger is not "available for public use," so registration is aimed at public stations. If you run a charger for a closed group, such as employees or tenants only, ask FDACS whether that counts as public use, because we could not load the rule definitions that decide this. See workplace EV charging for employers.

The separate weights and measures permit

FDACS also cites sections 531.60 to 531.66, which require users of weighing and measuring devices to hold a permit before using them in commerce. FDACS says each EV charging device that requires a fee for public use must have a valid Weighing and Measuring (WAM) device permit. It says it inspects all registered devices for safety and performs calibration tests on all devices that need a WAM permit. So a paid public charger needs two things: annual charger registration and a WAM permit. Both are online through FDACS.

Is selling a charge a retail sale of electricity in Florida?

No, when a nonutility does it for the public. Section 366.94(1) says the provision of EV charging to the public by a nonutility "is not the retail sale of electricity for the purposes of this chapter," and the rates, terms and conditions of those services are not subject to Chapter 366 regulation. That means the Public Service Commission does not set what a private charging business may charge. Utilities are different: subsection (5) lets the Commission approve voluntary utility charging programs under conditions.

Price accuracy is still regulated. The FDACS WAM permit and calibration tests deal with whether the kilowatt hours you are billed match what was delivered. See public charging prices and kWh rules.

What are the penalties for violations?

Section 366.94(3)(e) to (g) gives FDACS these tools:

  • Inspect and investigate. FDACS may inspect stations, conduct investigations and enforce the subsection and its rules.
  • Warning letter. The first and lightest penalty.
  • Administrative fine. A fine in the "Class II" category under section 570.971 for each violation.
  • Immediate final order. If FDACS decides a station or associated equipment presents a threat to public health, safety or welfare, it may prohibit use of the station or any portion of it.
  • Injunction. FDACS may sue in the circuit court of the county where the violation occurs. On competent and substantial evidence, the court "shall immediately issue" a temporary or permanent injunction, without bond.

The fine amounts are set by section 570.971, which we did not load, so we do not quote a dollar figure. Ask FDACS or an attorney.

Can a non-EV park in an EV space? What about signs?

No. Section 366.94(4)(a) says it is unlawful to stop, stand or park a vehicle "not capable of using an electrical recharging station within any parking space specifically designated for charging an electric vehicle." Under (4)(b), a law enforcement officer who finds a violation shall charge the operator or person in charge with a noncriminal traffic infraction, punishable under sections 316.008(4) or 318.18.

Two points that surprise people. First, the statute says "not capable of using," so the law is about vehicles that cannot use the charger, such as gasoline-only cars. It does not, in the text we loaded, address a plug-in vehicle that is parked but not charging. Second, the statute talks about "specifically designated" spaces, and the signage rule that makes a space "designated" is Rule 5J-28.005. We could not load that rule's text. If you are a site host, read it before you buy signs. If you are a driver, look for the posted sign and any wording on it about tow-away or fines.

Which building code applies to the installation? The 8th to 9th Edition changeover

Florida is about to change building code editions, and it matters for permits. Here are the facts we confirmed.

  • The Florida Building Commission lists the 8th Edition (2023) as effective December 31, 2023.
  • The International Code Council (ICC) reported on September 4, 2026 that Florida will move to the 9th Edition (2026) effective December 31, 2026, adopting with it the 2023 National Electrical Code (NFPA 70) and the 9th Edition fire, mechanical, plumbing, fuel gas, energy conservation, accessibility and residential codes.
  • Miami-Dade's permitting center says the 9th Edition becomes effective December 31, 2026, that all permit applications and plans submitted on or after that date must comply, and that online applications received after 4 PM on December 30, 2026 fall under the 2026 edition.
  • A Greenberg Traurig client alert (November 2026) says the edition in effect on the date of permit application governs the work for the life of the permit and any extension. That is a law-firm summary, so check section 553.73 and your building department.
  • Jacksonville's building inspection page says the code in effect is the 8th Edition (2023) for permits submitted on or after January 1, 2024, with online submission through JaxEPICS.

What we could not confirm. We did not verify which NEC edition the 8th Edition (2023) references. Sources say the 9th Edition adopts the 2023 NEC. So do not assume an installation permitted in 2026 follows the 2026 NEC that Texas adopted. Ask the building department which NEC edition applies to your permit date. Our guide on 2026 NEC changes explains the Texas side.

Cities: Miami, Tampa, Orlando and Jacksonville. Tampa uses Accela Citizen Access with a phone line at (813) 274-3100, option 1. Orlando offers online permit lookup and requires a recorded Notice of Commencement when a permit's contract price is over $5,000. Jacksonville's division can be reached at 904-255-8500.

Condos, HOAs and incentives in Florida

Florida's condominium law has an express right to install an EV charger in your own parking area. Section 718.113(8) bars a condo declaration, covenant or board from prohibiting a unit owner from installing a charger within the owner's limited common element or exclusively designated parking area, with conditions on insurance, metering, safety and cost. See Florida condo EV charger law. HOA law is different. Section 720.3075, as fetched November 20, 2026, has no provision specific to EV charging. See Florida HOA EV charger law.

The Alternative Fuels Data Center lists no state tax credit or rebate for residential chargers in Florida (reviewed February 2026) but does list utility programs from Duke Energy, Florida Power and Light, JEA, Kissimmee Utility Authority, Orlando Utilities Commission and Tampa Electric. Read Florida EV charger incentives. The federal 30C credit ended for property placed in service after June 30, 2026.

Where to complain or get answers

  • Charger registration, safety, signage, WAM permit or billing accuracy: FDACS Division of Consumer Services, 1-800-435-7352 (HELP-FLA), with a complaint form on fdacs.gov.
  • Electrical permit or inspection for a specific project: your city or county building department.
  • Whether a contractor is licensed: the Department of Business and Professional Regulation license lookup at MyFloridaLicense.com.
  • Legal questions about your rights: a Florida attorney.

How to choose a provider

  • Decide whether your charger is for your own car, a closed group, or the public.
  • If the public can use it, register each charger with FDACS before it goes into service and renew every year.
  • If drivers pay a fee, get the FDACS Weighing and Measuring device permit as well.
  • Read the current text of Rule 5J-28.002 to 5J-28.008 on flrules.org for signage, design and permit-time rules.
  • Use a licensed electrical contractor and ask the building department which code edition applies on your application date.
  • Know that applications filed before the changeover fall under the 8th Edition and later ones under the 9th Edition, and confirm the cutoff time with your building department.
  • Post required signs at designated EV spaces and do not mark spaces you do not serve.
  • Keep copies of registration, permit and inspection records.
  • If you manage a condo, review section 718.113(8) before you refuse an owner's request.
  • Call FDACS at 1-800-435-7352 if a rule is unclear.

Related home ev charger installation guides

Home EV charger installation by state and city

Questions people ask

What does Florida law say about EV charging stations?

Section 366.94 says nonutility public charging is not a retail electricity sale, preempts charging-station regulation to the state, makes FDACS the rule-maker, registrar and enforcer, requires public chargers to be registered, and makes it a noncriminal traffic infraction for a car that cannot charge to park in a designated EV space.

Can a city regulate EV chargers in Florida?

A city may not enact or enforce its own ordinance related to charging stations, but it must still issue permits based solely on FDACS rules and other state law. Building and electrical permits and inspections for the installation still go through your city or county building department.

Who regulates public EV chargers in Florida?

FDACS. It runs registration, weights and measures permits, inspections and enforcement. The Public Service Commission does not regulate the rates of a nonutility charging provider, but it can approve voluntary utility charging programs under conditions in section 366.94(5). Your city still handles building permits.

Do I register my charger, and does a free charger count?

A charger available for public use must be registered with FDACS before it is placed in service, and FDACS says it must be registered annually whether or not there is a fee. A private home charger for your own car is not public use. Ask FDACS about closed-group chargers.

Do I need a weights and measures permit?

If drivers pay a fee, yes. FDACS says each EV charging device that requires a fee for public use must have a valid Weighing and Measuring device permit under sections 531.60 to 531.66, and that it calibrates those devices. Free chargers do not need that permit, but still need registration.

What are the penalties for violations?

FDACS may issue a warning letter, impose a Class II administrative fine per violation, issue an immediate final order shutting down a station that threatens public safety, or seek a court injunction without bond. Parking violations in EV spaces are noncriminal traffic infractions. Fine amounts come from section 570.971.

Can a non-EV park in an EV space?

No. A vehicle not capable of using an electrical recharging station may not stop, stand or park in a space specifically designated for EV charging. An officer can issue a noncriminal traffic infraction. Check the posted sign for local wording and towing notices.

How long do Florida cities have to approve a charger permit?

The statute says FDACS sets the time period by rule. We could not load the text of Rule 5J-28.002 to confirm the number of days, so ask your building department or read the rule on flrules.org before you plan your schedule.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration