Local Guide · General and residential contractors

Contractor Deposits and Payment Schedules: How Much to Pay and When

Florida does not ban big deposits, but a contractor who takes more than 10% up front on a home job must pull permits within 30 days and start within 90 days after they issue, or face criminal penalties. Texas has no deposit cap, but owners must hold back 10% until 30 days after completion. Here is how to set deposits, draws, retainage and final payment so you never pay ahead of the work.

Keep the deposit small and tie every later payment to finished, inspected work. Florida does not cap deposits, but under s. 489.126 a contractor who takes more than 10% of the price up front on residential work must apply for permits within 30 days and start within 90 days after permits issue, or face criminal penalties. Texas has no deposit cap, but Property Code 53.101 requires owners to retain 10% of the contract price until 30 days after the work is completed.

Key facts

  • Florida: a contractor who receives more than 10% of the contract price as an initial payment for residential work must apply for permits within 30 days and start work within 90 days after permits issue, unless there is just cause or the owner agreed in writing to longer periods (Fla. Stat. 489.126(2)).
  • The owner's remedy under 489.126 starts with a written demand by certified mail, return receipt requested; failure to act or refund within 30 days of the demand allows an inference of no just cause.
  • Penalties for misusing a Florida residential deposit run from a first-degree misdemeanor (under $1,000) to a first-degree felony ($200,000 or more), and intent to return the money is not a defense (489.126(4)-(6)).
  • Section 489.126 applies to anyone performing or promising contractor work, licensed or not.
  • Texas: during the work and for 30 days after completion, the owner must reserve 10% of the contract price or 10% of the value of work done (Tex. Prop. Code 53.101).
  • If a Texas owner fails to reserve the 10%, properly noticed claimants have a lien at least up to the amount that should have been reserved (53.105).
  • Texas residential contractors must give a disbursement statement naming the subs they will pay each time they request payment, and a final bills-paid affidavit at final payment (53.258, 53.259).
  • Florida: at final payment the contractor must give the owner a Contractor's Final Payment Affidavit listing any lienor who served a Notice to Owner and was not paid (713.06(3)(d)).
  • Florida's Notice to Owner warns: 'To avoid a lien and paying twice, you must obtain a written release from us every time you pay your contractor' (713.06).
  • No one may require a Texas claimant to sign an unconditional lien waiver until the claimant has actually received that payment (Prop. Code ch. 53, Subchapter L).

The short version: how much deposit should you give a contractor?

There is no single legal number in either state, so the right deposit is the smallest amount that lets the contractor reserve your spot and order what has to be ordered. Everything after that should be paid only for work you can see, that has passed inspection, and that is backed by lien paperwork.

Two state rules give you useful anchors:

  • Florida's 10% line. Section 489.126 does not make a larger deposit illegal. It says that if a contractor takes more than 10% of the contract price as the initial payment on residential work, the contractor takes on deadlines: apply for permits within 30 days and start within 90 days after permits issue. Missing them without just cause, and not refunding after your written demand, can be a crime. Many Florida owners treat 10% as a practical ceiling for that reason.
  • Texas's 10% holdback. Texas does not limit deposits, but Property Code 53.101 requires the owner to keep back 10% of the contract price (or of the value of work done) during the job and for 30 days after the work is completed. This protects you from liens by unpaid subs and suppliers.

DBPR's Unlicensed Activity program lists "requests for big deposits, or payment in full before work begins" as a major red flag. A contractor who needs most of your money before starting is asking you to carry the job's costs and the risk if it never happens.

This guide is general information, not legal advice. For contract terms that fit your project, see the construction contract checklist.

What does Florida's 10% deposit law (s. 489.126) actually say?

Florida Statutes s. 489.126, "Moneys received by contractors," is the most important consumer payment law for Florida homeowners. It was most recently amended in 2025 (ch. 2025-40, Laws of Florida), so check that any guide you read quotes the current text. Here is what the 2026 statute says, piece by piece.

Who it covers

The word "contractor" in 489.126 includes anyone performing, contracting or promising to perform contractor work, "without regard to the licensure of the person" (489.126(1)). So it protects you even if the person you paid turns out to be unlicensed.

The deposit trigger: more than 10%

A contractor who receives, as an initial payment, more than 10% of the contract price for repair, restoration, improvement or construction of residential real property must (489.126(2)(a)):

  1. Apply for the necessary permits within 30 days after the payment, unless the work does not need a permit; and
  2. Start the work within 90 days after all necessary permits are issued.

Exceptions: the contractor has "just cause," or you agreed in writing to longer periods. Read your contract for a clause that quietly extends these deadlines. If you see one, decide whether you really want to give up that protection.

The mid-job rule: no 90-day stall while holding your money

A contractor who has received more money than the value of the work performed may not fail or refuse to perform any work for any 90-day period, or any other period stated in the contract (489.126(3)). The law treats that 90-day stoppage as prima facie evidence the contractor is holding excess money, unless the stoppage was related to your own termination or material breach, or the contractor had just cause or properly terminated by certified-mail letter.

Your written demand

If the contractor misses a deadline, you must send a written demand letter by certified mail, return receipt requested, to the address in your contract. If the contract lists no address or there is no written contract, send it to the address the contractor lists with DBPR or the local licensing board (489.126(2)(b)). The letter must demand that the contractor apply for permits, start the work, or refund the payment (or, for a stall, perform the work or refund the excess). If the contractor does none of these within 30 days of receiving it, the law lets a court infer there was no just cause.

Criminal penalties

Total money involvedOffense under 489.126(5) and (6)
Less than $1,000First-degree misdemeanor
$1,000 to under $20,000Third-degree felony
$20,000 to under $200,000Second-degree felony
$200,000 or moreFirst-degree felony

For the mid-job stall, the amount is the money received in excess of the value of work performed. The statute adds that intent can be shown at the time the contractor used the money, that intent to deprive may be inferred if the contractor does not refund within 30 days of your written demand, and that a plan to pay you back later is not a defense (489.126(4)).

What 489.126 does not do

  • It does not cap deposits. A 30% deposit is legal; it just triggers the deadlines.
  • It does not apply to commercial property. It covers residential real property.
  • It does not refund you automatically. You still need a civil or criminal process to get the money back.

Is there a deposit limit in Texas?

We found no Texas statute that caps the deposit a private residential contractor may request, and Texas has no state general contractor license that could impose one. That means the deposit is whatever you negotiate. Texas law protects you in other ways:

  • Statutory retainage (53.101). You must reserve 10% during the work and for 30 days after completion.
  • Trust funds (Property Code ch. 162). Construction payments are trust funds for the benefit of subs and suppliers. Misapplying them can be a crime. See our Texas construction trust fund guide.
  • Disbursement statements (53.258). On a residential contract, each time the contractor requests payment it must give you a statement listing at least the name and address of each direct sub it intends to pay from that money. Knowingly giving false information is a misdemeanor punishable by a fine up to $4,000, jail up to a year, or both.
  • The DTPA. Taking money for work never performed can support a Deceptive Trade Practices Act claim, which can bring up to three times economic damages when the conduct was knowing, plus attorney's fees (Bus. & Com. Code 17.50).

Because there is no Texas deposit deadline like Florida's, write your own into the contract: a permit application date, a start date, and an automatic refund of the deposit if the contractor misses them.

What is a draw schedule, and what does a fair one look like?

A draw schedule (also called a payment schedule or milestone schedule) lists each payment, what has to be finished before it is due, and what paperwork comes with it. A good schedule keeps your payments slightly behind the value of the work in place. If the contractor walks off the job, you should have paid less than the work is worth, not more.

Milestone payments vs percent-complete payments

MethodHow it worksOwner prosOwner cons
Milestone (event) drawsPayment due when a defined stage is done and inspected (rough-in passed, drywall hung, cabinets set)Easy to verify; ties money to inspectionsMilestones must be defined precisely
Percent-complete (progress) billingContractor bills monthly for the percent of each line item finished, often on a schedule of valuesCommon on larger and commercial jobs; transparent line itemsNeeds someone to judge percent complete honestly
Time-based (weekly or biweekly)Fixed payments on datesSimplePayments can outrun the work; avoid on fixed-price jobs
Cost-plus invoicesReimbursement of documented costs plus a feeFull transparency if you get receiptsRequires auditing; see our contract type guide

Example: a $60,000 kitchen remodel

This is an illustration of structure, not a recommended percentage for every job. Your contract, your contractor and, on an insurance claim job, your insurer's payment process may set different numbers.

DrawDue whenAmountPaperwork you get first
DepositContract signed$6,000 (10%)Signed contract with required notices; license and insurance verified; in Florida, no more than 10% so the 489.126 deadlines are not triggered (or they are, and you know the dates)
Draw 1Permit issued, demolition done, cabinets ordered with supplier confirmation$12,000Permit copy; cabinet order confirmation; invoice; lien releases or waivers for work paid so far
Draw 2Rough plumbing and electrical inspections passed$15,000Inspection records; invoice; releases from anyone who served notice
Draw 3Drywall, cabinets set, countertops templated$15,000Invoice; releases; updated sub list (Texas)
Draw 4Substantial completion: final inspection passed, appliances working$6,000Final inspection; punch list signed by both sides
FinalPunch list complete; in Texas, 30 days after completion for the statutory 10%$6,000Florida final payment affidavit or Texas final bills-paid affidavit; final releases or waivers; warranties and manuals

Notice how the 10% held to the end ($6,000) matches Texas's statutory reservation, and how in Florida the deposit stays at the 10% line. On a job where the contractor must pre-order expensive special-order items, a slightly larger early draw can be fair, but tie it to proof the order was placed with a named supplier, and consider paying the supplier directly.

What should I get before each payment?

Use a simple rule: payment for proof. Before every draw you should have three things.

  1. An invoice that matches the payment schedule and shows the contract price, prior payments, approved change orders, this request, and the remaining balance.
  2. Proof the work is done and passed inspection. Walk the job. Check the building department's online inspection record. Do not pay for a stage that failed inspection.
  3. Lien paperwork showing the people who worked on or supplied your job have been paid for the previous draw.

Florida lien paperwork per draw

  • Notices to Owner. Subs and suppliers who did not contract with you directly must serve a Notice to Owner within 45 days of first furnishing (713.06). Keep a list of everyone who sends one.
  • Releases. The 713.015 notice in your contract tells you to require a written release of lien from anyone who served a Notice to Owner before each payment. The Notice to Owner itself warns: "To avoid a lien and paying twice, you must obtain a written release from us every time you pay your contractor."
  • Why it matters: you have no obligation to lienors (other than laborers) who had not served a Notice to Owner at the time you made a payment (713.06), so payments made properly, with releases from those who did serve notice, protect you.
  • Notice of Commencement. For most jobs over $2,500 you must record one before work starts (713.13). Payments made after it expires are treated as improper payments and can cause you to pay twice. Keep an eye on its expiration date on long jobs. See Florida Notice of Commencement.

Texas lien paperwork per draw

  • Disbursement statement naming the direct subs the contractor will pay from this draw (53.258).
  • Statutory lien waivers. Texas waivers are enforceable only if they substantially comply with one of four statutory forms: conditional or unconditional waiver on progress payment, and conditional or unconditional waiver on final payment (Prop. Code ch. 53, Subchapter L). A conditional waiver releases rights only if evidence of payment exists. No one may require a claimant to sign an unconditional waiver until it has actually been paid.
  • Watch for notices of claim. If a sub or supplier sends you a notice of unpaid claim, you should withhold that amount from your next payment to the contractor until the dispute is resolved. If you keep paying without withholding, your property may be liable for the amount you failed to withhold.
  • Subcontractor list. Before construction starts, a residential contractor must give you a list of subs and suppliers and update it within 15 days of changes, unless you signed a statutory waiver (53.256). Compare each waiver to that list.

Deeper detail: Florida construction lien law for homeowners, Texas mechanic's lien guide and Texas lien waivers and releases.

What is retainage, and how much should I hold back until completion?

Retainage (or a holdback) is a percentage of each payment, or of the contract price, that the owner keeps until the job is complete. It gives the contractor a reason to finish the punch list and pay everyone, and it gives you a fund to cover unpaid subs or unfinished work.

Texas: 10% is required by law

Property Code 53.101 says that during the work and for 30 days after the work under the original contract is completed, the owner shall reserve 10% of the contract price, or 10% of the value of the work done measured against the contract price. The reserved funds secure payment of workers and suppliers (53.102). A sub or supplier gets a claim on the reserve if it sends the required notices and files a lien affidavit within 30 days after the earliest of completion, termination or abandonment (53.103).

If you do not keep the 10%, claimants who followed the notice rules have a lien "at least to the extent of the amount that should have been reserved" (53.105). In other words, skipping retainage can make you pay that amount a second time.

Texas homestead owners see this in writing: for a homestead lien to be valid, the claimant's notice to you must include a statement that your property may be subject to a lien if you fail to reserve 10% of the contract price during construction and for 30 days after completion (53.254(g)). Owners can also file an affidavit of completion with the county clerk, which documents the completion date and must warn claimants about the deadline for retained funds (53.106).

Florida: retainage comes from your contract

Chapter 713 does not contain a Texas-style rule requiring owners to reserve a percentage on private residential jobs. In Florida, your protection comes from paying properly (releases from everyone who served a Notice to Owner, and the final payment affidavit). Any retainage is a contract term you negotiate. Holding back a meaningful amount until the punch list and final affidavit are done is still a smart practice.

How much is reasonable?

In Texas, 10% for 30 days after completion is the legal minimum for lien protection. In either state, size your final holdback so it would cover finishing the punch list and any open supplier balances if the contractor disappeared. Spell out in the contract when retainage is released and what documents trigger it.

When should I make the final payment?

Make the final payment only when every one of these is true:

  1. The final inspection passed and, where required, you have a certificate of occupancy or certificate of completion.
  2. The punch list is done. Walk the job with the contractor, write down each item, and check them off. See punch list and closeout.
  3. You have the final lien paperwork.
    • Florida: the Contractor's Final Payment Affidavit, which must state that all lienors who timely served a Notice to Owner were paid in full or list those not paid and how much (713.06(3)(d)), plus final releases from those lienors. A contractor in default of giving this affidavit has no lien or right of action against you, and must deliver it at least 5 days before suing to enforce its lien.
    • Texas: the final bills-paid affidavit stating the contractor paid everyone in full, or listing who is owed and how much (53.259). Making a false or misleading statement in it is a misdemeanor, and the signer is personally liable for losses from false information. Get statutory conditional waivers on final payment from the contractor and major subs.
  4. In Texas, 30 days have passed since completion for the statutory 10%, or you have confirmed with an attorney that no claims were noticed.
  5. You have warranties, manuals, permit closeout and as-built information.

If you used a Notice of Commencement in Florida, make sure it has not expired before the final payment, or have it extended by amendment before it does (713.13).

Should I pay for materials upfront?

Materials are the most common reason contractors give for a large deposit. Sometimes it is legitimate: custom windows, cabinets and some roofing products are made to order and the supplier wants payment when ordered. But materials money is also the easiest to lose. Safer ways to handle it:

  • Pay the supplier directly or by joint check (made out to both contractor and supplier), and get the supplier's receipt or release.
  • Pay on delivery to your site, after you count the items against the order.
  • Ask for the order confirmation showing the supplier's name, item list, price and delivery date before releasing materials money.
  • Buy owner-furnished items yourself (appliances, plumbing fixtures, tile) if the contract says so, and be clear about who handles delivery damage and warranty.

In Florida, a supplier that sells to your contractor and serves you a Notice to Owner can lien your home if the contractor does not pay it, so a release from that supplier is worth more than the contractor's word. In Texas, the same risk is why the 10% retainage and the disbursement statement exist.

Payment methods compared: cash, check, card or payment app?

The way you pay matters almost as much as when. Use methods that leave a clear record tied to the contract, and avoid any method that cannot be traced or reversed.

MethodRecordCan it be disputed or reversed?Practical risk level
CashOnly a receipt, if you get oneNoHighest. Avoid. Harder to prove what you paid.
Peer-to-peer payment appsElectronic trailGenerally hard to reverse once sent; terms vary by app and bankHigh for large amounts to someone you do not know
Personal check payable to the businessCancelled check shows who cashed itOnly by stop-payment before it clearsModerate. Pay the business name on the contract, never an individual.
Joint check (contractor and supplier)Both must endorseSame as checkLower for materials
Credit cardStatementCard issuers have dispute processes with their own time limits and rulesLower, but contractors may add a fee, and disputes over workmanship are not guaranteed
Bank wire or ACHBank recordVery hard to reverseModerate to high. Verify wiring instructions by phone, because emailed instructions can be faked.
Escrow or third-party disbursementDisbursement recordsFunds released on conditionsLowest on large jobs

Whatever you choose, write the contract number and draw number on each payment, and keep copies. If you plan to rely on a card dispute, read your card agreement first and ask the issuer how it treats contractor disputes.

Should I pay a contractor in cash for a discount?

A cash discount offer is a common warning sign. Cash leaves almost no trail, so if the job goes wrong it is your word against the contractor's about what you paid. A contractor who wants cash may also be avoiding permits, payroll records or taxes, and DBPR lists "we don't need a permit" and no written contract among its red flags. If you do pay any cash, get a signed, dated receipt on the contractor's letterhead that references the contract and the draw.

What if the contractor asks for more money mid-job?

Mid-job requests usually fall into one of four buckets. Handle each differently.

RequestWhat to ask forPay when
Change you asked forA written change order with price and schedule effect, signed by bothPer the change order terms, usually with the next draw
Hidden condition (rot, old wiring, termite damage)Photos, explanation, written change order under the contract's concealed-conditions clauseAfter you approve the change order
Material price increaseThe escalation clause in the contract, supplier invoices showing the increaseOnly if the contract allows escalation
"Advance" on a future drawNothing: the answer should usually be noWhen the milestone is reached

An early advance is the classic step before abandonment. In Florida, if the contractor already holds more money than the work is worth and then stops for 90 days, 489.126(3) applies. In both states, a contractor that cannot reach the next milestone without your money may have cash-flow problems that will not get better. See change orders and contractor abandoned the job.

What if the contractor took my deposit and disappeared?

Florida: step-by-step demand

  1. Check the dates. Write down when you paid, the contract price, and the percentage you paid. If it was more than 10%, note whether 30 days passed without a permit application (check the building department's online permit search) or 90 days passed after permits issued without work starting.
  2. Send the certified-mail demand. Address it to the contractor's address in the contract, or the address on file with DBPR if there is none. Mail it certified, return receipt requested. Say clearly that you demand the contractor apply for permits, start work, or refund your payment of $X within 30 days, under s. 489.126. Keep a copy and the green card.
  3. Wait 30 days from receipt. If nothing happens, the statute lets a court infer no just cause and intent to deprive.
  4. Report it. File a police report and ask that it be referred to the State Attorney. File a DBPR complaint (licensed contractors) or call DBPR's Unlicensed Activity hotline at (866) 532-1440 (unlicensed).
  5. Consider the Recovery Fund if the contractor was licensed when you signed. It requires a judgment, arbitration award or CILB restitution order based on specified violations, and claims must be filed within 1 year after that action ends (489.141). See the Recovery Fund guide.
  6. Sue in county or small claims court for the deposit.

Texas: step-by-step demand

  1. Send a written demand by certified mail, return receipt requested, asking for performance or a refund by a set date.
  2. Send a DTPA notice at least 60 days before suing, describing your complaint and the economic damages and attorney's fees you claim (Bus. & Com. Code 17.505). You can combine it with your demand.
  3. Report it. Police or the district attorney for theft; the Texas Attorney General's consumer protection division for deceptive practices; TDLR if a licensed trade was involved.
  4. Sue in justice court for smaller claims or county or district court for larger ones. DTPA claims must be filed within two years (17.565).

See small claims court against a contractor and how to file a complaint.

Sample payment clause language to discuss with your contractor

These are plain-English ideas to raise, not legal forms. Have an attorney adapt them to your contract.

  • Deposit: "Owner will pay a deposit of $____ at signing. Contractor will apply for all required permits by ____ and start work by ____. If Contractor misses either date, Owner may cancel and Contractor will refund the deposit within 10 days."
  • Draws: "Each payment is due within ____ days after the listed milestone is complete, has passed any required inspection, and Contractor has delivered an invoice and lien releases or statutory waivers from Contractor and every subcontractor and supplier who has served notice for work paid by the prior payment."
  • Retainage: "Owner will retain 10% of each payment until 30 days after final completion and delivery of the final affidavit and final releases or waivers."
  • Final payment: "Final payment is due after final inspection, completion of the signed punch list, and delivery of the Contractor's final payment affidavit (Florida) or final bills-paid affidavit (Texas)."
  • No advances: "Owner is not required to pay for work not yet performed or materials not yet delivered, except special-order items listed in Exhibit __, paid directly to the supplier."

Florida vs Texas payment rules side by side

TopicFloridaTexas
Deposit capNone, but more than 10% on residential work triggers 30-day permit and 90-day start deadlines (489.126)None found
Criminal deposit lawYes, 489.126; misdemeanor to first-degree felony by amountConstruction trust fund law (Prop. Code ch. 162); general theft law
Statutory retainage on private homesNo; by contractYes, 10% until 30 days after completion (53.101)
Lien paperwork per drawReleases from anyone who served a Notice to OwnerDisbursement statement; statutory conditional and unconditional waivers
Final payment documentContractor's Final Payment Affidavit (713.06(3)(d))Final bills-paid affidavit (53.259)
Payment timing riskPayments after the Notice of Commencement expires are improperPayments made after receiving a notice of claim without withholding
Homestead formalitiesNot a separate contract-filing ruleLien on homestead needs written contract signed before work, by both spouses if married, filed with the county clerk (53.254)
Where to complainDBPR; local police and State AttorneyPolice or DA; Attorney General; TDLR for trades
Refund after a valid home-solicitation cancellationCancel by midnight of the 3rd business day (501.025); the federal rule requires a refund within 10 business days (16 CFR 429.1)Refund by the end of the 10th business day after the merchant gets the notice (Bus. and Com. Code 601.154)

State hubs: Florida contractor guide and Texas contractor guide.

Special cases: condos, HOAs, commercial tenants and new homes

  • Condo and HOA boards: association money is held for owners, so use draw schedules tied to an engineer's or architect's certification of completed work, keep retainage, and collect lien releases from every noticed lienor. See condo unit renovation in Florida.
  • Commercial tenants: 489.126's deposit deadlines apply to residential property, not commercial build-outs, so your lease and construction contract carry the protection. Landlord tenant-improvement allowances are often paid only after lien releases are delivered. See commercial tenant build-out guide.
  • New homes in Texas: a seller of a newly built home of up to four units meant as the buyer's principal residence must provide a bills-paid affidavit at closing (53.259(b)).
  • Custom homes: the same payment-for-proof rule applies, usually with more draws. See the custom home building process.

How to choose a provider

  • Verify the contractor's license (Florida) or trade licenses and city registration (Texas) before paying anything.
  • Keep the deposit small; in Florida, know that more than 10% on residential work triggers 489.126 deadlines.
  • Write permit-application and start dates into the contract, with an automatic deposit refund if missed.
  • Tie every draw to a defined, inspected milestone, not a calendar date.
  • Before each payment, collect an invoice, inspection proof and lien releases or statutory waivers.
  • Florida: track every Notice to Owner and get a release from each before paying.
  • Texas: get a disbursement statement with each request and withhold the amount of any notice of claim you receive.
  • Texas: retain 10% until 30 days after completion (Prop. Code 53.101).
  • Pay the business named in the contract by traceable method; never cash or payment apps for large sums.
  • Pay materials suppliers directly or by joint check for special-order items.
  • Do not advance money for future milestones.
  • At the end, get the Florida final payment affidavit or Texas final bills-paid affidavit before the last check.
  • If a deposit is held and nothing happens, send a certified-mail demand and calendar the 30-day mark.

Related general and residential contractors guides

General and residential contractors by state and city

Questions people ask

How much deposit should I give a contractor?

Neither Florida nor Texas sets a single legal deposit amount for private residential work. A small deposit tied to firm permit and start dates is safest. In Florida, more than 10% of the contract price as the initial payment triggers the 489.126 deadlines (permits within 30 days, work within 90 days after permits issue), so many owners keep deposits at or below 10%. Larger early payments for custom-ordered materials are safer when paid directly to the supplier.

Is it legal for a contractor to ask for 50% upfront?

In both states, yes, it is generally legal to ask. In Florida, taking more than 10% on a residential job obligates the contractor to apply for permits within 30 days and start within 90 days after permits issue, and failing to do so without just cause after your certified-mail demand can be a crime under 489.126. In Texas there is no deposit statute, so a 50% deposit is purely a matter of contract and risk. DBPR calls big upfront payments a major red flag.

What does Florida law say about contractor deposits over 10%?

Section 489.126(2) says a contractor receiving more than 10% of the contract price as the initial payment for residential work must apply for permits within 30 days and start work within 90 days after permits issue, unless there is just cause or you agreed in writing to longer periods. If not, you send a demand by certified mail, return receipt requested. No action or refund within 30 days supports an inference of no just cause.

Is there a deposit limit in Texas?

We found no Texas statute capping deposits on private residential construction, and Texas has no state general contractor license. Texas protects owners through the 10% statutory retainage in Property Code 53.101, the construction trust fund law in chapter 162, residential disbursement statements under 53.258, and the DTPA. Put your own deposit refund terms in the contract.

What is retainage?

Retainage is money the owner holds back until the job is finished, to make sure the punch list gets done and subs and suppliers are paid. In Texas it is required: owners must reserve 10% of the contract price or of the value of work done during the job and for 30 days after completion (53.101). In Florida, retainage on private homes is a contract term, not a statutory requirement.

Is it safe to pay a contractor through a payment app?

Payment apps are built for sending money to people you know and trust, and payments can be hard to reverse once sent. For a contractor, use a method that creates a clear record and pays the business named in the contract, such as a check or card. If you must use an app, send small amounts tied to specific invoices, and keep screenshots and the invoice.

Can I pay with a credit card for chargeback protection?

A credit card gives you a dispute process with your card issuer, which can help if a contractor never shows up. Issuers set their own rules and time limits, and disputes about workmanship quality are often harder to win than disputes about non-delivery. Some contractors add a card fee. Read your card agreement and ask the issuer how it handles contractor disputes before relying on it.

When should I make the final payment?

After the final inspection passes, the punch list is complete, and you have the final lien paperwork: in Florida, the Contractor's Final Payment Affidavit under 713.06(3)(d) and final releases from lienors who served notice; in Texas, the final bills-paid affidavit under 53.259 and statutory waivers on final payment. In Texas, also keep the 10% retainage until 30 days after completion.

What if the contractor asks for more money before the next milestone?

Ask why in writing. A change you requested or a hidden condition should come as a signed change order with a price. A price increase should only be paid if your contract has an escalation clause. A request for an advance on a future draw should usually be declined, because paying ahead of the work is how owners lose money when a job is abandoned.

What if the contractor took my deposit and disappeared?

In Florida, send a demand by certified mail, return receipt requested, under 489.126, wait 30 days, then file a police report and a DBPR complaint. If the contractor was licensed, a later judgment or restitution order may support a Recovery Fund claim. In Texas, send a written demand and DTPA notice at least 60 days before suing, report theft to police, and sue in justice or county court.

What is a milestone payment?

A milestone payment is due when a defined stage of the job is complete, such as rough-in inspections passed or cabinets installed, rather than on a calendar date. Milestones make it easy to see whether the work matches the money. Define each one precisely in the contract and require inspection approval and lien paperwork before payment.

Do Florida's deposit rules apply to commercial projects?

No. Section 489.126(2) and (3) are written for repair, restoration, improvement or construction of residential real property. For a commercial build-out, your contract and lease terms set deposits, draws and retainage, and the lien law still applies. Ask your attorney to include permit and start deadlines with refund terms.

If I cancel a contract I signed at home, how fast must my deposit come back?

If the sale is covered by the FTC Cooling-Off Rule ($25 or more at your home), the seller must honor a valid cancellation and refund all payments within 10 business days after receiving your notice (16 CFR 429.1(g)). Texas's home solicitation law sets the same deadline, the end of the 10th business day after the merchant receives a valid cancellation (Bus. and Com. Code 601.154). In Florida, you can cancel a home solicitation sale until midnight of the third business day after signing, by written notice delivered in person or by mail, and a mailed notice counts once it is postmarked (s. 501.025). Send it by certified mail and keep a copy.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration