Local Guide · Residential solar installers
Solar for Farms and Ranches in Texas and Florida: Wells, Barns, Land Leases and Taxes
Solar can run remote stock wells and cut barn and irrigation bills, and developers are offering land leases across both states. Here is how pumping systems work, what Texas decommissioning law requires, how ag tax valuation is affected, and what changed in USDA REAP in 2026.
Solar works well on farms for remote livestock wells (panels plus a water storage tank) and for barns, shops or irrigation meters with steady daytime use. Leasing land to a solar developer is different: in Texas the land likely loses ag valuation and triggers a three-year rollback tax, and Utilities Code chapter 302 requires removal and financial assurance terms. USDA REAP grants now pay only after a system has run 12 months.
Key facts
- Texas Utilities Code chapter 302 requires solar leases to provide removal of foundations and buried cables to at least three feet below grade (SB 760, 2021; amended by HB 3228, eff. Sept. 1, 2025).
- Texas solar leases must include decommissioning financial assurance based on an independent Texas-licensed engineer's estimate, delivered by the earlier of lease termination or the 20th anniversary of commercial operation.
- Landowners must request road removal and land restoration within 180 days after the facility stops commercial generation or after written notice of decommissioning (Utilities Code 302.0004(d)).
- Texas Tax Code 23.55 imposes a rollback tax for the three years before a change of use of open-space land, secured by a lien on the land.
- Florida Statute 193.461 requires reclassification of land diverted from agricultural to nonagricultural use.
- Florida Statute 163.3205 makes solar facilities a permitted use in all agricultural land use categories and agricultural zoning districts in unincorporated areas.
- USDA's REAP rule effective Oct. 16, 2026 requires projects to be built and operating 12 months before applying; grants run $1,500 to $500,000 with at least 75% cost sharing.
- Ground-mounted solar on cropland is ineligible for REAP grants under the 2026 rule.
- PVWatts models about 1,421 to 1,568 kWh per year per kW of fixed solar across major Texas and Florida cities.
Is solar worth it for a farm or ranch?
There are two very different solar questions on rural land, and it helps to separate them early:
- Solar that serves your operation: panels on a barn, shop or pump house, or a small array that runs a well. You pay for it and it lowers your own costs.
- Solar that a developer builds on your land: a utility-scale project that sells power to the grid. You lease land and receive rent. This is a real estate decision with tax and legal consequences.
For the first kind, the math works like any business system. Look at your 12 months of electric bills by meter. Farms often have many meters: the house, a shop, a center pivot, a barn, a distant well. Solar pays off best on a meter that uses a lot of power during the day, year-round, at a high price per kWh. Irrigation pumps, cooling for dairy or poultry barns, and shops with daytime loads are typical candidates. A meter that runs only a few weeks a year earns little.
Texas and Florida farms have good sun. Federal PVWatts modeling (now run by the National Laboratory of the Rockies, formerly NREL) estimates that each kilowatt of fixed, south-facing solar produces roughly 1,420 to 1,570 kWh a year across the major cities in both states, from about 1,421 kWh near Houston to about 1,568 near Tampa. Rural sites with open sky and no shade often do at least as well, and ground mounts can be tilted for best output.
For the second kind, the question is not "will solar save money" but "is this lease a good deal for my land and my family for the next 30 or 40 years?" That is covered in the lease sections below.
Can solar run a livestock water well pump?
Yes. Solar water pumping is one of the oldest and most practical uses of solar on ranches, especially for remote pastures where running a power line would cost more than the pump.
How a solar pumping system works
- Panels mounted on a pole or ground frame near the well.
- A pump controller that matches the pump to the panel output.
- A pump (submersible for wells, surface pumps for ponds or tanks) designed to run on variable solar power.
- A storage tank, which is the key part. Instead of storing electricity in batteries, most systems store water. The pump runs hard on sunny days and fills a large tank that covers nights and cloudy stretches.
- A float switch that stops the pump when the tank is full.
Storing water instead of power keeps the system simpler and cheaper to maintain. Batteries add cost and need replacing; a tank does not.
Sizing in plain terms
A pump system is sized by three numbers: how much water you need per day at the hottest time of year, how far the water must be lifted (well depth plus any rise to the tank, called total dynamic head), and how many days of storage you want. Deeper wells and bigger herds need more panel capacity. Ask the pump supplier for a written sizing sheet showing those inputs, and check it with your county extension office (Texas A&M AgriLife Extension or UF/IFAS Extension).
Things that go wrong
- Undersized storage, so cattle run dry after two cloudy days.
- Panels shaded by trees or the windmill tower in winter, when the sun is lower.
- Theft or damage at remote sites; use tamper-resistant hardware.
- Freezing. In North Texas and the Panhandle, plan for the tank and lines to survive hard freezes. During the February 2021 winter storm, more than 14 million Texans were under boil-water orders as power and water systems failed, a reminder that rural water depends on power too.
- Hail. Ground mounts in hail country should use panels tested to UL 61730; the Insurance Journal reported SEIA's recommendation of panels typically rated for 1-inch hail at about 50 mph.
A remote solar pump that is not connected to the grid needs no utility approval. If you connect any solar to the grid, the interconnection rules below apply.
Solar on barns, shops and irrigation
Grid-tied solar on farm buildings follows the same rules as other business systems:
- Florida investor-owned utilities (FPL, Duke Energy Florida, Tampa Electric, Florida Public Utilities) must offer net metering under Rule 25-6.065. Excess energy is credited to the next month, credits last up to 12 months, and unused credits are paid at year end at the utility's COG-1 as-available rate. Systems over 10 kW fall into Tier 2 (up to 100 kW), where the utility may require up to $1 million in liability insurance.
- Florida co-ops and municipal utilities set their own net metering programs under Fla. Stat. 366.91(6). Many Florida farms are on co-ops, so get your co-op's rules before you size anything.
- Texas co-ops also set their own buyback rates and interconnection rules. The PUC's consumer solar guide notes that city-owned utilities and electric cooperatives set their own buyback rates, and the PUC does not regulate them the way it regulates the wires utilities in competitive areas.
- Texas competitive areas: you sell surplus power to your retail electric provider at a price you agree on (Utilities Code 39.916(j)).
Can a co-op limit my farm solar?
Practically, yes. Because co-ops write their own interconnection and buyback policies, a co-op can cap system size, set a low buyback rate, require specific equipment, or charge fees allowed under its own policy. Ask your co-op for its distributed generation policy in writing, including the export credit, any size limit and any monthly charges for solar members. If your co-op pays little for exports, size the system to your daytime use on that meter, or add storage. Co-ops are member-owned, so members can raise solar policy at board elections and annual meetings.
Irrigation pumps
Large irrigation pumps can be good solar loads in Florida, where many groves and nurseries pump year-round. In Texas, seasonal irrigation may run hard for a few months and sit idle the rest of the year, which means much of the solar output would be exported. Check how your utility treats a meter that exports for most of the year. Some farms put the solar on the meter with the steadiest load instead.
State tax rules for on-farm solar
Texas
- Tax Code 11.27 exempts the added appraised value of a solar device installed primarily for on-site use. File Comptroller Form 50-123 with your county appraisal district between January 1 and April 30.
- Ag-valued land (open-space or "1-d-1" land) is valued on its capacity to produce agricultural products. The statute's list of appurtenances that remain part of ag land includes private roads, dams, reservoirs, water wells and fences. Whether a small solar array serving your own well or barn changes the use of the ground under it is a question for your chief appraiser; most on-farm systems occupy a tiny footprint, but ask before you build a large ground mount.
Florida
- For nonresidential property such as barns and packing houses, Fla. Stat. 193.624(2)(b) keeps 80% of the value added by a renewable energy source device out of the assessment, and 196.182 exempts 80% of a device treated as tangible personal property. For the farmhouse, 193.624(2)(a) excludes all of the added value.
- Solar equipment is exempt from Florida sales and use tax under 212.08(7)(hh).
- Land in agricultural classification (often called greenbelt) must be used for bona fide agricultural purposes. A small array serving your operation is unlikely to change that, but confirm with your county property appraiser if the array takes up meaningful acreage.
What is agrivoltaics?
Agrivoltaics means using the same land for solar panels and agriculture at the same time. Common versions include grazing sheep under panels, raising panels high enough to farm beneath them, and planting pollinator habitat between rows.
In Texas and Florida, the most common form is grazing, since sheep can keep vegetation down without damaging panels. Cattle are generally too large and can damage equipment, so cattle grazing under arrays requires special designs.
Agrivoltaics is not a legal category in either state's tax code. Whether land under panels keeps its agricultural valuation depends on how your appraisal district (Texas) or property appraiser (Florida) views the primary use. Federal policy has also shifted. USDA's 2026 rule for the Rural Energy for America Program says USDA is directed to "safeguard Cropland" and "disincentivize solar development on farmland," and it makes ground-mounted solar on cropland ineligible for REAP grants. That does not ban agrivoltaics, but it removes one federal grant path for it.
If a developer pitches a dual-use project, ask for written terms on who controls grazing, fencing, water access and vegetation management, and whether your ag valuation is expected to survive. Get the appraisal district's or property appraiser's view in writing if possible.
Should I lease my land to a utility-scale solar developer?
It can be a steady income, but it ties up your land for decades. Treat it like selling a long-term interest in your property. Before you sign anything, including an "option" or "letter of intent," talk to an attorney who handles rural land and energy leases. This section is general information, not legal advice.
How solar land leases usually work
- Option period: the developer pays a small fee to hold the land for several years while it studies the site and seeks a grid connection. Many optioned sites are never built.
- Construction and operating term: if the project goes ahead, the lease converts to a long operating term, often with extension options in the developer's favor.
- Rent: usually per acre per year, sometimes with an escalator.
- Decommissioning: removal of the equipment and restoration of the land at the end.
Questions to ask about any offer
- How many acres are included, and can the developer use only part while tying up the whole tract?
- What are the total years of option, construction and operation, including every extension?
- Who pays the property tax increase and any rollback tax when the land leaves agricultural use?
- What happens to existing grazing, hunting or farming leases on the land?
- How do the lease and the project affect mineral rights and access for oil and gas operations?
- Where will roads, fences, substations and power lines go, and who maintains them?
- What insurance and indemnity does the developer provide?
- Can the developer assign the lease to another company without your consent?
- Will a memorandum of lease be recorded on your title, and how will that affect a future sale of the land? Ask your attorney.
- What is the decommissioning plan, and what financial guarantee backs it?
Texas decommissioning law for solar leases (Utilities Code chapter 302)
Texas is one of the few states with a statute written specifically to protect landowners who lease to solar projects. Utilities Code chapter 302, added by SB 760 in 2021 and amended by HB 3228 effective September 1, 2025, sets mandatory terms for any "solar power facility agreement," which is a lease between a landowner and a company (other than an electric utility) that operates a solar facility on the land. The chapter applies to solar facilities that are generation assets under Utilities Code 39.251, meaning utility-scale projects rather than a farmer's own on-site system.
What the lease must require
- Removal: the company must remove every solar device, transformer and substation. Foundations and buried cables must be removed to at least three feet below the surface, and the holes filled with soil of the same or similar type. Overhead lines the company installed must be removed.
- Recycling and disposal: since the 2025 amendment, the company must reuse or recycle components practicably capable of it, including the panels, and dispose of the rest at properly authorized facilities.
- Roads and restoration, on your request: the company must remove roads it built. If reasonable, it must also remove excavated rocks over 12 inches across, return the land to a tillable state using methods such as scarification, V-rip or disc, and reseed pasture with native grasses where an agency prescribes them.
- Your deadline to ask: you must make those road and restoration requests within 180 days after the later of the date the facility can no longer generate electricity in commercial quantities, or the date you receive written notice that the company intends to decommission.
Financial assurance
- The company must give you evidence of financial assurance, such as a parent company guaranty from a parent with an investment-grade credit rating, a letter of credit, a bond, or another form reasonably acceptable to you.
- The amount must cover the estimated cost of removal, recycling or disposal and restoration, minus salvage value (less any part of that value pledged to secure the company's debt).
- An independent, Texas-licensed professional engineer must make the estimate, update it by the 10th anniversary of commercial operations, and update it at least every five years after that.
- The assurance must be delivered by the earlier of the lease's termination or the 20th anniversary of commercial operations. It cannot be cancelled until removal is complete unless replacement assurance is provided, and it stays in place through any change in ownership until the new owner provides its own.
Your remedies
Any lease provision that tries to waive these rights is void. A landowner harmed by a violation is entitled to injunctive relief, and other legal remedies remain available. Note one gap: the financial assurance does not have to be in place until as late as year 20. Your attorney may negotiate for earlier delivery.
Florida has no equivalent landowner decommissioning statute that we found. In Florida, decommissioning terms depend on your lease and on any conditions your county attaches to the project, so negotiate them carefully.
What happens to ag property tax valuation if I host a solar farm in Texas?
Expect the land under a utility-scale project to lose its agricultural (open-space) valuation, and expect a rollback tax.
- Rollback tax: under Tax Code 23.55, when the use of land appraised as open-space changes, an additional tax is imposed equal to the difference between the taxes paid under ag valuation and the taxes that would have been paid at market value, for each of the three years before the year the change occurs.
- Partial parcels: if only part of a tract changes use, the additional tax applies only to that part (23.55(d)).
- Lien: a tax lien attaches to the land on the date the change of use occurs, in favor of all taxing units involved.
- Who decides: the chief appraiser determines whether a change of use occurred and must send you notice explaining your right to protest.
- When it is due: the tax is billed and becomes delinquent, with penalties and interest, if not paid before the next February 1 that is at least 20 days after the bill is delivered.
Because the rollback tax is owed on the land, it falls on you as owner unless your lease shifts it to the developer. Most landowner attorneys insist that the lease make the developer pay the rollback tax and any increase in ongoing property taxes caused by the project. Get that in writing.
Large solar projects often negotiate tax abatements with counties or school districts. Those deals usually cover the developer's equipment, not your land's loss of ag valuation.
What about Florida's agricultural classification (greenbelt) and solar farms?
Florida's agricultural classification is in Fla. Stat. 193.461. The property appraiser classifies all land each year as agricultural or nonagricultural, and must reclassify land as nonagricultural if it is diverted from an agricultural to a nonagricultural use or is no longer used for agricultural purposes. Land must be used for "bona fide agricultural purposes," meaning good-faith commercial agricultural use, judged by factors such as how long and how continuously it has been farmed, its size, care under accepted practices, and the terms of any lease.
A utility-scale solar facility is not listed as an agricultural purpose, so acreage converted to a solar farm is likely to be reclassified. Ask your county property appraiser in writing how it treats leased solar acreage, and have your lease make the developer responsible for the resulting tax increase.
Florida zoning favors solar facilities on ag land
Under Fla. Stat. 163.3205, a solar facility (a plant that makes power consumed mostly offsite) is a permitted use in all agricultural land use categories in a local comprehensive plan and all agricultural zoning districts in unincorporated areas. It must meet the setback and landscaped buffer rules for similar uses, and a county may adopt buffer and landscaping requirements that are no stricter than those for comparable permitted uses. In practice, this means your neighbors cannot easily stop a solar project on ag-zoned land, and neither can you stop one next door.
The statute also requires construction-phase erosion and sediment control plans, including soil percolation testing, stormwater controls designed for the 100-year, 24-hour storm, phased clearing, and inspections by a certified Florida stormwater, erosion and sedimentation control inspector. A 2026 amendment requires operational stormwater systems in the Northwest Florida Water Management District to be designed for the 100-year, 24-hour storm for applications filed after July 1, 2026. These rules protect your land and your neighbors' land during and after construction.
Is USDA REAP still available for farms?
Yes, but it works very differently starting in late 2026. The Rural Energy for America Program gives grants to agricultural producers and rural small businesses for renewable energy systems.
- USDA rescinded the old multi-year funding notice on April 15, 2026, and said funding would be announced after new regulations were issued.
- The new rule took effect October 16, 2026. Projects must now be fully built and operating before you apply, and you must submit 12 months of actual production or savings data plus 12 months of usage from before installation.
- Grant requests run from $1,500 to $500,000 for renewable energy systems, and you must cover at least 75% of the project cost yourself.
- An "agricultural producer" generally must be a for-profit operation; for a family-owned operation, the majority owner must earn at least 50% of their income from the agricultural operation. A farm or ranch is any place that raised and sold, or normally would have, at least $1,000 of agricultural commodities; hobby farms do not count.
- Ground-mounted solar on cropland is ineligible, as are projects at more than one location, residential systems, and ground mounts that cannot document matching historical energy use.
The practical effect: a roof-mounted system on a barn or a pole-mounted pump array on pasture can still qualify, but you must pay for it first and then compete for a grant. Call your USDA Rural Development state office in Texas or Florida before you build to ask when the next funding notice will open and what scoring it will use.
Licensing and permits for farm solar
- Texas: grid-connected solar must be installed by or through a TDLR-licensed electrical contractor. Rural counties often have no building permit process for farm structures, but the utility or co-op will still require an interconnection application and may require an inspection.
- Florida: contractors installing solar must hold a Florida solar contractor license or another Chapter 489 license that covers the work. Check at myfloridalicense.com. County building permits generally apply.
- Off-grid pumps: a pump array that never connects to the grid needs no utility approval, but use qualified installers and follow electrical code for safety. In Texas, TDLR licenses water well drillers and pump installers as a separate regulated trade, so ask whoever sets or replaces the pump in your well for that license.
Both states have new rules for residential solar sales (Texas Occupations Code ch. 1806 and Florida's licensing rules), but Texas's solar retailer law exempts nonresidential property, so a barn or shop system may not carry the five-business-day cancellation right a homeowner gets. Read contracts carefully before signing.
How to choose a provider
- List every meter on your property and its 12-month kWh use and cost.
- Pick the meter with the steadiest daytime load as your first solar candidate.
- Get your utility's or co-op's written distributed generation policy and export credit.
- For remote water, compare a solar pump plus storage tank with the cost of a new power line.
- For barns and shops, get at least three itemized bids from licensed contractors.
- In Texas, file Form 50-123 for the on-site solar property tax exemption by April 30.
- If a developer offers a land lease, do not sign an option or letter of intent before an attorney reviews it.
- Check any Texas solar lease against Utilities Code chapter 302 removal and financial assurance terms.
- Ask your appraisal district or property appraiser how leased solar acreage will be valued.
- Make the lease assign rollback taxes and project-related tax increases to the developer.
- Contact your USDA Rural Development state office before building if you plan to apply for REAP.
Related residential solar installers guides
- Is Solar Worth It for a Small Business in Texas or Florida?
- Off-Grid Solar in Texas and Florida: Is It Legal, Practical and What Does It Take?
- Ground-Mounted vs Roof-Mounted Solar: Which Is Better for a Texas or Florida Home?
- Solar Property Tax Exemptions in Texas and Florida: How to Claim Them
- Solar Panels and Hail: Ratings, Damage, Insurance Claims and North Texas Risk
- Texas Utility Solar Rules: How Do Austin Energy, CPS Energy, Co-ops, Oncor, CenterPoint and Non-ERCOT Utilities Treat Rooftop Solar?
- Florida Utility Solar Rules: How Do FPL, Duke, TECO, JEA, OUC and the Co-ops Treat Rooftop Solar?
- What Happens to Solar Panels at End of Life? Recycling, Disposal and Storm Debris in Texas and Florida
Residential solar installers by state and city
Questions people ask
Is solar worth it for a farm or ranch?
Often, for the right load. Meters with steady daytime use, such as irrigation in Florida, barn cooling or a busy shop, are good candidates. Remote stock wells are a classic fit, because a solar pump with a storage tank can cost less than running a power line. Seasonal loads that sit idle much of the year earn less, especially if your co-op pays little for exported power.
Can solar run a livestock water well pump?
Yes. A solar pump system uses panels, a controller, a pump built for variable solar power, and a storage tank sized for several days of water, so cattle are covered at night and on cloudy days. Storing water instead of electricity avoids battery costs. Size it on peak summer water needs and the total lift from the water level to the tank.
How do solar land leases work in Texas?
A developer usually pays for an option period while it studies the site, then converts to a long operating lease with per-acre rent if it builds. Texas Utilities Code chapter 302 requires these leases to include removal of equipment, foundations and cables to three feet deep, recycling of components, and financial assurance for decommissioning. Have an attorney review any offer before you sign.
What is a rollback tax for solar on Texas ag land?
When open-space (ag-valued) land changes to another use, such as a solar farm, Tax Code 23.55 imposes an additional tax equal to the difference between ag-value taxes and market-value taxes for the three years before the change. A lien attaches to the land. Your lease should make the developer pay it, along with any ongoing tax increase from the project.
Can a co-op limit my farm solar?
Yes, in practice. Electric cooperatives in both Texas and Florida set their own interconnection and buyback policies, so they can set size limits, export credits and fees. Ask for the policy in writing before you buy. If exports earn little, size your system to the daytime load on that meter or consider storage.
Is USDA REAP still available?
Yes, under a new rule effective October 16, 2026. You must build the system first, run it for 12 months, and then apply with real production data. Grants range from $1,500 to $500,000, covering no more than 25% of the cost. Ground-mounted solar on cropland and projects at multiple locations are ineligible. Check with your USDA Rural Development state office for the next funding notice.
Will a solar farm lease cost me my Florida agricultural classification?
Probably for the leased acreage. Under Fla. Stat. 193.461, the property appraiser must reclassify land diverted to a nonagricultural use, and a utility-scale solar facility is not listed as an agricultural purpose. Ask your property appraiser in writing, and make the developer responsible for the tax increase in your lease.
What is agrivoltaics?
Agrivoltaics means using land for solar panels and agriculture at the same time, such as grazing sheep under panels or farming beneath raised arrays. It has no special tax status in Texas or Florida. USDA's 2026 REAP rule makes ground-mounted solar on cropland ineligible for those grants, reflecting a federal policy to discourage solar on farmland.
Sources
- Texas Utilities Code ch. 302, Solar Power Facility Agreements
- Texas Tax Code ch. 23 (Sec. 23.51, 23.55)
- Texas Tax Code ch. 11 (Sec. 11.27)
- Texas Comptroller Form 50-123
- Texas Utilities Code ch. 39 (Sec. 39.916)
- PUC of Texas consumer solar guide (March 2026)
- TDLR: What TDLR regulates (residential solar retailers)
- TDLR: Electricians program
- TDLR regulated industries list (incl. Water Well Drillers and Pump Installers)
- Florida Statutes 193.461
- Florida Statutes 163.3205
- Florida Statutes 193.624
- Florida Statutes 196.182
- Florida Statutes 212.08
- Florida Statutes 366.91
- Florida Statutes 489.105
- Florida Administrative Code Rule 25-6.065 (text)
- Federal Register: REAP final rule (Oct. 1, 2026)
- Federal Register: Rescission of REAP funding opportunity (Apr. 15, 2026)
- eCFR: 7 CFR part 4280 subpart B (REAP)
- FERC/NERC February 2021 Cold Weather report
- Insurance Journal: hail and solar claims (May 2025)
- PVWatts v8 API (National Laboratory of the Rockies), Tampa example
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.