How a Concrete (Gunite) Pool Is Built: Step-by-Step From Layout to First Swim
Every stage of a gunite or shotcrete pool build, the inspections that usually happen along the way in Texas and Florida, what to check and photograph yourself, and how to protect your money at each payment.
A concrete pool is built in about a dozen stages: design and permits, layout, excavation, steel, plumbing, electrical bonding, the gunite or shotcrete shell, curing, tile and coping, equipment, decking, barrier, interior plaster, and startup. Inspections usually happen before the shell is shot (steel and bonding), at plumbing pressure tests, before the deck, and at final. Fixr puts the whole build at 3 to 12 weeks, and weather, permits and inspections often stretch it.
Key facts
- Fixr (Jan. 2025) says a concrete pool typically takes 3 to 12 weeks to install because concrete must cure.
- The American Shotcrete Association recommends a minimum of 7 days of curing for pool shotcrete to control shrinkage.
- ASA says dry-mix pool shotcrete (gunite) should reach a minimum 28-day compressive strength of 4,000 psi, and recommends an ACI-certified nozzleman.
- Florida Building Code R4501.12.1 requires pool piping to pass a static water or air pressure test of at least 35 psi for 15 minutes.
- FBC R4501.19 requires final electrical and barrier inspections before a concrete pool is filled with water.
- FBC R4501.21.4 requires a hydrostatic relief device in areas of anticipated water table.
- ANSI/PHTA/ICC/NPC-12 2025 is the American National Standard for the Plastering of Swimming Pools and Spas.
- Texas residential contractors must give a final bills-paid affidavit as a condition of final payment (Property Code 53.259).
- Florida contractors must give a final payment affidavit when final payment becomes due under a direct contract (Fla. Stat. 713.06(3)(d)).
The stages at a glance
| Stage | What happens | Typical inspection or check (confirm with your city) | What you should photograph |
|---|---|---|---|
| 1. Design and permits | Plans, engineering, HOA approval, permits | Plan review | Approved plans and permit card |
| 2. Layout | Shape painted or staked on the ground | Your own check of size and setbacks | Layout with tape measure |
| 3. Excavation | Digging, rock removal, haul-off | Depth and shape check | Hole, depth marks, any rock or water |
| 4. Steel | Rebar cage tied | Pre-gunite steel inspection in many cities | Steel spacing, chairs, bonding wire |
| 5. Plumbing | Suction, return, skimmer, cleaner lines | Pressure test | Every line before burial, gauges |
| 6. Electrical rough-in and bonding | Bonding grid, light niches, conduit | Bonding inspection, often with steel | Bonding connections and conduit |
| 7. Shell | Gunite or shotcrete sprayed | Builder supervision; your own check | Shoot day, thickness, cleanup of rebound |
| 8. Curing | Shell kept damp, gains strength | Builder's curing plan | Watering, cracks |
| 9. Tile and coping | Waterline tile, coping stones | Your own check of level and joints | Tile lines, grout |
| 10. Equipment and electrical | Pump, filter, heater, panel | Electrical and gas inspections | Equipment labels and model numbers |
| 11. Deck | Base, forms, drainage, pour or pavers | Pre-deck in some cities | Base, joints, drains, slope |
| 12. Barrier and final | Fence, gates, alarms or cover | Final electrical and barrier before fill (FBC R4501.19) | Gate hardware, heights |
| 13. Plaster and fill | Interior finish applied, pool filled | Your own check of finish | Finish surface, fill start time |
| 14. Startup | Water chemistry, brushing, orientation | Builder or service company | Chemistry log, manuals |
Inspection names and order vary by city and county. Ask your building department or your builder for the exact list for your permit, and ask to be told the result of each one.
Stage 1: Design, engineering and permits
Before any digging, the builder prepares a plan showing the pool's size, shape, depth profile, distance from property lines and the house, equipment location, deck, and barrier. Some jurisdictions or soils need an engineered structural design or a soil report.
Florida. The pool must be built by a licensed pool/spa contractor, and the license number goes on the permit application (489.119). Florida law lets licensed contractors use master design drawings prepared by an engineer without new site-specific plans, and local building officials must accept them unless they have good cause to reject them (489.113). For most improvements over $2,500, a notice of commencement must be recorded and posted before work begins (713.13), and it is void if work does not start within 90 days of recording. If your pool is in a flood hazard area, the Florida Building Code points to its flood rules for A Zones and coastal V Zones (R4501.4.2.1).
Texas. Cities that regulate pools must use at least the 2019 ISPSC (Local Government Code 214.101 to 214.105). Houston and Dallas use the 2021 edition, while San Antonio and Austin use the 2024 edition. Austin's drought plan suspends new single-family pool permits in Stage 4 and Stage 5.
HOA approval. Many neighborhoods require architectural review before the city permit. Start early. See HOA pool approval and pool permits and inspections.
Your check: Get a copy of the approved plans. Make sure the depth, steps, benches, spa and equipment location match what you agreed to. Changes after this point usually need change orders and sometimes plan revisions.
Stage 2: Layout
The crew marks the pool outline on the ground with paint, stakes or string. This is your best and cheapest moment to make changes.
Your check:
- Walk the outline. Is it where you expected? Is it the right distance from the house, fence and property line?
- Measure the length and width with a tape. Compare with the plan.
- Check where the steps, bench, spa and equipment pad will go.
- Think about sun, shade, trees, views from the house and where kids will enter.
- Confirm underground utilities were marked. In both states, call 811 before digging is the standard practice, and your builder should arrange it.
If something is wrong, say so in writing before the excavator arrives.
Stage 3: Excavation
An excavator digs the hole to the shape and depth on the plan, slightly oversized to allow for the shell thickness. Dirt is either hauled away or spread on site.
Texas issues. In Austin, San Antonio and the Hill Country, crews may hit limestone or caliche that needs a rock hammer or saw. Fixr's 2025 data puts rock breaking or blasting at $1,050 to $9,700. In DFW and Houston, expansive clay can be sticky when wet and hard when dry, and rain can turn a dig site into mud.
Florida issues. Sandy soils can cave, and shallow groundwater can fill the hole. The builder may use dewatering pumps or well points. Florida code requires a hydrostatic relief device in areas of anticipated water table (R4501.21.4).
Your check:
- Photograph the hole from several angles with something for scale.
- Note any rock, water or buried debris, and ask the builder to document it in writing if it will change the price.
- Make sure the deep end and shallow end match the plan depth.
- Watch for damage to driveways, sprinklers, fences and lawns, and report it in writing right away.
If the builder says rock or water will cost extra, ask for the measure (hours, loads or cubic yards) and the rate from your contract's rock or soil clause. See the pool contract checklist.
Stage 4: Steel (rebar) and the pre-gunite inspection
The crew ties a grid of steel reinforcing bars (rebar) in the shape of the pool, held up off the soil by small supports called chairs so concrete can surround the steel. Steps, benches, the spa and the bond beam (the thick top edge of the pool) all get their own steel.
Many cities inspect the steel and the bonding before the shell is shot. This is often called the pre-gunite or steel and bonding inspection. The inspector checks steel size and spacing against the plan and checks the bonding connections that tie metal parts together electrically.
Your check:
- Photograph the steel everywhere, especially at steps, benches and corners, with a tape measure showing spacing.
- Look for steel lying directly on the dirt. It should be held up.
- Confirm the inspection passed before the shoot is scheduled.
On expansive clay, the steel design may be heavier. Ask if your plan is engineered for your soil.
Stage 5: Plumbing and the pressure test
Plumbers run pipes from the pool to the equipment pad: suction lines from skimmers and any main drains or suction outlets, return lines that push filtered water back, and often a dedicated cleaner line, spa lines and water feature lines.
Florida Building Code R4501.12.1 requires all pool piping to be tested and proved tight under a static water or air pressure test of at least 35 psi for 15 minutes. Texas cities apply their adopted code. The lines are usually kept under pressure, with a gauge, through the shell and deck stages so leaks show up before they are buried.
Suction safety matters. Florida code requires suction outlet entrapment protection under ANSI/PHTA/ICC-7 and limits pipe water speed to 10 feet per second on pressure lines and 8 feet per second on suction lines (R4501.6.3 and R4501.6.6). Drain covers sold in the U.S. must meet ANSI/APSP/ICC-16 2017 (16 CFR 1450). See drain safety and the VGB Act.
Your check: Photograph each line before it is covered, and photograph the pressure gauges with the date. Ask what pressure the lines are held at and for how long.
Stage 6: Electrical rough-in and bonding
Bonding connects the pool's steel, metal parts, light niches, nearby metal and the deck area into one electrical grid so there is no dangerous voltage difference for swimmers. It is not the same as grounding, and it is critical for safety.
The light niches (housings for underwater lights) and conduit are placed at this stage. The bonding is usually inspected with the steel, before the shell covers it.
Texas. Electrical work, including bonding, must be done by a TDLR-licensed electrician through a licensed electrical contractor unless an exemption applies (Occupations Code ch. 1305). Texas adopted the 2026 National Electrical Code effective September 1, 2026, and Houston reviews permit applications filed on or after that date under it. Check the electrician's license on TDLR's License Search.
Florida. A pool/spa contractor's license does not expand to electrical services that need an electrical contractor license (489.117(4)(e)). Ask who does the electrical work and check that license on myfloridalicense.com.
See pool electrical bonding and safety.
Stage 7: Shooting the gunite or shotcrete shell
This is the most dramatic day. A crew sprays concrete onto the steel to form the floor, walls, steps and bond beam. With gunite (dry-mix), dry material goes through the hose and water is added at the nozzle. With shotcrete (wet-mix), the concrete arrives premixed and is pumped. The American Shotcrete Association treats both as shotcrete, a placement method for concrete.
Quality depends on the crew. ASA recommends an ACI-certified shotcrete nozzleman and says dry-mix pool shotcrete should have a minimum 28-day compressive strength of 4,000 psi, with the required strength depending on the pool's design. ASA cites ACI 350, the concrete code for water-containing structures, as applying to pools.
Things to understand:
- Rebound is material that bounces off during spraying. It should be removed, not buried in the shell or left in the floor.
- Cold joints happen when spraying stops long enough for the surface to start setting. ASA says a joint can perform like one piece if the surface is roughened, clean, dampened to saturated surface dry, and placed with high-velocity equipment, and that bonding agents should not be used. For joints left overnight, the surface must be clean and free of laitance (a weak surface layer).
- Forms for steps or raised walls can generally be removed the day after shooting, per ASA.
Your check: Be there if you can. Photograph the shoot, note start and stop times, and ask whether there were any interruptions. Ask the builder whether test panels or cores will be taken if you request them. See gunite vs shotcrete explained.
Stage 8: Curing, and should I water my gunite shell?
Fresh concrete gains strength as it cures, and it needs moisture to do that. If it dries too fast in heat, sun or wind, it can shrink and crack. ASA recommends a minimum of 7 days of curing to control shrinkage in young concrete and warns that windy, hot or dry conditions without curing raise cracking risk. ASA's FAQ does not set a specific watering method.
Many builders ask the homeowner to wet the shell with a hose several times a day during the first week or so, especially in Texas and Florida summer heat. Others use their own crew or curing methods. The answer for your pool is whatever your builder's written curing plan says. Ask for it in writing:
- Who waters the shell, how often, and for how many days?
- Should water collect in the deep end, and should it be pumped out?
- What if a freeze is forecast (North Texas) or a heat wave hits?
- Are there drought rules that limit hose use? In San Antonio, for example, hand-held hose watering is allowed any time in Stages 2 and 3 under SAWS rules for landscapes; ask your utility how that applies to construction curing.
How long before plaster? ASA's FAQ does not give a set wait before plastering. Builders and plasterers set their own schedules, often several weeks after the shoot while tile, coping, equipment and deck work happen. Ask your builder for the planned wait and why.
Your check: Photograph the shell daily. Note any cracks. Hairline shrinkage cracks may be surface-level, but report any crack in writing so it is documented. See pool cracks and structural repair.
Stage 9: Tile and coping
Waterline tile is a band of tile at the top of the pool walls where the water level sits. It is easier to clean than plaster and hides the waterline. Coping is the cap on top of the bond beam, the edge you sit on, made of stone, brick, pavers, precast concrete or poured concrete.
Fixr's 2025 data puts coping at about $40 to $50 per linear foot and mosaic waterline tile at $20 to $50 per square foot.
Your check:
- Is the tile line level all the way around? An uneven tile line will be obvious once the pool is full.
- Do the tile and coping match your selections? Write down product names and colors.
- Are grout joints full and even?
- Is there an expansion joint between the coping and the deck, as your builder specified?
See pool decks and coping materials.
Stage 10: Equipment, gas and final electrical
The pump, filter, sanitizer, heater, controls and lights are installed at the equipment pad. Gas lines are run for gas heaters, and electrical circuits for pumps, heat pumps and lights are finished.
Code and rules to check:
- Pool pump motors of 1.15 to 5 total horsepower made on or after September 29, 2025 must be variable-speed (10 CFR 431.485).
- In Florida, filtration must turn the pool's full volume over in 12 hours or less (FBC R4501.20), and the code requires at least one skimmer per 800 square feet and one return per 300 square feet.
- Gas and electrical work usually have their own permits and inspections.
Your check: Photograph every equipment label showing brand and model. Compare them with your contract's equipment list. Substitutions should be approved in writing. See pool pumps, filters and heaters.
Stage 11: When does the decking go in?
The deck usually goes in after tile and coping and after the plumbing and bonding under it have passed inspection. The crew grades and compacts the base, sets forms, installs deck drains if planned, and pours concrete or lays pavers or stone. Some cities have a pre-deck inspection.
Fixr's 2025 pool deck guide puts a concrete deck around a 12 x 24 pool at about $6,750 to $8,000. Materials run $6 to $10 per square foot for concrete, $6 to $8 for pavers and $15 to $30 for stamped concrete.
Texas clay. Decks on expansive clay move. Ask how the deck is separated from the coping, how joints are spaced, and how water is drained away from the pool and the house.
Your check: Look at the slope. Water should run away from the pool and the house, toward drains or the yard. Photograph the base before the pour. After the pour, ask how long before you can walk on it and when furniture can go on it.
Stage 12: Barrier and final inspection
The barrier must be in place before final approval.
Florida. Florida Building Code R4501.19 says final electrical and barrier inspections must be completed before the pool is filled (fiberglass and vinyl pools are the exception, because they are filled on installation). Chapter 515 requires at least one of five safety features to pass final inspection: a 515.29 barrier, an ASTM F1346-91 safety cover, exit alarms on doors and windows with direct pool access, self-closing and self-latching door devices with the release at least 54 inches up, or an ASTM F2208 in-pool alarm. A screen enclosure built to code can serve as the barrier. The contractor must also give you a document describing chapter 515's requirements and the Department of Health's drowning prevention publication (515.33).
Texas. Barrier rules come from your city's adopted ISPSC and local ordinances, plus HOA rules. Ask your city what is checked at final and whether door alarms are required where the house wall is part of the barrier.
Your check: Test every gate: does it close and latch on its own from any open position? Is the latch out of a child's reach? Are there climbable objects near the fence? See Florida barrier laws and Texas barrier laws.
Stage 13: Plaster or interior finish, and filling
The interior finish (white plaster, colored plaster, quartz or pebble aggregate) is troweled over the shell. This is usually done in one day by a specialty crew, and the pool is filled right after, often starting while the crew is finishing.
A national standard covers this work: ANSI/PHTA/ICC/NPC-12 2025, the American National Standard for the Plastering of Swimming Pools and Spas, listed by the Pool and Hot Tub Alliance. Ask your builder whether the plaster crew follows it.
Common instructions builders give at fill time (follow your own builder's written instructions, which control):
- Do not stop the fill once it starts, because a stop can leave a ring.
- Put a soft cloth at the end of the hose so it does not gouge the fresh surface.
- Stay out of the pool, and keep pets out, until told otherwise.
- Check drought stage rules before filling. Austin's Emergency Stage 5 bans using water to fill pools. See drought restrictions and filling pools.
Fixr's 2025 concrete guide lists plaster at $1.50 to $5 per square foot and says plaster lasts roughly 5 to 10 years, with resurfacing every 10 to 15 years.
Stage 14: What is a pool startup and why does it matter for plaster?
Startup is the first few weeks after a new plaster or aggregate finish goes in. New plaster releases lime and other materials into the water as it hydrates, which pushes pH and alkalinity around and can leave plaster dust on the floor. How the water is balanced and brushed during this time affects how the surface looks and how long it lasts.
We could not load the National Plasterers Council's own startup guidance to confirm its current steps, so we do not list a step-by-step chemical recipe here. What to ask your builder:
- Who does the startup (the builder, the plasterer or a service company), and for how many days or weeks?
- What written startup method is used, and can I have a copy?
- How often will the pool be brushed and tested?
- When can we swim? When can the heater, salt system and automatic cleaner be turned on?
- What water chemistry log will I receive?
- Does the plaster warranty depend on following the startup method?
Ask for an orientation at the end: how to run the equipment, the timer or automation, how to test water, where the shutoffs are, and where the manuals are. See pool water chemistry.
Who does each stage? The subcontractor chain
Most concrete pools are built by a general pool builder who schedules several specialty crews: excavation, steel, plumbing, electrical, shotcrete or gunite, tile and coping, decking, plaster, and sometimes a screen enclosure company. Knowing this helps you understand delays (each crew has its own schedule) and lien risk (each crew or supplier may have rights if it is not paid).
Florida. DBPR describes swimming pool specialty contractor licenses for layout, structural, excavation, trim, decking, piping and finishes, and says those specialty contractors may not contract directly with the public. They must work under a pool/spa contractor licensed under 489.105(3)(j) to (l). A Florida general contractor does not have to subcontract structural pool work, but all other pool work must go to a licensed pool contractor (489.113). Unlicensed workers may do pool work only under the supervision of a licensed pool/spa contractor who is responsible for it (489.117).
Texas. Before construction starts, a residential contractor must give you a list of the subcontractors and suppliers it intends to use and update it within 15 days of any change, unless you sign a statutory waiver (Property Code 53.256). Do not waive it. That list tells you whose notices to watch for and whose lien releases to collect.
In both states, ask the builder at each stage which crew is coming and when, and keep a simple log of crews, dates and work done.
Change orders during construction
Ideas come up during the build: a bigger bench, an extra light, a different tile. Each change should go through a written change order that states the work, the price change, the schedule change and both signatures, before the work is done.
- Never approve changes verbally on site. Crews cannot change the contract.
- Ask whether the change needs a plan revision or a new inspection.
- Ask how the change affects the payment schedule. Paying for a change before it is done shifts risk to you.
- Keep every signed change order with the contract.
Rock or groundwater "extras" should be handled the same way: a written notice from the builder with photos, the measure used, and the contract rate. See the pool contract checklist.
Where spas, tanning ledges and water features fit in the sequence
Features are built into the same stages as the main pool, which is why late changes are costly:
- Spa: its own steel, plumbing (jets, suction, returns, often a separate heater circuit), bonding and shell are part of stages 4 to 7. A raised spa wall needs extra steel and forms.
- Tanning ledge and benches: shaped in the steel and shell stages. Measure their depth on the plan; a few inches changes how they feel.
- Water features: sheer descents, bubblers and deck jets need plumbing runs before the shell and deck. Fixr's 2025 data lists water features at $250 to $15,000.
- Lights: niches and conduit go in before the shell. Adding a light after the shoot means cutting concrete.
- Automatic cover: some types need a vault or track built into the bond beam or deck.
Decide on these before the steel inspection. See hot tubs and spas and pool lighting and landscaping.
Florida screen enclosures: where they fit
In much of Florida, the screen enclosure is the last major structure. It is usually installed after the deck, because its footings and anchors go into or along the deck edge. Florida Building Code Section 2002.4 requires screen enclosure frames to be designed for wind in two directions using pressures based on ultimate design wind speeds from 110 to 170 mph, plus a 300-pound vertical load on any foot of a primary member. Extruded aluminum members must be at least 0.040 inch thick.
If the enclosure will serve as the pool barrier, it must meet the barrier rules, and the final inspection may wait for it. If it uses the code's screen-removal alternate design (panels removed, retracted or cut in winds over 75 mph), the contractor must give written notice of that duty to you and the building department, and the barrier height must be kept even with panels removed.
Coordinate the enclosure company's schedule with the pool builder's, and make sure the deck is designed for its footings. See screen pool enclosures in Florida.
Your role: preparing the site and living with the build
- Access. Clear the path for the excavator and concrete pump. A fence section may need to come down. Agree in writing who rebuilds it.
- Sprinklers and utilities. Mark sprinkler heads and private lines (lighting, septic, irrigation) that utility locates will not show.
- Pets and children. An open hole, steel and wet concrete are dangerous. A hole that collects rainwater is a drowning hazard. Keep a temporary barrier up.
- Neighbors and HOA. Concrete trucks and pumps block streets for hours. Give neighbors notice and follow HOA work-hour rules.
- Water and power. Crews may use your outdoor water and power. Your contract should say so.
- Mail and notices. In Florida, watch for Notices to Owner from subcontractors and suppliers. In Texas, watch for notices of claim. Keep them; they tell you who to get lien releases from.
Pool construction terms you will hear
| Term | Plain meaning |
|---|---|
| Bond beam | The thick, reinforced top edge of the pool wall that supports coping and ties the shell together |
| Bonding | Connecting metal parts and the area around the pool into one electrical grid so there is no dangerous voltage difference |
| Chairs | Small supports that hold rebar off the dirt so concrete surrounds it |
| Cold joint | A seam where new concrete meets concrete that has started to set |
| Coping | The cap on top of the pool wall, the edge you sit on |
| Dewatering | Pumping groundwater out of the excavation so the crew can work |
| Hydrostatic relief valve | A valve that lets groundwater into the pool instead of pushing up on the shell when the pool is empty |
| Nozzleman | The crew member who controls the spray nozzle; ASA recommends ACI certification |
| Rebound | Material that bounces off during spraying and should be removed |
| Return | A fitting that pushes filtered water back into the pool |
| Skimmer | An opening at the waterline that pulls in floating debris |
| Startup | The first weeks of water care after a new plaster finish |
| Suction outlet | A drain or other fitting where the pump pulls water; must have a compliant cover |
| Turnover | The time for the pump and filter to move the pool's full volume once; 12 hours or less under Florida code |
Which inspections happen, by state?
Inspection lists differ by city and county. Use this as a guide to the questions to ask, and confirm the list on your permit.
| Inspection | Florida (FBC Residential Ch. 45 plus local) | Texas (city ISPSC plus local) |
|---|---|---|
| Plan review | Building department, licensed pool/spa contractor applies | City permit office where pools are regulated |
| Steel and bonding (pre-shell) | Common local inspection; confirm | Common local inspection; confirm |
| Plumbing pressure | FBC requires 35 psi for 15 minutes | Per adopted code; confirm |
| Electrical rough-in | Electrical permit | Electrical permit; TDLR-licensed electrician |
| Pre-deck | Some jurisdictions | Some jurisdictions |
| Gas | If gas heater | If gas heater |
| Final electrical and barrier | Before filling a concrete pool (R4501.19); chapter 515 feature required | Per city code; confirm whether before fill |
Many permit offices let you look up inspection results online by address or permit number. Florida law requires local building departments to accept inspection requests electronically (553.79). Write down each inspection date and result.
Weather delays: rain, hurricanes and freezes
- Rain. Heavy rain floods holes, softens clay, delays shoots and deck pours, and can wash out excavations. Summer afternoon storms are routine in Houston and across Florida.
- Hurricanes. Hurricane season begins June 1 (National Weather Service). Open excavations, unbackfilled steps and loose materials are hazards. Ask your builder for a storm plan: who secures the site, pumps the hole and pays for damage.
- Heat. Hot, dry, windy days increase cracking risk in fresh concrete, which is why ASA stresses curing.
- Freezes. North Texas freezes can delay concrete work and threaten exposed plumbing and equipment. Ask how fresh concrete and pipes are protected.
Your contract should say how weather days are handled and whether the completion date moves. See pool construction timeline and hurricane prep for pools.
What can go wrong during pool construction?
- Wrong size, depth or location because the layout was not checked
- Steel lying on the soil, or too little steel at steps and benches
- Rebound buried in the shell or floor
- Cold joints placed without proper preparation
- Plumbing leaks because lines were not pressure tested or the pressure was not kept on
- Missing or poor bonding connections
- Shell cracking from poor curing in hot weather
- Uneven tile lines
- Deck draining toward the pool or house, or cracking on clay
- Equipment substituted with cheaper models
- Gates that do not self-close and latch
- Plaster discoloration from poor startup
- Unpaid subcontractors or suppliers putting liens on your home
- Long gaps between stages with no explanation
How do I know if my builder skipped a step?
- Check the permit record. Look up your permit online and see which inspections were requested and passed. A shell shot without a passed steel inspection, or a deck poured without a passed plumbing or bonding inspection, is a red flag.
- Compare photos to the plan. Steel spacing, steps, light niches, skimmer count and equipment should match.
- Check equipment labels against the contract.
- Ask for test records: pressure test results, any strength test results, the startup log.
- Hire your own inspector if you are unsure. Texas's statutory disclosure statement (Property Code 53.255) reminds owners that city inspections are not quality control inspections and suggests owners inspect the work or hire an independent inspector.
If you find a problem, raise it in writing right away and keep a copy. See pool builder disputes and complaints.
What should I photograph, and how do I protect payments at each draw?
Photo log
Take dated photos at every stage, from several angles, with a tape measure where helpful: layout, the empty hole, any rock or water, steel and chairs, bonding, every plumbing line before burial, pressure gauges, the shoot, daily curing, tile and coping, equipment labels, the deck base, finished deck slope, gates and latches, the finish, and the startup log. Store them in a dated folder with your contract, change orders, permits and payments.
Lien waivers at each draw
Each payment should match a completed and inspected stage. With each payment, collect lien waivers or releases from the builder and from major subcontractors and suppliers who have notified you.
Florida. Subcontractors and suppliers who do not contract with you directly must serve a Notice to Owner, and if you receive one you should get a waiver from that company before or with the next payment. Florida's statutory forms are the "Waiver and Release of Lien Upon Progress Payment" and the "Waiver and Release of Lien Upon Final Payment" (713.20), and a lien right cannot be waived in advance. At final payment, the contractor must give you a final payment affidavit listing any unpaid lienors who served a notice (713.06(3)(d)).
Texas. Waivers are enforceable only if they substantially follow the statutory conditional or unconditional forms for progress and final payments (Property Code 53.281 to 53.284). As a condition of final payment, the contractor must give you a final bills-paid affidavit (53.259). Owners should retain 10% of the contract price during the work and for 30 days after completion to protect against claims.
See pool deposits and payment draws.
How to choose a provider
- Get a copy of the approved plans and permit.
- Walk and measure the layout before digging.
- Photograph the hole, steel, bonding and every plumbing line before they are covered.
- Confirm each inspection passed before the next stage starts.
- Get the curing plan in writing, including who waters and for how long.
- Check the tile line for level before coping and deck work.
- Match equipment labels to the contract list.
- Check deck slope and drainage before and after the pour.
- Test every gate for self-closing and self-latching.
- Follow the written plaster startup instructions.
- Collect lien waivers with each payment and the final affidavit before final payment.
Related swimming pool builders and contractors guides
- How Long Does It Take to Build a Pool in Texas and Florida?
- Gunite vs Fiberglass vs Vinyl Pools: Which Is Right for a Texas or Florida Yard?
- Do You Need a Permit to Build a Pool in Texas or Florida? Permits, Inspections and Who Pulls Them
- Pool Builder Deposits and Payment Schedules: How Much to Pay and When
- Pool Construction Contract Checklist: What Must Be in Writing Before You Sign
- Pool Electrical Safety and Bonding: What Do NEC Article 680, GFCI and Bonding Mean for Your Pool?
- Pool Water Chemistry Explained: Chlorine, pH, Alkalinity, CYA and Calcium Hardness
- Is a Pool Crack Serious? Surface Crazing vs Structural Cracks, Causes, Repairs and Your Legal Options in Texas and Florida
Swimming pool builders and contractors by state and city
Questions people ask
How long does it take to build a gunite pool?
Fixr's 2025 concrete pool guide says installation typically takes 3 to 12 weeks because the concrete needs to cure. That does not count design, HOA approval and permit review, which can add weeks or months. Rain, hurricanes, freezes, rock, groundwater and failed inspections add more time. Ask your builder for a schedule by stage and how weather days are handled in the contract.
How long does shotcrete need to cure before plaster?
The American Shotcrete Association recommends at least 7 days of curing to control shrinkage, especially in hot, dry or windy weather, but its pool FAQ does not set a fixed wait before plastering. Builders and plasterers set their own timing, often weeks later after tile, coping, equipment and deck work. Ask for your builder's planned wait and the reason in writing.
Should I water my gunite pool shell after it is shot?
Follow your builder's written curing plan. Fresh concrete needs moisture to cure, and ASA warns that hot, dry or windy conditions without curing raise cracking risk. Many builders ask homeowners to hose the shell several times a day for about the first week, while others handle curing themselves. Ask who is responsible, how often, how long, and what to do about pooled water.
When is the pool plumbing pressure tested?
Plumbing is usually pressure tested after it is installed and before it is buried, and many builders keep the lines under pressure with gauges through the shell and deck stages. Florida Building Code R4501.12.1 requires at least 35 psi of static water or air pressure for 15 minutes. Photograph the gauges with the date so you have a record before the deck covers the lines.
When is bonding inspected?
Bonding is usually inspected with the steel before the shell is shot, because the shell and deck will cover the connections. Some jurisdictions inspect deck-area bonding separately before the deck pour. Electrical work must be done by properly licensed electricians in both states. Ask your builder which inspections your permit requires and make sure each one passed before the next stage starts.
What is the tile and coping stage?
After the shell cures enough, crews set waterline tile around the top of the walls and coping on the bond beam. The tile line should be level, because the water surface will show any error. Fixr's 2025 data puts coping at about $40 to $50 per linear foot and mosaic waterline tile at $20 to $50 per square foot. Check product names and colors against your selections.
Can I be at the job site during construction?
Usually yes, but follow the builder's safety rules and stay out of the hole and away from equipment. Visiting at key stages, especially layout, steel, the shoot and tile, lets you catch problems early. Keep children and pets away from an open excavation, which is a fall and drowning hazard when it collects water. Put concerns in writing rather than telling crew members.
Who is responsible for the startup chemicals?
It depends on the contract. Many builders include startup chemicals and a set number of visits, while others hand off to a service company or to you on fill day. Because the first weeks affect how new plaster looks and lasts, the contract should say who does startup, for how long, what method is used and when the warranty starts. Ask for the chemistry log.
What if my builder stops work in the middle of the project?
Ask in writing for the reason and a restart date. In Florida, a contractor holding more of your money than the value of work done may not stop work for 90 days, or a contract-specified period, without just cause or proper certified-mail notice of termination (489.126). In Texas, look to your contract, the DTPA's 60-day pre-suit notice rule and an attorney. In both states, document everything and keep paying only for completed, inspected work.
Can a concrete pool be built in winter in Texas or Florida?
Yes, much of both states allows year-round building, and winter can mean shorter waits. North Texas freezes can delay shotcrete, deck pours and plaster, and fresh concrete must be protected from freezing. Florida winters are usually mild, but cold snaps can still affect plaster work in the north of the state. Ask your builder how cold-weather days are scheduled and how fresh concrete and exposed pipes are protected.
What happens if an inspection fails?
The builder must correct the problem and request a re-inspection before moving on. A failed steel, plumbing or bonding inspection delays the next stage. Ask the builder to send you the inspector's comments and the re-inspection result. Repeated failures, or work continuing without a passed inspection, are warning signs. In Florida, starting or performing permitted work without a permit in effect is a prohibited act under 489.127.
Sources
- Fixr: Concrete (Gunite) Pool Cost (updated Jan. 31, 2025)
- Fixr: Pool Deck Cost (updated Jan. 31, 2025)
- Fixr: Fiberglass In-Ground Pool Cost (updated Jan. 31, 2025)
- American Shotcrete Association: Pool FAQs
- PHTA: Find a Standard (ANSI pool and spa standards list)
- Florida Building Code, Residential (2023, 8th ed.) Chapter 45: Private Swimming Pools
- Fla. Stat. 489.119 (2026): License number on bids, contracts and ads
- Fla. Stat. 489.113 (2026): Qualifications for practice; subcontracting
- Fla. Stat. 489.117 (2026): Registration; specialty contractors
- Fla. Stat. 713.13 (2026): Notice of commencement
- Fla. Stat. 713.02 (2026): Types of lienors and exemptions
- Fla. Stat. Chapter 515 (2026): Residential Swimming Pool Safety Act
- Fla. Stat. 713.06 (2026): Liens of persons not in privity; notice to owner; final payment affidavit
- Fla. Stat. 713.20 (2026): Duration of liens; waivers and releases
- Fla. Stat. 553.79 (2026): Permits; applications; issuance; inspections
- Fla. Stat. 489.127 (2026): Prohibitions and penalties
- Texas Local Government Code Chapter 214 (municipal pool code, Sec. 214.101-214.105)
- Houston Permitting Center: Code Development
- City of Dallas: Know the Code
- City of San Antonio DSD: Codes and Ordinances
- City of Austin: Building Technical Codes
- Austin Water Drought Contingency Plan (2024)
- Texas Occupations Code Chapter 1305: Electricians
- TDLR License Search
- Houston Permitting Center: 2026 National Electrical Code now in effect
- Texas Property Code Chapter 53: Mechanic's, Contractor's, or Materialman's Liens
- eCFR 10 CFR 431.485: Pool pump motor energy conservation standards
- 16 CFR Part 1450: Virginia Graeme Baker Pool and Spa Safety Act rule
- National Weather Service: Hurricane Preparedness Plan
- SAWS: Stage 2 drought restrictions
- Florida DBPR: Construction Industry Licensing Board
- Florida Building Code, Building (2023) Chapter 20: Aluminum (screen enclosures)
- Fla. Stat. 489.126 (2026): Moneys received by contractors
- Texas Business and Commerce Code Chapter 17 (Deceptive Trade Practices Act)
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.