How Do You Make a Construction Defect Claim Under the Texas Residential Construction Liability Act (RCLA)?
Before you can sue a Texas builder or remodeler over a construction defect, Property Code chapter 27 makes you send notice, allow inspections and consider a repair offer. This guide walks through every RCLA deadline, what you can recover, what happens if you reject an offer, and the limitations and 10-year repose periods that can end a claim.
Under the Texas Residential Construction Liability Act (Property Code ch. 27), you must send the contractor written notice of the defects by certified mail, return receipt requested, at least 60 days before suing or starting arbitration, with your photos and expert reports. The contractor gets 35 days to inspect (up to three times) and 60 days to make a written settlement offer. If you think the offer is unreasonable, explain why in writing within 25 days. Rejecting a reasonable offer can cap what you recover.
Key facts
- RCLA applies to any action for damages from a construction defect in a residence, including new homes, remodels, repairs, additions and appurtenances such as garages and retaining walls, but not to personal injury, wrongful death or damage to goods (Prop. Code ss. 27.001, 27.002).
- The homeowner must give written notice by certified mail, return receipt requested, at least 60 days before filing suit or arbitration, and provide discoverable evidence such as expert reports, photographs and recordings (s. 27.004(a)).
- The contractor may inspect during the 35 days after receiving notice, with up to three inspections, and may make a written settlement offer within 60 days after receiving notice (s. 27.004(a)-(b)).
- If the homeowner considers the offer unreasonable, the homeowner must explain why in writing within 25 days; the contractor may make a supplemental offer within 10 days; an offer not accepted within 25 days is considered rejected (s. 27.004(b), (i)).
- A homeowner who rejects a reasonable offer may recover no more than the fair market value of the last offer, plus fees incurred before rejection (s. 27.004(e)).
- RCLA does not apply to claims from a contractor's wrongful abandonment of a project, violations of the construction trust fund law (Prop. Code ch. 162), or Bus. & Com. Code s. 27.01 (s. 27.002(d)).
- Since September 1, 2023, an attempted waiver of RCLA in a contract is void, and submitting a claim to arbitration affects limitations the same way as filing suit (ss. 27.008, 27.009, added by H.B. 2022).
- Texas's statute of repose generally bars residential construction defect suits more than 10 years after substantial completion, or 6 years if the contractor provided a qualifying written warranty (Civ. Prac. & Rem. Code s. 16.009(a-2)-(a-3)).
- The state-run inspection process (SIRP) that once had to be completed before suing ended when the Texas Residential Construction Commission Act expired on September 1, 2009.
What is the Texas Residential Construction Liability Act?
The Residential Construction Liability Act, usually called the RCLA, is chapter 27 of the Texas Property Code. It sets a mandatory pre-suit process for homeowners who want to recover money or other relief from a contractor because of a construction defect, which the Act defines as a deficiency in the design, construction or repair of a new residence, of an alteration, repair or addition to an existing residence, or of an appurtenance to a residence.
The idea is simple: before you go to court or arbitration, the contractor gets notice, a chance to inspect, and a chance to offer a fix or a payment. If you follow the process, you keep your full rights. If you skip it, the case gets put on hold. If you turn down a reasonable offer, your recovery can be capped.
The RCLA does not create a new right to sue. It shapes claims you already have, such as breach of contract, breach of warranty, negligence or a Deceptive Trade Practices Act (DTPA) claim, when they arise from a construction defect (s. 27.005). Where the RCLA conflicts with the DTPA or common law, the RCLA wins (s. 27.002(b)).
Who and what it covers
- Contractors: builders who contract with an owner to build or repair a new home or to repair, alter or add to an existing one; anyone selling a new home it built or had built; and contractors working for a condominium developer. The definition also reaches the contractor's owners, officers, employees and certain risk retention groups that insure the contractor (s. 27.001(4)).
- Residences: detached one- and two-family homes, townhouses up to three stories with separate exits, accessory structures up to three stories, duplexes through quadruplexes, and condominium or co-op units and common elements (s. 27.001(6)).
- Appurtenances: garages, outbuildings, retaining walls and recreational structures the contractor built with the home, attached or not.
- Later buyers: a subsequent purchaser who files a claim against the contractor is covered too (s. 27.002(a)(2)).
What it does not cover
- Claims for personal injury, survival or wrongful death, or damage to goods (but mental anguish is not treated as personal injury, and a residence is not goods) (s. 27.002(a), (c)).
- Damages from a contractor's wrongful abandonment of a project before completion. See contractor abandoned the job.
- Violations of the construction trust fund law, Property Code ch. 162. See the Trust Fund Act guide.
- Violations of Business and Commerce Code s. 27.01 (fraud in real estate and stock transactions) (s. 27.002(d)).
Does the RCLA apply to remodels?
Yes. The definitions reach the repair or alteration of, or an addition to, an existing residence. A kitchen remodel, bathroom renovation, room addition, roof replacement by a contractor or a foundation repair can all be RCLA claims if you are seeking damages for defective work. That is why remodeling contracts in Texas should contain the Act's required notice (below).
Two practical limits: the defect has to be in the contractor's work, and you must prove it existed when the construction, alteration or repair was completed and caused your damages (s. 27.006).
Step by step: the RCLA notice and offer process
Step 1: Send the notice
At least 60 days before you file suit or start arbitration, send written notice to the contractor at its last known address by certified mail, return receipt requested. If the contractor has told you in writing that it has a lawyer, send it to the lawyer under the Texas Rules of Civil Procedure (s. 27.004(o)). The notice must specify the defects in reasonable detail. You must also provide any evidence that shows the nature and cause of the defect and the repairs needed, including expert reports, photographs and video or audio recordings, if it would be discoverable in a lawsuit (s. 27.004(a)).
Practical content for the letter:
- A statement that it is a notice under Chapter 27 of the Texas Property Code.
- The property address, contract date and the work involved.
- A numbered list of each defect, its location, when you noticed it and the damage it is causing.
- A list of the evidence enclosed (photos, video, inspector or engineer reports, repair estimates).
- How to schedule inspections, with times you are available.
Step 2: Allow inspection (35 days)
During the 35 days after the contractor receives your notice, and on its written request, you must give the contractor a reasonable opportunity to inspect, or have someone inspect, the property. It may conduct up to three inspections in that period (or any extension) and may document the defect (s. 27.004(a)). Refusing reasonable access is one of the ways a homeowner loses full damages.
Step 3: The contractor's offer (60 days)
Within 60 days after receiving your notice, the contractor may send a written settlement offer by certified mail. The offer can be to repair, or have an independent contractor repair, some or all of the defects at the contractor's cost or at a reduced rate; to pay money; or to buy the house (s. 27.004(b), (n)). A repair offer must describe the repairs in reasonable detail and state the completion time if more than 60 days.
Step 4: Your response (25 days)
If you think the offer is unreasonable, then on or before the 25th day after you receive it, you must tell the contractor in writing, and in reasonable detail, why (s. 27.004(b)(1)). Do not just say no. Explain: "The offer to patch the slab cracks does not address the cause identified by my engineer, which is ..." Any offer not accepted before the 25th day after you receive it is considered rejected (s. 27.004(i)).
Step 5: Supplemental offer (10 days)
Within 10 days after receiving your explanation, the contractor may send a supplemental written offer (s. 27.004(b)(2)). Treat it like the first: accept, or explain again why it is unreasonable.
Step 6: Repairs under an accepted offer (60 days)
If you accept a repair offer, repairs must be made within 60 days after the contractor receives your written acceptance, unless you or events beyond the contractor's control delay them (s. 27.004(b)). The contractor may document the repair and have it inspected (s. 27.004(k)). If it refuses to start repairs under an accepted offer, the damage limits in the Act no longer apply (s. 27.004(q)).
Step 7: Suit or arbitration
If the process ends without a resolution, you may file suit or arbitration after the 60-day notice period. Under the Act, "action" includes both a court case and an arbitration (s. 27.001(1)).
RCLA deadlines at a glance
| Event | Deadline | Statute |
|---|---|---|
| Homeowner's notice of defects | At least 60 days before filing suit or arbitration | s. 27.004(a) |
| Contractor's inspection window | 35 days after it receives notice; up to 3 inspections | s. 27.004(a) |
| Contractor's written offer | Within 60 days after it receives notice | s. 27.004(b) |
| Homeowner explains why offer is unreasonable | On or before 25th day after receiving offer | s. 27.004(b)(1) |
| Offer deemed rejected | If not accepted before 25th day after receipt | s. 27.004(i) |
| Contractor's supplemental offer | Within 10 days after receiving homeowner's explanation | s. 27.004(b)(2) |
| Repairs under accepted offer | Within 60 days after contractor receives acceptance | s. 27.004(b) |
| If suit filed early to beat limitations: inspection | Up to 75 days after service of suit | s. 27.004(c) |
| If suit filed early: offer | Up to 60 days after service | s. 27.004(c) |
| Motion to compel mediation (claims over $7,500) | Within 90 days after suit is filed | s. 27.0041 |
You and the contractor may agree in writing to extend any of these periods (s. 27.004(h)). Get any extension in writing, and make sure it does not let a limitations period run out.
Example calendar
Suppose the builder receives your certified letter on March 3. The inspection window runs through about April 7. A written offer is due by about May 2. If the offer reaches you May 1, your written explanation of why it is unreasonable is due by about May 26, and the offer is deemed rejected if not accepted before then. Any supplemental offer comes within 10 days after the builder receives your explanation. Count days carefully from the dates on the return receipts, and confirm with a lawyer.
What if I reject the builder's offer?
This is the most important strategic point in the RCLA. If you reject a reasonable offer, or do not give the contractor a reasonable chance to inspect or to repair under an accepted offer, you may not recover more than:
- the fair market value of the contractor's last settlement offer, or
- the amount of a reasonable monetary settlement or purchase offer,
plus reasonable and necessary costs and attorney's fees incurred before the offer was rejected or considered rejected (s. 27.004(e)).
Whether an offer was reasonable is decided by the judge, jury or arbitrator (s. 27.004(j)). If the contractor fails to make a reasonable offer at all, those limits do not apply (s. 27.004(f)). An offer to buy back the home under a written conditional-sale agreement that meets s. 27.0042 is presumed reasonable unless there is clear and convincing evidence otherwise.
That means your response letter matters as evidence. A short "no" looks unreasonable. A detailed explanation backed by an engineer's report, showing that the offer does not fix the cause, protects you.
Imminent threats to safety
If a defect creates an imminent threat to the health or safety of the occupants, the contractor that receives written notice must take reasonable steps to cure it as soon as practicable. If it does not, you may have the defect cured and recover the reasonable cost of repairs plus attorney's fees and costs, in addition to other damages (s. 27.004(m)). Examples could include an electrical defect creating a fire risk or a structural failure. Document the danger and your notice carefully.
What damages can I recover under the RCLA?
Unless the offer-rejection cap applies, the RCLA limits recovery to these economic damages caused by the defect (s. 27.004(g)):
- The reasonable cost of repairs necessary to cure the defect.
- The reasonable and necessary cost to replace or repair damaged goods in the residence.
- Reasonable and necessary engineering and consulting fees.
- Reasonable expenses of temporary housing reasonably necessary during the repair period.
- The reduction in current market value, if any, after the defect is repaired, but only if the defect is a structural failure (actual physical damage to the load-bearing portion of the home caused by failure of that portion).
- Reasonable and necessary attorney's fees.
- Reasonable and necessary arbitration filing fees and your share of arbitrator compensation.
What limits the contractor's liability
A contractor is liable only to the extent the defect causes actual physical damage, an actual failure of a building component to perform its function, or a verifiable danger to occupants. It is not liable for damage caused by others' negligence, by an owner's failure to mitigate, maintain or timely notify, by normal wear and deterioration, by normal shrinkage or settlement cracking within building standards, or by reasonable reliance on false official records (s. 27.003). Keep maintenance records; they answer the most common defense.
Warranty of habitability claims
To maintain a claim for breach of the warranty of habitability, you must show the defect was latent (hidden) when the home was completed or title passed to the first buyer, and that it has made the home unsuitable for its intended use as a home (s. 27.003(c)).
The $500 disclosure penalty
Written contracts subject to the RCLA, other than a condominium developer's contract with its contractor, must contain a 10-point bold notice stating the contract is subject to Chapter 27 and summarizing the notice-and-inspection requirement. If the contract omits it, you may recover a $500 civil penalty in addition to other remedies (s. 27.007).
Abatement: what happens if you skip the notice
If you file without proper notice, or without giving the contractor its inspection or offer opportunities, the court or arbitrator must abate (pause) the case after a hearing (s. 27.004(d)). The case is automatically abated, without any order, starting on the 11th day after the contractor files a verified motion to abate, unless you file a sworn affidavit contesting it before that day.
There is an exception if notice is impracticable because you must sue right away to beat a limitations deadline, or if your claim is a counterclaim. Then no advance notice is required, but your petition must list each defect in reasonable detail, the contractor may inspect within 75 days after service, and may make an offer within 60 days after service. If the case would have been time-barred and the notice rules were not followed, the court abates the case to allow compliance (s. 27.004(c)).
The contractor can also ask the court to treat a late offer as timely if you withheld evidence you had when you sent notice, added a new defect, or events beyond its control got in the way (s. 27.004(g-1)). Send everything you have with the first notice, and send a supplemental notice if new defects appear.
Mediation, arbitration and contract clauses
- Mediation. If you sue for more than $7,500, either side may move to compel mediation within 90 days after the suit is filed. The court must order mediation within 30 days of the motion, mediation must begin within 30 days of the order (or up to 60 if more time is needed), and the parties split the mediator's cost equally unless they agree otherwise (s. 27.0041).
- Arbitration. Many builder contracts require arbitration. The RCLA treats arbitration as an "action", so the notice process applies before you file. Since September 1, 2023, submitting an RCLA claim to arbitration has the same effect on limitations as filing in court (s. 27.008). If you win, arbitration filing fees and your share of arbitrator compensation are recoverable damages.
- No waiver. Since September 1, 2023, an attempted waiver of the RCLA in a contract subject to it is void (s. 27.009).
- Frivolous claims. A party who files a groundless suit in bad faith or to harass is liable for the other side's reasonable attorney's fees and costs (s. 27.0031).
For a broader look at the options, see contractor dispute resolution.
Does the RCLA replace the DTPA?
Not entirely. The DTPA (Business and Commerce Code ch. 17, Subchapter E) still lets consumers sue over false or misleading practices, breach of express or implied warranty, and unconscionable conduct, and allows up to three times economic damages for knowing conduct. But for construction defect claims on a residence, the RCLA prevails wherever the two conflict (s. 27.002(b)). In practice, that means the RCLA's notice process applies and its list of recoverable damages controls.
The DTPA has its own pre-suit notice: at least 60 days' written notice describing the complaint and the damages and fees claimed (s. 17.505). Lawyers commonly combine the DTPA and RCLA notices in one certified letter when both may apply. DTPA claims generally must be filed within two years of the deceptive act or its discovery (s. 17.565). The DTPA also does not apply to projects with total consideration over $500,000, or to written contracts over $100,000 where the consumer had a lawyer, unless the transaction involves the consumer's residence.
Claims that fall outside the RCLA entirely, such as wrongful abandonment or trust fund violations, are not limited by it.
Statute of limitations and the 10-year statute of repose
The RCLA does not extend any limitations period (s. 27.005), so the general Civil Practice and Remedies Code deadlines decide how long you have. Which one applies depends on the legal theory your lawyer uses:
| Claim type | General period | Source |
|---|---|---|
| Breach of contract | Generally 4 years (debt claims and the residual period) | CPRC ss. 16.004, 16.051 |
| Injury to property (negligence-based property damage) | 2 years | CPRC s. 16.003 |
| DTPA | 2 years from the act or its discovery; can be extended 180 days if the defendant caused the delay | Bus. & Com. Code s. 17.565 |
| Fraud | 4 years | CPRC s. 16.004 |
When a claim "accrues" (starts the clock), and whether it was delayed until you discovered the defect, can be contested. Treat the earliest possible date as your deadline and get legal advice early.
Statute of repose
A statute of repose is an outer limit that runs from completion, no matter when you discover the problem. Texas has two that matter for homeowners:
- Builders and contractors, s. 16.009. For a claim arising from the design, construction or repair of a new residence, or an alteration, repair or addition to an existing one, suit must be brought within 10 years after substantial completion. If the contractor gave a written warranty providing at least 1 year for workmanship and materials, 2 years for plumbing, electrical, heating and air-conditioning delivery systems, and 6 years for major structural components, the period is 6 years (s. 16.009(a-2), (a-3), added by H.B. 2024 effective June 9, 2023).
- Architects, engineers, interior designers and landscape architects, s. 16.008. Suits over design, planning or inspection must be brought within 10 years after substantial completion.
Under s. 16.009, presenting a written claim to the contractor during the repose period extends it, by one year for residential claims under subsection (a-2). If damage occurs in the last year of the period, you may sue within two years after the claim accrues. The repose statute does not bar claims on a written warranty that expressly lasts longer, claims against someone in possession or control of the property when the damage occurs, or claims based on willful misconduct or fraudulent concealment (s. 16.009(c)-(e)). Your RCLA certified notice may qualify as a written claim, but confirm that with counsel rather than relying on it.
What was SIRP, and does it still exist?
From 2003 until 2009, Texas had a Texas Residential Construction Commission (TRCC) that registered builders and remodelers and ran the State-sponsored Inspection and Dispute Resolution Process, known as SIRP or the State Inspection Process. Homeowners generally had to go through it before suing over defects in covered homes, and the Commission maintained limited statutory warranties (one year for workmanship and materials, two years for plumbing, electrical, heating and air-conditioning delivery systems, and ten years for major structural components) and building and performance standards used in inspections.
The 2009 Sunset Advisory Commission review concluded the agency's regulation was fundamentally flawed and recommended abolishing it, noting homeowners who failed SIRP requirements could lose access to court. The Sunset bill did not pass, so the TRCC Act expired on September 1, 2009, with the agency winding down by September 1, 2010. SIRP no longer exists. If you read a guide that tells you to file with the TRCC first, it is outdated. Today the RCLA's notice-and-offer process is the main pre-suit step for residential defect claims.
Evidence to gather before you send notice
- The contract, plans, specifications, change orders and the builder's written warranty, if any.
- The permit and inspection history from the city (Houston, Dallas, San Antonio and Austin all have online permit records).
- Dated photos and video of each defect and the damage, with a ruler or level in frame for cracks and slopes.
- An independent inspector's or licensed engineer's report on cause and repair scope. Foundation, drainage, roofing and window-water claims usually need a professional opinion.
- Repair estimates from at least one contractor not involved in the original work.
- Maintenance records (gutter cleaning, HVAC service, sprinkler settings near the foundation) to answer the "failure to maintain" defense.
- All emails, texts and warranty requests showing when you first reported each problem.
- Receipts for any emergency repairs and for damaged belongings.
Remember the evidence rule: you must give the contractor discoverable evidence showing the nature and cause of the defect and the needed repairs along with the notice (s. 27.004(a)). Withholding it can let the contractor's late offer be treated as timely.
When to get a lawyer
This guide is general information, not legal advice. The RCLA rewards precision: certified mail, exact deadlines, detailed responses to offers, and a claim that fits the Act's damage categories. Consider a construction attorney licensed in Texas before you send the notice if the repairs are expensive, a structural failure is involved, your contract requires arbitration, or a limitations or repose deadline is near. The State Bar of Texas lawyer referral service can help you find one. For a smaller claim, see suing a contractor in small claims; justice courts in Texas hear claims up to $20,000, and the RCLA notice still applies to defect claims there because the Act covers any court action. Local guides: Houston, Dallas, San Antonio, Austin, and the Texas overview.
How to choose a provider
- Confirm the claim is about a construction defect in a residence, not abandonment or diverted funds.
- Find your contract's RCLA notice, warranty and arbitration clause.
- Get an independent inspector or engineer report on cause and repair scope.
- Calendar your earliest limitations date and the 10-year (or 6-year) repose date.
- Send RCLA notice by certified mail, return receipt requested, at least 60 days before filing.
- Enclose all photos, video, reports and estimates with the notice.
- Offer inspection times within the 35-day window and allow up to three inspections.
- Watch for the contractor's written offer within 60 days.
- Respond in writing within 25 days, with detailed reasons if the offer is unreasonable.
- If you accept a repair offer, give access and track the 60-day repair period.
- If a defect threatens safety, say so in the notice and document any emergency repair.
- Combine with a DTPA 60-day notice if a lawyer advises it.
Related general and residential contractors guides
- What Warranty Comes With a New Home or Remodel in Texas and Florida, and How Long Does It Last?
- Contractor Dispute: Should You Negotiate, Mediate, Arbitrate or Go to Court?
- How Do You Sue a Contractor in Small Claims: Texas Justice Court and Florida County Court?
- How Does Florida's Chapter 558 Construction Defect Notice Work, Step by Step?
- What Is the Texas Construction Trust Fund Act, and What Can I Do if My Contractor Misused My Money?
- Contractor Abandoned the Job or Stopped Showing Up: What Do You Do in Texas and Florida?
- Building Inspections Explained: What Inspectors Check at Each Stage
General and residential contractors by state and city
Questions people ask
What notice do I have to send my builder in Texas?
A written notice by certified mail, return receipt requested, to the contractor's last known address at least 60 days before suing or filing arbitration. It must describe each defect in reasonable detail and include evidence you have, such as photos, video and expert reports. If you know the contractor has a lawyer, send it to the lawyer. Mention Chapter 27 of the Texas Property Code.
How long does a Texas builder have to inspect?
The contractor may inspect during the 35 days after it receives your notice, on written request, and may conduct up to three inspections in that period or any agreed extension. If you had to file suit early to beat a limitations deadline, the inspection may happen up to 75 days after the suit is served. Refusing reasonable access can cap your damages.
What if my builder makes a repair offer?
You can accept it in writing, or, if you think it is unreasonable, explain why in writing and in reasonable detail within 25 days of receiving it. An offer not accepted within 25 days is considered rejected. If you accept, repairs generally must be done within 60 days after the contractor gets your acceptance. If it refuses to start, the Act's damage limits no longer protect it.
Can I sue my home builder in Texas?
Yes, after you complete the RCLA notice process or if the contractor fails to respond. Your claim can be in court or arbitration, depending on your contract. You can still use theories like breach of contract, breach of warranty, negligence or the DTPA, but for defect claims the RCLA controls where they conflict, including which damages you can recover.
What is the statute of limitations for construction defects in Texas?
It depends on the claim: generally four years for breach of contract, two years for property damage and for DTPA claims, and four years for fraud. The RCLA does not extend these. Separately, the statute of repose generally bars residential defect suits more than 10 years after substantial completion, or 6 years if the builder gave a qualifying 1-2-6 written warranty.
Does RCLA apply if my contractor abandoned the job?
No. The Act expressly does not apply to damages from a contractor's wrongful abandonment of an improvement project before completion, or to violations of the construction trust fund law. Those claims follow ordinary contract, DTPA and trust fund rules. If your claim also involves defects in finished work, the RCLA process may apply to that part.
Can my contract waive the RCLA?
Not anymore. Since September 1, 2023, Property Code s. 27.009 makes any attempted waiver of the Act in a contract subject to it void. Contracts must also include a 10-point bold notice that they are subject to Chapter 27; if yours does not, you may recover a $500 civil penalty in addition to other remedies.
Is the Texas Residential Construction Commission still around?
No. The TRCC Act expired September 1, 2009, and the agency wound down by September 1, 2010. Its State Inspection and Dispute Resolution Process (SIRP), which homeowners once had to complete before suing, ended with it, as did builder registration. Today the RCLA notice and offer process is the main pre-suit requirement for residential defect claims.
Can a later buyer of the house use the RCLA?
Yes. The Act applies to any subsequent purchaser of a residence who files a claim against a contractor, so a second owner follows the same notice, inspection and offer process. The statute of repose still runs from substantial completion of the original work, not from the date you bought the home, so later buyers often have less time.
Sources
- Texas Property Code ch. 27, Residential Construction Liability
- Texas Civil Practice and Remedies Code ch. 16, Limitations
- Texas Business and Commerce Code ch. 17 (DTPA)
- Texas Property Code ch. 162, Construction Trust Funds
- Texas Government Code ch. 27, Justice Courts
- Sunset Advisory Commission, Texas Residential Construction Commission Final Report (July 2009)
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.