Local Guide · Home EV charger installation
How Are Public EV Charging Prices Regulated in Texas and Florida? kWh Rules, Meter Accuracy and Price Display
What NIST Handbook 44, federal rules, TDLR and FDACS require of public chargers: price display, kWh billing, meter accuracy and where to complain.
No single rule forces every public charger to bill by the kilowatt hour. When a charger does sell by kWh, NIST Handbook 44 section 3.40 requires it to show energy delivered, the unit price and the total price, and sets accuracy limits. Texas (TDLR) requires up-front disclosure of fee methods and surcharges. Florida (FDACS) requires a weights and measures permit for paid chargers.
Key facts
- NIST Handbook 44 Section 3.40 (2023) requires a charger sold by the kilowatt hour to show energy in kWh, the unit price and the total price, and the maximum power and current type for each unit price.
- Handbook 44 load-test tolerances are 1.0 percent (acceptance) and 2.0 percent (maintenance); DC equipment is exempt from that test requirement until January 1, 2028. Handbook 44 is a model code that each state adopts by its own law or rule.
- 23 CFR 680.116 requires chargers funded under the federal NEVI program to display the price before a transaction starts, based on the price of electricity in dollars per kWh, and the price at the start of a session cannot change during the session.
- Texas Occupations Code 2311.0304 requires a provider to disclose the fee calculation methods and surcharges, and the rate the user will be charged before charging begins. Section 2311.0305 requires a receipt summary on request.
- Texas Occupations Code 2311.0303(a) says specifications and tolerances for charging equipment shall be the same as those recommended by NIST.
- FDACS says each Florida EV charging device that requires a fee for public use must have a valid Weighing and Measuring (WAM) device permit, and FDACS performs calibration tests on those devices.
- FPL's EV FAQ says its public chargers bill $0.45 per kWh in 2026, $0.47 in 2027, $0.48 in 2028 and $0.49 in 2029, plus applicable taxes and fees, as approved by the Florida PSC.
- Austin Energy lists two public Level 2 prices: $0.12203 per kWh on its EVerything Charging page and $0.09 per kWh from July 1, 2024 in a news release. Always trust the price posted at the charger.
- EIA reported average residential electricity prices of 15.91 cents per kWh in Texas and 14.99 cents in Florida in August 2026, versus 18.16 cents for the U.S.
Do public EV chargers have to charge by the kWh?
Not everywhere, and not always. Think of EV charging prices as living under three layers of rules: measurement standards, state registration and consumer protection laws, and extra federal rules for chargers built with federal money.
The U.S. Department of Energy notes that common ways to price charging are by kilowatt hour (kWh), by session, by length of time, or by subscription. It also says session and time-based pricing are common in states where non-utilities are prohibited from selling electricity. Neither Texas nor Florida bans non-utilities from selling EV charging (see below), but both states still allow several pricing methods.
- Texas: Occupations Code 2311.0304 speaks of "fee calculation method or methods" in the plural. It requires disclosure, not one method.
- Florida: Section 366.94(1) says nonutility charging rates and terms are not regulated under Chapter 366. FDACS regulates accuracy and registration, not the pricing method, in the sources we loaded.
- Federal money: if the charger was funded under the NEVI program or other Title 23 funds, 23 CFR 680.116 requires a price based on dollars per kWh and shown before the transaction.
So a driver may meet a per-minute charger, a per-session charger and a per-kWh charger on the same road trip. The rule that holds across all of them is simple: the price and any extra fees must be shown to you before you start.
What does NIST Handbook 44 section 3.40 require?
NIST Handbook 44 is the model code that states use to test devices that measure what is sold, such as gas pumps and scales. Section 3.40 covers electric vehicle fueling systems. It is a model, which means a state has to adopt it. Texas does that by statute (2311.0303(a) points to NIST specifications and tolerances), and Florida runs its own FDACS weights and measures program.
What a kWh-priced charger must show
Under the 2023 version of section 3.40, when electricity is sold by the kilowatt hour, the charger must indicate:
- the energy delivered in kWh (for AC, with a smallest displayed unit not over 0.0001 kWh);
- the unit price; and
- the total price for each transaction;
and it must show the maximum power and the type of current (AC or DC) for each unit price.
How accurate must the meter be?
The section sets load-test tolerances of 1.0 percent for acceptance tests and 2.0 percent for maintenance tests. In plain words, a meter that is checked when new may be off by no more than 1 percent in either direction, and a meter in service may be off by no more than 2 percent. DC equipment is exempt from that particular load-test requirement until January 1, 2028. We loaded the 2023 text. A state may adopt a different edition, so check the current rule.
What this means in practice: if your session ends and the screen shows 30 kWh, the meter should be within about 2 percent of true delivered energy. On a 30 kWh charge, 2 percent is 0.6 kWh. At $0.45 per kWh, that is about 27 cents.
What must federally funded chargers display?
Chargers built with National Electric Vehicle Infrastructure (NEVI) money must follow 23 CFR Part 680. Section 680.116 on price communication says:
- The price for charging must be displayed before the transaction starts and be based on the price for electricity to charge in dollars per kWh.
- The price shown must be the real-time price, and the price at the start of the session cannot change during the session.
- Any other fees on top of the electricity price must be clearly displayed and explained.
Part 680 also requires chargers to report energy dispensed per session and the real-time price to the customer, and it sets a minimum uptime of more than 97 percent per port. FHWA revised NEVI guidance in 2025 to 2026, so confirm current requirements with FHWA or the state plan. If you manage a site that took federal money, our NEVI guide explains the program.
Texas: what TDLR requires about price display, receipts and complaints
Texas puts the pricing duties in Occupations Code 2311.0304 and 2311.0305, for providers who are covered by Chapter 2311 (see Texas EV charging station laws for who is covered).
- On the display or digital network: the fee calculation method or methods, and applicable surcharges.
- Before charging begins: the rate you will be charged at the time of the transaction, and a list of applicable surcharges.
- A notice that TDLR regulates the equipment, with complaint information.
- On request, after a reasonable period: a receipt summary with date and time, physical location, duration, kWh provided, and an itemized list of fees.
TDLR says it will perform on-site inspections and tests of registered chargers after March 1, 2026, and fees for registration are $30 per port at first and $25 per port at renewal. The 2311.0303(a) rule that specifications and tolerances match NIST is what ties Texas inspectors to Handbook 44.
Exempt chargers are not covered. A home charger, a charger for a closed group such as employees, and a charger a business offers free of charge are exempt in accordance with TDLR rules, so these duties do not apply to them.
Florida: what FDACS requires
Florida splits the work into two parts at FDACS. First, a charger offered to the public must be registered with the department before it goes into service (366.94(3)(d)), and annually under Rule 5J-28. Second, under sections 531.60 to 531.66, every charging device that requires a fee for public use needs a valid Weighing and Measuring device permit. FDACS says it inspects registered devices for safety and does calibration tests on devices with a WAM permit. That calibration test is the Florida check on whether your kWh is really a kWh.
We could not load the full text of Rule 5J-28.005 (signage) or 5J-28.004 (installation and design), so we cannot say whether Florida requires a specific price display format on the charger. For Florida drivers, the safe assumption is: look for the price on the unit or app before you plug in, and look for an FDACS registration or permit sticker. Call FDACS at 1-800-435-7352 if a charger shows no price at all. See Florida EV charging station law.
Can chargers charge idle or time-based fees?
Often yes, but the rules in the statutes we loaded focus on disclosure rather than banning them. Texas requires disclosure of surcharges and fee methods before charging starts, so an idle fee that is not disclosed beforehand is a complaint risk. A federally funded charger must show the price structure, "including any other fees in addition to the price for electricity," clearly. We did not find a Texas or Florida statute in the loaded sources that sets a maximum idle fee. If we could not verify it, we do not state it: check the posted terms on the charger or app, and read Rule 5J-28 for Florida.
For site hosts, the Department of Energy gives a sample from workplace charging: free charging for up to four hours, then a $10 per hour fee, as one way to keep stalls turning over. It is an example of a policy, not a legal standard.
Per-minute versus per-kWh: why it matters
A per-kWh price charges you for energy. A per-minute price charges you for time, so a slow charger or a car that charges slowly costs more per kWh. Here is a made-up example to show the effect. A car draws 6 kW for one hour on a Level 2 charger: it receives 6 kWh. At a per-minute price of $0.10, you pay $6.00, or $1.00 per kWh. At $0.45 per kWh, you pay $2.70. The same hour, a different bill. Austin Energy's page lists DC fast charging at $0.23616 per minute, so a time-based price can be a good or bad deal depending on how fast your car charges.
What do public chargers cost in Texas and Florida?
Prices vary by owner, speed and date, so treat these as examples, not quotes.
| Source and date | Price | Cost to add 54 kWh* |
|---|---|---|
| FPL public chargers, 2026 (Florida PSC approved schedule) | $0.45 per kWh | $24.30 |
| FPL public chargers, 2029 | $0.49 per kWh | $26.46 |
| Austin Energy public Level 2, EVerything Charging page | $0.12203 per kWh | $6.59 |
| Austin Energy public Level 2, July 1, 2024 news release | $0.09 per kWh | $4.86 |
| Average home electricity, Texas, Aug 2026 (EIA) | 15.91 cents per kWh | $8.59 |
| Average home electricity, Florida, Aug 2026 (EIA) | 14.99 cents per kWh | $8.09 |
*The 54 kWh size comes from a Department of Energy example of a 200-mile-range vehicle. These totals are simple multiplication. They leave out charging losses, taxes and fees, so a real bill will be higher. Austin Energy's two Level 2 prices conflict, so read the price posted at the charger. FPL's figures are plus applicable taxes and fees. The state averages are for homes, not public chargers, and Texas retail plans differ widely. For home costs, see cost to charge an EV at home.
The reason public prices are higher is partly rate design: the Department of Energy says site owners pay per-kWh charges and often demand charges based on the highest 15-minute average use in a month, and they recover those costs through fees.
How to read a charger's price and check your bill
- Find the price before you plug in. It should be on the screen or in the app. If it is only in the app and you have no signal, wait.
- Look at the unit. Is it $ per kWh, per minute, per session, or a mix?
- Look for fees. Idle fees, connection fees and parking fees should be listed.
- Take a photo of the screen before and after, including the date and charger ID.
- Compare the kWh on the receipt to the kWh your car's dashboard added. Small differences are normal because cars and chargers measure at different points and losses occur.
- Ask for the receipt. In Texas, covered providers must transmit a summary on request.
- Complain in writing to the owner first, then to TDLR or FDACS.
Where do I complain about a wrong charge?
- Texas: TDLR regulates covered chargers and must tell consumers how to complain (2311.0205). The charger or app must show a TDLR notice. Start at tdlr.texas.gov/ev-charging.
- Florida: FDACS Division of Consumer Services, 1-800-435-7352, with a complaint form on fdacs.gov.
- Federally funded chargers: ask the owner, the state department of transportation, or the Federal Highway Administration.
- Your card issuer: for a charge you dispute.
This is general information, not legal advice. For a large dispute, talk to an attorney.
How to choose a provider
- Read the price, unit (kWh, minute, session) and fees on the screen before you plug in.
- Photograph the screen at the start and end of each session.
- Ask for the receipt and compare kWh to your vehicle's dashboard.
- If you host chargers, post the fee method, rate and every surcharge before charging starts.
- If you bill by kWh, use equipment that meets NIST Handbook 44 section 3.40 and ask the maker for test records.
- In Texas, register paid public chargers with TDLR and show the TDLR complaint notice.
- In Florida, register public chargers with FDACS and get a WAM permit if you charge a fee.
- If the charger was federally funded, show the real-time price in dollars per kWh before the session starts.
- Keep calibration and inspection records for at least three years (the Texas record rule).
- Review your complaint process so drivers can reach a person.
Related home ev charger installation guides
- What Texas Laws Apply to EV Charging Stations? TDLR Registration, Chapter 2311 and Utilities Code Chapter 42
- What Does Florida Law Say About EV Charging Stations? Section 366.94, FDACS Rule 5J-28 and Local Preemption
- How Much Does It Cost to Charge an EV at Home in Texas and Florida? kWh Prices, Examples and Rate Impacts
- NEVI and Grants for Business EV Charging in Texas and Florida: Who Qualifies and How to Apply
- Florida Utility EV Rate Plans: FPL, Duke Energy Florida, Tampa Electric, JEA and OUC Compared Neutrally
- Texas Electricity Plans for EV Owners: Retail Providers, Off-Peak Plans, City Utilities and Managed Charging
- How Can a Texas or Florida Employer Add Workplace EV Charging? Policies, Costs, Rules and Incentives
Home EV charger installation by state and city
Questions people ask
Do public chargers have to charge by kWh?
No general rule in the Texas and Florida laws we loaded forces kWh billing. Federally funded chargers must display the price in dollars per kWh. When any charger does sell by the kWh, NIST Handbook 44 section 3.40 requires it to show the kWh, unit price and total price. Other chargers may bill by session or time if disclosed.
What does NIST Handbook 44 require?
For kWh sales, the charger must show energy delivered in kWh, the unit price and the total price per transaction, plus the maximum power and type of current for each unit price. Section 3.40 (2023) sets meter load-test tolerances of 1.0 percent for acceptance and 2.0 percent for maintenance, with DC exempt from that test until January 1, 2028.
How accurate must a charger meter be?
Under the 2023 Handbook 44 text, the allowed error is 1.0 percent when the device is first accepted and 2.0 percent in service for the load test. DC chargers are exempt from that test until January 1, 2028. States adopt the handbook by their own law, so Texas and Florida rules control.
Who inspects charger accuracy in Texas, and in Florida?
In Texas, TDLR inspects registered chargers, and the statute ties tolerances to NIST. TDLR says on-site inspections and tests start after March 1, 2026. In Florida, FDACS inspects registered devices for safety and does calibration tests on every device that needs a Weighing and Measuring permit.
Can chargers charge idle fees?
Often yes. The Texas and Florida sources we loaded focus on disclosure rather than a ban or a cap. Texas requires fee methods and surcharges to be shown before charging starts. A federally funded charger must clearly display any fees beyond the electricity price. Check the posted terms on the unit.
What must a federally funded charger display?
The price, before the transaction begins, based on dollars per kWh. It must be the real-time price, and it cannot change during your session. Other fees must be clearly displayed and explained. That comes from 23 CFR 680.116 for NEVI and other Title 23 funded chargers.
What is the difference between per-minute and per-kWh pricing?
Per-kWh pricing charges for the energy you receive. Per-minute pricing charges for time, so a slower-charging car pays more per kWh. Sellers must show which method applies before you start. Compare the posted price to the number of kWh your car can actually take at that charger.
What did Austin Energy and FPL list for prices?
FPL's EV FAQ lists $0.45 per kWh in 2026 rising to $0.49 in 2029 for its public chargers, plus applicable taxes and fees. Austin Energy lists public Level 2 at $0.12203 per kWh on one page and $0.09 per kWh from July 1, 2024 in a release. Those two conflict, so trust the price posted at the charger.
Sources
- NIST Handbook 44 (2023) Section 3.40, Electric Vehicle Fueling Systems
- 23 CFR Part 680, National Electric Vehicle Infrastructure Standards (eCFR)
- Texas Occupations Code Chapter 2311
- TDLR, Electric Vehicle Charging Stations at a Glance (Dec 2025)
- FDACS, Electric Vehicle Charging Stations
- Florida Statutes 366.94 (2026)
- FPL, Electric vehicle FAQ
- Austin Energy, EVerything Charging
- Austin Energy news release, Power Partner EV program (2024)
- EIA Electric Power Monthly, average price of electricity to customers
- U.S. DOE AFDC, charging infrastructure maintenance and operation
- U.S. DOE AFDC, workplace charging
- U.S. DOE AFDC, charging at home (54 kWh battery example)
- U.S. DOE, Multifamily EV Charging Guide (Mar 2026)