Local Guide · Swimming pool builders and contractors

What Can You Do If Your Pool Builder Abandons the Job or Does Bad Work in Texas or Florida?

A step-by-step guide for Texas and Florida homeowners whose pool builder stopped showing up, took a deposit and vanished, or left defects. It covers state complaints, mechanic's liens, Florida's recovery fund, the Texas DTPA and RCLA, small claims limits and when to call a lawyer.

Start by documenting everything and sending a written demand by certified mail. In Florida, file a complaint with DBPR, use s. 489.126 if a deposit over 10 percent went unused, and ask about the Homeowners' Construction Recovery Fund (up to $30,000 for pool contracts signed on or after July 1, 2024). In Texas, there is no state pool license, so your tools are the DTPA, the RCLA notice process, Property Code chapter 53 lien rules and the chapter 162 trust fund law.

Key facts

  • Florida presumes a project abandoned after 90 days if the contractor stops without just cause or proper notice, or does no work without just cause for 90 consecutive days (Fla. Stat. 489.129(1)(j)).
  • Florida's Homeowners' Construction Recovery Fund pays up to $30,000 per Division II claim, which includes pool contractors, for contracts entered on or after July 1, 2024 (Fla. Stat. 489.143).
  • A Florida contractor who takes more than 10 percent up front must apply for permits within 30 days and start work within 90 days after permits issue, unless there is just cause or a written extension (Fla. Stat. 489.126).
  • A Florida owner can record a Notice of Contest of Lien, which cuts the lienor's time to sue from 1 year to 60 days after service (Fla. Stat. 713.22(2)).
  • Texas DTPA claims require written notice at least 60 days before filing suit, stating the complaint and the damages and fees claimed (Tex. Bus. & Com. Code 17.505).
  • Texas RCLA claims about residential construction defects need certified-mail notice at least 60 days before suit; the contractor may inspect within 35 days and make a written offer within 60 days (Tex. Prop. Code 27.004).
  • Texas justice courts hear civil claims up to $20,000, not counting interest (Tex. Gov't Code 27.031).
  • Florida small claims rules cover claims up to $8,000, not counting costs, interest and attorney's fees (Fla. Sm. Cl. R. 7.010(b), July 1, 2026 edition).
  • In Texas, construction payments are trust funds for subs and suppliers; misapplying $500 or more is a crime (Tex. Prop. Code ch. 162).

First 72 hours: what to do when your pool builder stops showing up

Most pool disputes start the same way. Calls go unanswered, the crew stops coming, and a hole or a half-shot shell sits in the backyard. Before you hire anyone else or stop payment, protect your position. What you do in the first few days often decides which remedies you keep.

  1. Stop paying for work not done. Do not release the next draw until the work it covers is complete and inspected. If you pay ahead of the work, the contractor has less reason to come back.
  2. Photograph and date everything. Take wide shots and close-ups of the site, the equipment pad, delivered materials and any defects. Save texts, emails, voicemails and payment records.
  3. Pull the permit record. Your city or county permit portal shows which inspections passed and which did not. This tells you how far the job really got.
  4. Re-read your contract. Look for the payment schedule, start and completion dates, the notice and cure clause, any arbitration clause, and the required state notices (see below).
  5. Send a written demand. Use certified mail, return receipt requested, to the address in the contract. Give a firm date to return to work. Keep a copy.
  6. Check for liens. Search your county clerk's official records for any claim of lien or lien affidavit filed on your property.
  7. Secure the site. An open excavation is a drowning and fall hazard. Put up temporary fencing and keep children away. See our guide to Florida pool barrier law and Texas pool barrier law.

Do not let a new builder tear out or redo work until you have documented the condition. If the case goes to court, an arbitrator or the state board, your photos and an independent inspection report are the evidence.

When is a pool job legally "abandoned"?

Florida gives a clear test. Under s. 489.129(1)(j), a project may be presumed abandoned after 90 days if the contractor ends the project without just cause or without proper notice to the owner, or fails to perform work without just cause for 90 consecutive days. Abandonment is grounds for discipline by the Construction Industry Licensing Board (CILB), which may fine a licensee up to $10,000 per violation.

Florida also treats certain money problems as financial misconduct under s. 489.129(1)(g). Examples in the statute include liens left on your property for supplies the contractor was already paid for, and walking off a job when the work done is worth less than what you paid, unless the extra is refunded within 30 days.

Texas has no statewide pool contractor license, so there is no licensing board definition of abandonment. Whether a builder breached the contract is a contract question. Your contract's schedule, notice and termination clauses matter a great deal. Texas lien law does use the word: a contractor's lien deadline runs from when its work was "completed, terminated or abandoned" (Property Code chapter 53).

IssueFloridaTexas
State license for pool buildersYes: CPC/RPC and servicing licenses under ch. 489No statewide pool builder license
Statutory abandonment test90 days without just cause (489.129(1)(j))None; contract terms control
Deposit ruleOver 10% down: permits in 30 days, start in 90 days (489.126)No deposit cap; trust fund rules (ch. 162)
State complaint officeDBPR / CILBAttorney General Consumer Protection Division
Recovery fundHomeowners' Construction Recovery FundNone
Pre-suit defect noticeCh. 558 (60 days)RCLA ch. 27 (60 days); DTPA (60 days)

How do I file a complaint against a pool builder in Florida?

Florida pool contractors are licensed by DBPR under chapter 489. Certified pool/spa contractor license numbers start with CP and registered ones with RP. First, look up the license at DBPR's construction industry page and note the license type, status and any past discipline.

Filing with DBPR

  • Online: use the Construction Industry complaint form on DBPR's File a Complaint page.
  • By mail: download the Construction Industry complaint package from the same page.
  • By phone: DBPR's Customer Contact Center is (850) 487-1395.

Attach your contract, payment records, photos, the permit history and your certified-mail demand. Keep it factual and in date order.

What DBPR can and cannot do

DBPR's power is over the license: reprimands, fines, probation, remedial education, suspension or revocation. DBPR says plainly that it cannot represent you in civil matters to recover money you paid. It also lists some fee disputes, contract disagreements and some workmanship issues as possibly outside its authority. So file with DBPR, but also plan your money recovery separately.

A CILB final order directing the contractor to pay you restitution is one of the routes that can open the recovery fund (see next section). Complaints to DBPR are generally public record.

If the builder was not licensed

Contracting without a Florida license is a first-degree misdemeanor, and a repeat offense or one during a declared state of emergency is a third-degree felony (s. 489.127). DBPR can issue stop-work orders, and local code officers can cite unlicensed contractors with fines up to $2,000. An unlicensed contractor cannot enforce its contract and has no lien rights (s. 489.128). Report unlicensed activity to DBPR and, for theft of a deposit, to your local police or sheriff. Read more in our Florida pool contractor license guide.

What is the Florida Homeowners' Construction Recovery Fund?

The recovery fund is a state fund that can pay homeowners who lost money because of certain acts by a licensed contractor and could not collect. It is a last resort, not a quick refund.

Payment caps

Contract dateDivision I cap (general, building, residential)Division II cap (pool and other specialty)
On or after July 1, 2024$100,000 per claim$30,000 per claim
July 1, 2016 to June 30, 2024$50,000 per claim$15,000 per claim
Before July 1, 2016$50,000 (contracts after July 1, 2004)Not eligible

Pool contractors are Division II. Payments for claims from the same transaction are capped in total, no matter how many claimants. The fund does not pay interest, attorney fees, court costs or punitive damages (s. 489.143).

Who qualifies (s. 489.141)

  • You have a final judgment, an arbitration award, or a CILB order to pay restitution.
  • It is based on specific violations: s. 489.129(1)(g) financial misconduct, (j) abandonment, (k) certain false statements, or s. 713.35 false lien statements.
  • The violator was a licensee, and the contractor held a valid, current license when you signed.
  • You tried to collect first, for example through a writ of execution that came back unsatisfied, and you exhausted any bond or insurance.
  • You file within 1 year after the related court, criminal, administrative or arbitration action ends.

Who does not qualify

Spouses of the contractor, people with another business relationship with the licensee, and anyone who hired an unlicensed contractor are excluded. That is a big reason to verify the license before you sign.

When the fund pays, the contractor's license is automatically suspended until the money is repaid with interest. Every Florida residential construction contract over $2,500 must include the recovery fund notice (s. 489.1425). If yours did not, mention that in your DBPR complaint.

Can I get my deposit back?

Sometimes. Your odds depend on where the money went and how fast you act.

Florida: s. 489.126

If a Florida contractor took more than 10 percent of the price as the first payment for residential work, it had to apply for permits within 30 days and start within 90 days after permits issued, unless it had just cause or you agreed in writing to more time. If it missed those deadlines, send a written demand by certified mail, return receipt requested, to the address in the contract, demanding that it apply for permits, start work, or refund. If the contractor does neither within 30 days of receiving the demand, the law allows an inference that it had no just cause.

Knowingly violating 489.126 is a crime. The level depends on the amount: a first-degree misdemeanor under $1,000, a third-degree felony from $1,000 to under $20,000, a second-degree felony from $20,000 to under $200,000, and a first-degree felony at $200,000 or more. This is why Florida sheriffs and state attorneys will take some deposit-theft cases. Separately, s. 713.345 makes it a felony to knowingly misapply payments meant for labor and materials already furnished.

Texas: trust fund law

In Texas, money you pay a contractor under a construction contract is held in trust for the subs and suppliers on your job (Property Code ch. 162). Misapplying $500 or more is a Class A misdemeanor, or a third-degree felony if done with intent to defraud. For a written contract over $5,000 to improve a residential homestead, the contractor must keep the funds in a separate account labeled a construction account. Ask your contractor for proof of that account early.

Practical steps

  • If you paid by credit card recently, ask your card issuer about a dispute right away. Card networks set their own deadlines.
  • Check whether the builder's contract or HOA required a bond. A bond claim can be faster than a lawsuit.
  • File a police report for clear cases of taking money with no intent to work. Bring the contract, the payment proof and your demand letter.

For how to structure payments so this is less likely, see pool deposits and payment draws.

Can a subcontractor put a lien on my house for my pool?

Yes, in both states, even if you already paid your builder. This is one of the most painful parts of a builder collapse: the excavator, steel crew, plaster company or equipment supplier was not paid, and now they look to your property.

Florida liens (chapter 713)

  • Most of the lien law does not apply if the direct contract price is $2,500 or less.
  • Subs and suppliers who did not contract with you must serve a Notice to Owner before starting or within 45 days after starting, and before your final payment. If they did not, that is a complete defense to their lien (s. 713.06).
  • A claim of lien must be recorded within 90 days after the lienor last furnished labor or materials (s. 713.08).
  • A lien expires 1 year after recording unless the lienor files suit to enforce it (s. 713.22(1)).
  • Every direct contract over $2,500 on a 1-4 unit home must include the lien law warning in at least 12-point capital bold type, signed by the owner (s. 713.015).

Texas liens (chapter 53)

  • On residential projects, subs and suppliers must send you and the original contractor a statutory notice of claim by the 15th day of the second month after the month they furnished labor or materials.
  • An original contractor must file its lien affidavit by the 15th day of the third month after the month its work was completed, terminated or abandoned.
  • Texas owners must retain 10 percent of the contract price during the work and for 30 days after completion. If you did, your exposure to sub claims is generally limited to that retainage plus funds you hold after a proper notice.
  • To fix a lien on a homestead, there must be a written contract signed before work started, signed by both spouses if married, and filed with the county clerk.
  • These deadlines come from the rewrite of chapter 53 that took effect January 1, 2022 (HB 2237). Older contracts follow older rules.

How do I remove a mechanic's lien from my property?

Florida options

  1. Ask for a release. If the lienor was paid, it can record a signed, notarized satisfaction or release (s. 713.21(1)-(2)).
  2. Record a Notice of Contest of Lien. Under s. 713.22(2), you or your attorney can record this notice with the clerk. The clerk serves the lienor. If the lienor does not sue to enforce within 60 days after service, the lien is extinguished automatically.
  3. File an order to show cause. Under s. 713.21(4), you can file a complaint in circuit court. The clerk issues a summons requiring the lienor to show cause within 20 days why the lien should not be enforced or canceled. If the lienor does not, the court orders it canceled.
  4. Wait it out. If no suit is filed within 1 year of recording, the lien expires (s. 713.22(1)).
  5. Transfer the lien to a bond or cash deposit so the property is clear while the dispute continues (ss. 713.23-713.24).

Be careful: a Notice of Contest speeds things up, which can push a valid lienor to sue sooner. Talk to a construction attorney before you use it.

Texas options

  1. Request a release. Once a debt is paid in collected funds, the lienor must give you a recordable release within 10 days of a written request (Property Code 53.152).
  2. Summary motion to remove. In a suit to foreclose or to declare a lien invalid, you may file a verified motion under s. 53.160. Grounds are limited to the list in the statute, such as a notice of claim that was not timely sent, a defective or late lien affidavit, notice of the affidavit not sent, retainage rules followed, funds deposited in the court registry, a homestead lien without the required signed and filed contract, or a valid waiver. The hearing cannot be held until at least 30 days after the claimant answers or appears.
  3. Let the deadline pass. Suit to foreclose must generally be brought by the first anniversary of the last day the lien affidavit could have been filed, unless extended by a recorded written agreement (to two years at most).
  4. Bond around the lien under the chapter 53 bond procedures.

In Texas residential lien cases, the court is not required to make the property owner pay the other side's costs and attorney fees (s. 53.156).

Florida chapter 558: the construction defect notice

If the pool was built but has defects (cracks, hollow plaster, leaks, bad slopes, equipment problems), Florida usually requires a pre-suit notice under chapter 558 before you sue.

  • Serve a written notice of claim at least 60 days before filing suit (120 days for an association representing more than 20 parcels). The notice must refer to chapter 558 and describe each defect and its location.
  • The contractor may inspect within 30 days and must give a written response within 45 days. The response can offer to repair, offer money, combine both, dispute the claim, or say its insurer will decide.
  • You then have 45 days to accept or reject a timely offer.
  • Serving the notice pauses the statute of limitations for a set period.

Contracts signed after October 1, 2009 should contain a notice that construction defect claims are subject to chapter 558. If it is missing, there is no penalty, but the process still applies unless the parties agreed it does not.

What is the DTPA and does it cover pool builders?

The Texas Deceptive Trade Practices-Consumer Protection Act (Business and Commerce Code s. 17.41 and following) lets consumers sue for false, misleading or deceptive acts, breach of warranty and unconscionable conduct. A homeowner buying pool construction services is usually a consumer under the act.

  • Notice first: at least 60 days before suing, send written notice describing your complaint in reasonable detail and the amount of economic damages, mental anguish damages and expenses, including attorney's fees (s. 17.505).
  • Damages: economic damages. If the conduct was committed knowingly, you may also recover mental anguish damages and up to three times economic damages (s. 17.50(b)).
  • Deadline: generally two years from the deceptive act, or from when you discovered or should have discovered it (s. 17.565).
  • Big-contract exemptions: claims over $500,000 are exempt unless they involve your residence, and some written contracts over $100,000 negotiated with your own lawyer are exempt if they do not involve your residence (s. 17.49(f)-(g)). A backyard pool at your home is a residence claim.

Examples that can fit: a builder that promised a start date it knew it could not meet to win the deposit, claimed a warranty it would not honor, or failed to disclose known information to get you to sign (s. 17.46(b)(24)).

Texas RCLA (Property Code chapter 27)

For construction defect claims about a residence, Texas also has the Residential Construction Liability Act. Its definition of construction defect includes deficiencies in an "appurtenance," defined to include a recreational facility built by a contractor in connection with a residence, which would generally cover a contractor-built pool. Before suing you must send notice by certified mail, return receipt requested, at least 60 days before filing. The contractor can ask to inspect within 35 days after receiving notice and can make a written settlement offer within 60 days. If you reject an offer that a court later finds reasonable, your recovery can be limited to the value of that offer plus costs and fees incurred before you rejected it. Written contracts covered by chapter 27 must include a boldface notice; if it is missing you may recover a $500 civil penalty.

Many claims involve both the DTPA and the RCLA, and the two notice processes run on different clocks. Get legal advice on which notice or notices to send. (Texas owners are also not liable for amounts properly paid to the original contractor before a sub's notice, except retainage they failed to hold: Property Code 53.084.)

How do I file a complaint against a pool builder in Texas?

Because Texas does not license pool builders statewide, there is no state board that can suspend a pool builder. Your options are:

  • Texas Attorney General, Consumer Protection Division. You can file a consumer complaint through the AG's website (texasattorneygeneral.gov). The AG enforces the DTPA for the public. Complaints help build cases against repeat offenders, but the AG does not act as your private lawyer.
  • Your city building department. If work was done without permits, or failed inspections, the city can act on the permit and may refuse future permits. Houston, Dallas, San Antonio and Austin all run pool permits through their building or development services departments.
  • TDLR for electrical work. Pool electrical work must be done by a TDLR-licensed electrician through a licensed electrical contractor (Occupations Code ch. 1305). If unlicensed electrical work was done, you can complain to TDLR.
  • Local police or district attorney for trust fund misapplication under chapter 162 or theft.
  • Better Business Bureau and review sites are not government remedies, but a factual public record can help others.

See our Texas pool builder license guide for which local registrations apply in your city.

Is unfinished pool work a crime?

Doing bad work or finishing late is usually a civil matter. It becomes criminal when money is taken or misused in ways the law makes a crime. Examples:

ConductFloridaTexas
Taking a large deposit and not pulling permits or startings. 489.126 (misdemeanor to first-degree felony, by amount)Possible theft; ch. 162 if funds diverted
Using your payments for other jobs while your subs go unpaids. 713.345 misapplication of construction funds (felony)Ch. 162 trust fund misapplication ($500+: Class A misdemeanor; felony with intent to defraud)
Contracting without a licenses. 489.127 (misdemeanor; felony if repeat or during an emergency)No state pool license; electrical work without TDLR license is a violation
False statement that subs were paids. 713.35; CILB discipline under 489.129(1)(k)Possible fraud or forgery

Contractor fraud in Florida is often charged under these statutes rather than a single "contractor fraud" law. Bring your paperwork to the sheriff or police and ask them to forward it to the state attorney. In Texas, contact your local police department or county district attorney.

Should I use small claims court?

Small claims makes sense for smaller losses: a deposit under the limit, a repair you paid someone else to do, or an unreturned equipment payment.

StateCourtLimitNotes
TexasJustice court (small claims cases)$20,000, excluding interestLawyer not required; informal hearings (Gov't Code 27.031, 27.060)
FloridaCounty court, small claims$8,000, excluding costs, interest and attorney's feesFla. Sm. Cl. R. 7.010(b)

Remember the pre-suit notices. A Texas DTPA claim needs the 60-day notice, and defect claims may need the RCLA or chapter 558 process. Small claims also cannot remove a lien or give you a recovery fund claim on its own terms, though a final judgment against a licensed Florida contractor can be one step toward the fund. If your loss is larger, or liens are involved, a construction attorney is usually worth it.

Check your contract for an arbitration clause. Some pool contracts require arbitration and limit court options.

How do I find a new builder to finish an abandoned pool?

Finishing another builder's pool is harder than starting fresh. Many builders decline these jobs, and those that accept will price in risk.

  1. Get an independent inspection first. Have a licensed pool contractor (Florida) or an engineer or experienced pool inspector (Texas) document steel, shell, plumbing pressure tests and electrical bonding before anything is covered.
  2. Settle the permit. The original permit is often in the first builder's name. Your building department will explain how to change the contractor of record or close and reissue the permit. In Florida, the new contractor's license number must appear on the permit application.
  3. Clear lien risk. Collect lien releases or confirm that deadlines have passed before you pay the new builder for overlapping work.
  4. Write a new contract that lists exactly what is being completed, what is being redone, and what warranty applies to the old work (often none).
  5. Keep the old contractor on notice. Your claim against the first builder includes the extra cost of finishing. Keep every invoice.

Our how to choose a pool builder and pool contract checklist guides list the questions to ask.

Warranties and workmanship disputes

Not every dispute is abandonment. Many are about warranties: plaster that delaminates, tile that pops, equipment that fails, or a fiberglass shell that bulges.

  • Read whose warranty it is. The builder warrants its workmanship. Shell, plaster and equipment makers issue their own warranties with their own registration and claim rules.
  • Register equipment. Many equipment warranties require registration and installation by a qualified installer. In Florida, equipment installation and repair is licensed work (see pool service costs and contracts).
  • Report in writing, fast. Send photos and the date you noticed the problem. Ask for a written response.
  • Separate chemistry from construction. Builders often blame water chemistry for plaster problems. Keep your service logs and water test records so you can show what the water was.

Florida's chapter 558 and Texas's RCLA can apply to warranty defects too, so the pre-suit notice rules above still matter.

When should I hire a construction attorney or other professional?

This page is general information, not legal advice. Talk to a licensed attorney when:

  • A lien has been recorded, or you are thinking about a Notice of Contest or a lien bond.
  • Your loss is above the small claims limit ($8,000 Florida; $20,000 Texas justice court).
  • You want to pursue the Florida recovery fund, which needs a judgment, arbitration award or CILB restitution order first.
  • Your contract has an arbitration clause, a fee-shifting clause, or a short deadline to bring claims.
  • You are sending a DTPA, RCLA or chapter 558 notice. A defective notice can delay your case or cap your recovery.

The Florida Bar and the State Bar of Texas both run lawyer referral services. If insurance is involved, for example storm damage to an unfinished pool, a licensed public adjuster may help with the claim. See pool insurance and liability.

How to choose a provider

  • Stop paying draws for work that is not done and inspected.
  • Photograph the site, materials and defects, with dates.
  • Download the permit and inspection history from your city or county.
  • Send a written demand by certified mail, return receipt requested.
  • Search county official records for liens on your property.
  • Florida: verify the license on DBPR and file a Construction Industry complaint.
  • Florida: use the s. 489.126 demand if more than 10 percent was paid and work never started.
  • Texas: send DTPA and, for defects, RCLA notice at least 60 days before suing.
  • Texas: ask whether the contractor kept your money in a construction account (ch. 162).
  • Get an independent inspection before a new builder covers anything.
  • Track every extra cost of finishing the job.
  • Calendar lien and limitation deadlines and talk to a construction attorney.

Related swimming pool builders and contractors guides

Swimming pool builders and contractors by state and city

Questions people ask

How long does a Florida contractor have to start work after I pay a deposit?

If you paid more than 10 percent of the contract price as the first payment on residential work, the contractor must apply for permits within 30 days of payment and start work within 90 days after the permits issue. The exceptions are just cause or your written agreement to a longer period. If those dates pass, send a certified-mail demand to the contractor's contract address. If it does not act or refund within 30 days, the law allows an inference that it had no just cause (Fla. Stat. 489.126).

Can the Florida recovery fund pay me if my pool builder was unlicensed?

No. Section 489.141 bars recovery when the contractor did not hold a valid, current license when the contract was signed. The fund also needs a judgment, arbitration award or CILB restitution order based on specific violations, plus proof you tried to collect. If the builder was unlicensed, your options are a civil suit, a DBPR unlicensed-activity complaint and a police report. The contract is also unenforceable by the unlicensed contractor, and it has no lien rights (s. 489.128).

How much can I get from the Florida recovery fund for a pool?

Pool contractors are Division II. For contracts signed on or after July 1, 2024, the cap is $30,000 per claim. For contracts from July 1, 2016 through June 30, 2024 it is $15,000. Pool contracts signed before July 1, 2016 are not eligible. The fund pays only actual damages, not interest, attorney fees, court costs or punitive damages, and payments are made in the order claims are filed, subject to the money available.

Do I have to pay a subcontractor's lien if I already paid my builder in full?

Possibly, which is why the notices matter. In Florida, a sub who did not serve a timely Notice to Owner generally has no valid lien, and proper final payment affidavits help protect you. In Texas, an owner who withheld the required 10 percent retainage for 30 days after completion is generally liable only up to that retainage and certain withheld funds. If you paid early without these protections, you may face a valid lien. Talk to a construction attorney before paying twice.

What is a notice of contest of lien in Florida?

It is a short form you or your attorney record with the county clerk under s. 713.22(2). The clerk serves it on the lienor. The lienor then has only 60 days after service to sue to enforce the lien instead of the normal 1 year. If the lienor does not sue in time, the lien is extinguished automatically. It is a strong tool against weak liens, but it can also prompt a valid lienor to sue quickly, so get advice first.

Does the Texas DTPA let me get triple damages from a pool builder?

Only if the conduct was committed knowingly. A consumer who wins a DTPA claim can recover economic damages. If the jury finds the builder acted knowingly, it may also award mental anguish damages and up to three times economic damages. You must send written notice at least 60 days before suing, describing the complaint and the damages and fees you claim. Many builders make settlement offers during that window, and an offer can affect what you recover later.

What happens if I reject my Texas builder's repair offer under the RCLA?

If a court later finds the offer was reasonable, your recovery can be limited to the fair market value of the contractor's last offer, plus reasonable costs and attorney fees incurred before you rejected it. An offer not accepted within 25 days is treated as rejected. If you think the offer is unreasonable, you must explain why in writing within 25 days, and the contractor then has 10 days to make a better offer. This is why many homeowners use a lawyer for RCLA disputes.

Can my HOA or city make me finish or fence an abandoned pool excavation?

Often yes. An open hole or an empty shell can violate pool barrier rules, property maintenance codes and HOA covenants. Florida's chapter 515 safety features are required before a new residential pool passes final inspection, and Texas cities can adopt pool fence ordinances and act against hazardous pool fences. Put up temporary fencing right away and tell the building department and HOA in writing what happened and your plan to finish.

Should I leave a bad online review of my pool builder?

You can share truthful, factual experiences. Stick to what happened, dates and documents, and avoid guesses about motives or crimes you cannot prove. Statements of fact that turn out false can create legal risk. Many homeowners wait until a complaint is filed, then describe the facts and the status of the complaint. If you are in active litigation or arbitration, ask your attorney first, since public posts can become evidence.

How long do I have to sue my pool builder?

It depends on the claim. Texas DTPA claims generally must be brought within two years of the deceptive act or its discovery. Contract, defect and lien claims each have their own deadlines in both states, and Florida's chapter 558 notice pauses the limitation clock for a time. A Florida recovery fund claim must be filed within 1 year after the related action ends. Because these windows differ and can be short, check them with an attorney as soon as a dispute starts.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration