Every notice Texas and Florida law requires in a residential construction or home improvement contract, in one place: the statute, what triggers it, the exact wording, the type size, and what happens if the contractor leaves it out. Plus your 3-day cancellation rights under federal and state law.
Florida residential contracts generally need the s. 713.015 construction lien notice (direct contracts over $2,500, dwellings up to four units), the s. 489.1425 Recovery Fund notice (residential work over $2,500), and the s. 558.005 chapter 558 notice. Texas residential contracts need the Prop. Code 53.255 disclosure statement before signing, the 53.256 subcontractor list, the 27.007 RCLA notice, and on homestead improvements the 41.007 'IMPORTANT NOTICE.' In-home sales also trigger 3-day cancellation notices under the FTC rule and state law.
Key facts
- Florida 713.015: direct contracts over $2,500 for dwellings up to four units need the lien law notice in at least 12-point, capitalized, bold type, on the front page or a separate page, signed and dated by the owner.
- Florida 489.1425: residential contracts need the Recovery Fund notice unless all labor and materials total $2,500 or less; CILB may fine up to $500 for a first omission and must fine $1,000 for each later one.
- Florida 558.005(6): written improvement contracts after October 1, 2009 must contain the chapter 558 notice, but omitting it carries no penalty.
- Texas 53.255: the residential disclosure statement must be delivered before the owner signs; omitting it does not invalidate a lien.
- Texas 53.256: the subcontractor and supplier list (with a 10-point bold notice) is due before construction and must be updated within 15 days of changes unless the owner signs the statutory waiver.
- Texas 27.007: contracts subject to the RCLA need a 10-point bold chapter 27 notice; if it is missing, the owner may recover a $500 civil penalty.
- Texas 41.007: homestead improvement contracts need a 10-point bold 'IMPORTANT NOTICE'; omission is a deceptive act actionable under the DTPA, and an arbitration clause not in 10-point bold is unenforceable against the owner.
- FTC Cooling-Off Rule: door-to-door sales of $25 or more at the buyer's home ($130 or more at temporary locations) require a 10-point bold 3-day cancellation statement and a duplicate cancellation form (16 CFR 429).
- Florida home solicitation sales over $25 can be canceled until midnight of the third business day; business days exclude Sundays and federal holidays (501.021, 501.025).
- Florida residential roof contracts signed within 180 days of a declared emergency can be canceled within 10 days or by the official start date, whichever comes first, and must say so in 14-point bold (489.147(6)).
Quick reference: every required notice at a glance
Use this table to check a contract in five minutes. Each notice is explained below with its exact wording. Statutes were checked against the 2026 Florida Statutes on flsenate.gov and the Texas Constitution and Statutes site (tcss.legis.texas.gov) on November 19, 2026. This is general information, not legal advice.
| Notice | State and law | Trigger | Format | If omitted |
|---|---|---|---|---|
| Construction lien law notice | FL 713.015 | Direct owner-contractor contract over $2,500 for 1-4 unit dwellings | 12-point, capitalized, bold; front page or separate page; owner signs and dates | Does not bar a lien against someone not adversely affected (713.015(2)(b)) |
| Recovery Fund notice | FL 489.1425 | Residential repair, restoration, improvement or construction contract over $2,500 | Statutory wording, followed by CILB address and phone | CILB fine: up to $500 first; $1,000 each later violation |
| Chapter 558 notice | FL 558.005(6) | Written owner-contractor or owner-design professional improvement contract after Oct. 1, 2009 (unless parties opt out) | Substantially the statutory sentence | No penalty |
| Home solicitation "Buyer's Right to Cancel" | FL 501.031 | Home solicitation sale over $25 | Conspicuous caption; statutory wording | Violations of 501.025-501.047 are first-degree misdemeanors (501.055) |
| Roof emergency cancellation notice | FL 489.147(6)(b) | Residential roof contract during a declared emergency | Bold, at least 14-point, immediately before owner's signature | Discipline and fines up to $10,000 per violation |
| Roof insurance notice | FL 489.147(7) | Any residential roof repair or replacement contract | Bold, at least 14-point, on the signature page | Discipline and fines up to $10,000 per violation |
| Roof "no inducements" notice | FL 489.147(5) | Residential roof contract | Notice that contractor may not offer rebates, gifts or deductible waivers | Owner may void the contract within 10 days |
| Residential disclosure statement | TX Prop. Code 53.255 | Residential construction contract (new home or remodel) | Separate statement, substantially the statutory text | Lien still valid (53.255(c)); talk to an attorney about other remedies |
| Subcontractor and supplier list | TX Prop. Code 53.256 | Residential construction contract | List with 10-point bold notice; owner may waive only with statutory waiver | Lien still valid (53.256(c)) |
| RCLA notice | TX Prop. Code 27.007 | Written contract subject to chapter 27 (residential) | 10-point bold, substantially the statutory text | $500 civil penalty to the owner |
| Homestead improvement "IMPORTANT NOTICE" | TX Prop. Code 41.007 | Contract for improvements to an existing homestead | 10-point bold | Deceptive act actionable under the DTPA |
| Homestead contract formalities | TX Prop. Code 53.254 | Any lien on a homestead | Written contract signed before work, both spouses, filed with county clerk | No valid lien on the homestead |
| Home solicitation cancellation notice | TX Bus. & Com. Code 601.052-.053 | In-home solicitation over $25 | 10-point bold near signature; detachable form in duplicate | Damages, attorney's fees; DTPA remedies (601.202, 601.204) |
| Cooling-Off Rule notice | Federal, 16 CFR 429 | Door-to-door sale of $25+ at home, $130+ elsewhere | 10-point bold statement plus duplicate cancellation form | Unfair and deceptive practice under FTC law |
| Lead pamphlet acknowledgment | Federal, 40 CFR 745 Subpart E | Paid renovation of pre-1978 housing | EPA pamphlet delivered no more than 60 days before work | EPA enforcement |
Florida: the construction lien law notice (s. 713.015)
Trigger: any direct contract greater than $2,500 between an owner and a contractor for improvements to real property consisting of single or multiple family dwellings up to and including four units.
Format: printed in no less than 12-point, capitalized, boldfaced type on the front page of the contract or on a separate page, signed by the owner and dated. If the contract is oral or implied, the notice must be given in a document that references the contract (713.015(2)(a)).
Statutory text: "ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW (SECTIONS 713.001 - 713.37 , FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO PAY SUBCONTRACTORS, SUB-SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT, EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS PROVIDED TO YOU A "NOTICE TO OWNER." FLORIDA'S CONSTRUCTION LIEN LAW IS COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY."
Exceptions: it does not apply when the owner is a chapter 489 licensed contractor or a person who creates parcels or offers them for sale or lease in the ordinary course of business (for example, a developer).
If it is left out: failure to give the notice "does not bar the enforcement of a lien against a person who has not been adversely affected" (713.015(2)(b)). In practice, a contractor that omitted the notice may face an argument that it cannot enforce its own lien against an owner who was harmed by not knowing the rules. Subs and suppliers not in privity with the owner keep their lien rights either way (713.015(2)(c)). If you face a lien and the notice was missing, raise it with a Florida construction attorney.
What to do with it: follow its advice. Require a written release from every person who served you a Notice to Owner before each payment. See Florida construction lien law for homeowners.
Florida: the Homeowners' Construction Recovery Fund notice (s. 489.1425)
Trigger: each agreement or contract for repair, restoration, improvement or construction to residential real property, except where the value of all labor and materials does not exceed $2,500.
Statutory text: "FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND PAYMENT, UP TO A LIMITED AMOUNT, MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS' CONSTRUCTION RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER CONTRACT, WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA LAW BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS:"
The statement must be immediately followed by the Construction Industry Licensing Board's address and telephone number as set by board rule. Check DBPR's Construction Industry page for the current contact details.
If it is left out: CILB may fine the contractor up to $500 for a first violation and must fine $1,000 per violation for second or later violations, with the money deposited into the fund (489.1425(2)). The omission does not take away your right to make a claim.
Why it matters: for Division I and Division II contracts entered into on or after July 1, 2024, the fund can pay up to $100,000 per Division I claim and $30,000 per Division II claim, with aggregate caps of $2 million and $600,000 per licensee (489.143(3)). Note: s. 489.143(2) still says payment is limited to the judgment amount "or $25,000, whichever is less," while subsection (3) sets the higher caps; ask DBPR's Recovery Fund office how it applies to your claim. Keep a signed copy of the notice with your contract. The fund only covers losses caused by a licensed contractor; see the Recovery Fund guide.
Florida: the chapter 558 construction defect notice (s. 558.005)
Trigger: after October 1, 2009, any written contract for improvement of real property between an owner and a contractor, or an owner and a design professional, unless the parties agree that chapter 558 does not apply.
Statutory text: "ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES."
If it is left out: nothing, as a penalty. The statute says the failure to include it "does not subject the contracting owner, contractor, or design professional to any penalty" because its purpose "is to promote awareness of the procedure." Chapter 558 still applies to your claim.
Older contracts: contracts signed between July 1, 2004 and September 30, 2009 used longer capitalized "CHAPTER 558 NOTICE OF CLAIM" paragraphs (558.005(3)).
What the notice means for you: before suing over a defect, you must serve a written notice of claim at least 60 days before filing (120 days for associations representing more than 20 parcels), let the contractor inspect, and respond in writing to any offer within 45 days. Watch for an "opt out" clause that removes the process; it must be agreed in writing. See Florida chapter 558 guide.
Florida: home solicitation sale cancellation (ss. 501.021-501.055)
Trigger: a sale, lease or rental of consumer goods or services over $25 where the seller personally solicits the sale somewhere other than its fixed business location and the agreement is made there, typically your home (501.021(1)). It does not include sales at fairs or similar exhibits, or a sale that results from the buyer's request for specific goods or services. So a contractor you called for a specific repair may not be covered by the Florida statute, though the federal rule may still apply.
Your right: you may cancel until midnight of the third business day after the day you sign. Business day means any calendar day except Sunday or a federal holiday. Cancel by written notice in person, by telegram, or by mail to the address in the agreement; mailed notice is effective when postmarked. Any written expression of intent not to be bound is enough (501.025).
Required statement (501.031): the agreement must show the date you actually signed and, under the conspicuous caption "BUYER'S RIGHT TO CANCEL," this text:
"This is a home solicitation sale, and if you do not want the goods or services, you may cancel this agreement by providing written notice to the seller in person, by telegram, or by mail. This notice must indicate that you do not want the goods or services and must be delivered or postmarked before midnight of the third business day after you sign this agreement. If you cancel this agreement, the seller may not keep all or part of any cash down payment."
Penalties: violating ss. 501.025-501.047 is a first-degree misdemeanor (501.055).
Florida: residential roof contract notices (s. 489.147)
Florida added roof-specific contract rules to fight claim-solicitation abuses. The section was most recently amended by ch. 2025-40.
1. "No inducements" notice (489.147(5))
A contractor may not sign a contract to repair or replace a residential roof without a notice that it may not offer you a rebate, gift, gift card, cash, coupon, deductible waiver or anything of value for a roof inspection or for filing a roof claim. If the notice is missing, you may void the contract within 10 days after signing.
2. Emergency cancellation notice (489.147(6))
If the contract is signed within 180 days of events covered by a Governor's emergency declaration, and the home is in the declared area, you may cancel without penalty within 10 days after signing or by the official start date, whichever comes first. The contract must include this language in bold, at least 14-point, immediately before your signature:
"You, the residential property owner, may cancel this contract without penalty or obligation within 10 days after the execution of the contract or by the official start date, whichever comes first, because this contract was entered into within 180 days of events resulting in the declaration of a state of emergency by the Governor. The official start date is the date on which work that includes the installation of materials that will be included in the final work on the roof commences, a permit has been issued, or a temporary repair to the roof covering or roof system has been made in compliance with the Florida Building Code."
Send your cancellation by certified mail, return receipt requested, or another mailing with proof, to the address in the contract.
3. Insurance verification notice (489.147(7))
Every residential roof repair or replacement contract must include, in bold of at least 14 points on the signature page:
"If the proposed work is related to an insurance claim, you, the residential property owner, should contact your insurance company to verify coverage for the proposed roofing work, including any claims, deductibles, and policy terms, before signing this contract. By signing this contract, you acknowledge that you have been advised to contact your insurance provider regarding coverage and reimbursement of the proposed work."
Violations can bring CILB discipline and fines up to $10,000 per violation; an unlicensed person who violates the section is guilty of unlicensed contracting (489.147(3)-(4)). See hiring after a hurricane.
Texas: the residential construction disclosure statement (Prop. Code 53.255)
Trigger: a residential construction contract, meaning a contract to build a new home or remodel existing residential property. Timing: the original contractor must deliver the statement before the owner signs (53.255(a)). Wording: must read substantially similar to the statute. It was last amended by H.B. 2237 (2021), effective January 1, 2022, so older versions you find online may differ.
If it is left out: "The failure of a contractor to comply with this section does not invalidate a lien under this chapter, a contract lien, or a deed of trust" (53.255(c)). The statute itself names no separate penalty; if a contractor skipped it, ask an attorney whether other claims, such as under the DTPA, fit your facts.
Full statutory text
KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW. You are about to enter into a transaction to build a new home or remodel existing residential property. Texas law requires your contractor to provide you with this brief overview of some of your rights, responsibilities, and risks in this transaction.
CONVEYANCE TO CONTRACTOR NOT REQUIRED. Your contractor may not require you to convey your real property to your contractor as a condition to the agreement for the construction of improvements on your property.
KNOW YOUR CONTRACTOR. Before you enter into your agreement for the construction of improvements to your real property, make sure that you have investigated your contractor. Obtain and verify references from other people who have used the contractor for the type and size of construction project on your property.
GET IT IN WRITING. Make sure that you have a written agreement with your contractor that includes: (1) a description of the work the contractor is to perform; (2) the required or estimated time for completion of the work; (3) the cost of the work or how the cost will be determined; and (4) the procedure and method of payment, including provisions for statutory reservation of funds and conditions for final payment. If your contractor made a promise, warranty, or representation to you concerning the work the contractor is to perform, make sure that promise, warranty, or representation is specified in the written agreement. An oral promise that is not included in the written agreement may not be enforceable under Texas law.
READ BEFORE YOU SIGN. Do not sign any document before you have read and understood it. NEVER SIGN A DOCUMENT THAT INCLUDES AN UNTRUE STATEMENT. Take your time in reviewing documents. If you borrow money from a lender to pay for the improvements, you are entitled to have the loan closing documents furnished to you for review at least one business day before the closing. Do not waive this requirement unless a bona fide emergency or another good cause exists, and make sure you understand the documents before you sign them. If you fail to comply with the terms of the documents, you could lose your property. You are entitled to have your own attorney review any documents. If you have any question about the meaning of a document, consult an attorney.
GET A LIST OF SUBCONTRACTORS AND SUPPLIERS. Before construction commences, your contractor is required to provide you with a list of the subcontractors and suppliers the contractor intends to use on your project. Your contractor is required to supply updated information on any subcontractors and suppliers added after the list is provided. Your contractor is not required to supply this information if you sign a written waiver of your rights to receive this information.
MONITOR THE WORK. Lenders and governmental authorities may inspect the work in progress from time to time for their own purposes. These inspections are not intended as quality control inspections. Quality control is a matter for you and your contractor. To ensure that your home is being constructed in accordance with your wishes and specifications, you should inspect the work yourself or have your own independent inspector review the work in progress.
MONITOR PAYMENTS. If you use a lender, your lender is required to provide you with a periodic statement showing the money disbursed by the lender from the proceeds of your loan. Each time your contractor requests payment from you or your lender for work performed, your contractor is also required to furnish you with a disbursement statement that lists the name and address of each subcontractor or supplier that the contractor intends to pay from the requested funds. Review these statements and make sure that the money is being properly disbursed.
CLAIMS BY SUBCONTRACTORS AND SUPPLIERS. Under Texas law, if a subcontractor or supplier who furnishes labor or materials for the construction of improvements on your property is not paid, you may become liable and your property may be subject to a lien for the unpaid amount, even if you have not contracted directly with the subcontractor or supplier. To avoid liability, you should take the following actions: (1) If you receive a written notice from a subcontractor or supplier, you should withhold payment from your contractor for the amount of the claim stated in the notice until the dispute between your contractor and the subcontractor or supplier is resolved. If your lender is disbursing money directly to your contractor, you should immediately provide a copy of the notice to your lender and instruct the lender to withhold payment in the amount of the claim stated in the notice. If you continue to pay the contractor after receiving the written notice without withholding the amount of the claim, you may be liable and your property may be subject to a lien for the amount you failed to withhold. (2) During construction and for 30 days after final completion, termination, or abandonment of the contract by the contractor, you should reserve or cause your lender to reserve 10 percent of the amount of payments made for the work performed by your contractor. If you choose not to reserve the 10 percent for at least 30 days after final completion, termination, or abandonment of the contract by the contractor and if a valid claim is timely made by a claimant and your contractor fails to pay the claim, you may be personally liable and your property may be subject to a lien up to the amount that you failed to reserve. "If a claim is not paid within a certain time period, the claimant is required to file a mechanic's lien affidavit in the real property records in the county where the property is located. A mechanic's lien affidavit is not a lien on your property, but the filing of the affidavit could result in a court imposing a lien on your property if the claimant is successful in litigation to enforce the lien claim.
SOME CLAIMS MAY NOT BE VALID. When you receive a written notice of a claim or when a mechanic's lien affidavit is filed on your property, you should know your legal rights and responsibilities regarding the claim. Not all claims are valid. A notice of a claim by a subcontractor or supplier is required to be sent, and the mechanic's lien affidavit is required to be filed, within strict time periods. The notice and the affidavit must contain certain information. All claimants may not fully comply with the legal requirements to collect on a claim. If you have paid the contractor in full before receiving a notice of a claim and have withheld the 10 percent of the contract price or value of work, you may not be liable for that claim. Accordingly, you should consult your attorney when you receive a written notice of a claim to determine the true extent of your liability or potential liability for that claim.
OBTAIN A LIEN RELEASE AND A BILLS-PAID AFFIDAVIT. When you receive a notice of claim, do not release withheld funds without obtaining a signed and notarized release of lien and claim from the claimant. You can also reduce the risk of having a claim filed by a subcontractor or supplier by requiring as a condition of each payment made by you or your lender that your contractor furnish you with an affidavit stating that all bills have been paid. Under Texas law, on final completion of the work and before final payment, the contractor is required to furnish you with an affidavit stating that all bills have been paid. If the contractor discloses any unpaid bill in the affidavit, you should withhold payment in the amount of the unpaid bill until you receive a waiver of lien or release from that subcontractor or supplier.
OBTAIN TITLE INSURANCE PROTECTION. You may be able to obtain a title insurance policy to insure that the title to your property and the existing improvements on your property are free from liens claimed by subcontractors and suppliers. If your policy is issued before the improvements are completed and covers the value of the improvements to be completed, you should obtain, on the completion of the improvements and as a condition of your final payment, a 'completion of improvements' policy endorsement. This endorsement will protect your property from liens claimed by subcontractors and suppliers that may arise from the date the original title policy is issued to the date of the endorsement.
Read it as a checklist. Each paragraph names a protection you should actually use: written contract, sub list, independent inspections, disbursement statements, 10% retainage, lien releases and bills-paid affidavits. See Texas mechanic's lien guide.
Texas: the subcontractor and supplier list (Prop. Code 53.256)
Trigger: construction under a residential construction contract. Before construction starts, the original contractor must give the owner a written list of each subcontractor and supplier it intends to use, with name, address and phone number, and must update it no later than 15 days after a sub or supplier is added or removed.
Required notice on the list (10-point bold):
"NOTICE: THIS LIST OF SUBCONTRACTORS AND SUPPLIERS MAY NOT BE A FINAL LISTING. UNLESS YOU SIGN A WAIVER OF YOUR RIGHT TO RECEIVE UPDATED INFORMATION, THE CONTRACTOR IS REQUIRED BY LAW TO SUPPLY UPDATED INFORMATION, AS THE INFORMATION BECOMES AVAILABLE, FOR EACH SUBCONTRACTOR OR SUPPLIER USED IN THE WORK PERFORMED ON YOUR RESIDENCE."
The waiver: you may give up the list only in writing, in at least 10-point bold, substantially in this form. If it is not part of the contract, you must sign it separately:
"WAIVER OF THE LIST OF SUBCONTRACTORS AND SUPPLIERS. AN OWNER IS NOT REQUIRED TO WAIVE THE RIGHT GRANTED BY SECTION 53.256, PROPERTY CODE, TO RECEIVE FROM THE CONTRACTOR AN ORIGINAL OR UPDATED LIST OF SUBCONTRACTORS AND SUPPLIERS. BY SIGNING THIS DOCUMENT, I AGREE TO WAIVE MY RIGHT TO RECEIVE FROM THE CONTRACTOR AN ORIGINAL OR UPDATED LIST OF SUBCONTRACTORS AND SUPPLIERS. I UNDERSTAND AND ACKNOWLEDGE THAT, AFTER SIGNING THIS DOCUMENT, THIS WAIVER MAY NOT BE CANCELED AT A LATER DATE. I HAVE VOLUNTARILY CONSENTED TO THIS WAIVER."
Advice: do not sign the waiver. The list is how you know whose lien waivers to collect. If the contractor fails to provide it, a lien is still valid (53.256(c)), so the list protects you only if you insist on it.
Texas: the RCLA notice (Prop. Code 27.007)
Trigger: a written contract subject to the Residential Construction Liability Act, other than a condominium developer's contract with its contractor. Format: 10-point boldface, reading substantially as follows:
"This contract is subject to Chapter 27 of the Texas Property Code. The provisions of that chapter may affect your right to recover damages arising from a construction defect. If you have a complaint concerning a construction defect and that defect has not been corrected as may be required by law or by contract, you must provide the notice required by Chapter 27 of the Texas Property Code to the contractor by certified mail, return receipt requested, not later than the 60th day before the date you file suit to recover damages in a court of law or initiate arbitration. The notice must refer to Chapter 27 of the Texas Property Code and must describe the construction defect. If requested by the contractor, you must provide the contractor an opportunity to inspect and cure the defect as provided by Section 27.004 of the Texas Property Code."
If it is left out: "the claimant may recover from the contractor a civil penalty of $500 in addition to any other remedy" (27.007(b)). Subsection (c) was repealed in 2023 by S.B. 1768 and H.B. 2022.
Also know: since September 1, 2023, an attempted waiver of chapter 27 in a contract subject to it is void (27.009), and submitting a claim to arbitration has the same effect on limitations as filing in court (27.008). See Texas RCLA guide.
Texas: the homestead improvement notice (Prop. Code 41.007)
Trigger: a contract for improvements to an existing residence that is a homestead (the kind of contract that can create a lien on the homestead under 41.001(b)(3)). Format: conspicuously printed, stamped or typed in at least 10-point bold type or the computer equivalent.
"IMPORTANT NOTICE: You and your contractor are responsible for meeting the terms and conditions of this contract. If you sign this contract and you fail to meet the terms and conditions of this contract, you may lose your legal ownership rights in your home. KNOW YOUR RIGHTS AND DUTIES UNDER THE LAW."
Outdated parts: 41.007(a)(1)-(2) still require a Texas Residential Construction Commission registration number and complaint address "if the contractor is required to register." The TRCC's law expired September 1, 2009, so no contractor is currently required to register with it. The IMPORTANT NOTICE wording in (a)(3) is the part that still matters.
If it is left out: a violation "is a false, misleading, or deceptive act or practice" under the DTPA and is actionable in a public or private suit (41.007(b)).
Arbitration clauses: in these homestead improvement contracts, a binding arbitration provision must also be conspicuous in at least 10-point bold, and it "is not enforceable against the owner" if it is not (41.007(c)-(d)).
Texas: homestead contract formalities and lien notices (Prop. Code 53.254)
These are not "notices" in the contract, but they control whether the contract can support a lien on your home, so they belong on the same checklist:
- The contractor and owner must sign a written contract setting out the terms.
- It must be signed before any material is furnished or labor performed.
- If the owner is married, both spouses must sign.
- The contract must be filed with the county clerk where the homestead is located.
A lien affidavit on a homestead must carry at the top, in at least 10-point bold: "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN." And for a homestead lien to be valid, the claimant's notice to the owner must include the statutory statement about withholding for noticed claims and reserving 10% for 30 days after completion (53.254(f)-(g)).
If you are married and only one spouse signed, or the contract was signed after work began, talk to a Texas attorney before paying a disputed bill. These rules come from the Texas Constitution's homestead protections as implemented in Property Code 41.001 and 53.254.
Texas: home solicitation cancellation notice (Bus. & Com. Code ch. 601)
Trigger: the merchant personally solicits the sale at a place other than its place of business, the agreement is given there, and the price exceeds $25 for goods or services (601.002). It does not apply to sales after negotiations at the merchant's fixed business location.
Your right: cancel until midnight of the third business day after signing (601.051 and the required notices).
Required statement (601.052): on the contract or receipt, in the language of the sales presentation, near your signature line, in at least 10-point bold:
"YOU, THE BUYER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION. SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT."
The merchant must also attach an easily detachable, completed "NOTICE OF CANCELLATION" form in duplicate, in 10-point bold (601.053). Using the FTC's forms counts as compliance (601.054). The merchant must orally tell you of the right to cancel, may not misrepresent it, and may not include a confession of judgment or any waiver of your rights (601.151-601.152).
After you cancel: the merchant must return payments, trade-ins and any note within 10 business days, and is not entitled to compensation for services performed under a canceled transaction (601.101). A merchant who violates the chapter is liable for actual damages, reasonable attorney's fees and court costs, and a violation is also a deceptive trade practice under the DTPA (601.202, 601.204).
Federal: the FTC Cooling-Off Rule (16 CFR Part 429)
The federal rule applies in both states, on top of state law.
- Covered sales: a sale where the seller personally solicits, "including those in response to or following an invitation by the buyer," and the agreement is made somewhere other than the seller's place of business. The threshold is $25 or more at your home and $130 or more at other temporary locations such as hotel rooms or fairgrounds (429.0(a)).
- Required statement (10-point bold, near your signature or on the receipt's front page, in the language of the sales pitch):
"You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction. See the attached notice of cancellation form for an explanation of this right."
- Cancellation form: a completed form in duplicate captioned "NOTICE OF RIGHT TO CANCEL" or "NOTICE OF CANCELLATION," with the seller's name and address and the cancellation deadline filled in.
- Oral notice: the seller must tell you about the right to cancel when you sign.
- Refund: within 10 business days of receiving your cancellation, the seller must refund all payments, return trade-ins and cancel any note.
- No waivers: the contract may not include a confession of judgment or a waiver of your cancellation rights.
- Business day: any calendar day except Sunday or a federal holiday.
State law still applies. The FTC rule does not displace state laws that give buyers the same or greater protection (429.2). The thresholds differ slightly: the federal rule covers "$25 or more" at home, while the Florida and Texas statutes cover amounts "in excess of" or exceeding $25. A $25 even sale at home can be covered federally but not by the state statute.
Does the 3-day cancellation right apply to storm repairs?
Sometimes yes, sometimes no. Here is how the rules interact after a hurricane, hailstorm or flood:
| Situation | Federal Cooling-Off Rule | State rules |
|---|---|---|
| A roofer knocks on your door after a storm and you sign at your kitchen table | Covered ($25+ at home) | FL 501.025 and TX 601 cancellation generally apply; in Florida, a roof contract signed within 180 days of a declared emergency also gets the 10-day 489.147 right |
| You call a contractor because water is pouring in, and you need work right now | Excluded only if you initiated contact for a bona fide immediate personal emergency and you hand-write, date and sign a separate statement describing the emergency and waiving the 3-day right (429.0(a)(3)) | Florida's definition excludes sales that result from your request for specific goods or services; Texas has no comparable emergency waiver in ch. 601 that we found |
| You visited the contractor's showroom and negotiated there | Not covered (prior negotiations at a fixed business location) | Not covered in Florida or Texas |
| Florida roof contract during a declared emergency | As above | 10 days after signing or by official start date, whichever first; 14-point bold notice; certified mail cancellation (489.147(6)) |
A printed "emergency waiver" form prepared by the contractor does not meet the federal requirement, which calls for a statement in the buyer's own handwriting. If a storm contractor pressures you to sign a waiver, slow down. See contractor scam red flags.
What font size do contract notices need?
| Notice | Minimum type | Placement |
|---|---|---|
| FL 713.015 lien notice | 12-point, capitalized, bold | Front page or separate page; owner signs and dates |
| FL 489.147(6) roof emergency cancellation | 14-point bold | Immediately before owner's signature |
| FL 489.147(7) roof insurance notice | 14-point bold | Page reserved for owner's signature |
| FL 489.147(1) roof claim ads | At least 12-point and at least half the largest font in the ad | In the advertisement |
| FL 501.031 Buyer's Right to Cancel | Conspicuous caption (no point size stated) | In the agreement |
| TX 27.007 RCLA notice | 10-point bold | In the contract |
| TX 41.007 homestead IMPORTANT NOTICE | 10-point bold | In the contract |
| TX 41.007(c) homestead arbitration clause | 10-point bold | The arbitration clause itself |
| TX 53.256 sub list notice and waiver | 10-point bold | On the list; waiver in contract or signed separately |
| TX 53.254(f) homestead lien affidavit header | 10-point bold | Top of the page of the lien affidavit |
| TX 601.052 cancellation statement | 10-point bold | Near consumer's signature or front of receipt |
| TX 17.42 DTPA waiver | 10-point bold, headed "Waiver of Consumer Rights" | Conspicuous |
| Federal 16 CFR 429 statement and form | 10-point bold | Near buyer's signature; form in duplicate |
The Florida 489.1425 and 558.005 notices do not set a point size in the statute; 558.005's older 2004-2009 versions required capitalized letters.
What happens if a contractor leaves a required notice out?
The consequence depends on the notice. Some give you money, some give you a cancellation right, some only expose the contractor to discipline, and some have no consequence at all.
| Missing notice | What you can do |
|---|---|
| TX 27.007 RCLA notice | Recover a $500 civil penalty in addition to other RCLA remedies |
| TX 41.007 homestead notice | Bring a DTPA claim; an arbitration clause not in 10-point bold cannot be enforced against you |
| TX 601 cancellation notice | Actual damages, attorney's fees and court costs under 601.202; DTPA remedies (601.204); a contract violating 601.053(b) or Subchapter D is void (601.201) |
| TX 53.255 disclosure or 53.256 list | No effect on lien validity; ask an attorney about other claims |
| FL 713.015 lien notice | Possible defense to the contractor's own lien if you were adversely affected |
| FL 489.1425 Recovery Fund notice | Report to DBPR; CILB fines the contractor |
| FL 558.005 notice | No penalty; chapter 558 still applies |
| FL 489.147(5) roof inducement notice | Void the contract within 10 days after signing |
| FL home solicitation statement | Report; violations are first-degree misdemeanors (501.055) |
| Federal Cooling-Off notice | Report to the FTC; state remedies also apply |
Whether a missing cancellation notice extends your time to cancel is a legal question for an attorney. For complaints, see how to file a complaint against a contractor.
Other paperwork you are entitled to during the job
These are not contract clauses, but the same statutes require them and they belong on your list:
- Florida Notice of Commencement (713.13): recorded by the owner before work starts on most jobs over $2,500 and posted at the site; a copy must be filed with the permit office before the first inspection when the direct contract exceeds $5,000 (713.135). See Florida Notice of Commencement.
- Florida Contractor's Final Payment Affidavit (713.06(3)(d)): due when final payment is due.
- Texas disbursement statement (53.258): with each payment request on a residential contract.
- Texas final bills-paid affidavit (53.259): at final payment; also from a seller at closing on a new home of up to four units.
- EPA lead pamphlet (40 CFR 745): for paid renovations of pre-1978 homes, delivered no more than 60 days before work, with your written acknowledgment or a certificate of mailing at least 7 days before work.
See deposits and payment schedules for how to tie these to payments.
For contractors: a compliance checklist
If you are a contractor or aspiring contractor reviewing your own forms (see becoming a Florida contractor and starting a Texas contracting business):
- Florida residential: license number on every bid and contract (489.119(5)(b)); 713.015 notice on contracts over $2,500 for 1-4 unit dwellings; 489.1425 notice with CILB contact details on residential contracts over $2,500; 558.005(6) sentence; 501.031 statement for in-home sales; all three 489.147 notices on roof contracts.
- Texas residential: deliver the 53.255 statement before signing and keep proof; 53.256 list before construction with updates in 15 days; 27.007 notice; on homesteads, the 41.007 notice, both spouses' signatures before work, and county clerk filing (53.254); 10-point bold for any arbitration clause; 601 notices and duplicate forms for in-home sales.
- Both states: federal Cooling-Off Rule notices for in-home sales; EPA RRP pamphlet and records for pre-1978 work.
Have a construction attorney in your state review your template at least after each legislative session, since several of these sections were amended in 2021-2025.
How to choose a provider
- Florida, contract over $2,500 on a 1-4 unit home: find the 713.015 lien notice in 12-point bold capitals and sign it.
- Florida residential over $2,500: find the 489.1425 Recovery Fund notice with CILB's contact details.
- Florida: look for the 558.005 sentence and any written opt-out of chapter 558.
- Florida roof job: confirm the three 489.147 notices; note the 10-day cancellation window after a declared emergency.
- Texas residential: get the 53.255 disclosure statement before you sign.
- Texas: get the 53.256 sub and supplier list before work starts; do not sign the waiver.
- Texas: find the 27.007 RCLA notice in 10-point bold.
- Texas homestead: find the 41.007 IMPORTANT NOTICE, make sure both spouses sign before work, and confirm filing with the county clerk.
- Texas homestead: check that any arbitration clause is in 10-point bold.
- Signed at home? Look for the 3-day cancellation statement and the duplicate cancellation form.
- Want to cancel? Send written notice before midnight of the third business day (Sundays and federal holidays do not count); keep proof of mailing.
- Pre-1978 home: confirm you received EPA's lead pamphlet before work.
- Keep a copy of every notice you signed with the contract.
Related general and residential contractors guides
- What Should Be in a Construction Contract? A Clause-by-Clause Checklist
- How Does Florida Construction Lien Law Work, and How Do Homeowners Avoid Paying Twice?
- What Is the Florida Homeowners' Construction Recovery Fund, Who Qualifies, and How Much Can You Recover?
- How Does Florida's Chapter 558 Construction Defect Notice Work, Step by Step?
- How Do You Make a Construction Defect Claim Under the Texas Residential Construction Liability Act (RCLA)?
- How Do Mechanic's Liens Work in Texas, and How Do Homeowners Avoid Paying Twice?
- How Do You Hire a Contractor After a Hurricane, Flood or Hailstorm in Florida or Texas?
- Contractor Deposits and Payment Schedules: How Much to Pay and When
General and residential contractors by state and city
Questions people ask
What notices must be in a Florida construction contract?
For residential work, generally three: the construction lien law notice under s. 713.015 (direct contracts over $2,500 for dwellings up to four units, in 12-point capitalized bold, signed by the owner), the Recovery Fund notice under s. 489.1425 (residential contracts over $2,500), and the chapter 558 notice under s. 558.005(6). In-home sales add the 501.031 Buyer's Right to Cancel statement, and roof contracts add three s. 489.147 notices.
What is the Florida Construction Industries Recovery Fund notice?
It is a required statement in residential construction contracts over $2,500 that tells the owner payment, up to a limited amount, may be available from the Florida Homeowners' Construction Recovery Fund if the owner loses money because of specified violations by a licensed contractor, followed by CILB's address and phone number. CILB can fine a contractor up to $500 for a first omission and $1,000 for later ones.
What is the Florida 713.015 lien notice?
It is a capitalized, bold, 12-point warning that people who work on or supply your project and are not paid can enforce a lien against your property even if you paid your contractor in full, and that you should require lien releases from anyone who sent a Notice to Owner before each payment. It is required in direct contracts over $2,500 for one- to four-unit dwellings and must be signed and dated by the owner.
What is the chapter 558 notice in Florida contracts?
It is one sentence required in written improvement contracts after October 1, 2009: 'ANY CLAIMS FOR CONSTRUCTION DEFECTS ARE SUBJECT TO THE NOTICE AND CURE PROVISIONS OF CHAPTER 558, FLORIDA STATUTES.' It reminds owners that they must serve a pre-suit notice of claim and allow inspection and an offer before suing. Omitting it carries no penalty.
What disclosures are required in Texas residential construction contracts?
The Property Code 53.255 'Know Your Rights and Responsibilities Under the Law' statement before signing, the 53.256 subcontractor and supplier list before construction, and the 27.007 RCLA notice in 10-point bold. Homestead improvement contracts also need the 41.007 IMPORTANT NOTICE, both spouses' signatures before work, and filing with the county clerk. In-home sales add chapter 601 cancellation notices.
What is the Texas residential construction disclosure statement?
It is a statutory summary of owners' rights that the original contractor must give the owner before a residential construction contract is signed. It covers not conveying your property to the contractor, checking references, getting the deal in writing, the subcontractor list, monitoring work and payments, how sub and supplier claims work, the 10% reservation, lien releases, bills-paid affidavits, and title insurance. Missing it does not invalidate a lien.
What is the RCLA notice in Texas contracts?
It is a 10-point bold paragraph saying the contract is subject to Chapter 27 of the Texas Property Code, that you must send the contractor a notice by certified mail at least 60 days before suing or starting arbitration over a defect, and that you must allow inspection and a chance to cure. If it is missing, you can recover a $500 civil penalty.
Do I have a right to cancel a contractor contract in 3 days?
Only in certain situations. If the contractor personally solicited the sale and you signed at your home or another place that is not the contractor's business, the federal Cooling-Off Rule ($25 or more at home) and state home solicitation laws in Florida and Texas generally give you until midnight of the third business day. Contracts negotiated at the contractor's office are generally not covered.
Does the 3-day cancellation apply to emergency storm repairs?
Usually yes if a contractor solicited you at home. The federal rule excludes an emergency only when you initiated contact for a bona fide immediate personal emergency and you hand-write, date and sign a statement describing the emergency and waiving the right. Florida excludes sales resulting from your request for specific services. Florida roof contracts signed within 180 days of a declared emergency also carry a separate 10-day cancellation right.
What does the Texas homestead notice say?
It reads: 'IMPORTANT NOTICE: You and your contractor are responsible for meeting the terms and conditions of this contract. If you sign this contract and you fail to meet the terms and conditions of this contract, you may lose your legal ownership rights in your home. KNOW YOUR RIGHTS AND DUTIES UNDER THE LAW.' It must be in at least 10-point bold in contracts for improvements to an existing homestead.
What font size do contract notices need?
Florida's 713.015 lien notice needs at least 12-point capitalized bold; Florida's roof cancellation and insurance notices need at least 14-point bold. Most Texas notices, including the RCLA, homestead, sub list and home solicitation notices, need at least 10-point bold, as does the federal Cooling-Off statement. Florida's 489.1425 and 558.005 notices have no stated point size.
How do I cancel within the 3 days?
Put it in writing, date it, and deliver it to the seller's address on the contract before midnight of the third business day after you signed, not counting Sundays or federal holidays. Use the cancellation form if you got one. Mail it with proof of mailing; in Florida, mailed notice is effective on postmark. Keep a copy. The seller must refund payments within 10 business days.
Sources
- Florida Statutes s. 713.015, Mandatory provisions for direct contracts (2026)
- Florida Statutes s. 489.1425 (2026)
- Florida Statutes s. 489.143 (2026)
- Florida Statutes s. 558.005 (2026)
- Florida Statutes s. 558.004 (2026)
- Florida Statutes s. 501.021 (2026)
- Florida Statutes s. 501.025 (2026)
- Florida Statutes s. 501.031 (2026)
- Florida Statutes s. 501.055 (2026)
- Florida Statutes s. 489.147 (2026)
- Florida Statutes s. 489.119 (2026)
- Florida Statutes s. 713.13 (2026)
- Florida Statutes s. 713.135 (2026)
- Florida Statutes s. 713.06 (2026)
- Texas Property Code ch. 53
- Texas Property Code ch. 27 (RCLA)
- Texas Property Code ch. 41 (s. 41.007)
- Texas Business & Commerce Code ch. 601
- Texas Business & Commerce Code ch. 17 (DTPA)
- Texas Sunset Advisory Commission, Texas Residential Construction Commission Final Report (2009)
- 16 CFR Part 429, Cooling-Off Rule (eCFR)
- 40 CFR Part 745 Subpart E (eCFR)
- Florida DBPR Construction Industry Licensing Board
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.