NEVI and Grants for Business EV Charging in Texas and Florida: Who Qualifies and How to Apply

NEVI funds go through state transportation departments, not directly to most small businesses. Here is how the program works in Texas and Florida, what federal rules a funded charger must meet, and the utility and state grants a business can check.

The National Electric Vehicle Infrastructure (NEVI) program sends federal money to states to build public fast chargers, and states pick site hosts and operators through their own application rounds. A funded station needs at least four ports, 150 kW per corridor DC port, 97 percent uptime and posted per-kWh pricing under 23 CFR 680. Texas awarded $226 million in October 2026. Florida's program status needs checking with FDOT.

Key facts

  • 23 CFR 680.106(b) and (c): a NEVI-funded station along an Alternative Fuel Corridor needs at least four network-connected DC fast ports able to charge four vehicles at once, and each DC port needs a permanently attached CCS Type 1 connector.
  • 23 CFR 680.106(d): corridor DC fast ports must provide a continuous power rating of at least 150 kW per port. Each Level 2 port must provide at least 6 kW.
  • 23 CFR 680.116: each charging port must have average annual uptime above 97 percent, and the price must be displayed before a session starts and be based on dollars per kWh.
  • 23 CFR 680.118: federal requirements apply to NEVI-funded projects, including Buy America rules, Davis-Bacon wage rates and the Americans with Disabilities Act.
  • 23 CFR 680.106(f): unless charging is permanently free, a funded station must offer contactless payment accepting major debit and credit cards and may not require a membership.
  • TxDOT announced on October 15, 2026 that it awarded $226 million in federal NEVI funds for 321 charging stations (264 in metropolitan planning organization areas and 57 in county seats). It reported 22 Phase I stations open.
  • FDOT's NEVI page says Florida was estimated to receive $198 million over five years and that FHWA suspended the program on February 6, 2025. FHWA's NEVI page lists interim final guidance dated August 11, 2025.
  • FHWA's Charging and Fueling Infrastructure (CFI) grants are open to states, local governments, metropolitan planning organizations, tribes and other public entities. FHWA's CFI page (updated February 24, 2025) said no estimated date for a future funding notice was available.
  • Austin Energy lists a business rebate of up to $5,000 toward installing EV charging stations. FPL's Make-Ready Credit pays up to $1,200 per Level 2 port and up to $20,000 to $50,000 per DC fast port.

What is NEVI, and who actually receives the money?

NEVI stands for the National Electric Vehicle Infrastructure Formula Program. Congress created it in the 2021 infrastructure law. Money goes from the Federal Highway Administration (FHWA) to each state. The state transportation department writes a plan and then chooses companies, governments or property owners to build and run stations, usually through a competitive application. A small business does not apply to Washington. It applies to the state, if the state is taking applications.

The program is for public fast charging, mostly along designated highway routes called Alternative Fuel Corridors. It is not a grant for a business's private charger for employees, and it does not pay for home chargers. If you want to add a few Level 2 chargers for customers or tenants, utility rebates and local programs are more likely to fit. They are covered below.

This page covers grants and rebates only. Nothing here is legal or tax advice. Programs change quickly, so we note dates throughout and tell you where to check.

What federal rules apply to a NEVI-funded charger?

The rules are in Title 23 of the Code of Federal Regulations, part 680. We loaded the current text from Cornell LII's electronic CFR in November 2026. Here are the main points a site host should understand before applying.

TopicRule (23 CFR 680)
Number of portsAlong corridors, at least four network-connected DC fast charging ports able to charge four vehicles at once. In other locations, at least four network-connected ports, DC fast or Level 2 or a mix (680.106(b)).
ConnectorsEach DC port needs a permanently attached CCS Type 1 connector. Each Level 2 port needs a permanently attached J1772 connector (680.106(c)).
PowerCorridor DC fast ports: at least 150 kW continuous per port, supplied simultaneously from each port. Level 2 ports: at least 6 kW per port (680.106(d)).
UptimeEach port's average annual uptime must be greater than 97 percent (680.116).
Open hoursCorridor stations must be available 24 hours a day, 7 days a week, year-round. Others must be open at least as often as the site host's business hours (680.106(e)).
Price displayThe price must be shown before a charging session starts and be based on the price of electricity in dollars per kWh. The price at the start of a session cannot change during it (680.116(a)).
PaymentUnless charging is always free: contactless payment accepting major debit and credit cards, plus a toll-free phone number or text message option. No membership may be required (680.106(f)).
CommunicationChargers must conform to ISO 15118 standards, and the rule sets the Open Charge Point Protocol (OCPP) and network connectivity requirements (680.108, 680.114). We summarized only part of those technical requirements, so ask your state for the current list.
Other federal rulesBuy America requirements, Davis-Bacon wage rates, 2 CFR part 200 grant rules and the Americans with Disabilities Act all apply (680.118).

Why this matters: the 97 percent uptime rule, the 24/7 access rule, and Davis-Bacon wage requirements raise costs and obligations. A small business should ask itself whether it can keep the station working, pay for repairs, and keep the site open. The rule also says States must submit data on uptime and usage. Many operators sign contracts that require the same reporting.

Important caution: FHWA changed its NEVI guidance in 2025 (see below). The eCFR text we loaded is the rule as published on that site on the day we checked. Confirm the current requirements with your state's application documents, because the state's contract controls.

What happened to NEVI in 2025 and 2026?

Federal policy shifted several times, so older articles may mislead. What we could verify from official pages:

  • February 6, 2025: FDOT's NEVI page says FHWA suspended the NEVI Formula Program as of this date, to review its compliance with executive orders.
  • August 11, 2025: FHWA's NEVI page lists "National Electric Vehicle Infrastructure Formula Program Interim Final Guidance" dated August 11, 2025, with a Federal Register notice. We could not load the full text of the guidance from FHWA, so we cannot summarize its details. News coverage said it simplified what state plans must contain, but we did not verify that from a primary source.
  • FHWA's page also lists the NEVI funding status as of February 6, 2025 and was last updated February 5, 2026.

Because funding, rules and deadlines can change after our review date, anyone planning a NEVI project should check the FHWA NEVI page, the state transportation department, and the current Federal Register notice. We marked each state's status in the sections below.

How does Texas distribute NEVI funds?

The Texas Department of Transportation (TxDOT) runs the program. AFDC lists Texas NEVI planning as a state incentive entry and says Texas keeps an annually updated EV Infrastructure Deployment Plan. TxDOT's October 15, 2026 newsroom story gives the latest numbers we could verify:

  • TxDOT awarded $226 million in federal NEVI funds for 321 charging stations in Phase II.
  • 264 of those stations are in metropolitan planning organization areas and 57 are in county seats.
  • Phase I: 22 stations were open, five more were expected by the end of 2026, and 30 more were planned for 2027.
  • Drivers can follow existing and planned locations on TxDOT's Statewide Planning Map.

The story did not describe eligibility rules or selection criteria, so we do not state them here. If you are a Texas site host, read the application documents TxDOT posts for the next round, if any. Expect requirements like those in 23 CFR 680. We could not load TxDOT's NEVI program page, so the status of any new application round is unverified. Contact TxDOT or watch its newsroom.

Texas law adds rules for who may own public stations. Under Utilities Code 42.0104, inside the ERCOT grid a transmission and distribution utility may not own, operate or provide EV charging service from a public EV charging station. Outside ERCOT, 42.0103 lets an electric utility build a public station under conditions and lets a property owner contract with a utility to own the station on the owner's property if the owner sets prices and controls access. Public chargers offered for a commercial transaction through a digital network must generally be registered with the Texas Department of Licensing and Regulation (TDLR) unless exempt, including exemptions for chargers provided at no charge or for the exclusive use of residents or tenants (Occupations Code 2311.0206 and 2311.0302). See our Texas station laws guide.

How does Florida distribute NEVI funds?

The Florida Department of Transportation (FDOT) runs the program. FDOT's NEVI page, which appears to be partly outdated, says Florida was estimated to receive $198 million over five years, including $29 million in the first fiscal year. It says funds are available until spent and that 10 percent is set aside for discretionary grants to state and local governments. It describes the federal suspension on February 6, 2025. FDOT's EV page says FDOT is seeking applicants for the Electric Vehicle Infrastructure Deployment Program, a Request for Application (RFA) that uses federal NEVI funds, but the page we loaded did not list eligibility or dates.

FDOT can be reached at (850) 414-4100 per its EV program page. Because we could not confirm a current Florida award list or an open application window, treat Florida NEVI status as unverified. Ask FDOT whether an RFA is open, what the site requirements are, and what the match is.

Florida's state rules for stations are separate. Section 366.94 says providing EV charging to the public is not a retail sale of electricity and preempts regulation of charging stations to the state. FDACS Rule 5J-28 and the statute require owners or operators of chargers available to the public to register annually, whether or not there is a fee, and a charger that requires a fee for public use needs a Weights and Measures (WAM) device permit. See our Florida station law guide.

What about the CFI grant program?

The Charging and Fueling Infrastructure (CFI) program is a competitive grant program from FHWA, created in the infrastructure law and codified at 23 U.S.C. 151. It has a community program and a corridor program, with $2.5 billion over five years. FHWA lists eligible applicants as states or political subdivisions, metropolitan planning organizations, local governments, special purpose districts or public authorities with a transportation function (including port authorities), tribes, territories, and entities owned by those groups. For the community program, state or local authorities with ownership of publicly accessible transportation facilities are also eligible.

That list does not include a private small business as a direct applicant. A private business may be a partner or site host working with an eligible public applicant. FHWA's CFI page, updated February 24, 2025, said no estimated date for a future funding notice was available and told readers to watch Grants.gov. We could not confirm any 2026 notice. If you want to partner with a city or county on an application, ask the local government whether it plans to apply.

What state and utility grants exist for business chargers?

Utility and state programs fit smaller projects better than NEVI.

Texas

  • TCEQ Alternative Fueling Facilities Program (AFFP): AFDC describes grants under the Texas Emissions Reduction Plan (TERP) for building or rebuilding an alternative fueling facility, including electricity, with priority for public entities. Funding availability varies, so check TCEQ for open periods.
  • Austin Energy: its EV pages list a Plug-In Austin commercial rebate of up to $5,000 toward installing charging stations at a business. Confirm the current amount and eligibility on Austin Energy's site.
  • Other Texas utilities: AFDC lists several Texas utilities as offering EV incentives, including AEP Texas, Bandera Electric Cooperative, CPS Energy, El Paso Electric, Entergy, Guadalupe Valley Electric Cooperative, Liberty Utilities, Oncor, SWEPCO, Texas Gas Service, United Cooperative Services and Xcel Energy. Listings are broad, so confirm each program.

Florida

  • FPL Make-Ready Credit: up to $1,200 per Level 2 port at public, workplace, fleet and multifamily sites, and up to $20,000, $30,000 or $50,000 per DC fast port by charger size, with site caps of $120,000, $180,000 and $300,000. It covers utility-side electrical work, not the charger itself, and is first-come, first-served.
  • FPL demand limiter rates: voluntary discounts on demand charges for public chargers on a dedicated meter, phasing out as use grows.
  • OUC: commercial programs for on-site charging and fleet electrification. We could not confirm dollar amounts.
  • Duke Energy Florida, JEA, TECO, KUA: listed by AFDC. We could not verify their business programs. Ask each utility.

The federal 30C credit for business chargers (6 percent up to $100,000 per item, or 30 percent with wage rules) ended for property placed in service after June 30, 2026. A business that placed one in service by that date should ask a tax professional about Form 8911.

Can a retail store or small business host a charger?

Yes, but think through the roles. The site host owns or leases the parking lot. The operator owns or runs the charger. They may be the same company or different ones. Federal NEVI rules apply to the funded project, whoever the parties are.

DOE says Level 2 and Level 1 stations fit places where cars park for long periods, such as shopping centers, airports, hotels and government offices. It says costs for a station owner include per-kWh charges and often demand charges based on the highest 15-minute average use in a month, and that hosts can collect fees at the unit, by card, by phone or at a nearby establishment.

Questions a host should answer before applying:

  1. Is there enough electrical capacity, or would the utility need to upgrade service?
  2. Who pays for repairs and the network fees after warranty?
  3. Who sets and posts the price?
  4. Will the spaces meet ADA rules? See our ADA guide.
  5. Will the lease or HOA allow it?
  6. What are the state registration duties (see below)?

Our workplace charging guide and small business fleet guide cover other business cases.

Do I need to register as a public charger?

It depends on the state and on how the charger is used.

TexasFlorida
AgencyTDLR (Occupations Code Chapter 2311)FDACS (Fla. Stat. 366.94, Rule 5J-28; weights and measures sections 531.60 to 531.66)
Who must registerAn EV supply provider must register each charging unit before it is made available on a digital network for a commercial transaction, unless exempt (2311.0302).Owners or operators of chargers available for public use register annually, whether or not there is a fee. Chargers that require a fee for public use also need a WAM device permit.
ExemptionsEVSE in or next to a private residence for noncommercial use, provided for the exclusive use of an individual or group such as employees, tenants, visitors or residents of a multiunit or office development, or provided by a business at no charge, in accordance with commission rule (2311.0206(b)).Charging that is not available to the public is outside the registration duty described by FDACS. Check the rule text for your case.
InspectionNon-exempt providers must have equipment inspected as the commission prescribes (2311.0301).FDACS inspects registered devices for safety and calibration.

We did not load TDLR's current rule text on exemptions, so confirm the exact scope with TDLR. Also note that NIST Handbook 44 section 3.40 is a model code on kWh pricing and meter accuracy. Each state adopts it by its own law or rule, so Texas and Florida rules control.

Application checklist for a business or site host

  1. Decide your goal: public fast charging (NEVI-type), customer Level 2, employee charging or fleet.
  2. Call your utility early about capacity and make-ready help. DOE says to engage the utility early.
  3. Ask your state transportation department whether a NEVI round is open and what site rules apply.
  4. Check utility rebates before you buy. Many require pre-approval.
  5. Plan for uptime, maintenance and network fees. A funded station must exceed 97 percent uptime.
  6. Plan accessible parking and routes.
  7. Check registration duties with TDLR or FDACS.
  8. Keep records of costs, permits and inspections for audits.

Business owners who rent their space should get the landlord's written permission before applying. See our Florida incentives guide and Texas incentives guide.

How to choose a provider

  • Confirm the state is taking NEVI applications now (TxDOT, FDOT).
  • Read the state application and the contract terms, not just the federal rule.
  • Check 97 percent uptime and 24/7 access duties against your operating plan.
  • Ask your utility about capacity, service upgrades and make-ready credits.
  • Check Austin Energy, FPL, OUC or other utility business rebates before buying.
  • Confirm wage, Buy America and ADA requirements apply to your project.
  • Check TDLR or FDACS registration duties.
  • Plan who pays maintenance after warranty.
  • Get written landlord permission and site control documents if you rent.
  • Keep every receipt, permit and inspection record.

Related home ev charger installation guides

Home EV charger installation by state and city

Questions people ask

What is the NEVI program?

The National Electric Vehicle Infrastructure Formula Program sends federal money to states to build public EV fast charging, mainly along highway corridors. States pick site hosts and operators through their own application rounds. It does not fund home chargers. Federal rules in 23 CFR 680 set standards for funded stations.

Can a small business get NEVI funds?

Possibly, as a site host or operator selected by the state, if the state has an open round. A small business does not apply to the federal government. It applies to TxDOT or FDOT when they take applications. The business must meet federal station standards, wage rules and reporting duties. Check each state for the current round.

What are NEVI requirements for chargers?

Under 23 CFR 680, a station needs at least four networked ports, each DC port needs a CCS Type 1 connector, corridor DC ports need at least 150 kW each, uptime must exceed 97 percent, pricing must be shown in dollars per kWh before a session, contactless payment is required and no membership may be required.

What is the CFI grant?

The Charging and Fueling Infrastructure program is an FHWA discretionary grant program with a community and corridor program. FHWA lists public entities as eligible applicants, such as states, local governments and tribes. A private business would usually partner with one. FHWA's page said no date for a new funding notice was available.

How does Texas distribute NEVI funds?

TxDOT runs the program and awarded $226 million for 321 stations in Phase II, announced October 15, 2026. Most are in metropolitan planning organization areas or county seats. We could not load TxDOT's NEVI page or application rules, so contact TxDOT for any new round.

How does Florida distribute NEVI funds?

FDOT runs it. Its page says Florida was estimated to receive $198 million over five years, and FHWA suspended the program on February 6, 2025. FDOT also mentions a Request for Application, but eligibility and dates were not shown on the page. Confirm the current status with FDOT at (850) 414-4100.

What are TCEQ grants for charging?

AFDC says TCEQ's Alternative Fueling Facilities Program under the Texas Emissions Reduction Plan offers grants for building or rebuilding alternative fueling facilities, including electricity, with priority to public entities. Funding periods vary. Check TCEQ for open application windows before planning around it.

What utility rebates exist for business chargers?

FPL's Make-Ready Credit pays up to $1,200 per Level 2 port and larger amounts per DC fast port. Austin Energy lists a business rebate up to $5,000. AFDC lists other utilities in both states. Confirm each program's current rules because budgets and amounts change.

What requirements apply to federally funded chargers?

Uptime above 97 percent, price displayed before charging in dollars per kWh, contactless payment, no membership, 24/7 availability for corridor stations, ISO 15118 and OCPP communication standards, Buy America, Davis-Bacon wages and ADA compliance, per 23 CFR 680. Your state's contract may add rules.

Do I need to register as a public charger?

In Texas, non-exempt providers register each unit with TDLR when it is on a digital network for commercial transactions. In Florida, owners or operators of publicly available chargers register annually with FDACS, and chargers that require a fee also need a weights and measures permit. Exemptions exist, so confirm with the agency.

Can a retail store host a charger?

Yes. A store can be a site host. DOE says shopping centers, hotels and similar places suit Level 1 and Level 2 stations, since cars park for long periods. The store must handle electricity costs, pricing, maintenance, accessibility and any state registration.

What about federal changes to NEVI in 2025 and 2026?

FHWA suspended the program on February 6, 2025, according to FDOT, and later posted interim final guidance dated August 11, 2025. The 30C business charger credit also ended for property placed in service after June 30, 2026. Check FHWA, your state and the IRS for the latest.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration