New Construction Plumbing Defects: What Goes Wrong, How Long Builder Warranties Last, and Your Rights in Texas and Florida

Slab leaks, crushed sewer lines and missing expansion tanks show up in new homes too. Here is how builder warranties work, why the 11-month inspection matters, and the Texas and Florida notice laws you must follow before suing.

New homes often have nicked supply lines, slab leaks, crushed or sagging sewer lines and water heater installation errors. Your builder warranty booklet controls coverage, often one year workmanship and two years plumbing systems. Before suing, Texas Property Code ch. 27 requires certified-mail notice at least 60 days ahead, and Florida ch. 558 requires notice at least 60 days ahead (120 for large associations). Get an inspection with a sewer camera before month 12.

Key facts

  • Texas Property Code 27.004 requires written notice by certified mail at least 60 days before suing a contractor over a construction defect.
  • A Texas contractor may inspect within 35 days and make a written offer within 60 days after receiving notice.
  • Rejecting a reasonable Texas Chapter 27 offer caps recovery at the offer's fair market value plus prior fees.
  • Florida Statute 558.004 requires a notice of claim at least 60 days before suit, or 120 days for associations over 20 parcels.
  • Florida contractors must respond within 45 days of a 558 notice (75 days for large associations).
  • Texas cuts the repose deadline from 10 to 6 years if the contractor gave a written warranty of at least 1 year workmanship, 2 years plumbing systems and 6 years structural (CPRC 16.009).
  • Florida's repose deadline for construction claims is 7 years from the certificate of occupancy (Statute 95.11(3)(b)).
  • Florida condo developers give an implied warranty on building plumbing elements of 3 years from completion, up to 5 years (Statute 718.203).

What plumbing defects are common in new homes?

New homes in fast-growing suburbs around Houston, Dallas-Fort Worth, San Antonio, Austin, Orlando, Tampa and Jacksonville are built quickly, often by several subcontractor crews in a row. Most plumbing defects come from one crew damaging another's work or from steps skipped under schedule pressure. These are the problems inspectors and homeowners report most often:

DefectHow it shows upWhy it matters
Nicked or punctured supply line in a wallWet drywall, a stain near a picture hanger or cabinet screwDrywall and trim crews drive screws through pipe
Leak under the slabMeter moves with all fixtures off, warm floor, damp flooringDamage to pipe during the pour or a bad fitting under concrete
Crushed, sagging or separated sewer lineSlow drains, gurgling, backups in the first monthsHeavy equipment over the yard line, poor bedding, or a belly from settling backfill
Debris in drainsClogs in a brand-new houseConstruction trash, grout, drywall mud or concrete washed into drains
Missing or wrong expansion tankDripping T&P valve on the water heaterA. O. Smith manuals require a properly sized thermal expansion tank on all closed water systems
Bad T&P discharge pipingPipe ends in the attic or garage with no drainManufacturers require it to end within 6 inches above a drain or outside
Loose or poorly sealed toilets and shower valvesWobbly toilet, stained ceiling below a bathroomWater runs into the floor system unseen
Water pressure set too highBanging pipes, running toilets, leaking fixturesSee water pressure
Venting and slope errorsGurgling drains, sewer smellSee sewer smells
Condensate and pan drains not connectedWater stains near the A/C closet or atticCommon in humid Florida and Gulf Coast homes

Can a brand-new home have a slab leak?

Yes. A pipe can be damaged during the concrete pour, a fitting can fail under pressure, or soil movement can stress lines. Expansive clay in North and Central Texas makes movement more likely. If your water meter moves with every fixture off, report it to the builder in writing at once. See slab leaks and leak detection.

How long is a builder warranty on plumbing?

It depends on your contract. Neither Texas nor Florida forces every builder to give a set warranty on a single-family house, so the booklet you signed at closing controls. Read it now, not when something breaks.

The common "1-2-10" structure

Many builders use, or buy from a third-party warranty company, a structure often called "1-2-10": one year on workmanship and materials, two years on plumbing, electrical and HVAC delivery systems, and ten years on major structural parts. That is a contract term, not a state law. Coverage, exclusions and claim steps vary a lot. Look for:

  • What "plumbing delivery system" means (pipes in walls and under slab are usually in; fixtures and appliances usually follow the manufacturer's warranty)
  • Whether the ten-year structural coverage includes damage caused by a plumbing leak under the slab
  • Written-notice deadlines and where to send notice
  • Whether claims go to arbitration

Texas: a law that rewards a written warranty

Texas sets a 10-year deadline (a statute of repose) for most suits against people who build or repair improvements to real property (Civil Practice and Remedies Code 16.009). For residential construction, a contractor who gave a written warranty meeting minimum terms gets a shorter six-year deadline. The minimum terms are one year for workmanship and materials, two years for plumbing, electrical, heating and air-conditioning delivery systems, and six years for major structural components (16.009(a-3)). So if your builder's warranty meets those minimums, plan on six years, not ten, to bring a suit.

Florida: condos get a statutory warranty

Florida does not give single-family buyers a statutory builder warranty, but condo buyers have one. Statute 718.203 gives each unit buyer an implied warranty of fitness from the developer. For plumbing elements serving the building, except mechanical elements serving only one unit, it runs three years from completion or one year after owners take control of the association, whichever is later, but no more than five years. Contractors and subcontractors give the developer and unit buyers a three-year warranty on plumbing elements serving a building. These warranties depend on routine maintenance being done.

Deadlines to sue

TexasFlorida
Outer deadline (repose)10 years after substantial completion; 6 years if the contractor gave a qualifying written warranty (CPRC 16.009)7 years after the certificate of occupancy, completion certificate or abandonment, whichever is earliest (Statute 95.11(3)(b))
Basic limitations periodVaries by claim type; ask an attorney4 years, running from the certificate date, or from discovery for a latent defect (95.11(3)(b))
Warranty repairs extend the deadline?Ask an attorneyNo, for permitted work with a certificate (95.11(3)(b))

These deadlines are why an early inspection matters. This is general information, not legal advice.

Should I get an 11-month warranty inspection?

Yes, if your one-year workmanship coverage ends at 12 months. An "11-month inspection" is a home inspection timed before that year runs out so you can send one complete list of defects while the builder still owes the repairs. It is a common practice, not a legal requirement.

What to ask the inspector to check for plumbing

  • A meter test for hidden leaks with all fixtures off
  • Water pressure at a hose bib with a gauge
  • Water heater: expansion tank, T&P discharge route, drain pan and pan drain, gas venting, earthquake or seismic straps if required locally, and permit sticker
  • Every toilet for movement at the base and leaks at the supply
  • Under every sink, including the back of the cabinet
  • Showers and tubs for leaks at the valve and drain
  • Outdoor hose bibs, backflow devices and irrigation
  • A sewer camera inspection of the building drain and yard line. This is the only way to see a belly, crushed section or construction debris. See sewer camera inspections.

Send the report to the builder in writing, the way the warranty booklet says. Keep proof of delivery. If you later need to use Texas Chapter 27 or Florida Chapter 558, that written record helps.

What is the Texas RCLA notice process (Property Code Chapter 27)?

The Residential Construction Liability Act, Texas Property Code Chapter 27, sets the steps a homeowner must take before suing a contractor over a construction defect in a residence. It covers new homes, additions, repairs, condos and townhouses, and it applies to later buyers too. Where it conflicts with other law, including the Deceptive Trade Practices Act, Chapter 27 controls (27.002). It was amended in 2023 by SB 1768 and HB 2022.

Step by step

  1. Written notice. At least 60 days before suing or starting arbitration, send written notice by certified mail, return receipt requested, to the contractor's last known address. Describe the defects in reasonable detail, and include evidence like expert reports, photos and videos (27.004(a)).
  2. Inspection. If the contractor asks in writing, you must allow a reasonable opportunity to inspect within 35 days after it receives the notice. It may request up to three inspections in that period.
  3. Offer. By the 60th day after receiving notice, the contractor may make a written settlement offer to repair, pay or both, sent by certified mail (27.004(b)). Repairs must be done within 60 days after the contractor receives your acceptance, unless delayed by you or events beyond its control.
  4. If the offer is unreasonable. Within 25 days of receiving it, explain in writing why. The contractor then has 10 days to make a supplemental offer. An offer not accepted within 25 days is considered rejected (27.004(i)).
  5. Mediation. If you sue for more than $7,500, either side may ask the court to order mediation within 90 days of filing (27.0041).

Why the steps matter

  • If you skip notice or block inspection, the court must pause (abate) the suit until you comply (27.004(d)).
  • If you reject a reasonable offer, you may recover no more than the fair market value of that offer plus fees incurred before the rejection (27.004(e)).
  • If the contractor makes no reasonable offer, or refuses to start repairs it agreed to, those limits do not apply (27.004(f), (q)).
  • For a defect that creates an imminent threat to health or safety, such as a sewage leak in the home, the contractor must take reasonable steps to cure it as soon as practicable. If it does not, you can have it fixed and recover the cost plus fees (27.004(m)).

What you can recover

Chapter 27 limits damages to listed economic damages: reasonable repair costs, replacing damaged goods in the home, engineering and consulting fees, temporary housing during repairs, loss of market value after repair if there was a structural failure, attorney's fees and arbitration costs (27.004(g)).

Contract notice and no waivers

Residential construction contracts must include a boldface notice that the contract is subject to Chapter 27. If it is missing, you may recover a $500 civil penalty (27.007). Since 2023, any attempt to waive Chapter 27 in a contract is void (27.009).

What is Florida Chapter 558 notice for construction defects?

Florida Statutes Chapter 558 creates a pre-suit "notice and opportunity to repair" process for construction defect claims. It applies to contracts for improvements made after October 1, 2009, unless both sides opted out in writing (558.005).

Timeline

StepHomeowner or small claimantAssociation with more than 20 parcels
Serve notice of claim before suitAt least 60 daysAt least 120 days
Contractor may inspectWithin 30 days of serviceWithin 50 days
Contractor may forward notice to subs and suppliersWithin 10 daysWithin 30 days
Written response to claimantWithin 45 days of serviceWithin 75 days
Claimant accepts or rejects an offerWithin 45 days of receiving itWithin 45 days

What the notice must say

The notice must refer to Chapter 558 and describe each defect, the known damage and its location in reasonable detail, based on at least a visual inspection. You do not have to do destructive testing (558.004(1)). Try to serve it within 15 days of finding a defect, though missing that window does not bar your suit.

The contractor's choices

The response must do one of these: offer to repair at no cost with a timetable; offer money; offer a mix of both; dispute the claim; or say its insurer will decide within 30 days. If the insurer does not respond in time, you are treated as having met the pre-suit steps (558.004(5)).

Effects

  • If you accept a repair offer, you must give reasonable access during normal working hours. If the contractor performs on time, you cannot sue on that claim. If it does not, you can (558.004(8)).
  • Serving notice pauses (tolls) the limitations period until the later of 90 days after service (120 for associations) or 30 days after the agreed repair or payment period ends (558.004(10)). It does not pause the 7-year repose deadline.
  • If you sue without answering a timely offer, the court will stay the case on motion (558.004(7)).

Code violations

Florida also allows a direct lawsuit for a material violation of the Florida Building Code that may reasonably cause physical harm or significant damage to a building's systems (Statute 553.84). If the work was permitted, passed inspection and caused no injury or damage to other property, the claim generally requires that the builder knew or should have known of the violation.

What if my builder won't fix a slab leak?

  1. Protect the house. If water is running, shut off the main and get a licensed plumber to confirm the leak with a meter test and leak detection. Keep the report.
  2. Notify in writing. Send a warranty claim the way the booklet requires. Ask for a written answer.
  3. Call your insurer if there is damage. Sudden water damage may be covered even if the pipe repair is not. In Texas, TDI lists slab and foundation damage as a common optional endorsement, so check your policy. See insurance coverage.
  4. Use the statute. In Texas, send Chapter 27 notice by certified mail. In Florida, serve a Chapter 558 notice. Follow every deadline.
  5. Get an independent opinion. A licensed plumber or engineer can say whether the cause was construction, soil movement or something else. Chapter 27 lets you recover reasonable engineering fees if you win.
  6. Talk to an attorney before rejecting an offer, especially in Texas, where rejecting a reasonable offer caps your damages.

If the builder offers to reroute the line through the attic instead of breaking the slab, that may be a fair repair. Ask for it in writing, with a permit and inspection. See repiping options.

Who pays if a new home's sewer line is crushed?

If the damage happened during construction or from poor bedding and backfill, the builder usually owes the repair under the workmanship or systems warranty, and the Texas or Florida pre-suit process applies. The public main in the street belongs to the utility, so a camera inspection that shows exactly where the break is matters. If the crush is on the city's side, call the utility.

Your homeowners policy usually excludes the pipe itself and often excludes sewer backup unless you bought that endorsement, but it may cover sudden water damage inside the home. Do not let anyone dig up the line before the builder has had its chance to inspect, or you may lose rights under Chapter 27 or 558. See main sewer line problems and sewer line repair options.

What is a post-tension slab and why does it matter for plumbing repairs?

Many new homes on Texas clay and some Florida soils sit on post-tensioned slabs. Steel cables, called tendons, run through the concrete and are pulled very tight after it cures. That lets the slab resist soil movement with less steel and concrete.

For plumbing, it means two things:

  • Cutting the slab is dangerous. Cutting or coring into a tendon can release it with great force and weaken the foundation. A plumber or concrete cutter should locate tendons first, often with ground-penetrating radar or scanning, and follow the builder's or engineer's guidance.
  • Tunneling or rerouting is often preferred. Because breaking a post-tension slab is risky, many slab leaks in these homes are fixed by tunneling under the slab or by rerouting the line. Fixr's slab leak cost data puts tunneling at $900 to $2,000 and breaking the slab at $500 to $3,000.

Look for a stamp or sticker in the garage that says the slab is post-tensioned. Ask the builder for the foundation plan before any slab work.

Can my HOA sue the builder for plumbing defects?

Florida. Once owners control the HOA, Statute 720.303(1) lets the association sue on behalf of members over matters of common interest, including mechanical, electrical or plumbing elements serving a building or improvement it is responsible for. Before suing over more than $100,000, the HOA needs majority approval of the voting interests at a meeting. Condo associations have similar power under Chapter 718, and associations with more than 20 parcels get longer Chapter 558 deadlines.

Texas. Condo associations with eight or more units must meet extra steps in Property Code 82.119 before suing over design or construction claims. They need an independent inspection and written report from a licensed professional engineer, at least 10 days' written notice of that inspection to the builder, a chance of at least 90 days after the report for the builder to inspect and fix, and approval by owners holding more than 50% of the votes. Chapter 27 also covers condo units and common elements.

Individual owners can still pursue defects in their own home. For shared pipes, see condo and HOA plumbing responsibility.

How to choose a provider

  • Find and read your builder warranty booklet now; note deadlines and the notice address.
  • Record your certificate of occupancy date and closing date.
  • Do a water meter test every few months during year one.
  • Book an independent inspection with a sewer camera at about month 11.
  • Send one complete written defect list the way the warranty requires, with proof of delivery.
  • For active leaks, shut off water and get a licensed plumber's written diagnosis.
  • If repairs stall, send Texas Chapter 27 or Florida Chapter 558 notice and calendar each deadline.
  • Allow the builder's inspections and keep a log of every visit.
  • Get written repair scopes, permits and inspection results for any fix.
  • Consult a construction attorney before rejecting any settlement offer.

Related plumbing guides

Plumbing by state and city

Questions people ask

Does a new home need a permit and inspection for its plumbing?

Yes in most places. Texas cities over 5,000 people must require plumbing permits (Occupations Code 1301.551), and Florida enforces the Florida Building Code through local permit offices, with rough-in and final plumbing inspections. Passing inspection does not mean the work is defect-free, and it does not bar a defect claim. You can usually look up the permit and inspection history on your city or county permit portal.

Should I hire my own inspector during construction?

Many buyers do, with phase inspections before the slab is poured, before drywall goes up and at final. A pre-pour check can catch damaged or poorly supported pipes that would be under concrete forever. Ask the builder in writing for access; some contracts limit when outside inspectors may visit.

What should I keep in my new-home file?

Keep the purchase contract, warranty booklet, every warranty request and answer, photos, inspection reports, the permit and certificate of occupancy dates, the water heater install date and model, and the sewer camera video. Florida's 7-year repose period runs from the certificate of occupancy, so that date matters.

Can I fix a defect myself and bill the builder?

Usually not without risk. Under Texas Chapter 27, if an assignee or insurer repairs before the builder gets notice and a chance to inspect, the builder may not be liable for those repairs. In Florida, a Chapter 558 repair offer you accept bars a suit if the builder performs. Stop active water damage, document it and give notice first.

Does my homeowners insurance cover new construction defects?

Generally not the defect itself. Policies cover sudden accidental damage, such as water from a burst fitting, but usually exclude faulty workmanship, wear and gradual leaks. The insurer may pay the water damage and then seek repayment from the builder. Report promptly and keep copies of everything you send the builder.

Is the 11-month inspection worth it if nothing seems wrong?

Usually yes. Many plumbing defects, like a slow slab leak, a sewer belly or a missing expansion tank, give no clear sign in year one. A meter test and sewer camera can find them while repairs are still the builder's cost. One combined written list is easier for builders to act on than scattered requests.

Do Texas DTPA claims apply to new home plumbing defects?

Chapter 27 controls where it conflicts with the DTPA, so construction defect claims against a contractor go through Chapter 27's notice and damage rules (27.002). Some claims, such as a contractor wrongfully abandoning a project, fall outside it. An attorney can sort out which rules apply to your facts.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration