What Is a Florida Condo SIRS (Structural Integrity Reserve Study), and What Are the Deadlines, Scope and Hiring Rules?

Florida's structural integrity reserve study law (s. 718.112(2)(g)) as it stands in 2026: which buildings need one, the December 31, 2026 outer deadline, required components and the $25,675 threshold, who can prepare it, reserve waiver limits, and bid and conflict rules for repairs.

A SIRS is a Florida-required study of a condo building's roof, structure, fire protection, plumbing, electrical, waterproofing, windows and doors, and other items over $25,000 (inflation-adjusted to $25,675 in 2026), with a reserve funding plan. Residential condo buildings three habitable stories or higher need one at least every 10 years. Owner-controlled associations existing by July 1, 2022 had until December 31, 2025, or with a milestone inspection, no later than December 31, 2026. Owners can no longer waive SIRS reserves.

Key facts

  • Residential condo associations must complete a SIRS at least every 10 years for each building three habitable stories or higher (Fla. Stat. s. 718.112(2)(g)1.).
  • Required SIRS items: roof, structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, and other items over the threshold.
  • The threshold is $25,000 or DBPR's inflation-adjusted amount; DBPR lists $25,675 for 2026.
  • A SIRS must be performed or verified by a Florida-licensed engineer or architect, or a CAI reserve specialist or APRA professional reserve analyst.
  • Associations existing on or before July 1, 2022 had to complete a SIRS by December 31, 2025, or with a milestone inspection, no later than December 31, 2026.
  • For budgets adopted on or after December 31, 2024, unit owners may not vote to waive or reduce reserves for SIRS items (limited exceptions).
  • Associations must distribute the SIRS (or notice of availability) to owners and file a completion statement with DBPR within 45 days.
  • Condo contracts exceeding 5% of the total annual budget, including reserves, require competitive bids; engineering services are exempt (s. 718.3026).
  • HB 913 (Ch. 2025-175, effective July 1, 2025) added the baseline funding plan, the 25-year useful-life rule and SIRS bid disclosures.

What is a structural integrity reserve study (SIRS)?

A structural integrity reserve study, or SIRS, is a required study that tells a Florida condominium association what its building's structural and life-safety components will cost to repair or replace, when, and how much the association must set aside each year so the money is there. The Florida Department of Business and Professional Regulation (DBPR) describes it as "a budget planning tool that looks at the parts of a building a condominium association is required to maintain, the status of the condominium's existing reserve fund, and the amount of funding needed to offset anticipated expenses."

The law is Florida Statutes s. 718.112(2)(g), with the reserve and budget rules in s. 718.112(2)(f). It was created by Senate Bill 4-D in 2022 and has been rewritten every year since. This guide reflects the 2026 statutes and DBPR's posted guidance as of November 2026. Because the law keeps changing, check the current statute before relying on any article dated before July 1, 2025, including older versions of this one.

A SIRS is different from a milestone inspection. The milestone inspection under s. 553.899 checks the building's current structural condition. The SIRS looks forward and builds a funding plan. The two are linked, as explained below and in our milestone inspection guide.

Which Florida condos need a SIRS?

Under s. 718.112(2)(g)1., a residential condominium association must have a SIRS for each building on the condominium property that is three habitable stories or higher, as determined by the Florida Building Code.

The requirement does not apply to (s. 718.112(2)(g)5.):

  • Buildings less than three stories in height.
  • Single-family, two-family, three-family or four-family dwellings with three or fewer habitable stories above ground.
  • Any portion or component of a building that has not been submitted to the condominium form of ownership.
  • Any portion or component of a building that is maintained by a party other than the association.

So a community of two-story townhome condos does not need a SIRS, while a five-story mid-rise does. A mixed-use tower needs a SIRS for the condominium portions the association maintains, not for a commercial podium owned and maintained by someone else. Cooperatives have a parallel rule in chapter 719.

What is the SIRS deadline?

SituationDeadline
Ongoing requirementAt least every 10 years after the condominium's creation (s. 718.112(2)(g)1.)
Associations existing on or before July 1, 2022, controlled by unit ownersBy December 31, 2025 (s. 718.112(2)(g)7.)
Same associations that must also complete a milestone inspection on or before December 31, 2026May complete the SIRS together with the milestone inspection, but in no event after December 31, 2026
After a completed milestone inspectionMay delay a required SIRS for no more than the 2 consecutive budget years immediately following, to focus money on milestone repairs (s. 718.112(2)(g)9.)
Developer turnoverBefore turning over control, the developer must have a turnover inspection report under s. 718.301(4)(p) and (q) for each building three stories or higher (s. 718.112(2)(g)6.)

DBPR's SIRS page also states that by October 1, 2025, all condominium and cooperative associations were required to create an online account with the Division of Florida Condominiums, Timeshares and Mobile Homes, and that associations confirm SIRS completion through that account.

What components must a SIRS include?

Section 718.112(2)(g)1. requires, at a minimum, a study of these items as they relate to the structural integrity and safety of the building:

ComponentWhat it typically covers
a. RoofRoof membrane, insulation, flashing, drains
b. StructureLoad-bearing walls and other primary structural members and systems as defined in s. 627.706: foundations, columns, beams, slabs, balconies
c. Fireproofing and fire protection systemsFire sprinklers, standpipes, fire alarms, fire pumps, fire-rated assemblies
d. PlumbingRisers, stacks, main lines, pumps
e. Electrical systemsMain service, switchgear, distribution, emergency power
f. Waterproofing and exterior paintingSealants, coatings, deck membranes, exterior paint
g. Windows and exterior doorsCommon-element glazing and doors the association maintains
h. Other items over the thresholdAny item with a deferred maintenance expense or replacement cost over $25,000 (or the inflation-adjusted amount), if failing to maintain or replace it negatively affects items a. through g., as determined by the visual inspection

The threshold changed. Older articles say $10,000. HB 913 (Chapter 2025-175, effective July 1, 2025) revised the threshold, and the current statute uses $25,000 or the inflation-adjusted amount, whichever is greater. DBPR must adjust it every year using the Consumer Price Index for All Urban Consumers and post it by February 1. DBPR's Reserve Threshold page lists the 2025 threshold as $25,000 and the 2026 threshold as $25,675. The 2027 figure is due by February 1, 2027.

Only items the association is responsible for under the declaration are reserved. If your declaration makes owners responsible for their own windows, those windows are generally outside the association's SIRS reserves, though the study may still note them.

What must the SIRS report contain?

Under s. 718.112(2)(g)2. and 4., a SIRS is based on a visual inspection of the condominium property and, at a minimum, must:

  • Identify each item of condominium property being visually inspected.
  • State each item's estimated remaining useful life and estimated replacement cost or deferred maintenance expense.
  • Provide a reserve funding plan or schedule with a recommended annual reserve amount that reaches each item's estimated cost by the end of its remaining useful life.
  • Include a recommended reserve funding schedule based on a baseline funding plan, meaning reserve funding for each budget year is enough to keep the reserve cash balance above zero. The study may recommend other schedules, as long as each one meets the association's maintenance obligation.

Additional rules added in 2025:

  • The study may recommend no reserves for items whose useful life and replacement cost cannot be determined, or may recommend a deferred maintenance amount for them.
  • The study may recommend no replacement reserves for any item with an estimated remaining useful life of more than 25 years, but may recommend a deferred maintenance amount.
  • If the study recommends reserves for items the law does not require, those amounts must be separately identified.
  • The study must take into account the funding method or methods the association uses. If the association later approves a different funding method, such as a special assessment, the SIRS must be updated to reflect it, including any expected change in regular assessments.
  • The association must obtain an updated SIRS before adopting any budget in which reserve funding does not align with the funding plan in the most recent SIRS.
  • The study may be updated after items are repaired or replaced to reflect their new useful lives.

DBPR is required to adopt a SIRS form by rule in coordination with the Florida Building Commission (s. 718.112(2)(g)13.). Ask your preparer to use the current DBPR form or show how the report maps to it.

Who can prepare a SIRS?

Under s. 718.112(2)(g)3.a., a SIRS, including its visual inspection portion, must be performed or verified by one of the following:

  • An engineer licensed under chapter 471.
  • An architect licensed under chapter 481.
  • A person certified as a reserve specialist (RS) by the Community Associations Institute (CAI).
  • A person certified as a professional reserve analyst (PRA) by the Association of Professional Reserve Analysts (APRA).

Many associations pair the two skill sets: an engineer handles the visual inspection of structure, waterproofing and systems, and a reserve specialist builds the funding model, or one firm does both. A milestone inspection done in the past 5 years that meets the SIRS requirements may be used in place of the SIRS visual inspection portion (s. 718.112(2)(g)8.), which can save the association from paying for two inspections.

Contractors who want to do the study

A design professional (as defined in s. 558.002) or a contractor licensed under chapter 489 who bids to perform a SIRS must disclose in writing any intent to bid on maintenance, repair or replacement work the study may recommend. A design professional or contractor who bids on recommended services may not have a direct or indirect interest in the firm that prepared the SIRS, or be a relative of someone who does, unless the relationship is disclosed in writing. "Relative" means within the third degree by blood or marriage. A services contract made without the required disclosure is voidable and ends when the association files a written termination notice, and the professional can face discipline (s. 718.112(2)(g)3.b.).

Can unit owners waive SIRS reserves?

Generally no, not anymore. Under s. 718.112(2)(f)2.b., for any budget adopted on or after December 31, 2024, the members of a unit-owner-controlled association that must have a SIRS may not vote to provide no reserves or less reserves than required for the SIRS items in paragraph (g). Unit owners can still vote by majority of total voting interests to waive or reduce reserves for non-SIRS items (for example, a clubhouse or pool, if they are not SIRS components).

Exceptions written into the current statute:

  • Multicondominium associations may vote for no or reduced SIRS reserves if an alternative funding method has been approved by the division.
  • Termination: if owners vote to terminate the condominium under s. 718.117, they may vote to waive the reserves recommended by the most recent SIRS.
  • Developer control: a developer-controlled association may not vote to waive or reduce reserves before turnover.

Related protections:

  • For budgets adopted on or after December 31, 2024, members may not vote to use SIRS reserve funds, or their interest, for anything other than replacement or deferred maintenance of SIRS components (s. 718.112(2)(f)3.).
  • Reserve funds for SIRS components may be pooled only with other SIRS components, and the pooled funding must be enough to meet projected expenses under the most recent SIRS (s. 718.112(2)(f)4.).
  • Any proxy question about waiving or reducing reserves must carry this statement in capitalized, bold letters larger than any other font on the ballot: "WAIVING OF RESERVES, IN WHOLE OR IN PART, OR ALLOWING ALTERNATIVE USES OF EXISTING RESERVES MAY RESULT IN UNIT OWNER LIABILITY FOR PAYMENT OF UNANTICIPATED SPECIAL ASSESSMENTS REGARDING THOSE ITEMS." (s. 718.112(2)(f)5.)

Can a board pause reserve contributions?

In two narrow situations under s. 718.112(2)(f)2.:

  1. After a milestone inspection (sub-subparagraph e.): for a budget adopted on or before December 31, 2028, if the association completed a milestone inspection within the previous 2 calendar years, the board may, with approval of a majority of the total voting interests, temporarily pause reserve contributions or reduce reserve funding for no more than two consecutive annual budgets, to fund the repairs the milestone inspection recommended. This does not apply to developer-controlled associations, associations where non-developer owners have been in control for less than 1 year, or associations controlled by bulk assignees or bulk buyers. An association that pauses must have a SIRS performed before it resumes contributions.
  2. After a natural emergency (sub-subparagraph d.): if the local building official determines the entire building is uninhabitable due to a natural emergency, the board may pause or reduce reserve contributions until the building is determined habitable, and may spend reserve funds to make it habitable. Contributions must resume immediately once the building is declared habitable.

How does a SIRS affect special assessments and monthly dues?

Directly. Once a SIRS exists, the reserve amount in the budget for SIRS items must be based on the findings and recommendations of the most recent SIRS (s. 718.112(2)(f)2.a.). Where reserves are short and work is due soon, a special assessment may be needed.

Key rules for owners and boards:

  • SIRS reserves may be funded by regular assessments or special assessments, among other methods the statute lists. A special assessment used to fund SIRS reserves under s. 718.112(2)(f)2.c. requires approval of a majority of the total voting interests of the association.
  • The SIRS must be updated to reflect the funding method the association chooses and its effect on the funding schedule (s. 718.112(2)(g)4.c.).
  • Any such special assessment must be included in the annual financial statement delivered to owners and provided to prospective buyers (s. 718.112(2)(f)2.c.(II)).

Owners should read the SIRS funding schedule closely: it shows what each component will cost and when, which tells you whether a future special assessment is likely. This page covers the rules, not how to pay; owners with questions about their own situation should talk to the association's manager or a Florida condominium attorney.

Owner notice, reporting and director duties

  • Owners: within 45 days after receiving the SIRS, the association must distribute a copy to each unit owner, or deliver a notice that the completed study is available for inspection and copying on written request. Delivery is by U.S. mail or personal delivery, or electronically to owners who consented (s. 718.112(2)(g)11.).
  • DBPR: within 45 days after receiving the SIRS, the association must give the division a statement that the study was completed and provided or made available to owners, using the division's form (s. 718.112(2)(g)12.). DBPR says associations confirm SIRS completion through their online account and that reported studies appear in the public SIRS database within one business day.
  • Directors: an officer or director must sign an affidavit acknowledging receipt of the completed SIRS (s. 718.112(2)(g)10.). If officers or directors willfully and knowingly fail to complete a SIRS, that is a breach of their fiduciary relationship to unit owners under s. 718.111(1).
  • Website: associations with 25 or more units must post the most recent SIRS on their website or app (s. 718.111(12)(g)).

DBPR's Division of Florida Condominiums, Timeshares and Mobile Homes lists (954) 202-6831 and ctmheducation@myfloridalicense.com for SIRS reporting questions.

What changed with each law since 2022?

LawApprovedMain SIRS and reserve changes (from the session law title and current statute)
SB 4-D, Ch. 2022-269May 26, 2022Created the milestone inspection (s. 553.899) and the SIRS requirement; barred waiving or reducing reserves for SIRS items after a set date; required SIRS and reports to be posted and provided to buyers.
CS/CS/SB 154, Ch. 2023-203June 9, 2023Revised the SIRS definition and requirements; defined "alternative funding method"; revised reserve waiver rules; added SIRS and milestone disclosures for buyers.
CS/CS/CS/HB 1021, Ch. 2024-244June 14, 2024 (effective July 1, 2024)Required distribution of the SIRS to owners and a completion statement to DBPR within set timeframes; added the natural-emergency reserve pause; added director education and kickback penalties; required posting of building permits online.
CS/CS/HB 913, Ch. 2025-175June 23, 2025 (generally effective July 1, 2025)Raised the reserve threshold and required annual inflation adjustment; revised SIRS items; added the baseline funding plan; let studies skip replacement reserves for items with more than 25 years of remaining life; allowed a 2-budget-year SIRS delay after a milestone inspection; added the milestone-based reserve pause through budgets adopted by December 31, 2028; required bid disclosures for SIRS preparers; required a director affidavit; allowed video conference meetings.

The 2026 statute (s. 718.112) also shows an amendment by Chapter 2026-14. Boards should have their association attorney confirm whether any 2026 change affects their budget cycle.

How should a board pick contractors for SIRS repairs?

Competitive bids under s. 718.3026

If a contract for materials, equipment or services requires payment by the association that exceeds 5% of the association's total annual budget, including reserves, the association must obtain competitive bids. All such contracts, and any contract not fully performed within 1 year, must be in writing. The association is not required to accept the lowest bid.

Exceptions in s. 718.3026(2):

  • Contracts with association employees and for attorney, accountant, architect, community association manager, timeshare management firm, engineering and landscape architect services.
  • Obtaining needed products and services in an emergency.
  • A vendor that is the only source of supply within the county.
  • Associations with 10 or fewer units may opt out with a two-thirds vote of unit owners.

Conflict-of-interest rules under s. 718.3027

Directors, officers and their relatives (within the third degree) must disclose any activity that may be a conflict of interest. A conflict is presumed if, without prior notice, a director, officer or relative contracts with the association, or holds an interest in a business that does business with or proposes to contract with the association. The proposed contract must be listed on the meeting agenda with the documents attached, approval requires a two-thirds vote of the other directors present, and the interested director must leave during discussion and the vote. Members can bring the contract up at the next members' meeting and cancel it by majority vote. A contract not properly disclosed is voidable on written notice signed by at least 20% of the voting interests.

Chapter 718 also makes it a third-degree felony for an officer, director or manager to knowingly solicit, offer to accept or accept a kickback, and requires removal from office (s. 718.111(1)(a)).

A sound selection process

  1. Have the engineer prepare repair drawings, specifications and a bid form so every contractor prices the same work.
  2. Invite several licensed contractors. Check each license (see Florida license lookup), insurance and experience with occupied concrete buildings.
  3. Collect written disclosures: SIRS or milestone preparers' intent to bid, and any ties between bidders and the study firm.
  4. Compare bids line by line, including unit prices for concrete repair quantities, since actual quantities are not known until damaged concrete is opened up. See how to compare bids.
  5. Award at a properly noticed board meeting, with any conflicts handled under s. 718.3027.
  6. Use a written contract with a schedule, payment terms tied to engineer-verified progress, change order procedures and lien releases. See contract checklist and change orders.
  7. Keep the engineer on the job to observe construction and approve quantities.

How to choose a provider

  • Confirm which buildings are three habitable stories or higher and which components the association maintains under the declaration.
  • Check the current DBPR reserve threshold before scoping the study.
  • Decide whether to coordinate the SIRS with the milestone inspection.
  • Hire a qualified preparer (engineer, architect, RS or PRA) and collect written bid-intent disclosures.
  • Provide the preparer with drawings, past reports, repair records and current reserve balances.
  • Review the draft for every required component, remaining useful life, cost and baseline funding plan.
  • Have an officer or director sign the receipt affidavit.
  • Distribute the SIRS or notice of availability to owners within 45 days and post it if you have 25 or more units.
  • File the completion statement through the association's DBPR online account within 45 days.
  • Adopt a budget whose SIRS reserves match the study; update the SIRS if funding changes.
  • Bid repair work under s. 718.3026 and handle director conflicts under s. 718.3027.
  • Calendar the next SIRS no later than 10 years out.

Related general and residential contractors guides

General and residential contractors by state and city

Questions people ask

Is the SIRS threshold still $10,000?

No. HB 913 (2025) revised the threshold for other items in a SIRS and for required reserves. The current statute uses $25,000 or the inflation-adjusted amount DBPR posts, whichever is greater. DBPR lists the 2026 threshold as $25,675 and will post the 2027 amount by February 1, 2027. Articles quoting $10,000 predate the 2025 law.

Can our association do the SIRS with the milestone inspection?

Yes, in two ways. Associations existing on or before July 1, 2022 that must complete a milestone inspection by December 31, 2026 may complete the SIRS at the same time, but no later than December 31, 2026. And a milestone inspection done within the past 5 years that meets SIRS requirements may replace the SIRS visual inspection portion under s. 718.112(2)(g)8.

Does my two-story condo need a SIRS?

No. The requirement applies only to buildings three habitable stories or higher. The statute excludes buildings less than three stories, one- to four-family dwellings with three or fewer habitable stories above ground, portions not under condominium ownership, and components maintained by someone other than the association. Regular reserve rules in s. 718.112(2)(f) may still apply.

How often must a SIRS be updated?

At least every 10 years for each covered building. It must also be updated when the association adopts a budget whose reserve funding does not match the most recent SIRS funding plan, after the association chooses a funding method such as a special assessment, and before resuming reserve contributions after a milestone-based pause. It may be updated after repairs change components' useful lives.

Can a contractor prepare our SIRS and then do the repairs?

Only with written disclosure. Under s. 718.112(2)(g)3.b., a licensed contractor or design professional bidding to perform a SIRS must disclose in writing any intent to bid on recommended work, and bidders on that work must disclose any interest in or family relationship with the SIRS firm. Without disclosure, the contract is voidable. A contractor alone cannot sign a SIRS unless it is performed or verified by an engineer, architect, RS or PRA.

What happens if our board never did a SIRS?

If officers or directors willfully and knowingly fail to complete a required SIRS, that is a breach of their fiduciary duty to owners under s. 718.112(2)(g)10. and s. 718.111(1). Owners can raise it with the board, check DBPR's public SIRS database, and file a complaint with the Division of Florida Condominiums, Timeshares and Mobile Homes. A Florida condominium attorney can advise on further steps.

Do unit owners get a copy of the SIRS?

Within 45 days of receiving it, the association must send each owner a copy, or a notice that the study is available for inspection and copying on written request. Associations with 25 or more units must also post the most recent SIRS on their website or app. Buyers receive SIRS information in condo sale disclosures.

Does a SIRS cover items inside my unit?

Generally no. A SIRS covers condominium property the association must maintain under the declaration. Items inside a unit that the owner maintains, and portions maintained by someone other than the association, are excluded by s. 718.112(2)(g)5. Check your declaration's maintenance section to see which windows, doors and plumbing the association maintains.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration