Local Guide · Electricians
What Electrical Does a Restaurant, Salon, Clinic or Shop Need? A Build-Out Checklist by Business Type
A business-by-business electrical build-out guide for Texas and Florida: lease due diligence, load profiles, restaurant hoods and shunt trips, walk-in coolers, salons, medical offices, gyms, lighted signs, food trucks and permit timelines.
Before signing a lease, have a licensed electrician confirm the space's service size, voltage, phase and metering against your equipment list. Restaurants need the most power: cooking lines, dish machines, walk-ins and hood interlocks that cut power when the fire suppression system discharges. Salons, gyms and medical offices need careful circuit planning. Lighted signs need a licensed sign or electrical contractor and a sign permit.
Key facts
- Texas licensed AC and refrigeration contractors are exempt for electrical connections supplying HVAC and refrigeration equipment, including the disconnect (Occ. Code 1305.003(a)(11)).
- Low-voltage and communications wiring is exempt from Texas electrician licensing (Occ. Code 1305.003(a)(12)).
- TDLR electrical sign contractors must be or employ a master electrician or master sign electrician.
- Texas master sign electricians need 12,000 hours of training; journeyman sign electricians 8,000 hours (Occ. Code 1305.154; TDLR).
- Florida DBPR specialty electrical categories include electrical sign work (ES certified, ET registered).
- Florida DBPR licenses Mobile Food Dispensing Vehicles through its Division of Hotels and Restaurants.
- FPL says planning a new project can take a few months and asks customers to contact it early.
- Florida requires a recorded notice of commencement before the first inspection on contracts over $5,000 (s. 713.135).
- Texas uses the 2026 NEC since Sept. 1, 2026; Florida's 9th Edition building code (2023 NEC) takes effect Dec. 31, 2026 (Tampa: Jan. 1, 2027).
Before you sign the lease: the electrical due diligence checklist
The most expensive electrical surprise in a build-out is discovering, after you sign, that the space cannot power your equipment. Before signing a lease for a restaurant, salon, clinic, gym or shop in Texas or Florida, get a licensed electrical contractor to walk the space and answer these questions in writing:
- Service size, voltage and phase. What amperage serves this unit, at what voltage (120/240, 120/208, 277/480), single- or three-phase? Is it enough for my equipment list?
- Metering. Is the unit separately metered by the utility, submetered by the landlord, or included in rent?
- Panel condition and space. Age, brand, condition, open breaker spaces, and labeled circuits.
- Distance and route. How far is the meter or main switchgear from where heavy equipment will go?
- Existing violations. Anything an inspector will likely make you fix when you pull a permit.
- Utility upgrade path. If more capacity is needed, what will the utility require, and how long might it take? FPL, for example, says planning a new project can take a few months and asks customers to contact it early.
- Lease terms. The work letter, tenant improvement allowance, alterations clause, who owns new electrical equipment, and restoration at lease end. See commercial electrical services for lease terms explained.
Bring a complete equipment list with nameplate data. Electricians size services from real loads, not guesses.
How to build your equipment list (the load profile)
A "load profile" is simply a list of everything that uses electricity, how much it draws, and how much runs at the same time. Your electrician turns it into a load calculation. For each item, record:
| Field | Where to find it |
|---|---|
| Voltage and phase | Nameplate or spec sheet (for example "208V, 3-phase") |
| Amps, watts or kW | Nameplate or spec sheet |
| Circuit requirement | Installation manual: dedicated circuit, breaker size, receptacle type, hardwired |
| Location | Your floor plan |
| Usage pattern | Runs all day, cycles, or occasional |
The biggest mistake is buying used equipment rated for 240 volts when the building has 208-volt three-phase service, or single-phase equipment for a three-phase building. Match equipment to the service before you buy.
What electrical does a restaurant need?
Restaurants are the most electrically demanding small business most owners will build. Typical systems:
| System | Electrical considerations |
|---|---|
| Cooking line | Electric fryers, ovens, griddles, induction and combi ovens may need large, often three-phase circuits. Gas equipment still needs power for controls and ignition. |
| Kitchen hood exhaust and makeup air | Fan motors, controls, lights, and interlocks with the fire suppression system (below) |
| Refrigeration | Reach-ins on receptacles; walk-in cooler and freezer condensing units and evaporators on dedicated circuits |
| Dish area | Dish machine and booster heater, often among the largest single loads |
| Water heating | Electric tankless or tank water heaters can be very large loads |
| Ice machines, beverage, espresso | Dedicated circuits per manufacturer |
| Point of sale, network, music, cameras | Dedicated circuits help; low-voltage cabling is exempt from Texas electrician licensing (Occ. Code 1305.003(a)(12)) but must still meet code |
| Lighting | Dining, kitchen, exterior, signage, emergency and exit lighting |
| HVAC | Rooftop units sized for kitchen heat; licensed AC contractors may make the HVAC equipment connections and disconnect in Texas (1305.003(a)(11)) |
Kitchens are wet, hot and greasy environments, so receptacle protection, weather-resistant devices outdoors, and wiring methods suited to the space matter. Ask your contractor which receptacles need GFCI protection under the NEC edition your city enforces: the 2026 NEC in Texas since Sept. 1, 2026, and the 2020 NEC in Florida until the 9th Edition building code (2023 NEC) takes effect Dec. 31, 2026 (Tampa says Jan. 1, 2027).
What is a hood suppression electrical interlock (shunt trip)?
Commercial cooking hoods over grease-producing equipment have a fire suppression system. When it discharges, the fire code and the suppression system's design generally call for shutting off fuel and electric power to the cooking appliances under the hood, so the fire is not re-fed. For gas, that is a gas shutoff valve. For electric equipment, it is usually a shunt-trip breaker or a contactor:
- A shunt-trip breaker is a circuit breaker with an extra coil that trips the breaker remotely when it receives a signal, here from the suppression system's control.
- A contactor is a heavy-duty relay that opens power to a group of circuits on a signal.
Other common interlocks: the hood exhaust fan must run when cooking equipment is on, makeup air ties to the exhaust, and the suppression system may signal the building fire alarm.
Who does what: the fire suppression contractor installs and certifies the suppression system; the electrical contractor installs the shunt-trip breakers or contactors and wiring that the suppression system controls; the fire marshal inspects the whole sequence. We did not load the NFPA standards that set these requirements, so get the required sequence from your fire marshal and the suppression system's design documents, and make sure both contractors coordinate before inspection. In Florida, the fire code is the Florida Fire Prevention Code adopted by the State Fire Marshal (s. 633.202).
Who installs walk-in cooler electrical?
Usually two trades share the job:
- The refrigeration contractor sets the box, condensing unit, evaporator and refrigerant piping.
- The electrical contractor runs the dedicated circuits and feeders from the panel, installs disconnects as needed, and wires lights and door heaters if not factory-wired.
In Texas, a licensed air conditioning and refrigeration contractor is exempt from electrician licensing for the electrical connections supplying HVAC and refrigeration equipment, including the required disconnect (Occ. Code 1305.003(a)(11)). That exemption covers the final connections, not new circuits or panel work, which need a licensed electrical contractor. In Florida, confirm each contractor's license scope on DBPR before work starts. Agree in writing who provides the disconnect, who wires the evaporator and defrost controls, and who schedules the electrical inspection.
How many circuits does a hair salon need?
There is no fixed number in law. Circuit count comes from the equipment list and layout. Salons are deceptively heavy loads because many high-wattage tools run at once:
- Styling stations: blow dryers, flat irons and curling irons, often several per station at peak times. Electricians typically plan dedicated or lightly shared circuits per station or pair of stations.
- Hood dryers and processors: large loads, often on their own circuits.
- Shampoo area: receptacles near sinks need ground-fault protection where the NEC requires it; tankless or large water heaters for constant hot water can be among the largest loads in the space.
- Nail stations: UV or LED lamps, drills and ventilation units.
- Laundry: washer and dryer for towels; a commercial dryer may need a 208 or 240 volt circuit.
- Lighting: high color-accuracy lighting at stations, plus emergency and exit lighting.
- Front desk: point of sale, network, music.
Ask the electrician to show the load calculation and the circuit schedule (which station is on which breaker). Tripping breakers during busy hours is the most common salon electrical complaint, and it is usually a design problem. See breaker keeps tripping.
What electrical is required for a dental or medical office?
Health care spaces have stricter electrical rules than ordinary offices, because patients may be connected to equipment, and some loads must keep running in an outage. Expect:
- Special requirements for patient care spaces in the NEC and related NFPA health care standards, which can cover grounding, receptacle types and essential electrical systems.
- Dedicated circuits for imaging (x-ray, panoramic and CBCT units), dental chairs, compressors, vacuum pumps, sterilizers and lab equipment, per each manufacturer's installation specifications.
- Backup power decisions for vaccine and medication refrigerators and critical equipment.
- Engineering. Medical and dental build-outs commonly use an electrical engineer, and plan review is usually more detailed.
We could not load the current health care sections of the NEC or NFPA 99 from a free primary source, so we do not summarize their specific requirements here. Ask your engineer which health care rules apply to your space category, and get equipment installation manuals to your electrician before the design is final. For home medical equipment power needs, see medical equipment power and backup.
What electrical does a gym or fitness studio need?
- Cardio equipment: many commercial treadmills need dedicated circuits; check each model's manual. Self-powered bikes and ellipticals may need little or none.
- HVAC and ventilation: high occupancy and exercise heat mean larger HVAC loads.
- Locker rooms: showers, water heating, hand dryers, and receptacle protection near water.
- Sound and lighting: studio lighting and audio systems.
- Floor boxes: receptacles in the floor for equipment in open areas, which need proper floor-rated boxes.
- Saunas or hot tubs: large dedicated circuits and bonding requirements. See pool and spa electrical bonding.
Retail stores and offices
Retail and office spaces are lighter loads but have their own needs:
- Lighting: display and track lighting, controls required by the energy code, and emergency and exit lighting.
- Point of sale and network: dedicated circuits for registers and network racks; a small backup battery for the network.
- Refrigerated cases in convenience and grocery uses, each on its own circuit.
- Window and storefront signs (below).
- Office furniture systems with built-in power need coordinated feeds.
- EV charging for customers or staff, which may push a service upgrade. See EV charger installation.
What permits and licenses are needed for lighted signs?
An illuminated sign usually needs a sign permit (zoning and structural) and electrical approval, and the electrical work must be done by someone licensed for sign work.
Texas
- TDLR licenses electrical sign contractors, who may design, manufacture, install, connect, reconnect or service electric signs, cold cathode, neon gas tubing or outline tubing, and alter sign wiring inside or outside a building.
- An electrical sign contractor must employ (or be) a licensed master electrician or master sign electrician. Individual licenses include master sign electrician (12,000 hours of training under a master sign electrician plus an exam) and journeyman sign electrician (8,000 hours plus an exam) (Occ. Code 1305.154; TDLR).
- Sign contractors must carry liability insurance of at least $300,000 per occurrence, $600,000 aggregate and $300,000 products and completed operations, and workers' compensation or an approved alternative.
Florida
- DBPR's electrical specialty categories (ES certified, ET registered) include electrical sign work. A certified electrical contractor (EC) may also do it.
- The sign itself typically needs a local sign permit from the city or county.
The circuit feeding the sign from your panel is regular electrical work for your electrical contractor. Ask your landlord about sign criteria in the lease, and your city about sign permits, before ordering a sign.
Do food trucks need electrical inspections?
Rules depend on where the truck operates. What we could confirm:
- Florida: DBPR's Division of Hotels and Restaurants licenses Mobile Food Dispensing Vehicles (food trucks and hot dog carts where food is prepared or served) and publishes an application guide. Check that guide for equipment and inspection requirements, and ask local fire officials about generators and propane.
- Texas: we did not load Texas state or city mobile food unit rules for this guide. Before you buy or build a truck, ask your city or county health department (for example, in Houston or Austin) and the local fire marshal what permits, inspections and generator rules apply.
Electrical issues to plan for in any state: properly rated shore-power inlets and cords for commissary or event hookups, generator placement away from service windows and air intakes, and never running a generator inside an enclosed space. CPSC says most portable generator incidents involve carbon monoxide. If the truck plugs into a building, the receptacle on the building side is permanent electrical work that needs a licensed contractor and, often, a permit.
How long does commercial electrical permitting take?
There is no statewide number in either state, and timelines vary by city, season and job size. What drives the schedule:
- Plan review. Simple tenant work may be reviewed quickly; restaurant and medical build-outs usually involve more reviewers, including fire.
- Code changeovers. Texas moved to the 2026 NEC for permit applications on or after Sept. 1, 2026. In Florida, Tampa says permit applications must be accepted by Dec. 31, 2026 to vest under the 8th Edition building code; the state's 9th Edition takes effect Dec. 31, 2026. Expect busy permit counters near changeover dates.
- Utility work. New or upgraded service can take the longest. FPL says new projects can take a few months to plan, and it coordinates disconnects and reconnects with local inspection.
- Notice of commencement (Florida). For contracts over $5,000, a recorded notice of commencement is required before the first inspection (s. 713.135).
- Inspections. Rough-in, above-ceiling and final inspections, plus fire inspections, each need scheduling. In Houston, the licensed contractor schedules electrical inspections.
Ask your contractor for a realistic permit and inspection timeline at your city right now, and build it into your opening date. Rent often starts before you can open.
Common electrical build-out mistakes, and how to avoid them
| Mistake | What happens | How to avoid it |
|---|---|---|
| Buying equipment before confirming the service | A 240-volt single-phase oven arrives at a 208-volt three-phase space | Get the service voltage and phase in writing first, then order |
| Signing a lease without a capacity check | The tenant pays for a service upgrade the landlord would have negotiated | Make capacity part of the work letter or TI allowance |
| Hiring a residential-only license | Work stalls at permit or inspection | Texas: not a residential wireman. Florida: not the residential specialty (043) |
| Starting utility requests late | Finished space, no power, rent running | Request service changes as soon as the load is known |
| No coordination between suppression, refrigeration and electrical contractors | Failed fire inspection or missing disconnects | Assign each interface in writing |
| Blocking the panel after opening | OSHA citation risk and slower emergency shutoff | Keep at least the required working space clear and label every circuit (29 CFR 1910.303) |
| Skipping the as-built panel schedule | Every future repair starts with guesswork | Require a labeled directory and as-built schedule at final |
One more: plan for the next tenant or your own growth. Spare breaker spaces and a little extra conduit now are far cheaper than tearing into finished walls later.
Build-out checklist by phase
| Phase | Electrical tasks |
|---|---|
| Before lease | Site walk with a licensed contractor; confirm service size, voltage, phase, metering; review work letter, TI allowance and alterations clause |
| Design | Final equipment list with nameplate data; load calculation; panel schedule; lighting and emergency lighting plan; engineer if required |
| Permits | Building and electrical permits; fire review for hoods, alarms, emergency lighting; sign permit; Florida notice of commencement over $5,000 |
| Utility | Service change request; schedule disconnect and reconnect; new meter if separately metered |
| Rough-in | Circuits, boxes, conduit; rough inspection before walls close |
| Trim and equipment | Devices, fixtures, equipment connections; hood interlocks; refrigeration connections |
| Final | Final electrical and fire inspections; labeled panel directory; as-built panel schedule; warranty papers; lien releases |
| Operations | Keep panel fronts clear and circuits labeled (OSHA 1910.303); emergency light test log; maintenance plan |
How to choose a provider
- Walk the space with a licensed electrician before signing the lease.
- Build an equipment list with voltage, phase, amps and circuit requirements.
- Match equipment to the building's service before buying anything.
- Negotiate the work letter, TI allowance and electrical ownership terms.
- Request utility service changes early.
- Coordinate hood suppression, shunt trip and fire alarm work between contractors.
- Assign walk-in cooler electrical tasks in writing.
- Hire a licensed sign contractor and get the sign permit.
- Build permit and inspection time into your opening date.
- Get a labeled panel directory and as-built panel schedule at final.
Related electricians guides
- What Do Small Businesses Need to Know About Commercial Electrical Work in Texas and Florida?
- Workplace Electrical Safety for Small Businesses: OSHA Rules, Panels, Extension Cords and Inspections
- How Do You Hire an Electrician in Texas or Florida? Licenses, Insurance, Contracts and Red Flags
- How Do You Read and Compare Electrical Quotes? Sample Line Items and Red Flags
- How Do You Install a Home EV Charger? Circuits, Panels, Permits, GFCI Rules and Cost in Texas and Florida
- Whole-Home Standby Generators: How Do You Size, Install, Permit and Fuel One in Texas or Florida?
- Do You Need an Electrical Permit in Texas, and Can a Homeowner Do the Work?
- Florida Electrical Permits: Owner-Builder Rules, Exemptions, Open Permits and Inspections
Electricians by state and city
Questions people ask
What should I check in a commercial lease about electrical capacity?
Ask for the service amperage, voltage and phase serving your unit, whether it is separately metered, the panel's condition and open spaces, and who pays for upgrades. Read the work letter, tenant improvement allowance, alterations clause and restoration terms. Have a licensed electrician check the space against your equipment list before you sign.
Do I need three-phase power for a restaurant?
Often, but not always. Many commercial cooking, dish and refrigeration units and rooftop HVAC units are made in three-phase versions, and some are available only that way. Smaller cafes using gas cooking may manage on single-phase. Check equipment nameplates and confirm your building's service before buying equipment.
Who wires a commercial kitchen hood's fire suppression shutoff?
The fire suppression contractor installs and certifies the suppression system, and the electrical contractor installs the shunt-trip breakers or contactors that cut power to cooking equipment when the system discharges. The fire marshal inspects the whole sequence, so make sure both contractors coordinate before inspection.
Can my HVAC or refrigeration contractor wire the walk-in cooler in Texas?
Partly. A licensed Texas air conditioning and refrigeration contractor is exempt from electrician licensing for the electrical connections supplying HVAC and refrigeration equipment, including the required disconnect (Occupations Code 1305.003(a)(11)). New circuits, feeders and panel work still need a licensed electrical contractor.
Who can install a lighted sign in Texas?
A TDLR-licensed electrical sign contractor, which must employ or be a master electrician or master sign electrician, or a licensed electrical contractor for the supply circuit. Sign contractors carry the same minimum liability insurance as electrical contractors. You will usually also need a city sign permit.
Do Florida food trucks need a state license?
Yes. Florida DBPR's Division of Hotels and Restaurants licenses Mobile Food Dispensing Vehicles, defined as a food truck or hot dog cart where food is prepared or served, and publishes an application guide. Local fire officials may also have generator and propane rules, so check with them before operating.
Sources
- Texas Occupations Code Chapter 1305
- TDLR Electrical Sign Contractor license
- TDLR Master Sign Electrician license
- TDLR Journeyman Sign Electrician license
- DBPR Electrical Contractors' Licensing Board
- DBPR Division of Hotels and Restaurants
- Florida Statutes s. 633.202, Florida Fire Prevention Code
- Florida Statutes s. 713.135, Notice of commencement and permits
- FPL Electric Service Standards (November 2026)
- FPL, Building and Construction
- Houston Permitting Center, Electrical Inspections
- TDLR adopts 2026 NEC (rulemaking notice)
- Florida Building Commission, 9th Edition course text
- City of Tampa, FBC 9th Edition announcement
- CPSC Portable Generator Safety Alert
- OSHA 29 CFR 1910.303, General requirements
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.