How Do You Build a Custom Home in Texas or Florida, From Lot to Keys?
A neutral, step-by-step map of building a custom home: lot feasibility, design, builder selection, contracts and allowances, Texas MUDs and Florida impact fees, inspections, closeout and warranty.
Building a custom home runs in this order: secure a buildable lot, test feasibility (survey, flood zone, soils, utilities, fees), design with an architect or builder, get comparable bids, sign a contract with clear allowances and milestone payments, obtain permits, then build through foundation, framing, rough-ins, a pre-drywall walkthrough, finishes and final inspections to a certificate of occupancy. In Texas, check MUD taxes and county inspection limits; in Florida, check impact fees, flood elevation and wind design.
Key facts
- NAHB's 2024 survey put average construction cost at $428,215, about $162 per square foot, for a 2,647 sq. ft. home (national averages).
- In that survey, construction was 64.4% of the $665,298 average sales price and the finished lot 13.7%.
- Texas Water Code 49.452 requires a written district notice before a binding sale contract, or the buyer may terminate.
- Florida impact fees may not be collected earlier than building permit issuance (s. 163.31801).
- Texas counties that opt in under LGC ch. 233 cannot require approval before construction, but builders must arrange at least three inspections.
- Florida must decide residential permits within 30 business days for structures under 7,500 sq. ft. (s. 553.792).
- Florida's new s. 553.385 (July 1, 2026) requires factory-built single-family homes to be permitted as of right where site-built homes are allowed.
- TCEQ says a permit and approved plan are required to build an on-site sewage facility, with a limited 10-acre exception.
What are the steps to building a custom home? (Process map)
Building a custom home is a chain of about a dozen decisions, and each one limits the next. Here is the full map, from lot to keys, with the main risk at each stage.
| Stage | What happens | Main risk if you skip or rush it |
|---|---|---|
| 1. Land | Find and buy a lot, or confirm the one you own can be built on | Buying a lot you cannot build the house you want on |
| 2. Feasibility | Survey, soils, flood zone, utilities, deed restrictions, zoning, fees | Surprise costs for fill, septic, utility extensions or elevation |
| 3. Design | Architect or designer drafts plans; engineer designs foundation and structure | Designing a house that costs far more than your budget |
| 4. Pricing and bids | Builders price the plans and specifications | Bids that cannot be compared because the scope is vague |
| 5. Contract | Price structure, allowances, schedule, payment schedule, warranty | Unclear allowances and change-order rules |
| 6. Permits | Plan review, permits, utility applications, impact or district fees | Delays and fees nobody budgeted |
| 7. Site work and foundation | Clearing, fill, utilities, foundation | Poor drainage or a foundation not matched to the soil |
| 8. Framing and dry-in | Walls, roof structure, sheathing, roof, windows | Water damage if the house is not closed in quickly |
| 9. Rough-ins | Plumbing, electrical, HVAC, low-voltage | Missed outlets, poor duct layout; hard to fix later |
| 10. Pre-drywall walkthrough | Owner and inspector review what will be hidden | Defects sealed inside walls |
| 11. Insulation, drywall and finishes | Cabinets, counters, flooring, trim, paint, fixtures | Allowance overruns and late selections |
| 12. Final inspections and certificate of occupancy | Code finals, CO, final walkthrough, punch list | Paying in full before the punch list is done |
| 13. Warranty | Warranty period, 11-month walkthrough | Missing the window to report defects |
The rest of this guide walks through each stage, with what is different in Texas and Florida.
Custom vs semi-custom vs production builders: what is the difference?
| Type | Who owns the lot | Design freedom | Pricing | Best for |
|---|---|---|---|---|
| Production builder | Builder owns lots in its subdivision | Pick from set plans and option packages | Published base price plus options | Buyers who want predictability and speed |
| Semi-custom builder | Builder's lot or yours | Start from the builder's plan library and modify | Base price plus priced changes | Buyers who want some changes without full design |
| Custom builder | Usually your lot | Build any plan, often from your own architect | Fixed price or cost-plus on your plans | Buyers with a specific design or an unusual lot |
The legal side changes with the model. In a production home you usually sign a purchase agreement for a finished house and lot. In a custom home on your own land you sign a construction contract, and that brings lien law, permit responsibilities and payment schedules into play. In Florida, you will record a Notice of Commencement before work starts. In Texas, the builder must hand you the "Know Your Rights and Responsibilities Under the Law" disclosure before you sign a residential construction contract (Prop. Code 53.255).
Do I need an architect or a builder first?
Either order can work. What matters is that cost and design are checked against each other early.
- Architect first: you get a design built around your lot and your needs, then bid it to several builders. Risk: a design that comes in over budget. Fix: ask for a builder's rough pricing at the schematic stage.
- Builder first: the builder (often with an in-house designer or a design partner) prices as the design develops. Risk: less competition on price. Fix: ask for an open-book estimate and line-item allowances.
- Design-build: one firm designs and builds under one contract. See design-build vs architect vs general contractor.
Whatever the order, you will usually need a licensed engineer for the foundation and, in Florida and coastal Texas, for wind design. The Florida Building Code is updated every 3 years from the International Codes, and the code edition in effect on the date of your permit application governs that permitted work for the life of the permit (s. 553.73).
Lot feasibility: survey, soil test and geotechnical report
A lot feasibility study answers one question: can you build the house you want on this lot, for a cost you can accept? Do it before you buy, or before you design if you already own the land. Our land due diligence checklist goes deeper. The core pieces:
- Boundary and topographic survey: shows property lines, easements, setbacks, elevations and drainage. Your designer needs it to place the house.
- Flood zone check: search the address on FEMA's Flood Map Service Center (msc.fema.gov), the official public source for flood hazard information for the National Flood Insurance Program. In a flood zone, your floor may need to sit above a required elevation, which can mean fill, stem walls or a raised foundation.
- Geotechnical (soils) report: a geotechnical engineer drills or probes the soil and reports what it is, how much it can carry, how much it can swell or settle, and where groundwater sits. The foundation engineer uses it to design the slab or piers.
- Septic suitability if there is no sewer: see the septic section below.
- Utility availability: water, sewer, power, gas, internet, and who pays to extend them.
- Rules on the land: zoning, deed restrictions, HOA design rules and any special district taxes.
Texas soils: expansive clay and post-tension slabs
Much of Texas, including large parts of the Dallas-Fort Worth, Houston, Austin and San Antonio areas, sits on clay soils that swell when wet and shrink when dry. That movement is why many Texas homes are built on engineered slabs, often post-tensioned (steel tendons in the concrete are tightened after it cures to hold the slab together). Your geotechnical report drives that design. Ask builders who engineers their foundations and whether the engineer inspects the cables or rebar before the pour.
Florida: flood elevation, wind design and soils
Florida lots raise different questions: flood elevation, high water tables, organic or sandy soils and, near the beach, the coastal construction control line. Wind design under the Florida Building Code shapes the roof, wall connections, windows and doors. Ask the builder how the house will meet wind requirements and which products are approved for your area.
Infrastructure and fees: MUDs in Texas, impact fees in Florida
Infrastructure costs are where custom home budgets most often get blindsided. In both states, ask early: who provides water and sewer, what will it cost to connect, and what ongoing taxes or fees come with the lot?
Texas: municipal utility districts (MUDs) and other special districts
Many new Texas neighborhoods, especially around Houston, Austin and Dallas-Fort Worth, get water, sewer and drainage from a municipal utility district or similar special district. These districts can issue bonds and levy their own property tax on top of city, county and school taxes.
- Under Texas Water Code s. 49.452, a person selling property in a covered district must give the buyer a written notice before the buyer signs a binding contract. If the seller does not, the buyer is entitled to terminate the contract. If the notice is given late but the buyer chooses to close anyway, the buyer is presumed to have waived those rights.
- Section 49.4521 prescribes the notice: a bold title, "NOTICE TO PURCHASER OF SPECIAL TAXING OR ASSESSMENT DISTRICT," the district's current or projected tax rate per $100 of value, voter-approved and issued bond amounts for water, sewer and drainage, roads and parks, any standby fee, and whether the district is in a city's extraterritorial jurisdiction.
- The district may impose an unlimited rate of tax to pay voter-approved bonds. Read the rate and bond figures before you sign.
Outside districts and cities, rural Texas lots often rely on a private well and an on-site sewage facility (septic system).
Florida: impact fees
Florida counties and cities charge impact fees to pay for growth-related roads, schools, parks, water and sewer. Florida's Impact Fee Act (s. 163.31801) requires fees to be based on a study using the most recent and localized data within 4 years, bars collection earlier than building permit issuance, requires at least 90 days' notice before a new or increased fee takes effect, and limits how fast fees can rise. It also requires dollar-for-dollar credits when a local government makes you contribute infrastructure in the same category. Ask the county and city impact fee office for a fee estimate on your parcel before you finalize the budget.
What fees cost nationally (NAHB 2024)
The National Association of Home Builders' Cost of Constructing a Home-2024 survey (published January 20, 2025) reported these average site-work items per home: building permit fees $7,640, impact fees $6,367, water and sewer fees and inspections $6,260, and architecture and engineering $6,480. These are national averages from a survey of builders, not Texas or Florida figures, and your local numbers can be very different.
Septic, wells and sewer: rural lots in both states
Texas. The Texas Commission on Environmental Quality (TCEQ) says a permit and approved plan are required to construct, alter, repair, extend and operate an on-site sewage facility (OSSF). Applications go to the local permitting authority (an authorized agent, often a county) or a TCEQ regional office where there is no local program. TCEQ advises a preconstruction site evaluation by a licensed site evaluator or licensed professional engineer, and installation by a licensed installer of the correct level. A permit may not be needed under the "10 acre rule" for a single-family home on a tract of 10 acres or more, with all parts of the system at least 100 feet from the property line, effluent kept on the property and only one dwelling on the tract. Local programs can be stricter, so always check.
Florida. Effective July 1, 2021, the Florida Department of Environmental Protection (DEP) became responsible for the onsite sewage (septic) program, which moved from the Department of Health. DEP says county health department offices continue to do septic permitting and inspection in most counties, while permitting in the Panhandle counties and Marion County is handled by DEP. Some areas near springs and in Basin Management Action Plan areas have stricter septic rules, including enhanced nutrient-reducing systems. Ask DEP or your county health department what system your lot will need before you buy.
How do I choose a custom home builder? (Scorecard)
Score each builder you interview from 1 to 5 on each line. A low score on any of the first four is a reason to walk away, regardless of price.
| Criterion | What to check | Texas | Florida |
|---|---|---|---|
| License or registration | Correct license type, active status, complaint history | No state homebuilder license since the Texas Residential Construction Commission expired in 2009; check city registration and trade licenses (electrical, plumbing, HVAC) | Certified or registered building, general or residential contractor under ch. 489; check myfloridalicense.com |
| Insurance | General liability and workers' compensation certificates sent directly from the insurer | Same | Same |
| Homes like yours | Similar size, style, lot type (sloped, flood zone, rural septic) | Experience with expansive clay and engineered slabs | Experience with flood elevation and wind design |
| Recent clients | Talk to 3 owners from the last 2 years, including one whose project had problems | Visit a finished home | Visit a finished home |
| Estimate quality | Line items, realistic allowances, clear exclusions | Compare allowance amounts across bids | Same |
| Contract terms | Price type, payment schedule tied to milestones, change orders, delays, warranty | 53.255 disclosure; retainage; final bills-paid affidavit | Deposit rule in s. 489.126; Notice of Commencement; lien releases |
| Communication | Who your day-to-day contact is, update schedule, owner portal | Same | Same |
| Warranty | Written warranty, what it covers, who backs it | No state-mandated new-home warranty program | Read the builder's written warranty |
For the questions to ask in the interview, see questions to ask a contractor and checking references and reviews.
Fixed price or cost-plus for a custom home? And what is an allowance schedule?
Fixed price (also called lump sum) means the builder agrees to build the plans and specifications for a set price. Changes come through priced change orders. You carry less cost risk, but builders add a cushion for unknowns.
Cost-plus means you pay the actual costs plus a fee, either a percentage or a fixed amount. You get transparency and savings if costs come in low, but you carry the risk of overruns. Ask for a guaranteed maximum price (a cap) if you go cost-plus, and the right to audit invoices. Full comparison: fixed price vs cost-plus vs time and materials.
The builder's allowance schedule
An allowance is a placeholder budget for something you have not picked yet, such as "$X for kitchen cabinets" or "$Y per square foot for tile, installed." If you pick something more expensive, you pay the difference, often plus the builder's markup. Allowances are where many custom budgets quietly grow.
- Ask whether each allowance covers material only or material plus installation.
- Check that the amounts are realistic by pricing your actual picks at a showroom.
- Ask how overages are marked up and whether credits flow back to you if you spend less.
- Put a selection deadline next to each allowance so late choices do not delay the job.
What are the stages of building a house, and what gets inspected?
Inspections happen at points where work is about to be covered up. A typical sequence:
- Site and foundation: layout, forms, plumbing under the slab, then reinforcing or post-tension cables before the concrete pour.
- Framing: walls, floor and roof structure, sheathing and wind connections (straps, anchors). In Florida, roof sheathing and connector inspections are especially important.
- Dry-in: roof underlayment and roofing, windows and exterior doors.
- Rough-ins: plumbing, electrical and mechanical rough inspections.
- Insulation: energy code compliance before drywall.
- Finals: building, electrical, plumbing and mechanical finals, then the certificate of occupancy.
Permit timing laws
Florida local governments must decide residential permit applications within 30 business days for structures under 7,500 square feet and 60 business days for larger ones, absent a written waiver, and must cut the permit fee by 10 percent for each business day they are late, with exceptions (s. 553.792). You may also hire a private provider for plan review or inspections (s. 553.791). In Texas, if a city or county runs more than 15 days past its deadline to review or inspect, a qualified third party such as a licensed engineer or an ICC-certified inspector may do it, at no added fee from the government (Local Gov. Code ch. 247).
Building outside city limits in Texas
Texas counties have limited building authority. Under Local Government Code ch. 233, subchapter F, a county that opts in by order can require new single-family homes and duplexes in unincorporated areas to follow the International Residential Code as published May 1, 2008, or the version used in the county seat. Even then the county may not require prior approval before construction begins, and the builder must arrange at least three inspections (foundation before concrete, framing and mechanical before drywall, and completion) by a licensed engineer, registered architect, TREC-licensed professional inspector, ICC-certified residential combination inspector or other listed inspector. If the county requires it, the builder files notice of the inspection results within 10 days of the final inspection. If a city has adopted a code in its extraterritorial jurisdiction, the city code controls there. In short, on rural land you may be the only quality control unless you hire it.
What is a pre-drywall walkthrough, and how many site visits should I make?
The pre-drywall walkthrough happens after rough-ins and insulation are done and before drywall goes up. It is your last easy look at everything that will be hidden. Bring the plans and check:
- Outlet, switch, light, data and TV locations match your plans
- Blocking for grab bars, TV mounts, shelving and heavy fixtures
- Plumbing locations for sinks, showers, tub, laundry and any gas lines
- Duct runs and returns in every room
- Window and door sizes and swings
- Visible water damage, missing straps or damaged framing
Take photos and video of every wall. They are worth a lot when you later need to find a pipe or wire.
Site visits. Agree on a cadence in the contract: a scheduled weekly walk with the builder's superintendent, plus visits at the key milestones (foundation before the pour, framing, pre-drywall, cabinets installed, final). Respect site safety rules and route requests through the superintendent, not the trades.
Do I need a home inspector for new construction?
It is strongly recommended. Code inspectors check minimum code compliance at specific points; they are not working for you and do not check quality or the plans' details. The Texas residential disclosure statement in Prop. Code 53.255 itself warns owners that required outside inspections, including government inspections, are not quality-control inspections and recommends that owners inspect or hire an independent inspector.
Common "phase inspections" by a private inspector are at foundation (before the pour), pre-drywall and final. In Texas, professional inspectors are licensed by the Texas Real Estate Commission (TREC), and a TREC-licensed inspector is one of the people allowed to perform county-required inspections under Local Gov. Code 233.154. In Florida, use a licensed home inspector or an engineer. Put your right to bring an inspector, with reasonable notice, into the contract.
How long does it take to build a custom home?
Plan for the pre-construction phases to take as long as you let them. Design, engineering, bidding and permitting often take several months before ground breaks. Construction time then depends on size, complexity, weather, inspection scheduling and material lead times. A rainy season in Florida or a wet spring on Texas clay can stall site work for weeks.
Instead of trusting a single number, ask each builder for a phase-by-phase schedule for your plan, how many homes like yours they finished in the past year, and how long those actually took from permit to certificate of occupancy. Write delay rules into the contract: what counts as an excused delay, how you are notified, and what happens if the builder stops work. In Florida, a contractor holding residential project money beyond the work performed may not stop work for any 90-day period without just cause or proper notice (s. 489.126). See construction timelines and delays.
What does it cost to build a custom home in Texas or Florida?
The most cited national benchmark is NAHB's Cost of Constructing a Home-2024 survey (January 20, 2025):
| Item (NAHB 2024 survey, national averages) | Figure |
|---|---|
| Average sales price | $665,298 |
| Average construction cost | $428,215 (64.4% of price) |
| Construction cost per square foot | About $162 |
| Average finished area | 2,647 sq. ft. |
| Average lot size | 20,907 sq. ft. |
| Finished lot cost share | 13.7% of price |
| Builder profit share | 11.0% of price |
Within construction cost, interior finishes were the biggest stage at 24.1%, then major system rough-ins (19.2%), framing (16.6%), exterior finishes (13.4%), foundations (10.5%), site work (7.6%) and final steps (6.5%).
Two big cautions. First, NAHB says its sample is too small for state or regional breakdowns, so these are national figures. Second, the survey reflects homes built by a subset of NAHB builders, mostly for sale, not necessarily custom homes on owner lots. Custom homes with higher-end finishes, coastal wind design, flood elevation, septic and long utility runs often cost more. For local context, see custom home cost per square foot.
Factory-built homes in Florida: the new 2026 parity law
If you are considering a modular or other factory-built home, Florida changed the rules in 2026. Chapter 2026-63, Laws of Florida, created s. 553.385, effective July 1, 2026. It requires an "offsite-constructed residential dwelling" (a manufactured building intended for single-family use, or a manufactured home built wholly or partly off site and treated as real property) to be permitted as of right in any zoning district where single-family detached homes are allowed. Local governments may not treat these homes differently or more restrictively than site-built homes in the same district. They may still apply design, setback, height and bulk standards that apply equally to site-built homes, and may adopt compatibility standards limited to roof pitch, livable square footage, exterior finish materials, foundation enclosure, attached structures, and setbacks, lot dimensions and orientation. Deed restrictions and HOA rules are a separate question; read them.
Closing out: certificate of occupancy, final payment and warranty
- Certificate of occupancy (CO): issued after final inspections. Do not move in or make the final payment before it, and get a copy.
- Final walkthrough and punch list: list every item to fix, with a date. Hold back enough money to cover it. See punch list and closeout.
- Lien paperwork: in Texas, at final payment the original contractor must sign a final bills-paid affidavit stating everyone was paid, or listing who is owed. Texas owners also withhold 10% for 30 days after completion. In Florida, get final lien releases from the contractor and from anyone who served you a notice to owner. See Texas lien waivers and Florida lien law.
- Warranty: Texas has had no state homebuilder warranty program since the Texas Residential Construction Commission Act expired on September 1, 2009, so the builder's written warranty and the contract control. Read it before you sign. See home builder warranties.
- The 11-month walkthrough: many builder warranties cover workmanship for one year. Walk the house about a month before that ends, list settling cracks, nail pops, doors that stick and drainage issues, and submit them in writing.
- Defect claims: Texas requires a Residential Construction Liability Act notice at least 60 days before suing; Florida requires a ch. 558 notice at least 60 days before suing. Florida's statute of repose generally bars construction defect actions more than 7 years after the CO or similar milestone (s. 95.11).
How to choose a provider
- Confirm the lot works: survey, flood map at msc.fema.gov, soils report, utilities, deed restrictions
- In Texas, read the MUD or special district notice (Water Code 49.452) before signing to buy
- In Florida, get impact fee estimates from the county and city
- For septic lots, contact the TCEQ authorized agent (TX) or county health department or DEP (FL)
- Choose a design path and get early cost checks at the schematic stage
- Score at least three builders with the scorecard and verify licenses or registrations and insurance
- Pick fixed price or cost-plus with a cap, and review every allowance amount
- Tie payments to inspected milestones and keep lien paperwork current
- Hire an independent inspector for foundation, pre-drywall and final
- Do a pre-drywall walkthrough and photograph every wall
- Collect the CO, final lien releases or bills-paid affidavit, warranties and manuals
- Schedule the 11-month warranty walkthrough on your calendar now
Related general and residential contractors guides
- What Should You Check Before Buying Land to Build a House in Texas or Florida?
- Custom Home Building Costs in Texas and Florida: What Goes Into the Price Per Square Foot
- Fixed-Price vs Cost-Plus vs Time-and-Materials Contracts: Which Protects You?
- What Warranty Comes With a New Home or Remodel in Texas and Florida, and How Long Does It Last?
- How Long Does a Remodel or New Build Take? Timelines and Why Projects Run Late
- Design-Build vs Hiring an Architect Then a Contractor: Which Delivery Method Fits Your Project?
- Can You Build a Barndominium in Texas, and What Permits Does It Need?
- Building Inspections Explained: What Inspectors Check at Each Stage
General and residential contractors by state and city
Questions people ask
How long does it take to build a custom home in Texas or Florida?
It depends on design time, permit review, the lot, weather and the builder's workload, so treat any single number with caution. Pre-construction (design, engineering, bids and permits) often takes several months. Ask builders how long their last few comparable homes took from permit to certificate of occupancy, and write delay and notice rules into your contract. Florida's permit review deadlines (s. 553.792) and Texas's third-party review law (LGC ch. 247) can help with permit delays.
What is a MUD, and why does it matter for a custom home in Texas?
A municipal utility district is a special district that provides water, sewer and drainage, often in new suburbs around Houston, Austin and Dallas-Fort Worth. It can issue bonds and levy its own property tax, which is on top of other taxes. Under Texas Water Code 49.452, the seller must give you a written notice with the district's tax rate and bond amounts before you sign a binding contract, or you may terminate.
What are impact fees in Florida, and when are they paid?
Impact fees are one-time charges by Florida counties and cities to help pay for roads, schools, parks and utilities that growth requires. Under s. 163.31801, they must be based on a recent localized study and may not be collected earlier than the date the building permit is issued. Amounts vary widely by county and city, so ask the local impact fee office for an estimate on your parcel before you set your budget.
Do I need a soil test before building a house?
In most of Texas and much of Florida, yes, in practice. A geotechnical report tells the foundation engineer how much the soil can carry and how much it will swell, shrink or settle. In Texas, expansive clay soils drive the slab design. In Florida, high water tables, organic soils and fill are common issues. Many building departments and engineers will not design or approve a foundation without one. Get it before you finalize house placement.
Who inspects a new house built outside city limits in Texas?
Often no government inspector does. Texas counties may opt in under Local Government Code ch. 233, subchapter F, and then require the builder to arrange at least three inspections by a licensed engineer, architect, TREC-licensed inspector or other listed inspector. The county cannot require approval before construction starts. Hire your own independent inspector for foundation, pre-drywall and final regardless, and put that right in the contract.
What is a builder's allowance, and how do I avoid overruns?
An allowance is a budget placeholder for an item you have not yet chosen, such as flooring or light fixtures. If your choice costs more, you pay the difference, often with markup. To avoid overruns, price your real selections early, ask whether the allowance includes installation, ask how overages are marked up and whether savings are credited back, and set a selection deadline for each item.
Can my Florida city stop me from building a modular home?
Since July 1, 2026, new Florida Statutes s. 553.385 says offsite-constructed residential dwellings must be permitted as of right in any zoning district that allows single-family detached homes, and local rules cannot treat them more restrictively than site-built homes. Cities can still apply equal design, setback, height and bulk standards and limited compatibility standards. Private deed restrictions and HOA covenants are separate, so read them before you buy.
Should I make the final payment at the certificate of occupancy?
Not all of it until the punch list is finished and the lien paperwork is in hand. In Texas, collect the contractor's final bills-paid affidavit and remember owners withhold 10% for 30 days after completion under the lien statute. In Florida, collect final lien releases from the contractor and any subcontractor or supplier who served a notice to owner. Hold back enough to cover unfinished punch list items.
Sources
- NAHB, Cost of Constructing a Home-2024 (Jan. 20, 2025, PDF)
- NAHB Eye on Housing, Cost of Constructing a Home in 2024
- Texas Water Code ch. 49 (ss. 49.452, 49.4521)
- Texas Local Government Code ch. 233
- Texas Local Government Code ch. 247
- Texas Property Code ch. 53
- Texas Property Code ch. 27 (RCLA)
- Texas Sunset Commission, TRCC Final Report (2009)
- TCEQ, Getting a Permit for an On-Site Sewage Facility
- Florida DEP, Onsite Sewage Program
- Florida Statutes s. 163.31801 (2026)
- Florida Statutes s. 553.73 (2026)
- Florida Statutes s. 553.792 (2026)
- Florida Statutes s. 553.791 (2026)
- Laws of Florida ch. 2026-63 (CS/CS/HB 803)
- Florida Statutes s. 489.126 (2026)
- Florida Statutes s. 713.13 (2026)
- Florida Statutes s. 558.004 (2026)
- Florida Statutes s. 95.11 (2026)
- FEMA Flood Map Service Center
- Florida DBPR, Construction Industry Licensing
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.