New ebook: Before You Borrow, how lenders decide and how to get your business loan approved. Get it for $7.99 →
New ebookHow to Research Like a Wall Street AnalystFind original sources, analyze trends, build your own insightsGet it now →
Markets
Real businesses. Bigger perspective. · Thu, Nov 19, 2026News. Tools. Scores. Games. Free.The Morning Chronicle
Donate BTCOpen dDashboard

Local Guide · Swimming pool builders and contractors

Pool Construction Contract Checklist: What Must Be in Writing Before You Sign

The clauses every pool contract needs, the red flags to watch for, and the notices Florida and Texas law require in residential construction contracts.

A pool contract should include a dimensioned plan and depth profile, a full equipment list with model numbers, every allowance, rock and soil terms, haul-off, permits and inspections, barrier responsibility, startup, cleanup and yard repair, warranties, a change-order process, dispute terms and payments tied to inspected milestones. Florida contracts over $2,500 must include the lien law warning and recovery fund notice and the license number. Texas contractors must give the statutory disclosure statement before you sign.

Key facts

  • Florida direct contracts over $2,500 for 1-4 unit dwellings must include the construction lien law warning in at least 12-point capitalized boldface, signed and dated by the owner (713.015).
  • Florida residential construction contracts over $2,500 must contain the Homeowners' Construction Recovery Fund notice; violations can bring board fines of up to $500, then $1,000 (489.1425).
  • Florida contractors must put their license number on every bid, contract and advertisement (489.119).
  • Florida contracts with unlicensed contractors are unenforceable by the contractor, who has no lien or bond claim (489.128).
  • Texas residential contractors must deliver the 'Know Your Rights and Responsibilities Under the Law' disclosure before the owner signs (Property Code 53.255).
  • To fix a lien on a Texas homestead, the written contract must be signed before work starts, by both spouses if married, and filed with the county clerk (53.254).
  • The FTC Cooling-Off Rule gives buyers 3 business days to cancel qualifying sales made at their home of $25 or more, with stated exclusions (16 CFR 429).
  • A Texas DTPA waiver is void unless in writing, signed, the consumer had a lawyer and was not in a significantly disparate bargaining position (Bus. and Com. Code 17.42).

The core checklist: what every pool contract should say

ItemWhat good looks like
Parties and licenseFull legal names, addresses; in Florida the CP or RP pool/spa license number; in Texas the electrician's TDLR license for the electrical subcontractor
Scope drawingsA dimensioned plan attached and signed: length, width, shape, location with setbacks
Depth profileShallow, deep and transition depths; steps, benches, ledges and spa depths
StructureShell type (gunite, shotcrete, fiberglass model, vinyl wall type); steel or engineering notes for your soil
Equipment listBrand and model for pump, filter, sanitizer, heater, controls, lights, cleaner; no substitutions without written approval
FinishesTile, coping, interior finish product and color, deck material and square footage
AllowancesEach allowance listed with dollar amount and what happens if exceeded
Rock and soilWhat is included, how extra is measured and the rate
Overdig and haul-offWho pays for extra digging and how many loads are removed
GroundwaterDewatering included or the daily rate; hydrostatic relief in Florida
Permits and inspectionsBuilder obtains all permits and schedules all inspections; copies to you
BarrierWho provides the fence, gates, alarms or cover needed to pass final
Electrical and gasRun lengths, panel work, gas line, bonding; who does it and licensed by whom
StartupWho does it, method, length, chemicals included
Cleanup and yard repairDebris removal, sod, sprinklers, driveway, fence rebuild
SchedulePermit application date, start date, estimated completion, weather and change-order extensions
Payment scheduleEach payment tied to a completed, inspected milestone
Lien releasesWaivers from builder and notifying subs and suppliers with each payment
Change ordersWritten, priced, signed before the work
WarrantyWorkmanship, structural, surface and equipment, with terms and who backs each
InsuranceGeneral liability and workers' compensation certificates attached
Termination and disputesNotice and cure, your right to terminate, how disputes are resolved
Mandatory noticesFlorida: 713.015 lien warning, 489.1425 recovery fund notice. Texas: 53.255 disclosure delivered before signing; 53.256 subcontractor list

Does Florida require specific notices in a residential construction contract?

Yes. Three requirements matter most for a pool contract:

  1. Construction lien law warning (713.015). Any direct contract greater than $2,500 between an owner and a contractor for improvements to a one- to four-unit dwelling must contain a statutory notice, printed in at least 12-point, capitalized, boldface type on the front page or a separate page, signed and dated by the owner. It begins "ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW" and warns that unpaid subcontractors and suppliers can enforce a lien against your property even if you paid your contractor in full. It advises you to require written lien releases from anyone who served you a Notice to Owner before each payment.
  2. Recovery fund notice (489.1425). Every residential construction contract over $2,500 must contain a statement that payment, up to a limited amount, may be available from the Florida Homeowners' Construction Recovery Fund if you lose money because of specified violations by a licensed contractor, followed by the board's address and phone number. The board may fine a contractor up to $500 for a first violation and $1,000 for later ones.
  3. License number (489.119). Every certified or registered contractor must put the license number on each permit application and in every bid, contract and advertisement. Check it on DBPR's site at myfloridalicense.com. Pool/spa licenses use CP (certified) and RP (registered) prefixes.

Also required: a pool contractor who agrees to build a residential pool must give you a document with chapter 515's safety requirements and the Department of Health's drowning prevention publication (515.33). If the 713.015 notice is missing, that is a red flag about the contractor's knowledge of Florida law.

What does Texas require before you sign?

  • Disclosure statement (Property Code 53.255). Before you sign a residential construction contract, the original contractor must give you a statement titled "KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW." It tells you to get the agreement in writing with a description of the work, the time for completion, the cost and the payment method including the statutory reservation of funds, and to get any promise or warranty in writing.
  • Subcontractor and supplier list (53.256). Before construction starts, the contractor must give you a list of the subcontractors and suppliers it intends to use, and update it within 15 days of any change, unless you sign a statutory waiver. Do not sign the waiver.
  • Homestead lien requirements (53.254). To have a lien on a homestead, the contractor and owner must sign a written contract before materials are furnished or labor performed, both spouses must sign if the owner is married, and the contract must be filed with the county clerk. Builders working on homesteads may ask both spouses to sign for this reason.
  • Retainage (ch. 53). The statutory disclosure tells owners to reserve 10% of payments during construction and for 30 days after completion. Write this into your payment schedule.
  • Final bills-paid affidavit (53.259). As a condition of final payment, the contractor must give you an affidavit that everyone has been paid, or listing who is still owed.

Texas has no statewide pool builder license, so there is no state license number to put in the contract. Ask for the electrical contractor's and electrician's TDLR license numbers instead, and the builder's legal entity name. See Texas pool builder license rules.

What is an allowance, and why is it risky?

An allowance is a dollar amount set aside for something you have not picked yet, like tile, lights or landscaping. If your choice costs more, you pay the difference. If it costs less, you should get a credit.

Allowances become risky when:

  • The amount is unrealistically low, so the bid looks cheaper than competitors.
  • The contract does not say whether the allowance includes labor, tax and delivery.
  • There is no credit for unused amounts.
  • The builder adds a markup on overages without saying so.

Ask for each allowance in writing: the amount, what it covers, whether labor is included, the markup on overages and the credit for underages. Better yet, make selections before signing and replace allowances with fixed prices. See pool cost breakdown.

Should the contract list equipment brands and model numbers?

Yes. "Variable-speed pump" or "cartridge filter" is not enough; the price difference between models can be large. List brand, model, size and quantity for the pump, filter, sanitizer or salt system, heater, automation, lights and cleaner, and say substitutions require your written approval at equal or better quality.

Federal energy rules now require most pool pump motors from 1.15 to 5 total horsepower made on or after September 29, 2025 to be variable-speed (10 CFR 431.485), so a single-speed motor in a new-build bid is worth asking about. See pool pump guide.

Who is responsible if the builder hits rock, and who pays for haul-off?

Only your contract answers this. A good rock clause states:

  • What is included in the base price (for example, a set number of hours of rock hammering)
  • How extra rock is measured: hours, truckloads or cubic yards
  • The rate for extra rock
  • That the builder must notify you in writing, with photos, before charging extra
  • A cap, or your right to stop and discuss before costs exceed a number

For haul-off, the contract should say how many loads of soil are removed, whether some soil stays on site for grading, and the cost of extra loads. For overdig (digging beyond the plan, for example for a deeper end), it should say who pays and the rate.

Fixr's 2025 data shows rock breaking or blasting at $1,050 to $9,700, a reminder of why the clause matters in Austin, San Antonio and the Hill Country. In Florida, the same kind of clause should cover dewatering in high groundwater.

What happens if the pool is not finished on time?

The contract should state the permit application date, the start date, an estimated completion date or number of working days, and how weather, inspections and change orders extend it. Some contracts include a daily credit for late completion; many builders resist that. At minimum, include:

  • A maximum period of no work without a written explanation
  • Notice and a cure period if the builder falls behind
  • Your right to terminate and hire someone else to finish after the cure period

Florida law adds rules: if the contractor took more than 10% upfront, it must apply for permits within 30 days and start within 90 days after permits issue unless there is just cause or you agreed in writing to longer periods, and a contractor holding more than the value of the work done may not stop work for 90 days without just cause or certified-mail notice (489.126). Be careful about signing a clause that extends those periods. See pool construction timeline.

Can I cancel a pool contract after signing?

Sometimes. The federal FTC Cooling-Off Rule (16 CFR 429) gives buyers three business days to cancel a "door-to-door sale," which includes sales of consumer goods or services of $25 or more made at the buyer's home, or $130 or more at other temporary locations, when the seller personally solicits the sale away from its place of business. The seller must give a written "NOTICE OF CANCELLATION" form, and after a valid cancellation must refund payments within 10 business days. Exclusions include sales after you visited the seller's permanent retail location, sales of real property, buyer-requested repairs, and some emergencies. Whether it applies to your pool contract depends on the facts, such as where you signed and whether you first met the seller at its showroom.

Otherwise, cancellation depends on the contract. Read the termination clause before signing: what happens to your deposit, what costs the builder can keep, and how much notice is required. If you want to cancel, do it in writing and keep proof. For a large deposit, talk to an attorney.

What warranty language should I look for?

  • Workmanship warranty from the builder: what it covers (leaks, plumbing, structure, tile, deck), for how long, and how to make a claim.
  • Structural warranty on the shell: who backs it (builder or fiberglass manufacturer), how long, whether it is transferable to a future buyer.
  • Surface warranty on plaster, aggregate or gelcoat: term, proration, and conditions such as following startup and chemistry instructions.
  • Equipment warranties from manufacturers, and whether the builder registers them for you.
  • Exclusions: ground movement, draining, water chemistry, freeze, acts of nature. Ask what each means for your soil.
  • Response time: how quickly the builder will respond to a claim.

In Texas, the statutory disclosure tells owners that any promise, warranty or representation from the contractor should be specified in the written agreement. Anything said in a sales meeting and not written down is hard to enforce.

Should the contract include a change-order process?

Yes. A change-order clause should require every change to be written, priced and signed by both sides before work is done, and should say how the change affects the schedule and payments. It should say that crew members cannot approve changes and that unapproved extra work is not billable. Keep signed change orders with your contract, and match them against invoices. See how a concrete pool is built for where changes are cheapest.

Is an arbitration clause in a pool contract bad for me?

Not always, but understand it before you sign. Arbitration replaces a court case with a private decision-maker. It can be faster, but it is usually final with limited appeal, and fees can be significant. Look for: who picks the arbitrator, who pays fees, where it happens, whether small claims court is still available, and whether claims must be brought within a shortened time.

Two state points:

  • Florida recovery fund. The fund generally pays after a final judgment, arbitration award or CILB restitution order based on specified violations, so an arbitration award can still support a claim (489.141).
  • Texas DTPA waivers. A clause waiving your Texas DTPA rights is void unless it is in writing and signed, you are not in a significantly disparate bargaining position, and you were represented by your own lawyer; the waiver must also be conspicuous, in bold type of at least 10 points, under a heading such as "Waiver of Consumer Rights" (Bus. and Com. Code 17.42).

This is general information. Ask an attorney how an arbitration clause would work in your situation.

Who is responsible for damage to my yard, sprinklers or driveway?

Write it down. Heavy equipment, concrete trucks, pumps and cranes can crack driveways, crush sprinkler lines, rut lawns and damage fences. A good clause says:

  • The access route and whether a fence section will be removed and rebuilt
  • That the builder repairs damage it causes to driveways, sidewalks, sprinklers and utilities, or the limits of that duty
  • Who restores sod and landscaping, and to what standard
  • Debris and concrete washout cleanup

Take before photos of the access route, driveway and street on day one.

Permits, and the owner-builder trap

The contract should say the builder obtains every permit in its own name and license, schedules every inspection, and gives you copies of results. Be wary if a builder suggests you pull the permit yourself as an "owner-builder."

Florida. The owner-builder exemption is for owners building or improving their own one- or two-family home for their own use, not for sale or lease (489.103). When you pull the permit as owner-builder, you take legal responsibility for the work. If the person actually doing the work is an unlicensed contractor, you also lose access to the Homeowners' Construction Recovery Fund, which cannot pay if the contractor was not licensed when you signed (489.141). Starting work that needs a permit without one in effect is a prohibited act (489.127).

Texas. Cities set their own permit rules. If a builder asks you to apply for the permit, ask why, and check whether your city treats you as responsible for code compliance. Electrical work still needs a TDLR-licensed electrician unless the homeowner exemption truly applies.

See pool permits and inspections.

Red flags in a pool contract

  • No dimensioned drawing or depth profile attached
  • Equipment described only as "standard" or "or equal" with no models
  • Large, vague allowances
  • Rock, soil and groundwater are entirely the owner's risk with no rate
  • Large deposit, or payments by date instead of milestones
  • In Florida: no license number, no 713.015 lien notice, no 489.1425 recovery fund notice
  • In Texas: no disclosure statement before signing, or a request to waive the subcontractor list
  • A request to pull the permit as owner-builder when a contractor is doing the work
  • No barrier responsibility stated
  • Warranty described only verbally
  • Pressure to sign today for a special price
  • Payment requested in cash or to a personal name

In Florida, contracting without a license is a crime, and a contract with an unlicensed contractor is unenforceable by that contractor (489.127 and 489.128). See how to choose a pool builder.

Should I have an attorney review my pool contract?

For a project of this size, a one-time review by a construction attorney is often worth it, especially if the contract has arbitration, a large deposit, a short warranty, unusual risk on rock or groundwater, or a homestead lien. Florida's own statutory lien notice says the lien law is complex and recommends consulting an attorney. Bring the full contract, drawings, equipment list and payment schedule. Ask specifically about lien exposure, termination rights and what happens if the builder fails to finish.

How to choose a provider

  • Attach a signed, dimensioned plan and depth profile.
  • List equipment by brand and model.
  • List every allowance with amount, scope and overage terms.
  • Add rock, overdig, haul-off and dewatering terms with rates.
  • State who provides the barrier to pass final inspection.
  • Tie each payment to a completed, inspected milestone.
  • Require lien waivers with each payment.
  • In Florida, confirm the license number, 713.015 notice and 489.1425 notice.
  • In Texas, get the 53.255 disclosure before signing and the 53.256 sub list before work.
  • Attach insurance certificates.
  • Get all warranties in writing.
  • Read the termination and dispute clauses before signing.

Related swimming pool builders and contractors guides

Swimming pool builders and contractors by state and city

Questions people ask

What should a pool construction contract include?

At minimum: the parties and, in Florida, the license number; a signed, dimensioned drawing and depth profile; equipment by brand and model; finishes; every allowance; rock, haul-off and dewatering terms; permits, inspections and barrier responsibility; startup, cleanup and yard repair; schedule; payments tied to inspected milestones; lien waivers; change orders; warranties; insurance; termination and dispute terms; and the notices your state requires.

Does the contract need the builder's license number in Florida?

Yes. Florida Statutes 489.119 requires every certified or registered contractor to put its license number on each permit application and in every offer, bid, contract and advertisement. Pool/spa licenses start with CP for certified or RP for registered. Look up the number on myfloridalicense.com to confirm the license is active and is a pool/spa license, not a different trade.

Do I have to sign the Florida lien law notice?

The notice in 713.015 must be signed and dated by the owner when it appears in a direct contract over $2,500 for a one- to four-unit dwelling. Signing it does not waive your rights; it confirms you were warned that unpaid subcontractors and suppliers can lien your home. Read it carefully, because it tells you to require written lien releases from anyone who served you a Notice to Owner before each payment.

Should my Texas pool contract be signed by both spouses?

If the pool is on your homestead and you are married, Texas Property Code 53.254 says the written contract must be signed by both spouses, before work begins, and filed with the county clerk for a lien on the homestead to be valid. Builders may ask both spouses to sign for that reason. Read the contract together and make sure you both understand the lien and payment terms.

Can I cancel a pool contract I signed at my kitchen table?

Possibly. The FTC Cooling-Off Rule gives three business days to cancel qualifying sales of $25 or more made at your home when the seller solicited you away from its place of business, and the seller must give a cancellation form. Exclusions include sales after you visited the seller's permanent store and real property sales, so whether it covers a pool contract depends on the facts. Act in writing quickly and consider an attorney.

What if the builder will not include a rock clause?

Then you carry unknown risk. Ask why, and ask for at least a rate for extra rock and a requirement of written notice with photos before any extra charge. Compare with other bids that include rock terms. On rocky lots in Central Texas, a builder who has dug nearby may be able to give a realistic allowance. If no terms are offered, factor that risk into the bid comparison.

Is a verbal promise from the salesperson enforceable?

It is much harder to prove and enforce than written terms. Texas's statutory disclosure statement tells owners to make sure any promise, warranty or representation is specified in the written agreement. The same advice applies in Florida. If a salesperson promises a free upgrade, a completion date or a warranty term, ask for it to be added to the contract or a signed addendum before you sign.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration