Local Guide · General and residential contractors
Building Inspections Explained: What Inspectors Check at Each Stage
A stage-by-stage guide to the code inspections on a new home or remodel, what to do when one fails, when to hire your own inspector, and the Texas and Florida rules that matter: third-party inspections, windstorm certificates, wind mitigation forms and threshold buildings.
A permitted new home usually gets inspected at the foundation (before concrete), at framing and the electrical, plumbing and mechanical rough-ins (before walls close), at insulation, and at final, before a certificate of occupancy issues. Remodels get only the stages that apply. City inspectors check code minimums, not workmanship, so many owners also hire a licensed phase inspector. Texas lets third parties inspect when cities miss deadlines (LGC ch. 247), and Florida lets owners use private providers (s. 553.791).
Key facts
- Texas cities apply the International Residential Code to residential construction and remodeling under Local Government Code 214.212.
- Texas's Property Code 53.255 disclosure warns that inspections by government authorities and other outside parties are made for their own purposes and are not quality-control inspections.
- If a Texas city misses an inspection deadline by 15 days, an ICC-certified inspector, another jurisdiction's inspector or a licensed engineer may do it at no city fee (LGC ch. 247).
- In Texas counties that opt into LGC ch. 233 subchapter F, new rural homes need foundation, framing and mechanical, and final inspections by builder-hired inspectors.
- Texas requires a TREC license to act as a professional real estate inspector for a buyer or seller (Occupations Code 1102.103).
- Florida owners may hire private providers for plans review or inspections and get a reduced permit fee (s. 553.791).
- Florida's Uniform Mitigation Verification Inspection Form OIR-B1-1802 (Rev. 04/26) has been required since April 1, 2026, according to Simpson Strong-Tie.
- A Florida threshold building is over three stories or 50 feet, or a large assembly occupancy, and needs a special structural inspector (ss. 553.71, 553.79(5)).
- Coastal Texas structures built or altered since January 1, 1988 must meet windstorm specifications to be insurable by TWIA (Ins. Code 2210.251).
What is a building inspection, and who does it?
A building inspection is a check by the building department (or a licensed private inspector working in its place) that permitted work meets the adopted building code at a specific stage. Inspections are tied to a permit. No permit, no inspections, and no record that the work was ever checked.
The inspector's job is narrow. He or she checks code minimums for safety: structure, fire separation, egress, electrical, plumbing, mechanical, energy and, in Florida and on the Texas coast, wind resistance. The inspector does not check whether the tile is straight, whether you got the cabinets you paid for, or whether the contractor followed your contract. That is your job, or the job of an inspector you hire.
Texas's statutory homeowner disclosure makes the same point. The "Know Your Rights and Responsibilities" statement a Texas residential contractor must give owners under Property Code 53.255 warns that inspections by government authorities and other outside parties are made for their own purposes and are not quality-control inspections and recommends that owners inspect the work or hire an independent inspector.
Which code applies
- Florida: the Florida Building Code applies statewide, enforced by city or county building departments. Under s. 553.79, it is unlawful to construct, alter, repair or demolish a building without first getting a permit, unless the law provides otherwise.
- Texas cities: Local Government Code 214.212 adopts the International Residential Code (as it existed May 1, 2012) as the municipal residential code for all residential construction, alteration, remodeling and repair in a city, and lets cities adopt local amendments and newer editions. Section 214.216 does the same with the International Building Code for commercial buildings.
- Unincorporated Texas: rules depend on the county. See the Texas section below.
What inspections are required during construction? A stage-by-stage table
The exact list depends on the permit and the jurisdiction. A new house or major addition usually goes through these stages. Remodels skip the stages that do not apply. A kitchen remodel, for example, may need only rough-in, insulation (if walls are opened) and final inspections.
| Stage | When it happens | What the inspector looks at | Common reasons it fails |
|---|---|---|---|
| Site, setback or survey | Before or with the foundation | Building location against approved site plan, setbacks, easements, erosion control, flood elevation where required | Forms placed over a setback line; missing survey; silt fence down |
| Footing or foundation (pre-pour) | After trenches and forms, steel and anchors are set, before concrete | Footing size and depth, rebar size, spacing and cover, post-tension cables, vapor retarder, anchor bolts or straps | Rebar on the dirt with no chairs; wrong spacing; debris in trenches |
| Underslab plumbing and electrical | Before the slab is poured | Drain slope, pipe material, pressure or water test, conduit under slab | Test not holding; backfall in drain lines |
| Sheathing or roof deck nailing (common in Florida) | After roof and wall sheathing, before coverings | Nail type and spacing, secondary water barrier, straps | Nails missed framing; wrong spacing at edges |
| Framing | Frame, roof, windows and doors in; before insulation and drywall | Lumber sizes, spans, bracing, headers, fire blocking, connectors and hurricane straps, stairs, egress windows | Missing connectors; notched joists; fire blocking gaps |
| Rough-in electrical, plumbing and mechanical (MEP) | Same window as framing, before walls close | Wire size, boxes, grounding and bonding, drain and vent layout, gas piping test, duct sizing and support | Boxes not bonded or supported; work covered; no plans on site |
| Insulation and energy | After rough-ins pass, before drywall | Insulation R-values, air sealing, window ratings against the energy code | Gaps and compression; missing labels or certificates |
| Drywall or lath (some jurisdictions) | After board is hung, before finish | Fire-rated assemblies, fastening, lath for stucco | Wrong board type at rated walls |
| Final building and trade finals | Work complete | Smoke and CO alarms, guards and handrails, GFCI and AFCI protection, water heater, HVAC operation, grading, address numbers, energy compliance | Missing alarms; open junction boxes; unfinished grading |
| Certificate of occupancy or completion | After all finals pass | Paper record that the building may be used | Open trade permit; unpaid fees |
Ask the building department for its inspection list when the permit issues. Many departments print the required inspections on the permit card or in the online permit record.
What happens at the key inspections: foundation, framing, rough-in, insulation and final
What is a foundation inspection?
The foundation inspection happens before concrete. It is the last chance to see the steel, trench depth and slab prep. In much of Texas, slabs on expansive clay are often post-tensioned or engineer-designed, so the inspector compares the work to the engineer's plan. A separate engineer's inspection is often required by the plan itself. Once concrete is placed, problems are expensive to fix, so never let a contractor pour before the inspection passes.
What is a framing inspection?
Framing is the skeleton. Inspectors look at member sizes and spans, load paths, bracing and shear walls, headers over openings, fire blocking, stairs, and in hurricane areas the connector hardware that ties roof to walls and walls to foundation. Framing is usually inspected at the same time as, or right after, the trade rough-ins.
What is a rough-in inspection?
"Rough-in" means the parts of the electrical, plumbing and mechanical systems that will be hidden inside walls, floors and ceilings: wiring and boxes, supply and drain lines, vents, gas piping and ducts. Each trade usually has its own rough-in inspection under its own trade permit. The golden rule: nothing gets covered until the rough-in passes.
What is an insulation or energy inspection?
After the rough-ins pass, insulation goes in. The inspector checks it against the energy code (in Florida, the Energy volume of the Florida Building Code; in Texas cities, the energy code the city has adopted). Some jurisdictions accept a third-party energy rater's report instead.
What is a final inspection?
The final checks the finished, working building: life-safety items, fixtures, outlets and breakers, the HVAC system, stairs and guards, grading and drainage. Each trade permit has its own final. When all finals pass, the department issues a certificate of occupancy (new buildings) or completion (remodels) and closes the permit.
In Austin, for example, the general contractor on a permit is responsible for scheduling inspections including the final and for getting the certificate of occupancy or completion. On most contracts, the contractor schedules inspections; on owner-builder permits, you do.
What happens if I fail an inspection?
Failing an inspection is common and is not, by itself, a sign of a bad contractor. What matters is what happens next.
- Get the correction notice. The inspector records the failed items in the permit file or leaves a correction notice at the site. Ask for a copy, or look it up in the online permit record. Florida building departments must accept inspection requests electronically and post permit status online (s. 553.79).
- Find out who fixes it and who pays. Your contract should say the contractor corrects code failures at no cost to you. Re-inspection fees are usually the contractor's cost unless the failure came from your own change.
- Fix only what is listed, then re-request. The contractor corrects the items and calls for a re-inspection.
- Do not let work proceed over failed items. Covering failed work means tearing it open later.
- If you disagree, ask the inspector for the code section. Departments have a supervisor review and an appeal process (often to the building official or a board of appeals).
- Track repeats. One failed inspection is normal. The same failure twice, or many failures across trades, is a warning sign about supervision.
The most common reasons inspections fail
San Antonio's Development Services Department publishes its top causes of delays. On residential jobs it lists, among others: the house was locked and the inspector could not get in, work covered up (sheetrocked or insulated) before inspection, no plans on the job site, plumbing "not ready for full inspection," backfall on drain lines, and mechanical problems such as improperly sloped condensate drains and missing dryer vents. Most of these are scheduling and preparation failures, not hard engineering problems.
If an inspection is not even scheduled on time, see the next section. Both Florida and Texas now have laws that address slow inspections.
What can I do if the city is slow to inspect?
Texas: third-party inspections under LGC ch. 247
Texas H.B. 14 (effective September 1, 2023) created Local Government Code ch. 247. If a regulatory authority does not conduct a required inspection within 15 days after its deadline, the inspection may be done by an ICC-certified inspector, an approved inspector from another jurisdiction, or a licensed engineer. The city may not charge a fee for the third-party inspection and may not make you waive these deadlines. The third party must report results within 15 days after the inspection. S.B. 1202 (effective September 1, 2025) added s. 247.0025 for home backup power (generators, batteries and standby systems at 600 volts or less on 1 to 2 family homes), letting licensed master electricians, electrical inspectors or other qualified third parties review and inspect those installations.
Florida: private providers under s. 553.791
Florida lets the owner, or the owner's contractor with written authorization, hire a private provider for plans review or inspections at any time, paying the provider directly. The local permit fee must be reduced by the cost savings. You must notify the building official in writing at permit application or by 2 p.m., 2 business days before the first scheduled inspection, on a Florida Building Commission form. On one- and two-family homes, you can also switch to a private provider for single-trade inspections after construction starts, by notifying the building official before the next scheduled inspection.
Should I be present for inspections? Should I hire my own inspector?
Being there
You do not have to attend city inspections, and many inspectors prefer to deal with the contractor. But it helps to be nearby for the big ones (foundation, framing and rough-in, final) so you can ask what passed, what failed, and why. At minimum, read every inspection result in the online record the same day. If a stage passed, take dated photos of the open walls before they close. Those photos are gold later, when you need to find a pipe or prove what was installed.
Third-party phase inspections for new homes
A "phase inspection" is an independent inspection you hire at key stages of a new home: usually pre-pour foundation, pre-drywall (framing and rough-ins), and final before closing or move-in, with an 11-month warranty inspection later. It goes beyond code to look at workmanship and the plans.
- Texas: anyone paid to inspect for a buyer or seller of real property must be licensed by the Texas Real Estate Commission (TREC). Occupations Code 1102.103 says a person may not act as a professional inspector for a buyer or seller without a professional inspector license. Ask for the TREC license number and check it on TREC's website. For structural questions, hire a licensed professional engineer.
- Florida: home inspection services are defined in s. 468.8311 as a limited visual examination of readily accessible installed systems, and s. 468.8319 bars anyone from practicing or offering home inspection services without complying with the home inspector law. A Florida home inspector also may not perform or offer to perform repairs on a home he or she or the company inspected. Check licenses on DBPR's license search.
Builder contracts sometimes limit when outside inspectors may visit. Read the clause before you sign and ask for reasonable access at each phase.
Code inspection vs home inspection
| Code (building department) inspection | Home or phase inspection you hire | |
|---|---|---|
| Who pays | Paid through permit fees | You pay the inspector directly |
| Who it works for | The public | You |
| Standard | Minimum code | Code plus workmanship, plans and condition |
| Licensing | Certified building inspectors or private providers | TREC license in Texas; Florida home inspector license |
| Result | Pass or fail; permit closed | Written report with photos and recommendations |
| Required? | Yes, when a permit is required | No, but strongly recommended for new homes |
Texas specifics: unincorporated areas and coastal windstorm
Do Texas cities inspect new homes?
Yes. Cities enforce the residential code adopted under LGC 214.212 and inspect permitted work. Outside city limits it is different. Counties generally do not issue building permits. A county may opt into LGC ch. 233 subchapter F, which requires new homes and large additions in unincorporated areas to meet the IRC, with at least three inspections: foundation before concrete, framing and mechanical systems before wall covering, and on completion. The builder hires the inspectors: a licensed engineer, registered architect, TREC-licensed professional inspector, licensed municipal plumbing inspector, a political subdivision's building inspector, or an ICC-certified residential combination inspector. The county may require notice of the final inspection result within 10 days. If your county has not opted in, there may be no required building inspections at all, which makes a private phase inspector your only check.
Rural septic systems are separate: under Health and Safety Code 366.055, a system may not be used until it is inspected and approved by TCEQ or its authorized agent.
Windstorm certification on the coast
Texas Insurance Code 2210.251 says structures in the designated coastal catastrophe area that are built, altered, remodeled, enlarged or repaired on or after January 1, 1988 must comply with the windstorm building specifications in the plan of operation to be insurable by the Texas Windstorm Insurance Association. The Texas Department of Insurance issues WPI-8 certificates of compliance for ongoing or completed construction and lists qualified windstorm inspectors. Get the windstorm inspector involved before work is covered, because the inspector must see the connections and fastening.
Florida specifics: wind mitigation, 4-point and threshold inspections
What is a wind mitigation inspection in Florida?
A wind mitigation inspection documents your home's wind-resistant features so your insurer can apply discounts. Florida law (s. 627.0629) requires residential property insurance rate filings to include actuarially reasonable discounts, credits or other rate differentials for construction features that reduce windstorm loss, such as roof strength, roof covering performance, wind uplift prevention and opening protection.
The results go on the Uniform Mitigation Verification Inspection Form, OIR-B1-1802. According to Simpson Strong-Tie's summary of the 04/26 revision, all wind mitigation inspectors must use the revised form beginning April 1, 2026, it adds performance-based options for roof-to-wall connections, and the form remains valid for five years if no material changes are made to the structure. The form records:
- roof covering type and code compliance documentation;
- roof deck attachment;
- roof-to-wall attachment (toe nails, clips, single or double wraps);
- roof geometry (hip roofs score best);
- secondary water resistance (a sealed roof deck); and
- opening protection for windows, doors and garage doors.
Citizens Property Insurance lists who may complete the form: a Florida home inspector licensed under s. 468.8314 who has completed hurricane mitigation training and a proficiency exam, a building code inspector certified under s. 468.607, a general, building or residential contractor licensed under s. 489.111, a professional engineer, a licensed architect, or others the insurer recognizes. If you are re-roofing or replacing windows, ask your contractor to save the product approvals, nailing details and permit records so the next wind mitigation inspection can credit the work.
What is a 4-point inspection?
A 4-point inspection is an insurance underwriting report on four systems of an existing home: roof, electrical, plumbing and HVAC. It is not a building department inspection and not a full home inspection. Florida insurers commonly ask for it on older homes when writing or renewing a policy; each insurer sets its own age thresholds and acceptable conditions. A 4-point that flags an old roof, an obsolete electrical panel or polybutylene pipe can lead to a remodel, which then needs its own permits and inspections.
Threshold buildings and special inspectors
Larger Florida buildings get an extra layer. A "threshold building" is one greater than three stories or 50 feet in height, or an assembly occupancy over 5,000 square feet with an occupant content over 500 persons (s. 553.71(12)). Under s. 553.79(5), the building department must require structural inspections by a special inspector during new construction and during repairs that modify the structural system, following a structural inspection plan the engineer or architect of record prepares. The owner selects and pays the special inspector, who must be a licensed engineer or architect and who reports to the enforcement agency. Condo boards running major concrete restoration should expect this. See Florida milestone inspections.
Inspection limits in Florida
For one- and two-family homes, s. 553.79(21) bars building officials from requiring inspection of parts of the property not directly impacted by the permitted work, with exceptions for substantial improvements, change of occupancy and historic buildings, and for violations in plain view. One- and two-family detached homes are not subject to plan review or inspection by the local fire official unless a local ordinance expressly requires it (s. 553.79(15)). On jobs with a direct contract over $5,000, a copy of the recorded notice of commencement must be filed with the permitting agency before the first inspection, or later inspections cannot be approved (s. 713.135).
How to choose a provider
- Get the list of required inspections when the permit issues.
- Keep the approved plans and permit card on site for every inspection.
- Make sure the site is unlocked and ready when an inspection is scheduled.
- Never pour concrete or close walls before the inspection passes.
- Check inspection results online the same day.
- Photograph open walls and slabs after each passed inspection.
- Make the contractor responsible in writing for fixing code failures and paying re-inspection fees.
- Hire a TREC-licensed (Texas) or licensed Florida home inspector for phase inspections on a new home.
- On the Texas coast, book the windstorm inspector before work is covered.
- In Florida, save roof and window product approvals and permit records for your next wind mitigation form.
- Confirm all trade finals passed and the permit is closed before final payment.
Related general and residential contractors guides
- Do I Need a Building Permit in Texas? City-by-City Rules for Remodels, Additions and New Homes
- Do I Need a Building Permit in Florida? What Needs One, the New $7,500 Exemption, and How Permits Work in Miami-Dade, Tampa, Orlando and Jacksonville
- Punch Lists, Final Walkthrough and Closeout: What Must You Have Before Final Payment?
- What Warranty Comes With a New Home or Remodel in Texas and Florida, and How Long Does It Last?
- Florida Owner-Builder Permits: Rules, the Disclosure Statement and the 1-Year Rule
- Building or Remodeling Your Own Home in Texas as an Owner-Builder
- What Are Florida Milestone Inspections, and What Must Condo and Co-op Boards Do Before Hiring Engineers and Contractors?
- How Do You Build a Custom Home in Texas or Florida, From Lot to Keys?
General and residential contractors by state and city
Questions people ask
Can I cover work before the inspection passes?
No. Covering work before it passes is one of the top reasons inspections fail. San Antonio lists "work covered up (sheetrocked / insulated)" and "work covered prior to inspection" among its most common residential delays. If an inspector cannot see the work, he or she can require it to be opened, at the contractor's cost under most contracts. Build the schedule so drywall never starts until framing and all rough-ins are approved.
Who schedules building inspections, me or my contractor?
Normally the permit holder. When a contractor pulls the permit, the contractor schedules inspections and fixes failures. Austin, for example, makes the general contractor on a permit responsible for scheduling inspections including the final and obtaining the certificate of occupancy. If you pulled an owner-builder permit, you schedule them yourself. Either way, you can watch results in the city's online permit record.
Does passing city inspection mean the work is good quality?
No. City inspectors check code minimums for safety, not workmanship or whether the contractor met your contract. Texas's statutory disclosure under Property Code 53.255 warns that inspections by government authorities and other outside parties are made for their own purposes and are not quality-control inspections and recommends hiring an independent inspector. A third-party phase inspector or engineer can catch problems a code inspection never looks for.
How much does a wind mitigation inspection save in Florida?
Savings depend on your insurer, your home's features and your windstorm premium. Florida law requires insurers to offer actuarially reasonable discounts for features that reduce wind loss, and insurers must post their available hurricane mitigation discounts on their websites. Ask your insurer or agent what credits apply before and after features like a new roof, roof-to-wall straps or impact windows.
What is an 11-month warranty inspection?
It is a private inspection scheduled shortly before a builder's one-year workmanship warranty ends. The inspector looks for settling, cracks, leaks, drainage problems and items the builder should fix under warranty. In Texas, hire a TREC-licensed inspector; in Florida, a licensed home inspector. Send the builder the report in writing before the warranty expires. See our guide to home builder warranties.
Does a remodel need inspections?
If the remodel needs a permit, yes. A kitchen or bath remodel that moves plumbing or adds circuits usually needs rough-in and final inspections for each trade. Florida exempts some single-family work under $7,500 from permits since July 1, 2026, but never electrical, plumbing, structural, mechanical or gas work, and never in flood hazard areas. Check your city's rules before you start.
Sources
- Florida Statutes s. 553.79 (2026), Permits; applications; issuance; inspections
- Florida Statutes s. 553.71 (2026), Definitions (threshold building)
- Florida Statutes s. 553.791 (2026), Alternative plans review and inspection
- Florida Statutes s. 713.135 (2026), Notice of commencement and applicability of lien
- Florida Statutes s. 468.8311 (2026), Home inspection definitions
- Florida Statutes s. 468.8319 (2026), Prohibitions; penalties
- Florida Statutes s. 627.0629 (2026), Residential property insurance; rate filings
- Citizens Property Insurance Corp., Authorized Wind Mitigation Inspectors
- Simpson Strong-Tie, Florida OIR Uniform Mitigation Verification Inspection Form OIR-B1-1802 (Rev. 04/26)
- Texas Local Government Code ch. 214 (Municipal Regulation of Housing and Other Structures)
- Texas Local Government Code ch. 233 (County Regulation of Housing and Other Structures)
- Texas Local Government Code ch. 247 (Third-Party Review and Inspection)
- Texas Occupations Code ch. 1102 (Real Estate Inspectors)
- Texas Property Code ch. 53 (Mechanic's Liens; s. 53.255 disclosure)
- Texas Health and Safety Code ch. 366 (On-Site Sewage Disposal Systems)
- Texas Insurance Code s. 2210.251
- Texas Department of Insurance, Windstorm inspections
- City of Austin, Contractor Registration (contractor responsibilities)
- City of San Antonio DSD, Top 10 Developer Delays
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.


