What Should Be in a Construction Contract? A Clause-by-Clause Checklist

A clause-by-clause checklist for home improvement and construction contracts, with plain-English explanations, red-flag wording, the standard AIA forms, and the notices Texas and Florida law require in residential contracts.

A construction contract should name both parties and the contractor's license number, describe the scope with drawings and specifications, state the price and how it can change, set a payment schedule tied to completed and inspected work, give start and completion dates, assign permits, insurance and cleanup, explain change orders, warranties, termination and dispute resolution, and include the notices your state requires: in Florida the lien law, Recovery Fund and chapter 558 notices; in Texas the residential disclosure statement and RCLA notice.

Key facts

  • Florida requires a contractor's certification or registration number in each bid, proposal, contract and advertisement (Fla. Stat. 489.119(5)(b)).
  • Florida residential contracts over $2,500 must include the Homeowners' Construction Recovery Fund notice (489.1425).
  • Florida direct contracts over $2,500 for dwellings up to four units must include the construction lien law notice in at least 12-point capitalized bold type, signed and dated by the owner (713.015).
  • Texas residential contractors must deliver the 'Know Your Rights and Responsibilities Under the Law' disclosure statement before the owner signs (Tex. Prop. Code 53.255).
  • A Texas homestead lien requires a written contract signed before work starts, by both spouses if married, and filed with the county clerk (53.254).
  • Texas home improvement contracts on an existing homestead must carry a 10-point bold 'IMPORTANT NOTICE' warning, and a binding arbitration clause in them is unenforceable against the owner unless printed in at least 10-point bold (Prop. Code 41.007).
  • Texas contracts subject to the RCLA must include a 10-point bold chapter 27 notice; if omitted, the owner can recover a $500 civil penalty (27.007), and a contract waiver of chapter 27 is void (27.009).
  • A Texas DTPA waiver is valid only if in writing, signed, the consumer is not in a significantly disparate bargaining position, and is represented by counsel not chosen by the defendant (Bus. & Com. Code 17.42).
  • AIA's current owner-contractor forms include A101-2017 (stipulated sum), A105-2017 (short form), A201-2017 (general conditions) and G701-2017 (change order).

Is a verbal agreement with a contractor binding?

A spoken agreement can be a contract, but it is a poor way to build anything. Without paper, nobody can prove the scope, the price or what was promised. Both states push owners toward writing:

  • Texas: the statutory residential disclosure statement (Prop. Code 53.255) tells owners to get a written agreement covering the work, the completion time, the cost and the payment method, and warns that "an oral promise that is not included in the written agreement may not be enforceable under Texas law." On a homestead, a contractor's lien is valid only if a written contract was signed before work began, by both spouses if married, and filed with the county clerk (53.254).
  • Florida: the lien law disclosure in 713.015 still applies to oral contracts over $2,500; the notice must be given in a document that references the oral contract. But an oral deal makes every dispute a credibility contest.

DBPR's Unlicensed Activity program lists "no written contract" as a red flag: "Unlicensed providers often avoid written contracts to dodge accountability."

Should I use the contractor's contract, my own, or a standard form?

Most homeowners sign the contractor's form. That is fine if you read it and negotiate changes, but remember who wrote it. Three options:

OptionProsCons
Contractor's formFamiliar to the contractor; often includes required state noticesWritten to protect the contractor; may include one-sided arbitration, broad delay excuses, and weak warranties
Standard industry form (AIA, ConsensusDocs)Widely used, balanced starting point; courts and lawyers know themLong; must be adapted for Texas or Florida notices and small residential jobs
Your attorney's formTailored to you and the projectLegal fees; some contractors resist

AIA forms you may see

The American Institute of Architects publishes the most common standard forms. AIA's current documents list includes:

  • A101-2017: Owner-Contractor Agreement where the basis of payment is a Stipulated Sum (fixed price).
  • A102-2017: Cost of the Work Plus a Fee, with a Guaranteed Maximum Price.
  • A103-2017: Cost of the Work Plus a Fee, without a GMP.
  • A104-2017: Standard Abbreviated Form (formerly A107-2007).
  • A105-2017: Standard Short Form of Agreement Between Owner and Contractor, often used for smaller residential projects.
  • A201-2017: General Conditions of the Contract for Construction, the rulebook paired with A101, A102 and A103.
  • G701-2017: Change Order; G702-1992: Application and Certificate for Payment.

ConsensusDocs, a coalition-endorsed contract family in use since 2007, offers more than 100 construction documents, including general contracting forms. Home builder associations have also offered member forms; we did not confirm current editions, so ask for the version date on any form you receive.

None of these national forms automatically include the Texas or Florida residential notices described below. If you use one, add them. See fixed price vs cost-plus vs T&M to choose the right payment basis.

The clause-by-clause checklist

Go through your contract with this table. "Good wording" is what to look for. "Red flag" is wording that should make you stop and negotiate. These are plain-language examples, not legal forms.

Parties, scope and price

ClauseWhy it mattersGood wording looks likeRed flag wording
Parties and licenseYou need to know exactly who you can hold responsibleFull legal business name, address, license number (required on Florida contracts by 489.119(5)(b)), and the owner's names. Texas: both spouses on a homestead.Only a first name or a dba with no entity; license number of a different person or company
PropertyLiens and permits attach to a specific propertyStreet address and legal descriptionAddress only, wrong owner name
Scope of workEverything not written is a future change order"Work per plans dated __, specifications Exhibit A, and this line-item list" with brands, models and quantities"Remodel kitchen" or "as discussed"
ExclusionsTells you what you will pay extra forA short list: "Excludes: asbestos abatement, structural repairs not shown on plans"Long, vague exclusions like "any work not specifically listed" on a scope that lists little
AllowancesPlaceholder amounts for items you pick laterEach allowance stated with amount and what happens if you go over or under (credit back)Allowances far below realistic prices, or no credit for unused amounts
Contract priceThe number you are agreeing toFixed price, or cost-plus with fee and GMP stated clearly"Estimate" language on a document called a contract; price "subject to change" without limits
EscalationWho pays if material prices jumpEscalation limited to named materials, with supplier invoices, a cap, and a right to cancel"Contractor may adjust price for any cost increase"

Money and time

ClauseWhy it mattersGood wording looks likeRed flag wording
DepositYour biggest risk before work startsSmall deposit; permit and start dates; refund if missed. In Florida, more than 10% triggers 489.126 deadlines.Large deposit plus a clause extending 489.126 deadlines
Payment scheduleKeeps payments behind the workMilestone draws tied to inspections, each requiring lien releases or statutory waiversWeekly payments regardless of progress; final payment "on substantial completion" with no punch list
RetainageLeverage to finish and pay subsOwner retains 10% until 30 days after completion (required in Texas by 53.101)No retainage, or contract says owner waives retainage
Start and completion datesWithout dates, delay has no consequenceStart date, completion date or number of working days, and a written schedule"Contractor will proceed as schedule permits"
DelaysDefines excusable vs inexcusable delayWeather and owner changes extend time only with written notice within a set number of daysContractor excused for "any cause beyond its control" including its own subs
Liquidated damagesA pre-agreed daily amount for late completionA reasonable daily amount tied to your real costs (rent, storage)None on a time-critical job, or a tiny amount that means nothing

Changes, quality and closeout

ClauseWhy it mattersGood wording looks likeRed flag wording
Change ordersMain source of budget overrunsNo extra work or charges without a written change order signed by both, stating price and time"Owner agrees to pay for extra work requested verbally"
Concealed conditionsHidden damage behind wallsContractor must stop, document with photos, and get written approval before extra workContractor may proceed and bill at its standard rates
Permits and inspectionsUnpermitted work hurts safety, insurance and resaleContractor obtains all permits in its name and schedules inspections; permit costs includedOwner obtains permits (turns you into the owner-builder); "permits if required"
Substantial completionStarts warranty and final payment clocksDefined as final inspection passed and the space usable for its purposeDefined as whatever the contractor says
Punch listGets the last details doneJoint walk-through; written list; completion within a set number of days; final payment afterNo punch list process
WarrantyYour remedy after the jobWorkmanship warranty with a stated period; manufacturer warranties passed to owner"As is"; warranty void if owner pays late
Cleanup and site protectionDust, debris and damageDaily cleanup, dumpster, floor and furniture protection, repair of damage contractor causesSilent
Lien paperworkPrevents paying twiceFlorida: releases from all who served Notice to Owner, final payment affidavit. Texas: disbursement statements, statutory waivers, final bills-paid affidavit.Silent on releases

Risk and disputes

ClauseWhy it mattersGood wording looks likeRed flag wording
InsuranceCovers injury and damageContractor carries general liability and workers' comp (or proof of exemption), certificates delivered before start"Contractor is insured" with no certificate
IndemnificationWho pays if someone suesContractor indemnifies owner for claims caused by contractor's work and subsOwner indemnifies contractor for everything, including contractor's own negligence
TerminationHow either side can end the dealOwner may terminate for cause after written notice and a cure period; termination for convenience with payment for work doneOnly the contractor may terminate; owner owes full contract price if it ends the job
Right to cureA chance to fix problems before terminationWritten notice, a set cure period (for example 7 to 10 days), then terminationIndefinite cure periods
Dispute resolutionWhere and how you fightNegotiation, then mediation, then court or arbitration you chose knowinglyMandatory arbitration in a distant city, with the contractor choosing the arbitrator
Attorney's feesWho pays legal costsPrevailing party recovers reasonable feesOwner pays contractor's fees in any dispute, win or lose
Plans ownershipWhether you can reuse drawingsOwner gets a license to use the drawings for this property, including completion by another contractorPlans remain contractor's property and may not be used if contract ends
Waivers of rightsSome rights cannot be waived; others need strict formalitiesNo waiver of consumer protectionsTexas: a DTPA waiver you sign without your own lawyer; any waiver of chapter 27 (void under 27.009)

Key clauses explained in plain English

Termination for convenience

This lets the owner end the contract without proving the contractor did anything wrong, usually by paying for work done plus some overhead or profit on that work. It is valuable when your plans change or the relationship sours. Contractors may ask for a fee. Without it, ending the job early can expose you to a claim for lost profit on the whole contract.

Liquidated damages

A fixed dollar amount per day the contractor owes if it finishes late without an excuse. It saves you from proving your actual losses. The amount should be a reasonable estimate of your real costs, not a penalty. On most small remodels, owners skip it; on a restaurant or rental build-out with rent running, it matters.

Indemnification

A promise by one party to cover the other's losses from certain claims. You want the contractor to cover injuries and damage caused by its own work, workers and subs. Be wary of clauses that make you cover the contractor for its own negligence.

Substantial completion

The point when the work is complete enough to use as intended, even if minor punch-list items remain. It often triggers final payment timing, warranty start dates and liquidated damages. Define it to require a passed final inspection.

Right to cure

Before you can terminate for a breach, many contracts require you to give written notice and a period to fix it. Follow the clause exactly, by the delivery method it names. Firing a contractor without following it can turn you into the party in breach. See how to fire a contractor.

Warranty

A workmanship warranty is the contractor's promise to fix defects for a period. It is separate from manufacturer warranties on products. Know that statutes may limit how long you can sue regardless of the warranty: in Florida, actions on construction generally must be brought within 4 years, and the statute of repose bars them after 7 years (Fla. Stat. 95.11). Warranty repairs do not extend the Florida construction limitations period for permitted work with a certificate of occupancy. See home builder warranties.

Should I agree to binding arbitration?

Arbitration replaces a court trial with a private decision-maker. It is a real trade-off.

ProsCons
Often faster than courtFiling and arbitrator fees can be higher than court costs
Arbitrator may have construction knowledgeVery limited right to appeal a bad decision
PrivateLess discovery to find the contractor's records
Flexible schedulingThe clause may pick a forum or location that favors the contractor

Texas homestead rule: in a contract for improvements to an existing homestead, a binding arbitration clause must be conspicuously printed in at least 10-point bold type, and it is not enforceable against the owner if it is not (Prop. Code 41.007(c)-(d)). Under the RCLA, submitting a defect claim to arbitration has the same effect on limitations as filing in court (27.008).

Florida: the chapter 558 pre-suit notice process applies before arbitration or suit on defect claims unless the parties agreed in writing to opt out (558.005). Watch for an opt-out buried in the contract.

A middle path many owners prefer: mandatory mediation first, then court, with small claims always allowed. See contractor dispute resolution.

Texas: what must be in a residential construction contract?

Texas has several contract rules that apply to homes. Each is covered with exact wording in our required contract notices guide. In summary:

  • Residential disclosure statement (Prop. Code 53.255). Before you sign, the original contractor must deliver the "Know Your Rights and Responsibilities Under the Law" statement. It covers no required conveyance of your property, getting it in writing, the subcontractor list, monitoring payments, and the 10% reservation.
  • Subcontractor and supplier list (53.256). Due before construction, updated within 15 days of changes, unless you sign the statutory waiver.
  • Homestead formalities (53.254). Written contract signed before work or materials, both spouses if married, filed with the county clerk.
  • Home improvement contract notice (41.007). For improvements to an existing homestead, the 10-point bold "IMPORTANT NOTICE: You and your contractor are responsible for meeting the terms and conditions of this contract..." warning. Leaving it out is a deceptive act actionable under the DTPA. The section still mentions TRCC registration numbers, but that agency expired in 2009.
  • RCLA notice (27.007). 10-point bold notice that the contract is subject to Chapter 27; $500 civil penalty if omitted.
  • No conveyance (53.260). A contractor may not require you to convey your property to it as a condition of the contract.
  • Home solicitation (Bus. & Com. Code ch. 601). If the sale was made at your home after a personal solicitation and is over $25, you get a 3-business-day cancellation right with a 10-point bold notice and a cancellation form in duplicate.

DTPA waivers

If a Texas contract asks you to waive the Deceptive Trade Practices Act, that waiver is void unless it is in writing and signed by you, you are not in a significantly disparate bargaining position, and you are represented by a lawyer in the transaction who was not identified, suggested or selected by the contractor. It must be conspicuous, in at least 10-point bold, headed "Waiver of Consumer Rights," and in substantially the statutory wording (Bus. & Com. Code 17.42). A DTPA waiver in a homeowner's form contract signed without counsel generally fails these tests. Also note the DTPA does not apply to projects with total consideration over $500,000, or to written contracts over $100,000 where the consumer had independent counsel, unless the transaction involves the consumer's residence (17.49).

Florida: what must be in a residential construction contract?

  • License number (489.119(5)(b)). Must appear on every bid, proposal and contract.
  • Recovery Fund notice (489.1425). Required in residential repair, restoration, improvement or construction contracts unless all labor and materials total $2,500 or less. CILB may fine up to $500 for a first omission and must fine $1,000 per later violation.
  • Construction lien law notice (713.015). Direct contracts over $2,500 for dwellings up to four units: 12-point, capitalized, bold, on the front page or a separate page, signed and dated by the owner.
  • Chapter 558 notice (558.005(6)). Written contracts for improvement of real property after October 1, 2009 must contain substantially: "ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES." Leaving it out carries no penalty.
  • Home solicitation sale (501.021-501.055). If sold at your home after a personal solicitation and over $25, the agreement must show a "BUYER'S RIGHT TO CANCEL" statement and you may cancel until midnight of the third business day (501.025, 501.031). Sales that result from your own request for specific goods or services are excluded from the Florida definition.
  • Roof contracts (489.147). Residential roof contracts need 14-point bold notices about verifying insurance coverage, and after a declared emergency a 10-day cancellation right applies to contracts signed within 180 days of the declaration.
  • Deposit deadlines (489.126). Not a notice, but know them before you sign a contract that takes more than 10% up front.

Federal rules can add more: the FTC Cooling-Off Rule for in-home sales (16 CFR 429) and, for homes built before 1978, EPA's lead Renovation, Repair and Painting rule, which requires the renovation firm to give you EPA's lead pamphlet no more than 60 days before work and get your written acknowledgment (40 CFR 745 Subpart E).

What happens if the contract doesn't mention permits?

Permits are still required by law. Florida law makes it unlawful to construct, alter, repair or demolish a building without a permit unless the law exempts it (553.79), and starting permitted work without a permit in effect is a prohibited act for contractors (489.127(1)(h)). Since July 1, 2026, Florida local governments must exempt some single-family work under $7,500, but not electrical, plumbing, structural, mechanical or gas work, and not property in a flood hazard area (553.79, as amended by Ch. 2026-63).

If the contract is silent, disputes follow: who pulls the permit, who pays the fees, who fixes work that fails inspection. Add a sentence: "Contractor will obtain, in its name and at its cost, all permits and inspections required for the Work." Interestingly, Florida local governments may not require the owner-contractor contract or a cost breakdown to issue a building permit (553.79), so the permit office will not catch a weak contract for you. See Florida permits and Texas permits.

Should a lawyer review my construction contract?

Not every bathroom refresh needs a lawyer. But attorney review is worth it when:

  • The job is large relative to your savings, such as an addition, whole-house remodel or custom home.
  • It is your Texas homestead and the contract includes arbitration, a DTPA waiver, or lien terms you do not understand.
  • The contract is cost-plus or has escalation, liquidated damages or termination clauses.
  • You are a condo association, HOA board or commercial tenant signing on behalf of others or under a lease.
  • The contractor refuses to add required state notices.

Ask for a flat-fee review if available. Bring the bid, plans, specifications and your list of questions. Our questions to ask a contractor list helps.

Special notes for condo boards, tenants and commercial owners

  • Condo and HOA boards: follow your governing documents and Florida association procurement rules for bids and approvals, and require the contractor to carry insurance naming the association. See condo renovation in Florida and HOA architectural approval.
  • Commercial tenants: your lease's work letter usually controls approvals, contractor insurance, lien releases and who owns improvements. Make the construction contract match it. See commercial tenant build-out guide.
  • Commercial owners: residential notice rules (Florida 713.015, Texas 53.255) are tied to residential property, but the lien laws and permit rules still apply.

How to choose a provider

  • Confirm the business name and license number on the contract match the license record.
  • Attach plans, specifications and a line-item scope; list exclusions and allowances with amounts.
  • State the price type (fixed, cost-plus with GMP, or T&M with a not-to-exceed) and any escalation limits.
  • Tie payments to inspected milestones with lien releases (FL) or statutory waivers (TX); keep retainage.
  • Write start and completion dates and how delays are handled.
  • Require signed written change orders for any price or time change.
  • Put permits, inspections, cleanup and site protection on the contractor.
  • Get insurance certificates before work starts.
  • Define substantial completion, punch list and warranty terms.
  • Include termination for cause with a cure period, and consider termination for convenience.
  • Choose dispute resolution knowingly; in Texas, arbitration on a homestead must be in 10-point bold.
  • Florida: confirm the 713.015 lien notice, 489.1425 Recovery Fund notice and 558 notice are in the contract.
  • Texas: get the 53.255 disclosure statement before signing, the 53.256 sub list before work, and the 27.007 notice.
  • Texas homestead: both spouses sign before work starts, and the contract is filed with the county clerk.
  • Keep a fully signed copy with every exhibit and change order.

Related general and residential contractors guides

General and residential contractors by state and city

Questions people ask

What should be in a home improvement contract?

At minimum: names, addresses and license number; the property; a detailed scope with drawings, specs and exclusions; the price and how it can change; a payment schedule tied to completed, inspected work with lien paperwork; start and completion dates; permits, insurance, cleanup and warranty terms; change-order, termination and dispute clauses; and the notices your state requires. In Florida that includes the 713.015, 489.1425 and 558 notices; in Texas, the 53.255 disclosure and 27.007 notice.

What clauses protect the homeowner the most?

A detailed scope, milestone payments tied to inspections and lien releases or waivers, retainage, a written change-order requirement, firm dates, contractor-pulled permits, insurance certificates, a defined punch list, a workmanship warranty, termination for cause with a cure period, and a fair dispute clause. In Texas, the 10% statutory retainage under Property Code 53.101 should be written in.

What is an AIA contract and should I use one?

AIA contracts are standard forms published by the American Institute of Architects. Common ones are A101-2017 for a fixed price, A102-2017 and A103-2017 for cost-plus with and without a guaranteed maximum price, A105-2017 short form for smaller projects, and A201-2017 general conditions. They are a balanced starting point, but they do not include Texas or Florida residential notices, so add those.

Should I agree to binding arbitration?

It depends on the job and the clause. Arbitration can be faster and private, but fees can be high and appeals are very limited. On a Texas homestead improvement contract, an arbitration clause is not enforceable against the owner unless it is conspicuously printed in at least 10-point bold (Property Code 41.007). Many owners prefer mediation first, then court.

What is a termination for convenience clause?

It lets you end the contract without proving the contractor breached it, usually by paying for work completed and sometimes a modest fee. Without one, ending a job early can expose you to a claim for the contractor's lost profit on the remaining work. Ask for it, especially on long or uncertain projects.

What is a liquidated damages clause?

It sets a fixed amount per day that the contractor owes for unexcused late completion, so you do not have to prove actual losses. It should reflect a reasonable estimate of your real costs, like rent or temporary housing. It is most useful on time-critical projects such as a business build-out.

Who owns the plans and drawings?

Unless the contract says otherwise, the designer or contractor who created them usually keeps the copyright. What you need is a written right to use them to build and maintain your project, including if you have to hire another contractor to finish. Put that license in the contract.

What happens if a required notice is missing from my contract?

It depends on the notice. In Texas, a missing RCLA notice lets you recover a $500 civil penalty (27.007), and a missing 41.007 homestead notice is a deceptive act actionable under the DTPA. In Florida, CILB can fine a contractor for leaving out the Recovery Fund notice, while leaving out the 558 notice carries no penalty. See our required notices guide for each rule.

Can a Texas contractor make me waive the DTPA?

Only under strict conditions. Bus. & Com. Code 17.42 says a waiver is void unless it is written and signed, you are not in a significantly disparate bargaining position, and you have your own lawyer not chosen by the contractor. It must be in at least 10-point bold under a heading like 'Waiver of Consumer Rights.' A waiver in a standard homeowner form usually fails.

Is the contractor's estimate the same as a contract?

No. An estimate is a price guess and usually is not binding. A contract is a signed agreement with a scope, price and terms. If the document you are about to sign calls itself an estimate or proposal, make sure it has signature lines, says it becomes the contract when signed, and contains the full scope, schedule and state notices.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration