In Texas, a contractor, subcontractor or supplier who is not paid for work on your property can file a lien affidavit with the county clerk. On a residential job the general contractor must file by the 15th day of the third month after its work ended, and subs must first send you a notice of claim by the 15th day of the second month. You limit your exposure by keeping 10% of the price for 30 days after completion and withholding money once you receive a notice.
Key facts
- HB 2237 (87th Legislature) rewrote much of Property Code Chapter 53 effective January 1, 2022, and applies only to original contracts entered into on or after that date.
- On a residential project, an original contractor must file its lien affidavit by the 15th day of the third month after the month its work was completed, terminated or abandoned (fourth month on non-residential projects) (Section 53.052).
- A subcontractor or supplier on a residential project must send a Notice of Claim for Unpaid Labor or Materials to the owner and original contractor by the 15th day of the second month after the month the work or materials were provided (Section 53.056).
- Owners must reserve 10% of the contract price, or 10% of the value of work done, during the job and for 30 days after the work is completed (Section 53.101).
- A lien on a Texas homestead requires a written contract signed before work starts, signed by both spouses if the owner is married, and filed with the county clerk (Section 53.254).
- Suit to foreclose a lien must generally be filed by the first anniversary of the last day the claimant could have filed its lien affidavit (Section 53.158).
- A bond to indemnify against a lien must generally be double the lien amount, or for liens over $40,000, the greater of 1.5 times the liens or the liens plus $40,000 (Section 53.172).
- A person who knowingly files a fraudulent lien with intent to cause financial injury is liable for the greater of $10,000 or actual damages, plus costs, attorney's fees and exemplary damages (Civil Practice and Remedies Code Section 12.002).
How does a mechanic's lien work in Texas?
A mechanic's lien is a legal claim against real estate that secures payment for labor or materials that improved it. In Texas the rules live in Property Code Chapter 53. When someone who worked on your house is not paid, the law lets that person file a sworn document called a lien affidavit with the county clerk where the property sits. Once it is recorded, it shows up in the property records. It can block a clean sale, and if the claimant follows every step and sues in time, a court can order the property sold to pay the debt.
Texas sorts claimants into two groups, and the difference drives almost every deadline on this page:
- Original contractor: the company or person who contracts directly with you, the owner (Section 53.001). On most remodels this is your general contractor.
- Derivative claimants: everyone below the original contractor, such as subcontractors, sub-subcontractors and material suppliers. Their right to a lien is limited by how much you still owe or should have kept back, which is why the notice and retainage rules matter so much to owners.
The key idea for homeowners: you are not supposed to pay twice. The statute caps your exposure to derivative claimants mainly at two pots of money: the 10% you are required to hold back (called retainage or reserved funds) and any money you keep paying your contractor after you receive a written notice of an unpaid claim. If you follow the rules, a sub's lien usually cannot reach beyond those pots. If you ignore them, you can end up paying the same bill to your contractor and again to the unpaid sub.
Texas homesteads get extra protection from the Texas Constitution and Section 53.254, covered below. Liens that are not perfected on time, or that miss a required notice, are open to removal through a fast court procedure in Section 53.160.
What changed in Texas lien law with HB 2237?
House Bill 2237, passed by the 87th Legislature in 2021, took effect January 1, 2022. Its transition section says the changes apply only to an original contract entered into on or after that date; older contracts stay under the prior law. Many websites still describe the old system, so check the date of anything you read.
| Topic | Before 2022 (old law) | Contracts on or after Jan. 1, 2022 |
|---|---|---|
| Sub and supplier notices | Several separate notice provisions that varied by the claimant's tier, now repealed by HB 2237 | One Notice of Claim for Unpaid Labor or Materials on a statutory form, sent to both the owner and the original contractor (Section 53.056) |
| Residential notice deadline | Depended on the claimant's tier under the repealed provisions | 15th day of the 2nd month after the month the work or materials were provided |
| Lien affidavit deadline | Rules in the prior version of Section 53.052 | Original contractor: tied to when its own work ended. Others: tied to when they last provided labor or materials (Section 53.052) |
| Retainage notice | Older retainage notice provisions, repealed by HB 2237 | One Notice of Claim for Unpaid Retainage form within 30 days of completion, termination or abandonment (Section 53.057) |
| Lien waivers | Statutory forms had to be notarized | Notarization requirement removed; the claimant's signature is enough (Section 53.281) |
| Foreclosure suit deadline | Prior Section 53.158(b), repealed by HB 2237 | Generally one year from the last day to file the lien affidavit, extendable by recorded agreement (Section 53.158) |
The statutory notice forms now print a warning that matters to owners: "Owner's property may be subject to a lien if sufficient funds are not withheld from future payments to the original contractor to cover this debt." When you see that sentence, act on it. See Texas lien waivers for the waiver changes in detail.
What counts as a residential project, and what property can a lien reach?
The shorter residential deadlines apply to a residential construction project, meaning construction or repair of a new or existing residence under a residential construction contract (Section 53.001). A residence is a single-family house, duplex, triplex or quadruplex, or a condo or co-op unit, that is owned by one or more adults and used or intended to be used as a dwelling by one of the owners.
That definition has practical edges:
- A rental house you do not live in is usually not a "residence" under this definition because it is not used as a dwelling by an owner. Longer non-residential deadlines may apply. Ask an attorney if you own investment property.
- A home a builder is putting up on its own lot for sale is not owned by the future occupant during construction, so treat it as non-residential for lien timing until a lawyer tells you otherwise.
- Outside a city, town or village, a lien can cover the improvement and up to 50 acres of land. Inside a city it extends to each lot the improvement sits on (Section 53.022).
Texas also has a sham contract rule. If an owner sets up a related company as a purported original contractor, someone who contracts directly with that company is treated as an original contractor for perfecting a lien (Section 53.026). Owners who try to dodge lien rights by inserting a friendly middle company do not escape.
What are the Texas lien deadlines for a residential job?
Texas counts many deadlines by month, not by days. "The 15th day of the third month after the month" means: find the month the work ended, count forward three months, and stop on the 15th. If your general contractor finished on March 3, March is the month of completion, so its lien affidavit deadline is June 15.
| Step | Who | Residential deadline | Non-residential deadline | Statute |
|---|---|---|---|---|
| Notice of Claim for Unpaid Labor or Materials | Subs and suppliers | 15th day of 2nd month after each month of unpaid work or materials | 15th day of 3rd month | 53.056 |
| Notice of Claim for Unpaid Retainage | Subs whose contracts provide for retainage | Earlier of 30 days after their subcontract ends or 30 days after the original contract is terminated or abandoned | Same | 53.057 |
| Lien affidavit | Original contractor | 15th day of 3rd month after the month its work was completed, terminated or abandoned | 15th day of 4th month | 53.052(a) |
| Lien affidavit | Subs and suppliers | 15th day of 3rd month after the month they last provided labor or materials | 15th day of 4th month | 53.052(b), (c) |
| Lien affidavit for retainage | Subs | 15th day of 3rd month after the month the original contract was completed, terminated or abandoned | Same | 53.052(d) |
| Copy of filed affidavit to owner | Every claimant | Within 5 days after filing; subs also send to the original contractor | Same | 53.055 |
| Lien on reserved (retainage) funds | Claimants | Affidavit filed no later than 30 days after the earliest of completion, termination or abandonment, unless the retainage-notice route in 53.057(f) applies | Same | 53.103 |
| Suit to foreclose | Claimant | First anniversary of the last day it could file the affidavit; can be extended to two years from filing by a recorded written agreement with the owner | Same | 53.158 |
A notice is required for each month of unpaid work, so a sub who was unpaid for April and May may send two notices or one notice that covers both, as long as each month's deadline is met. A sub whose notice for a given month is late generally has no lien for that month's work, which is one of the grounds for the summary motion described below.
The statute defines completion as actual completion of the work, including extras and change orders, but not warranty work or repairs to work already done (Section 53.001). A contractor cannot restart its own clock by coming back for a warranty visit.
What notices will I receive from subcontractors and suppliers?
Expect three kinds of paper, sent by mail or another method the statute allows:
- Notice of Claim for Unpaid Labor or Materials. A one-page statutory form that names the claimant, the type of work, your original contractor, the party the claimant contracted with and the claim amount. It may include an invoice. This is your signal to stop paying that portion to your contractor.
- Notice of Claim for Unpaid Retainage. Same idea, for money the sub's own contract allowed its customer to hold back until the end.
- Copy of a filed lien affidavit. If a claimant goes on to file, it must send you a copy within 5 days of filing (Section 53.055). On a homestead, the affidavit must carry, at the top in at least 10-point bold, "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN."
Your contractor may also get past-due invoice reminders from its subs under Section 53.056(a-4). Those optional notices go to the contractor, not to you, and are not needed for a lien.
What to do the day a notice of claim arrives
- Write the date you received it on the envelope and keep both.
- Do not release the claimed amount to your general contractor. Section 53.081 lets you withhold it immediately for a notice under 53.056, and from receipt of a copy of the affidavit for a retainage notice under 53.057.
- Send your contractor a short written message: you received a claim from [sub] for [amount] and will hold that amount until the sub signs a release or the claim is resolved.
- Keep holding until the time to file a lien affidavit passes, or until the claim is settled, released, bonded or ruled invalid (Section 53.082).
- If your contractor says the sub is wrong, ask for proof and a statutory waiver signed by the sub. A joint check made out to both the contractor and the sub, exchanged for a conditional waiver, is a common way to clear it.
The statute is blunt about why this matters: if you received the notice, the lien is later secured, and the claim goes to final judgment, you are liable for money you paid your contractor after you were authorized to withhold (Section 53.084(b)).
How does the 10% retainage rule work for Texas homeowners?
Section 53.101 requires the owner to reserve 10% of the contract price, or 10% of the value of work done measured against the contract price, during the work and for 30 days after the work is completed. The reserved funds secure payment of laborers, subs and suppliers (Section 53.102). "Owner" includes your agent, trustee or receiver.
If you skip it, claimants who follow the rules have a lien at least to the extent of the amount you should have kept (Section 53.105). In other words, the 10% is not optional protection; it is the minimum the law assumes you held.
A worked example
You sign an $80,000 kitchen and bath remodel. Your contract pays in draws.
| Draw | Work value | You pay (90%) | Held back (10%) |
|---|---|---|---|
| 1: demolition and rough-in | $20,000 | $18,000 | $2,000 |
| 2: cabinets and drywall | $30,000 | $27,000 | $3,000 |
| 3: finish and punch list | $30,000 | $27,000 | $3,000 |
| Total | $80,000 | $72,000 | $8,000 held until 30 days after completion |
If the tile sub sends a valid notice of claim for $5,000 during draw 3, you withhold that $5,000 from draw 3 in addition to the running 10%. Thirty days after completion, if no lien affidavits on the retainage have been filed and the notice has been resolved by a signed release, you pay the balance. Build this into your contract's payment schedule so your contractor expects it. Our guide to payment schedules and deposits explains how to structure draws.
Fixing the completion date: the affidavit of completion
You may file an affidavit of completion with the county clerk (Section 53.106). It names you and the contractor, describes the property and the work, states the completion date, and carries a conspicuous statement that a claimant may not have a lien on retained funds unless it files on time. You must send copies to the contractor and to each claimant who sent you a notice. A timely affidavit is prima facie evidence of the completion date, which starts the 30-day retainage window. If you file it more than 10 days after completion, the filing date becomes the completion date for that purpose.
The separate owner notice of termination or abandonment in Section 53.107 does not apply to residential projects, so homeowners usually rely on the affidavit of completion.
Can a subcontractor put a lien on my house if I already paid my contractor?
Yes, a sub can file, but whether the lien is enforceable against you depends on what you did with your money. Under Section 53.084(a), you are not liable for amounts you paid your original contractor before you were authorized to withhold, except for the 10% you were required to reserve. So the question is usually: did you keep the retainage, and did you keep paying after a notice arrived?
| Scenario | Likely exposure to an unpaid sub |
|---|---|
| You held 10% for 30 days after completion and paid nothing after receiving a notice | Generally limited to the reserved funds and any amount withheld after notice |
| You paid 100% early, before any notice, and never held retainage | The sub may have a lien up to the 10% you should have reserved (Section 53.105) |
| You received a notice of claim and still paid your contractor in full | You may be liable for the amounts paid after notice, if the lien is perfected and reduced to judgment (Section 53.084(b)) |
| The sub's notice was late or never sent | The lien for that month's work is open to removal (Section 53.160(b)(1)) |
The statutory homestead statement that must accompany a sub's notice says it in plain words: if you complied with the 10% rule, withheld enough to cover written notices of claim, and paid that amount to the claimant, a sub's lien claim should not be enforceable beyond that. Section 53.255's "Know Your Rights" disclosure similarly tells owners that if they paid the contractor in full before receiving a notice and withheld the 10%, they may not be liable.
Can someone put a lien on my homestead in Texas?
Yes, but only by following stricter rules. The Texas Constitution (Article XVI, Section 50) protects homesteads from forced sale except for listed debts, one of which is work and material for improvements. For new improvements the work must be contracted for in writing. For repairs or renovations of existing improvements, the constitution requires, among other things, a written contract with the consent of both spouses for a family homestead, a clause letting the owner rescind without penalty within three days after everyone signs, and signing only at the office of an attorney, a title company or another third party the constitution lists, with an exception for immediate health-and-safety repairs the owner acknowledges in writing.
Property Code Section 53.254 adds the statutory requirements. For a lien on a homestead to be valid:
- The contractor and owner must sign a written contract setting out the agreement.
- It must be signed before any material is furnished or labor is performed.
- If the owner is married, both spouses must sign.
- The contract must be filed with the county clerk. A contract made by the original contractor benefits its subs and suppliers.
- The lien affidavit must carry the "THIS IS NOT A LIEN" notice at the top.
- The sub's notice to the owner must include or attach the statutory homestead statement about withholding and the 10% reserve.
Missing any of these is a listed ground to remove the lien on summary motion (Section 53.160(b)(6)). This does not mean you can skip paying for work you received; it means the debt may not be secured by your homestead. A contractor can still sue you for breach of contract.
Other residential disclosures your contractor owes you
- Know Your Rights statement (Section 53.255): before you sign a residential construction contract, the original contractor must give you this statutory disclosure. It explains liens, the 10% reserve, the value of a written contract, that you cannot be required to convey your property to the contractor as a condition of the deal, and that government inspections are not quality-control inspections.
- List of subcontractors and suppliers (Section 53.256): before construction starts, the contractor must give you a written list with names, addresses and phone numbers, and an update within 15 days of any change, unless you sign the statutory waiver. Do not waive it; this list tells you who might send you a notice.
- Disbursement statement (Section 53.258): each time the contractor asks for payment, it must give you a statement naming each direct sub it intends to pay from that draw. Knowingly giving false information is an offense.
- Final bills-paid affidavit (Section 53.259): as a condition of final payment, the contractor must sign an affidavit that everyone was paid, or list who is owed and how much. A false affidavit is a misdemeanor punishable by a fine up to $4,000, up to a year in jail or both, and the signer is personally liable for losses.
A contractor's failure to give the list or statements does not by itself invalidate a lien, so treat them as your early-warning system rather than a defense.
How long does a Texas mechanic's lien last?
A Texas lien does not last forever. Under Section 53.158, the claimant must sue to foreclose by the first anniversary of the last day it could have filed its lien affidavit. Example: a residential sub last worked in March 2026. Its affidavit deadline was June 15, 2026. Its foreclosure suit deadline is June 15, 2027.
The claimant and the then-current record owner can sign a written agreement, before the deadline runs, extending it to no later than the second anniversary of the date the affidavit was filed. The agreement must be recorded in the same county. Do not sign one without legal advice, because it keeps the cloud on your title longer.
If the deadline passes with no suit, the lien can be discharged of record (Section 53.157). Filing a suit only to discharge an expired lien does not revive the claimant's right to foreclose (Section 53.158(a-1)). Expired liens do not vanish from the county records on their own, so you or your title company will typically need a recorded release, a court order or other proof to clear the record.
How do I remove a mechanic's lien in Texas?
Section 53.157 lists the ways a lien affidavit can be discharged of record. Here they are in the order homeowners usually try them.
1. Ask for a release after payment
When the debt is paid by collected funds, the claimant must give a release within 10 days after receiving a written request from the owner, the original contractor or whoever paid (Section 53.152). The release must be in a form that can be recorded. Record it with the county clerk.
2. Let the foreclosure deadline expire
If the claimant does not sue in time, the lien is unenforceable. See the section above.
3. File a summary motion to remove an invalid lien (Section 53.160)
In a suit to foreclose, or a suit you bring to declare the lien invalid, you can file a verified motion to remove it. The grounds are limited to these:
- The notice of claim was not timely sent under Section 53.056 or 53.057.
- The affidavit did not meet Section 53.054's content rules or was not filed on time under 53.052.
- The copy of the filed affidavit was not sent under 53.055.
- Retainage deadlines expired, you complied with the 10% rule, and you paid the retainage and everything else owed before the claimant perfected its claim and before you received notice.
- All funds subject to the notices were deposited in the court registry and you owe nothing more.
- For a homestead: no contract was signed or filed as Section 53.254 requires, or the affidavit or notice lacked the required homestead language.
- The claimant signed a valid waiver or release.
The claimant gets at least 30 days' notice of the hearing and can take expedited discovery. At the hearing, the claimant must prove its notices and affidavit were properly furnished; you must prove any other ground. There is no interlocutory appeal. If the court removes the lien, it sets a security amount; the claimant can stay the removal by posting a bond or deposit within 30 days (Section 53.161). If it does not, you can record the order and a clerk's certificate to clear title. A removed lien can be revived if the claimant later wins at trial, but not against buyers or creditors who took an interest in between (Section 53.162).
4. Bond around the lien (Sections 53.171 to 53.175)
Anyone can file a bond to indemnify against the lien with the county clerk. Once a compliant bond is filed, the clerk mails notice to the claimant, and the bond and notice are recorded, the lien is discharged from the property and the claimant's remedy shifts to the bond. The bond must be issued by a corporate surety licensed in Texas and must be:
| Lien amount | Minimum bond |
|---|---|
| $40,000 or less | Double the lien amount (for a $15,000 lien, $30,000) |
| Over $40,000 | The greater of 1.5 times the liens or the liens plus $40,000 (for a $100,000 lien, $150,000) |
A claimant must sue on the bond within one year after notice of the bond is served or after the lien becomes unenforceable under Section 53.158 (Section 53.175). Bonding is common when you need to sell quickly and the dispute will take longer. Often the general contractor, who caused the problem, is asked to buy the bond.
5. Get a court judgment
A final judgment discharging the lien can be recorded (Section 53.157(3)). In any proceeding over a lien's validity, the court awards costs and reasonable attorney's fees as equitable and just, but on a residential construction contract the court is not required to order the homeowner to pay them (Section 53.156).
What is a fraudulent lien in Texas?
Filing a lien in a payment dispute is not fraud by itself. Texas punishes liens that are knowingly false and filed to hurt you.
- Civil liability (Civil Practice and Remedies Code Chapter 12): a person may not make, present or use a document knowing it is a fraudulent lien, intending it to have legal effect, and intending to cause financial injury, mental anguish or other harm. A violator owes each injured person the greater of $10,000 or actual damages, plus court costs, reasonable attorney's fees and exemplary damages (Section 12.002). The property owner can sue, as can government attorneys (Section 12.003).
- The Chapter 53 safe harbor: someone claiming a mechanic's lien is not liable under Section 12.002 unless the person acts with intent to defraud (Section 12.002(c)). A sloppy or disputed lien is usually fought with Section 53.160, not Chapter 12.
- Contractual waivers on single-family work: a lien filed despite an enforceable advance waiver in a single-family, townhouse or duplex contract does not violate Section 12.002 unless the owner or original contractor sends a written explanation, evidence of the waiver and a request for release, and the claimant does not release within 14 days (Section 53.282(b)).
- Criminal refusal to release: under Penal Code Section 32.49, a person who holds a fraudulent lien and, with intent to defraud or harm, refuses to sign a release within 21 days after a written request sent by certified or registered mail commits a Class A misdemeanor. Failing to release within that time creates a presumption of intent.
If you think a lien is fraudulent rather than merely disputed, send the 21-day certified letter and talk with a Texas real estate or construction attorney before you sue, because fee-shifting and damages rules cut both ways.
Does a lien stop me from selling my house?
A recorded lien affidavit is a cloud on title. A buyer's title search will find it, and the buyer's title company will typically want it released, bonded or otherwise resolved before closing. You generally have three paths: pay and record a release, bond around it under Section 53.171, or win a removal order under Section 53.160.
Texas also builds paperwork into sales:
- On request before closing, a seller must give the buyer an affidavit that the seller has paid its contractors and suppliers for construction through a stated date, or list who is owed (Section 53.085(b)).
- A seller of a newly built home of up to four units intended as the buyer's principal residence must deliver a bills-paid affidavit at closing (Section 53.259(b)).
If you recently finished a project and plan to sell, collect the final bills-paid affidavit and unconditional final waivers from your contractor and every sub on your Section 53.256 list before you list the house.
Texas vs. Florida: how lien protection differs
| Issue | Texas (Prop. Code ch. 53) | Florida (ch. 713) |
|---|---|---|
| Owner's main shield | Hold 10% for 30 days after completion; withhold after a notice of claim | Record a Notice of Commencement and get releases from everyone who served a Notice to Owner |
| Sub's early notice | Notice of claim by the 15th day of the 2nd month (residential) | Notice to Owner within 45 days of first furnishing |
| Lien filing deadline | 15th day of 3rd month (residential) | 90 days after final furnishing |
| Homestead | Written contract signed before work, both spouses, filed with clerk | Homestead exemption does not block liens for improvements |
For Florida rules, read Florida construction lien law for homeowners and the Florida Notice of Commencement. For a statewide overview, start at the Texas contractor guide or the city pages for Houston, Dallas, San Antonio and Austin.
When should I call a lawyer, and where do I file or look up liens?
This guide is general information, not legal advice. Talk with a Texas-licensed construction or real estate attorney if:
- A lien affidavit has been filed on your homestead and you want it removed.
- You are selling or closing soon and a lien showed up in the title search.
- Your contractor walked off the job owing subs. Our guide to a contractor who abandoned the job covers next steps, and the Texas Construction Trust Fund Act may apply.
- You received a notice of claim and are not sure how much to withhold.
- You are asked to sign an extension agreement under Section 53.158(a-2).
Lien affidavits, homestead contracts, affidavits of completion, bonds and releases are all filed with the county clerk in the county where the property is located (Harris County for most of Houston, Dallas County, Bexar County for San Antonio, Travis County for most of Austin). Most county clerks offer an online official public records search where you can look up your address or name. The State Bar of Texas runs a lawyer referral service if you need help finding counsel.
How to choose a provider
- Before signing, confirm you received the Section 53.255 Know Your Rights disclosure and keep a copy.
- For a homestead remodel, sign a written contract before any work starts, have both spouses sign, and make sure it gets filed with the county clerk.
- Get the written list of subcontractors and suppliers before construction and do not sign the waiver of updates.
- Write the 10% retainage, held for 30 days after completion, into the payment schedule.
- Ask for a disbursement statement and conditional waivers from the contractor and listed subs with every draw.
- Date-stamp every notice of claim and withhold the claimed amount immediately.
- Tell your contractor in writing what you are holding and why.
- File an affidavit of completion with the county clerk within 10 days of completion and mail the copies the statute requires.
- At final payment, collect the final bills-paid affidavit and unconditional final waivers after funds clear.
- Wait 30 days after completion, check the county records for filed affidavits, then release the retainage.
- If a lien is filed, request a release in writing, calendar the foreclosure deadline, and consult an attorney about a summary motion or bond.
Related general and residential contractors guides
- What Are the Texas Statutory Lien Waiver Forms, and When Should a Homeowner Ask for Each?
- What Is the Texas Construction Trust Fund Act, and What Can I Do if My Contractor Misused My Money?
- Contractor Deposits and Payment Schedules: How Much to Pay and When
- What Should Be in a Construction Contract? A Clause-by-Clause Checklist
- Required Notices in Texas and Florida Construction Contracts (With Statute Citations)
- Contractor Abandoned the Job or Stopped Showing Up: What Do You Do in Texas and Florida?
- How Does Florida Construction Lien Law Work, and How Do Homeowners Avoid Paying Twice?
General and residential contractors by state and city
Questions people ask
How long does a contractor have to file a lien in Texas?
For residential projects under contracts signed on or after January 1, 2022, the original contractor must file its lien affidavit by the 15th day of the third month after the month its work was completed, terminated or abandoned. Subcontractors and suppliers on residential jobs file by the 15th day of the third month after the month they last provided labor or materials. Non-residential projects get one more month. The affidavit must be filed with the county clerk where the property is located, and a copy must reach the owner within 5 days.
What is the residential lien deadline for subcontractor notices in Texas?
A subcontractor or supplier on a residential project must send the Notice of Claim for Unpaid Labor or Materials to both the owner and the original contractor by the 15th day of the second month after the month the labor or materials were provided. For non-residential projects the deadline is the 15th day of the third month. A separate retainage notice is due within 30 days after the sub's contract, or the original contract, is completed, terminated or abandoned.
What is a notice of claim for unpaid retainage?
It is a statutory notice from a subcontractor whose contract allowed part of each payment to be held back until the end. It tells you and the original contractor the total retainage still unpaid and warns that your property may be subject to a lien if you do not withhold enough. It must be sent by the earlier of 30 days after the sub's contract ends or 30 days after the original contract is terminated or abandoned, unless the retainage was already covered in an earlier notice of claim.
Do I have to hold back 10% from my Texas contractor?
Section 53.101 tells the owner to reserve 10% of the contract price, or of the value of work done, during the job and for 30 days after completion. The statute does not fine you for skipping it, but if you do not reserve it, subs and suppliers who comply with the law can have a lien at least up to the amount you should have kept. Holding it is how you cap your risk of paying twice.
Is a lien on my Texas homestead valid if my spouse did not sign the contract?
If the homestead owner is married, Section 53.254 requires both spouses to sign the written construction contract, which must be signed before work starts and filed with the county clerk. If those steps were skipped, the lien on the homestead is open to removal by summary motion under Section 53.160. The contractor may still have a contract claim for money, so talk with an attorney before refusing to pay for work you received.
What is a bond to indemnify against a lien?
It is a surety bond filed with the county clerk that replaces your property as the security for the lien claim. After a compliant bond is filed, the clerk sends notice to the claimant and the bond and notice are recorded, the lien no longer encumbers your property, and the claimant must pursue the bond instead. For liens of $40,000 or less, the bond must be double the lien amount; above that, the greater of 1.5 times the liens or the liens plus $40,000.
What is a summary motion to remove an invalid lien?
It is a fast court procedure in Section 53.160. In a suit over the lien, you file a verified motion stating why the lien is invalid on a listed ground, such as a late notice, a late or defective affidavit, missing homestead requirements, or a signed waiver. The hearing cannot be held until at least 30 days after the claimant answers. If the court removes the lien, the claimant has 30 days to post security to stay the order.
Does my contractor have to give me a list of subcontractors in Texas?
Yes, on a residential construction contract. Before construction begins, the original contractor must give you a written list with the name, address and phone number of each sub and supplier it intends to use, and update it within 15 days of any addition or deletion, unless you sign the statutory waiver. Failure to provide the list does not invalidate a lien, but the list tells you who could send you a notice of claim.
Can a lien be filed for a remodel on a rental property in Texas?
Yes. Liens are not limited to homes the owner lives in. The difference is timing and homestead protection. A rental that no owner uses as a dwelling usually does not meet the statute's definition of a residence, so the longer non-residential deadlines may apply, and the homestead contract requirements in Section 53.254 do not protect it. Landlords should hold retainage and collect waivers just like homeowners.
Sources
- Texas Property Code Chapter 53, Mechanic's, Contractor's, or Materialman's Liens
- H.B. 2237, 87th Legislature, enrolled bill text (effective date and transition sections)
- Texas Constitution Article XVI, Section 50 (homestead)
- Texas Civil Practice and Remedies Code Chapter 12, Fraudulent Lien or Claim
- Texas Penal Code Chapter 32 (Section 32.49, refusal to execute release of fraudulent lien)
- Texas Property Code ch. 162 (Construction Trust Fund Act)
- Florida Statutes s. 713.13 (2026), Notice of commencement
- Florida Statutes s. 713.08 (2026), Claim of lien
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.