Texas Utility Solar Rules: How Do Austin Energy, CPS Energy, Co-ops, Oncor, CenterPoint and Non-ERCOT Utilities Treat Rooftop Solar?
Texas has no statewide net metering. What your panels earn depends on whether you are served by a city utility, a co-op, a competitive retail provider or a regulated utility outside ERCOT. This guide maps each one.
Texas has no single solar rule. In competitive areas served by Oncor, CenterPoint, AEP Texas or TNMP, you pick a retail electric provider and negotiate its buyback rate. City utilities and co-ops set their own terms: Austin Energy credits all solar production at a Value of Solar rate of 12.89 cents per kWh, PEC credits exports at about 7.19 cents, and El Paso Electric nets usage under its own tariff. The state itself offers no solar rebate.
Key facts
- Texas Utilities Code 39.916(j): in competitive areas, a solar owner sells surplus power to the retail electric provider serving the home at a value the two agree on; there is no mandated statewide net metering rate.
- Utilities Code 39.916 defines distributed renewable generation as up to 2,000 kW and bars utilities and retail providers from requiring extra liability insurance from compliant systems.
- The Public Utility Commission of Texas says the State of Texas offers no grants or rebates for installing solar panels.
- Austin Energy credits 100% of a customer's metered solar production at the Value of Solar rate, 12.89 cents per kWh for FY2027 to FY2029, up from 9.91 cents.
- Austin Energy announced an increased home solar rebate of $4,000 for eligible projects on August 24, 2026.
- CPS Energy's residential rooftop solar page says it does not currently offer rebates for residential solar installations.
- Pedernales Electric Cooperative credits exported energy from systems under 50 kW AC at a Sustainable Power Credit of $0.071921 per kWh, with unused credits expiring at the end of each calendar year.
- PEC charges a one-time, non-refundable $500 application fee for a Tier I residential system under 50 kW AC.
- El Paso Electric credits Texas customers' net production under Rate Schedule No. 48 and charges an $85 application fee for systems of 1 to 100 kW.
- Oncor says the time from installer application to permission to operate can range from a few days to several months.
Why there is no single Texas solar rule
Florida has one net metering rule for its big utilities. Texas does not. What your solar panels earn, what you apply for and who approves your system all depend on which of four utility types serves your home:
- Competitive (deregulated) areas. Most of Houston, Dallas-Fort Worth and many other ERCOT areas. A wires company, called a transmission and distribution utility (TDU), owns the poles and meters: Oncor, CenterPoint Energy Houston Electric, AEP Texas or Texas-New Mexico Power (TNMP). You buy electricity from a retail electric provider (REP) you choose.
- City-owned utilities. Austin Energy, CPS Energy in San Antonio and many smaller cities. They own the wires and sell the power, and their city councils or boards set solar terms.
- Electric cooperatives. Member-owned utilities such as Pedernales Electric Cooperative (PEC), Bluebonnet, CoServ, Guadalupe Valley and Sam Houston. Each sets its own solar rules.
- Regulated utilities outside the competitive market. El Paso Electric, Entergy Texas, Southwestern Electric Power Company (SWEPCO) and Xcel Energy's Southwestern Public Service in the Panhandle. These are investor-owned utilities regulated by the Public Utility Commission of Texas (PUCT), and customers cannot pick a retail provider.
The law behind this split is Chapter 39 of the Texas Utilities Code. Section 39.002 says most of Chapter 39 does not apply to city-owned utilities or electric cooperatives. Section 39.916, the distributed renewable generation section, applies in competitive areas, and it does not set a buyback price. Instead, section 39.916(j) says a solar owner sells surplus electricity to the retail provider serving the home "at a value agreed" between them. That value may be based on the wholesale energy clearing price or a carried-over bill credit.
The PUCT's 2026 consumer solar guide puts it simply: your buyback rate is part of your contract with your electric provider and is usually lower than the retail price you pay. In competitive areas, you shop for a plan with a buyback rate. City-owned utilities and co-ops set their own buyback rates. The PUCT regulates the wires utilities and REPs, but not city-owned utilities or co-ops.
Two state-level points apply nearly everywhere:
- No state rebate. The PUCT guide says the State of Texas does not offer grants or rebates for installing solar panels. Any rebate you hear about comes from a specific utility.
- Property tax. The main statewide benefit is the property tax exemption for solar under Texas Tax Code 11.27. See our solar property tax exemption guide.
Texas utility solar comparison table
This table summarizes what we could confirm from each utility's own pages or filings as of November 2026. Rates change, so treat every number as a starting point and confirm before you sign.
| Utility | Type | How solar is credited | Rebate or incentive | Key fee or rule |
|---|---|---|---|---|
| Austin Energy | City-owned | All solar production credited at Value of Solar rate: 12.89 cents/kWh (systems under 1 MW); all usage billed at standard rates; credits roll over, no cash value | $4,000 home solar rebate (announced Aug. 24, 2026), through a participating contractor; $500 battery rebate plus performance payments in Power Partner Battery | Auxiliary Power electrical permit and Austin Energy final solar inspection required |
| CPS Energy (San Antonio) | City-owned | Net metering under Rider #5 for systems 25 kW AC or less sized to match use; confirm the credit rate with CPS | No residential solar rebate currently offered | Batteries in a net-metered install may not export to the grid |
| Pedernales Electric Cooperative | Co-op | Sustainable Power Credit: $0.071921/kWh on exported energy (under 50 kW AC); optional time-of-use credit | Confirm with PEC | $500 Tier I application fee; unused credits expire at year end |
| Other co-ops (Bluebonnet, CoServ, GVEC, Sam Houston and others) | Co-op | Set by each co-op's board | Varies | Ask for the distributed generation tariff |
| Oncor, CenterPoint, AEP Texas, TNMP areas | Competitive | Your REP's buyback plan, if you choose one; no required rate | TDU energy efficiency programs may include solar incentives in some years | TDU interconnection and permission to operate; REP buyback is separate |
| El Paso Electric | Regulated, non-ERCOT | Net metering: usage netted against generation; net production credited under Rate Schedule No. 48 | Confirm with EPE | Application fee $85 (1 to 100 kW), $230 (over 100 kW) |
| Entergy Texas, SWEPCO, Xcel (SPS) | Regulated, non-ERCOT | Set by each utility's PUCT-approved tariff; confirm | Confirm | Confirm |
Austin Energy: the Value of Solar rate
Austin Energy does not use net metering. It uses a Value of Solar (VoS) rate, which it says was the approach it built to credit solar fairly for everyone in a community-owned, not-for-profit utility.
How Value of Solar works
- Production. Austin Energy meters everything your panels produce and credits 100% of it at the VoS rate. It does not matter whether you used that power in the house or sent it to the grid.
- Consumption. You are billed for all the electricity your home uses, whether it came from your panels or the grid, at standard tiered rates.
- Credit. The solar credit is applied to the electric part of your City of Austin utility bill. Your bill shows a line like "Solar Credit [amount] PV kWh at $[rate] per kWh."
- Leftovers. Extra credit rolls to the next month. Austin Energy says credits do not expire, but they have no cash value, cannot be transferred and end if the account closes. They cannot pay water, trash or other city charges.
Example from Austin Energy: Pat's panels earn 12.89 cents for every kWh they produce, and the credit reduces the electric portion of Pat's bill. If the credit is larger than what Pat owes, it carries over to a future bill.
Because the credit does not depend on your usage tier, Austin Energy recommends sizing a system to meet your annual energy use. Making more than you use builds credits you can never cash out.
Current rate and history
| Period | Residential VoS rate (cents/kWh) |
|---|---|
| FY2012 to FY2013 | 12.8 |
| FY2018 to FY2022 | 9.7 |
| FY2023 to FY2026 | 9.91 |
| FY2027 to FY2029 | 12.89 |
Austin's fiscal year starts October 1, so the 12.89-cent rate applies from fiscal 2027. A city staff presentation in April 2026 listed the new rate as 12.88 cents for systems under 1 MW and 10.21 cents for systems over 1 MW, with implementation scheduled for November 2026; Austin Energy's own rate page shows 12.89 and 10.22 cents. We use the utility's published figures.
What goes into the rate
The VoS rate adds up four avoided-cost parts: ERCOT energy savings, ancillary services savings (the cost of keeping the right plants ready), transmission savings, and societal benefits, which use the federal social cost of carbon with Texas-specific carbon per kWh. Systems of 1 MW AC or larger do not get the transmission and ancillary parts. The rate equals the average of the five prior years' assessments and is recalculated every three years. The next update is scheduled for October 2029.
The parts move a lot. In the April 2026 update, the ERCOT energy component fell from about 10.05 cents per kWh (FY2022) to 2.80 cents (FY2025), while the societal benefits component rose from 2.26 to 4.85 cents. That means the rate is not guaranteed to stay at 12.89 cents after 2029. Build any payback estimate with a range, not a single number. Our payback math guide shows how.
Batteries are not factored into the VoS rate; it is applied only to energy your solar produces. Austin Energy also says it does not maintain your system: if production drops, call your installer. You can track generation with the Solar Insights tool in your COAUtilities.com account.
Does Austin Energy offer a solar rebate?
Yes. On August 24, 2026, Austin Energy announced an increased home solar rebate of $4,000 for eligible projects. The rebate is paid for systems installed through a participating solar contractor, so check that your installer is on Austin Energy's list before you sign. Some older third-party guides still cite a lower $2,500 figure; use the utility's current number.
Austin Energy's older rebate page was not loading when we checked, so ask your contractor and Austin Energy for the current eligibility terms in writing, including system size limits, roof and shading requirements, and whether a rebate is reserved before installation or paid after.
Battery rebate and Power Partner
Austin Energy's Power Partner Battery program, which it expanded in November 2026, pays:
- A $500 upfront rebate per new battery system that receives permission to operate on or after February 18, 2025.
- A performance payment of $75 per kW per year, based on the battery's size, backup reserve level and average event hours. Austin Energy's example works out to about $324 per year for one common home battery.
Rules: the battery must be customer-owned (not third-party owned), installed by a participating contractor, and does not require solar. Events are limited to 40 per year, excluding grid emergencies, usually last 2 to 3 hours, and typically happen on the hottest summer afternoons. Austin Energy says events will not take your battery below your backup reserve, which its FAQ lists as 20 percent, and that it typically will not call events when a severe storm is forecast. You can opt out of a single event through the manufacturer's app without a penalty, but your annual payment goes down. See our virtual power plant guide for how these programs compare.
Permits and inspections in Austin
Every solar system in Austin Energy's service area must pass a final solar inspection before it can be turned on. The first step is an Auxiliary Power electrical permit from Austin Development Services, following the Austin Energy Solar Permitting Manual. Solar companies request inspections through Austin Build + Connect, and both the company and the customer get emails when an inspection is received, scheduled, passed or failed. Rough inspections are needed if wiring will be covered before the job is done, and meter-placement variances must be approved before equipment goes in. See our Austin solar guide and Texas solar permits guide.
Commercial Solar Standard Offer
For commercial property owners, Austin Energy runs a Solar Standard Offer program that pays for solar on rooftops and parking lots that feeds its Community Solar program. Projects installed after April 2026 get a guaranteed minimum price for 10 years: $0.11 per kWh for systems under 1 MW and $0.08 per kWh over 1 MW. That is a business program, not a homeowner rebate; see our small business solar guide.
CPS Energy (San Antonio): net metering, rebates and recent changes
CPS Energy is the nation's largest municipally owned energy utility, serving more than 970,000 electric customers in and around San Antonio. Its rules come from its own tariffs and its Distributed Generation (DG) Manual.
Does CPS Energy have net metering?
Yes, for smaller systems. CPS's DG Manual (9th edition, May 1, 2024) says a system with output of 25 kW AC or less that is expected to match the customer's use is a net-metered installation under Rider #5 of CPS Energy's tariffs. Larger systems that want to sell power to CPS need a separate purchase power agreement. CPS links a "Solar Billing Facts" document from its rooftop solar page; ask for it and confirm exactly how exports are valued and how long credits last, because we could not confirm the current credit rate from a CPS page.
Other DG Manual rules:
- Batteries installed as part of a net-metered system may not export power to the grid. They can power essential loads during an outage.
- CPS designs, supplies, owns and maintains the meters, but metering design, equipment and installation are at the DG owner's expense.
- A site screening study is free for systems from 1 kW AC to under 50 kW AC.
- For installations of 50 kW AC and smaller, the owner does not have to give CPS a certificate of insurance, though CPS recommends carrying liability coverage.
In a May 21, 2024 memo, CPS said the DG Manual was being revised to add battery energy storage, microgrids and ERCOT distributed generation resource requirements, and that those revisions could change technical rules, timelines and study fees. Until then, CPS asks installers to contact its DG section (210-353-2700, DG@cpsenergy.com) with battery questions.
Does CPS Energy offer a solar rebate?
Not now. CPS Energy's residential rooftop solar page says it "does not currently offer rebates for residential solar installations."
CPS did run rebates in the past. Its Solar Rebate Program Manual (effective June 1, 2017, revised June 21, 2019) paid residential rebates of $2,500 per project, plus $500 for locally made modules, for systems priced at $4.00 per DC watt or less. Applicants had to own the system and be interconnected behind a net meter. In December 2018, CPS allocated $15 million in additional funds to that program. If a salesperson quotes a CPS rebate today, ask them to show you the current CPS page that offers it.
What else CPS tells customers
- CPS's page lists an average cost of $3.80 per watt in its territory in 2023 and estimated savings of about $90 per month for an average 6 kW system. It stresses that solar systems "require a large investment and are NOT free."
- CPS suggests a roof 10 years old or newer, facing southwest, south or southeast, and making the home as efficient as possible first.
- CPS says to add the system to your homeowners insurance at full replacement cost.
- CPS recommends getting at least three quotes from registered contractors, who handle the interconnection application.
- CPS's page says you can cancel a purchase contract within 72 hours. Texas law now gives more: since September 1, 2025, residential solar sale and lease contracts covered by Occupations Code Chapter 1806 carry a five-business-day right to cancel. Use the longer state right. See our contract cancellation guide.
- Build San Antonio Green's Bring Solar Home program offers free technical help, according to CPS.
CPS community solar
CPS Energy's community solar program lets customers buy as little as one panel in an off-site solar facility, or enough to offset up to 100% of their average annual use, and get bill credits. It is open to renters and businesses, and credits move with you if you relocate within CPS territory. In 2026, CPS selected a developer to build up to 50 MW of new community solar under 20-year contracts. The enrollment button led to a waitlist when we checked. See our community solar guide and San Antonio solar guide.
Electric co-ops: Pedernales and the rest
Texas has dozens of electric cooperatives, and each one writes its own solar rules. Chapter 39's competitive-market rules mostly do not apply to them. That means a co-op can set its own export credit, its own application fees and its own technical rules.
Pedernales Electric Cooperative (PEC)
PEC serves members in the Hill Country and around Austin. Its published rules are a good example of how a co-op handles solar:
| Item | PEC rule |
|---|---|
| Who qualifies for the standard DG rate | Residential and small power members with systems under 50 kW AC |
| Export credit | Sustainable Power Credit of $0.071921 per kWh (about 7.19 cents) on energy PEC receives from you |
| What you pay for grid power | Residential service availability charge $32.50 a month; delivery 2.2546 cents/kWh; transmission cost of service 2.0688 cents/kWh; base power 6.59 cents/kWh |
| Year-end | Credits apply toward the base power charge; unused credits expire at the end of each calendar year |
| Optional time-of-use credit | Export credits from 4.3481 cents (off-peak) up to 16.1843 cents (summer peak, 4:01 to 8 p.m.); 12-month commitment |
| Application fee | $500 for Tier I (under 50 kW AC), $700 for Tier II, $2,500 for Tier III (1 MW to under 10 MW), plus any upgrade costs; $100 for each failed inspection revisit |
What the time-of-use option means in practice: a summer-peak export earns more than twice the standard credit, but most solar output happens midday, when the TOU export credit is lower. A battery that discharges in the 4 to 8 p.m. window can change that math. Because you are locked in for 12 months and must wait a year to re-enroll after leaving, run the numbers with a full year of your interval data before switching.
PEC's process, in order: confirm your account and meter numbers; your installer applies through PEC's online portal with a one-line diagram and total output in kW AC; you sign the interconnection agreement and member acknowledgement yourself (installers cannot sign for you); the fee posts to a future bill; PEC reviews and emails approval to install; after city permits and inspections, your installer requests PEC's final inspection, which PEC aims to schedule within 10 to 15 business days; then PEC emails permission to operate. You may not run the system before that. Any battery inverter counts toward total kW AC and must appear on the one-line diagram. If you buy a home with solar, you must apply and sign an Existing DG Interconnection Agreement, and the system must stay off until PEC grants permission to operate.
Other co-ops
Bluebonnet Electric, CoServ, Guadalupe Valley Electric Cooperative, Sam Houston Electric and many other co-ops each publish their own distributed generation tariffs and interconnection agreements. We did not confirm their current credit rates for this guide. When you call yours, ask the questions in our checklist below, and ask for the tariff page number so the answer is in writing.
Can a co-op charge a solar fee?
Yes. Because co-ops set their own rates, they can charge application fees (PEC charges $500 for a typical home system), inspection fees and different monthly charges for members with solar. Co-op members do have a say: rates and policies are set by a board that members elect. Batteries are a separate question. Texas SB 1252 limits city regulation of home backup systems but lets city-owned utilities keep their own rules, and co-ops set their own interconnection requirements, so ask your co-op how it handles a battery before you buy one.
Competitive areas: Oncor, CenterPoint, AEP Texas and TNMP
If you live in Dallas-Fort Worth, Houston or another competitive ERCOT area, two different companies are involved, and you deal with each one for a different job.
| Job | Who does it |
|---|---|
| Approve the hookup and give permission to operate | Your TDU (Oncor, CenterPoint, AEP Texas or TNMP) |
| Program the smart meter to measure exports | Your TDU |
| Pay you for exported power (buyback) | Your retail electric provider, if your plan includes it |
| Bill you for the power you use | Your retail electric provider |
How interconnection works with Oncor
- Your installer sends you a tariff application to sign.
- The installer submits the system through Oncor's online installer portal as a certified residential or small commercial system. A certified system uses an inverter tested to UL 1741 Utility Interactive.
- Oncor reviews the application, performs a study and prepares an interconnection agreement for all parties to sign.
- After everyone signs, Oncor sends a Permission to Operate (PTO) letter to you and the installer.
- Oncor programs your advanced meter to measure surplus generation sent to the grid.
- Surplus data goes to your retail provider within 30 to 60 days of PTO, in the first full billing cycle.
Oncor says the whole timeline can range from a few days to several months. You can see your 15-minute meter data at SmartMeterTexas.com.
CenterPoint, AEP Texas and TNMP
A 2022 matrix posted by ERCOT compared these wires utilities. For AEP Texas, CenterPoint, Oncor and TNMP, the customer is responsible for the initial interconnection notice but may authorize the installer to file it. Lead time from application to permission to operate was listed as up to 30 days, plus 30 to 60 days to update the meter's load profile. CenterPoint required a signed DG application, one-line diagrams, inspection photos, service locations and a signed interconnection agreement. AEP Texas required a city or county inspection permit and final installation photos. These requirements are from 2022, so ask your installer what each utility asks for today. Houston readers, see our Houston solar guide; Dallas readers, our Dallas solar guide.
Buyback: your retail provider's job
Oncor says it is your responsibility to talk with your retail provider about buyback plans or credits for surplus energy, and that you are not required to join any buyback program. Plans vary widely. Some pay a fixed credit per exported kWh, some pay a wholesale-based rate, some cap credits at your bill. Credits often cannot be cashed out. Compare plans on Power to Choose, the PUCT's official shopping site, and read the electricity facts label. Our Texas solar buyback plans guide explains how to compare them line by line.
Important: you still pay the TDU delivery charges on every kWh you buy from the grid, and there will continue to be a monthly delivery charge, Oncor notes. Solar reduces what you buy but does not remove the wires charge.
What incentives do Oncor, CenterPoint or AEP Texas offer for solar?
The wires utilities do not set buyback rates, but they do run energy efficiency programs that have sometimes included solar. Texas Utilities Code 39.905 sets energy efficiency goals for investor-owned utilities, and the PUCT carries it out through rule 16 TAC 25.181. The law's list of eligible program types includes solar electric programs, and utilities deliver them through standard offer programs (fixed incentives for qualifying projects) and market transformation programs (targeted programs to grow a market). Incentives usually go to the qualified service provider, typically the installer, who passes them on to the customer.
Two examples from utility filings:
- Oncor (2023 program year). Oncor's 2023 solar program kickoff listed a residential budget of about $1.35 million, a residential system size from 3 kW DC to 15 kW DC, a battery storage requirement for residential solar, and incentives calculated project by project with PVWatts. In 2022, Oncor paid $1.63 million in residential solar incentives across 288 projects averaging 4.6 kW. Each service provider was capped at about 15% of the budget, and the 2023 program closed to submissions on November 30, 2023.
- CenterPoint Houston (2025 plan). CenterPoint's 2025 Energy Efficiency Plan and Report, filed with the PUCT on April 1, 2025, announced a stand-alone Residential Solar Program for 2025 that would pay qualified service providers for new photovoltaic systems in existing homes. The plan said solar was already an eligible measure in its other programs and that program details were still being developed.
These programs run on yearly budgets that often fill fast, and rules (such as Oncor's battery requirement) change between years. Before counting on a TDU incentive, ask your installer which program year they are using, whether funds are reserved for your project, and get the reservation in writing. Each utility's annual plan is filed in a PUCT project number and posted on the PUCT Interchange.
Regulated utilities outside ERCOT: El Paso Electric, Entergy Texas, SWEPCO and Xcel
Parts of Texas are not in the competitive retail market. Where El Paso Electric, Entergy Texas, SWEPCO or Xcel Energy's SPS serves you, a single investor-owned utility sells you power and runs the wires, under rates approved by the PUCT. You cannot shop for a retail provider. The PUCT guide tells customers in areas not open to competition to contact their utility to find out its buyback rate.
El Paso Electric
- Most solar customers qualify for EPE's net metering rate, which nets renewable generation against what you use from EPE. Net consumption is charged at the applicable rate, such as the T-01 residential rate effective August 1, 2026. Net production is credited under Rate Schedule No. 48, Non-Firm Purchased Power Service from Distributed Generators.
- Application fees: $85 for 1 to 100 kW, $230 for over 100 kW, $42.50 for an expansion.
- Steps: file the Standard Interconnection Application online with a one-line and site diagram; get EPE design approval; get building permits from your city or county and install; after the final city or county electrical inspection, email EPE to request its field inspection and bi-directional meter. Do not turn the system on until EPE inspects it and installs the meter.
- Customers with distributed generation cannot be on EPE's Texas Community Solar Program or Budget Billing Plan; enrollment in either ends automatically.
- If you have a separate water heater meter, it must be rewired and removed first.
Entergy Texas, SWEPCO and Xcel Energy (SPS)
We could not load current distributed generation tariffs from these three utilities for this guide. Each has PUCT-approved rates and an interconnection process. Ask for the specific tariff or rider that sets the credit for exported energy, the monthly charges that still apply, and the application fee, and ask whether net metering or a lower avoided-cost credit applies. Keep in mind that Chapter 39 has separate subchapters for utilities that have not introduced customer choice, and those subchapters say most of the chapter does not apply until choice begins. So for these utilities, the PUCT-approved tariff, not section 39.916, is the document that controls your solar credit.
Lubbock Power & Light
Lubbock's market structure has changed in recent years. We could not load a current LP&L solar page, so we are not stating whether Lubbock customers now buy from retail providers or what buyback rules apply. Ask LP&L directly, and check Power to Choose with your ZIP code to see whether retail plans are offered at your address.
Other city-owned utilities
Beyond Austin and San Antonio, many other Texas cities run their own electric systems. Each sets its own solar credit, which may be net metering, a buyback rate or something like Austin's Value of Solar. The PUCT does not regulate their solar terms. Ask your city utility for:
- Its distributed generation or net metering policy and interconnection agreement.
- Whether it requires its own solar permit or inspection in addition to the city building and electrical permit.
- Its rules for home batteries. Texas SB 1252 bars cities from regulating home backup systems up to 50 kW and 100 kWh since September 1, 2025, but city-owned utilities can still set their own requirements as utilities.
Does my city utility require its own solar permit or inspection?
Often, yes. In Austin, the city requires an Auxiliary Power electrical permit and Austin Energy performs a final solar inspection before the system can be turned on. PEC performs its own final inspection after city permits and may inspect without notice. El Paso Electric inspects after the city's final electrical inspection. In competitive areas, the TDU approves the interconnection, while your city or county handles building and electrical permits.
Statewide, residential solar must be installed by a licensed electrical contractor. Since September 1, 2025, Occupations Code 1806.155 requires a solar contract that includes installation to state that a licensed electrical contractor will do the work and to give that contractor's name and license number. See our Texas installer licensing guide and permission to operate guide.
How do I find out if I'm in a deregulated area?
- Look at your bill. If it comes from a retail provider and lists a separate TDU delivery charge (Oncor, CenterPoint, AEP Texas or TNMP), you are in a competitive area. If it comes from a city (such as the City of Austin utility bill) or a co-op, you are not.
- Use Power to Choose. Enter your ZIP code on the PUCT's official shopping site. If plans appear for your address, retail choice is available. Some ZIP codes are split, so confirm with your address.
- Ask the PUCT. The PUCT regulates the wires utilities and retail providers in competitive areas and the regulated utilities outside ERCOT. It does not regulate city utilities or co-ops, so if the PUCT says it has no jurisdiction over your provider, you are likely served by one of those.
- Check before you sign. A solar proposal should name your utility and the exact credit it used. If it assumes a buyback rate, ask which plan and which provider.
What rights do Texas solar buyers have?
Some rights come from the competitive-market law and apply mainly where Chapter 39 applies; others come from the 2025 solar sales law and apply statewide.
- No extra insurance (competitive areas). Under Utilities Code 39.916(e), utilities and retail providers may not require a compliant distributed renewable generation owner to buy liability insurance they would not otherwise need.
- Interconnection right (competitive areas). Section 39.916 requires utilities to allow interconnection of distributed renewable generation, defined as up to 2,000 kW on the customer's side of the meter, if the system has a five-year warranty against breakdown or undue degradation and does not exceed the service capacity.
- No utility registration for typical homes. Under 39.916(k), a customer whose system is sized so it makes no more than the home uses in a year is not an electric utility or retail provider and does not need to register with the PUCT.
- Five business days to cancel (statewide). Since September 1, 2025, residential solar sale and lease contracts under Occupations Code Chapter 1806 carry a five-business-day right to cancel without penalty, and the contract must state the last day to cancel. If you cancel, any linked contract arranged or referred by the seller must also be cancelled. TDLR's "Residential Solar Retailers at a Glance" says the covered agreements include power purchase agreements, not just sales and leases.
- Registered sellers. Since September 1, 2026, most people and companies that sell or lease residential solar systems must hold a TDLR registration. Check a seller's registration on TDLR's site and see our door-to-door solar guide.
- No fake utility ties. Occupations Code 1806.201 bars solar sellers from falsely implying they are affiliated with a utility or government agency. If a salesperson says they are "with Oncor" or "with the city," ask for proof.
This is general information, not legal advice. For contract disputes, contact TDLR (for contracts on or after September 1, 2025) or the Texas Attorney General's Consumer Protection Division. See our solar complaints guide.
Which Texas setup gives solar the most value?
It depends on how the credit is built, not just the cents per kWh:
- Austin Energy credits every kWh your panels make, including the ones you use, at 12.89 cents. You pay standard rates for everything you use. That structure makes it easy to estimate: production times 12.89 cents is your credit, until it exceeds your electric bill.
- PEC credits only exported kWh at about 7.19 cents, while solar you use at home avoids the full delivered price (base power, delivery and transmission charges add up to about 10.9 cents per kWh before the monthly charge). Using solar at home is worth more than exporting it.
- Competitive areas depend entirely on the retail plan you choose. Self-used solar avoids your full energy and delivery charges; exports earn whatever the plan pays. Plans change, and a good buyback plan this year can be repriced at renewal.
- Net metering utilities like El Paso Electric net your use and production; confirm how Rate Schedule 48 values net production.
In every case, the money is in using your own solar first. Size the system to your annual use, shift big loads like pool pumps and laundry into daylight hours, and treat exports as a bonus. Our is solar worth it in Texas guide and sizing guide show worked examples using PVWatts production for Houston, Dallas, Austin and San Antonio.
Worked example: the same 7 kW system in Austin, PEC and a competitive area
Here is how the credit structure changes the value of one system. PVWatts, the free solar calculator from the National Laboratory of the Rockies (formerly NREL), models about 1,483 kWh per year for each 1 kW of south-facing panels in Austin. So a 7 kW system would make roughly 10,400 kWh a year. That is a model estimate; shade, tilt and equipment change it. The self-use split below (40% used at home, 60% exported) is an assumption for illustration only. Your real split depends on when you use power.
| Utility setup | How the 10,400 kWh is valued | Rough annual value |
|---|---|---|
| Austin Energy | All 10,400 kWh credited at 12.89 cents, regardless of self-use | About $1,340 in bill credits, usable only against electric charges |
| PEC (standard credit) | 4,160 kWh used at home avoid about 10.9 cents each (base power, delivery and transmission); 6,240 kWh exported earn 7.19 cents | About $450 avoided plus about $450 in credits, roughly $900; unused credits expire at year end |
| Competitive area | Self-used kWh avoid your plan's energy price plus TDU delivery; exported kWh earn whatever the buyback plan pays | Depends entirely on your plan; get the plan's numbers before estimating |
What the example shows: under PEC's structure, every kWh you move from "exported" to "used at home" is worth about 3.7 cents more. Under Austin's structure, it makes no difference to the credit. That is why the same battery or load-shifting advice can be worth a lot in one territory and little in another. Ask any installer to show the calculation with your utility's actual credit and your own interval data.
Texas cities at a glance
| City | Typical utility setup | What to read first |
|---|---|---|
| Houston | Competitive area; CenterPoint Energy Houston Electric runs the wires and you choose a retail provider | Buyback plan terms, CenterPoint interconnection steps, Houston guide |
| Dallas | Competitive area; Oncor runs the wires and you choose a retail provider | Oncor PTO steps, buyback plans, Dallas guide |
| San Antonio | CPS Energy, city-owned; no retail choice | Rider #5 net metering, no current rebate, San Antonio guide |
| Austin | Austin Energy, city-owned; no retail choice. Some suburbs are served by PEC or other co-ops | Value of Solar, $4,000 rebate, final inspection, Austin guide |
Suburbs do not always follow the big city. A home a few miles outside Austin may be a PEC member, and parts of the Houston and Dallas metros are served by co-ops or city utilities rather than the competitive market. Always go by the name on your bill.
Questions to ask your utility before you sign a solar contract
- How is each kWh my system produces or exports credited, and at what rate today?
- When does that rate next change, and is my rate locked for any period (through grandfathering or a plan term)?
- Do unused credits roll over, expire or get paid out, and when?
- What monthly charges stay on my bill no matter how much I produce?
- What application, study and inspection fees apply to my system size?
- Do you do your own inspection, and what must happen before you issue permission to operate?
- How do you treat a home battery: can it export, does it change my rate, and is there a rebate or program?
- Will my current rate plan or programs (budget billing, community solar, time-of-use) end if I add solar?
- What does a new owner have to file if I sell the house?
Get the answers in an email or a tariff page reference, and give them to every installer you are comparing so the proposals use the same numbers. Our solar quote review guide shows how to check a proposal's savings math.
What happens to your utility deal when you sell or buy a house
- Austin Energy: credits end when an account closes and have no cash value. A buyer starts a new account; ask Austin Energy what the buyer must file to keep receiving the Value of Solar credit.
- PEC: the buyer must apply and sign an Existing DG Interconnection Agreement, and the system must stay off until PEC grants permission to operate.
- Competitive areas: the buyback plan belongs to the seller's retail account, not the house. The buyer must choose a plan with buyback.
- Leases and PPAs: Texas Business & Commerce Code 115.004 and 115.005 require the seller to disclose in writing whether the agreement and warranties transfer to a later buyer.
See our selling a home with solar guide.
How to choose a provider
- Identify your utility type from your bill: competitive (REP plus TDU), city-owned, co-op or regulated non-ERCOT.
- Download 12 months of usage (SmartMeterTexas.com in competitive areas, or your utility account) so the system is sized to real numbers.
- Get the exact export credit in writing: Austin's VoS rate, your co-op's tariff, your REP's buyback plan or your regulated utility's rider.
- Ask which monthly charges still apply after solar (service availability, delivery, minimum bill).
- Ask your utility about application and inspection fees and whether it requires its own inspection.
- Ask whether a battery changes your rate, and whether batteries can export (CPS net-metered batteries cannot).
- Confirm any rebate (Austin Energy $4,000) on the utility's own site and whether your installer is a participating contractor.
- For TDU incentives, ask which program year applies and get the funds reservation in writing.
- Check that the seller is TDLR-registered and the installer is a licensed electrical contractor named in the contract.
- Note the last day of your five-business-day cancellation window.
- Do not turn the system on before permission to operate.
- In a competitive area, switch to a buyback plan only after PTO and meter reprogramming, and check the contract term and renewal rate.
Related residential solar installers guides
- How Do Texas Solar Buyback Plans Work Without Net Metering?
- Is Solar Worth It in Texas in 2026? An Honest Breakdown by Utility and City
- ERCOT, Solar and Home Batteries: What Are Virtual Power Plants, Grid Alerts and Outage Risks for Texans?
- What Is Solar Permission to Operate, and How Long Does Interconnection Take?
- Do I Need a Solar Permit in Texas? Houston, Dallas, San Antonio, Austin and Rural Areas
- Solar Property Tax Exemptions in Texas and Florida: How to Claim Them
- Community Solar in Texas and Florida: How Utility Subscription Programs Work
- How Much Does Electricity Cost in Texas and Florida, and Where Are Rates Heading?
Residential solar installers by state and city
Questions people ask
What is Austin Energy's Value of Solar rate?
It is the credit Austin Energy pays for every kWh your solar system produces. Austin Energy meters 100% of your production and credits it at the Value of Solar rate, 12.89 cents per kWh for fiscal 2027 through 2029, while billing all your usage at standard rates. Credits roll over month to month but have no cash value and cannot pay non-electric city charges. The rate is recalculated every three years from a five-year average of avoided costs.
Does CPS Energy have net metering?
Yes, for smaller systems. CPS Energy's Distributed Generation Manual says systems of 25 kW AC or less that are expected to match the customer's use are net-metered under Rider #5 of its tariffs. Batteries in a net-metered installation may not export to the grid. Ask CPS for its Solar Billing Facts sheet to confirm how exported energy is valued today, because we could not confirm the current credit rate.
Did CPS Energy change its solar policy?
Its rebate is gone. CPS Energy's rooftop solar page says it does not currently offer rebates for residential solar, after years of rebates of $2,500 or more per project. Its DG Manual was also being revised in 2024 to add battery storage and ERCOT distributed generation requirements. In 2026 CPS expanded community solar by selecting a developer for up to 50 MW. Confirm net metering terms with CPS before signing.
Do Texas co-ops buy back solar?
Most do, but each sets its own terms. Pedernales Electric Cooperative, for example, credits exported energy from home systems at about 7.19 cents per kWh, and unused credits expire at the end of each year. Other co-ops may use net metering, an avoided-cost rate or a different credit. Ask your co-op for its distributed generation tariff and interconnection agreement in writing.
What is the TDU solar standard offer program?
Texas wires utilities such as Oncor and CenterPoint must run energy efficiency programs under Utilities Code 39.905 and PUCT rule 16 TAC 25.181. Some program years include solar incentives, paid through qualified service providers like installers. Oncor's 2023 residential solar program required a battery and limited systems to 3 to 15 kW DC. Budgets are set each year and can run out, so confirm the current program before counting on it.
Does El Paso Electric have net metering?
Yes. El Paso Electric says most Texas solar customers qualify for its net metering rate, which nets renewable generation against usage. Net consumption is billed at the applicable rate, and net production is credited under Rate Schedule No. 48. Application fees are $85 for systems from 1 to 100 kW. You must wait for EPE's inspection and bi-directional meter before turning the system on.
Do I need permission before turning on my solar system?
Yes, everywhere in Texas. Oncor issues a Permission to Operate letter, PEC emails permission to operate after its final inspection, El Paso Electric says not to energize until it inspects and installs the meter, and Austin Energy requires a final solar inspection. Turning a system on early can be unsafe for line workers and can violate your interconnection agreement.
Can a Texas utility make me buy extra insurance for solar?
Not in competitive areas. Texas Utilities Code 39.916(e) says utilities and retail electric providers may not require the owner of compliant distributed renewable generation to buy liability insurance they would not otherwise need. City utilities and co-ops set their own rules: CPS Energy, for example, does not require a certificate of insurance for systems of 50 kW AC or smaller but recommends coverage. Read your interconnection agreement.
Does the state of Texas give solar rebates?
No. The Public Utility Commission of Texas says the State of Texas does not offer grants or rebates for installing solar panels. Rebates come from individual utilities, such as Austin Energy's $4,000 home solar rebate announced in August 2026. The main statewide benefit is the property tax exemption for solar under Texas Tax Code 11.27. Be wary of any pitch for a "Texas solar program" that makes panels sound free.
How long does solar interconnection take in Texas?
It varies by utility. Oncor says the process can take from a few days to several months. A 2022 ERCOT-posted comparison listed up to 30 days from application to permission to operate for the major wires utilities, plus 30 to 60 days to update the meter profile for buyback. PEC aims to schedule its final inspection within 10 to 15 business days of a request. Incomplete paperwork is the most common cause of delay.
Sources
- Texas Utilities Code Chapter 39 (incl. 39.002, 39.905, 39.916)
- PUC Texas: Solar Guide for Consumers (March 2026)
- Austin Energy: Value of Solar rate
- Austin Energy: Value of Solar FAQs
- City of Austin: Value of Solar update presentation (April 2026)
- Austin Energy: Save More with the Increased Home Solar Rebate (Aug. 24, 2026)
- Austin Energy: Power Partner Program expands Virtual Power Plant (Nov. 16, 2026)
- Austin Energy: Power Partner Battery
- Austin Energy: Solar inspections
- Austin Energy: Solar Standard Offer program
- CPS Energy: Rooftop Solar (Residential)
- CPS Energy: Distributed Generation Manual, 9th edition (May 2024)
- CPS Energy: Solar Rebate Program Manual (rev. 2019)
- CPS Energy: Community Solar
- Pedernales Electric Cooperative: DG Interconnection Rates
- Pedernales Electric Cooperative: Interconnection Process
- Oncor: Solar
- Oncor: For installers
- Oncor: 2023 Solar Program Kick-off Presentation
- CenterPoint Energy Houston Electric: 2025 Energy Efficiency Plan and Report (PUCT Project 57468)
- ERCOT: REP Solar Questions TDSP Matrix (Aug. 2022)
- El Paso Electric: Texas interconnection of facilities up to 10 MW
- TDLR: Residential solar retail sales now regulated by TDLR
- TDLR: Residential Solar Retailers, what is in effect
- Texas Occupations Code Chapter 1806
- Texas Business & Commerce Code Chapter 115
- NLR (formerly NREL): PVWatts v8 model for Austin
- PUCT: Hurricane Beryl investigation report (Project 56822)
- TDLR: SB 1252 changes to residential energy backup system regulations
- TDLR: Residential Solar Retailers at a Glance
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.