Local Guide · Residential solar installers

How Do I Read and Compare a Solar Proposal?

A line-by-line walk-through of a solar proposal, with a PVWatts production check for eight Texas and Florida cities, the equipment listings to look for, and the savings assumptions that most often mislead.

Check that the proposal lists kW DC and kW AC, exact equipment models, a shade report and year-one production with its assumptions. Re-run the production estimate in PVWatts with the same tilt, direction and losses; a south-facing Texas or Florida roof typically yields about 1,420 to 1,570 kWh per kW per year. Then audit the savings: your real rate, the export value for your plan or utility, fixed charges, and no 25D credit for 2026 purchases.

Key facts

  • PVWatts v8 estimates 1,421 kWh per kW DC per year in Houston and 1,568 in Tampa for a south-facing, 20-degree roof with 14% losses.
  • Texas Bus. & Com. Code 115.003 requires written disclosure of equipment, costs, fees, performance and financial representations, and warranties.
  • Florida Rule 25-6.065 rates inverter systems at DC nameplate x 0.85 AC; Tier 1 (up to 10 kW) cannot be charged extra fees or required to carry insurance by an IOU.
  • In Texas competitive areas, surplus solar is sold to your retail electric provider at an agreed value, usually below retail (Utilities Code 39.916(j); PUC guide).
  • Austin Energy's Value of Solar rate is 12.89 cents per kWh for FY2027 to FY2029.
  • Oncor defines a certified system as inverter-based and certified to UL 1741 Utility Interactive.
  • The federal 25D credit is not available for systems whose installation is completed after December 31, 2025.
  • EnergySage put average installed prices at $2.26/W in Texas and $2.12/W in Florida (November 2026).

What a complete solar proposal contains

A solar proposal is a sales document, so it shows the numbers in the best light. Your job is to check that every number is complete, sourced and repeatable. Start by confirming the proposal has all of these parts. If a part is missing, ask for it in writing before you compare prices.

SectionWhat it should sayWhat to check
System sizeSize in kW DC (panel nameplate) and the inverter AC ratingBoth numbers are shown, not just one
Equipment listExact make and model of panels, inverter or microinverters, racking, roof attachments, battery, monitoringModel numbers you can look up; spec sheets attached
Roof layoutDrawing of where panels go, which roof faces, how many panels per facePanels avoid shaded areas and leave fire-code pathways
Shade reportSolar access or TSRF percentage for each roof faceMeasured on site or with a recognized tool, not assumed
Production estimateExpected kWh in year one, plus assumptions (tilt, direction, losses, weather data)Re-run it yourself in PVWatts
OffsetShare of your yearly use the system is expected to coverBased on your actual 12-month usage, not an estimate
PriceTotal price, cost per watt, itemized adders (panel upgrade, roof work, trenching, critter guards)Permit and interconnection fees included or listed
Savings projectionYear-one savings and long-term estimateRate escalation, export value and incentive assumptions stated
WarrantiesPanel product and power warranties, inverter, battery, workmanship, roof penetrationLength and who backs each one
TimelineSteps from signing to permission to operateWho does what, and what happens if a deadline slips
Contract termsPayment schedule, change orders, cancellation right, licensed contractorMatches what the salesperson told you

Texas makes several of these legally required. Under Business and Commerce Code 115.003, anyone selling or leasing a home solar system must give you, in writing, the salesperson's and installer's contact information, a description and the cost of all equipment, a detailed accounting of fees, any performance or financial representations made, and all warranties. TDLR's guidance under the 2025 solar retailer law says all costs to the customer must be itemized on the consumer disclosure form. If a Texas seller will not put the production and savings claims in writing, that is a warning sign, because those representations must be disclosed.

kW DC vs. kW AC: why a quote shows two sizes

Solar panels make direct current (DC). Your home uses alternating current (AC). The inverter converts one to the other. That is why a proposal often lists two sizes.

  • kW DC is the total nameplate rating of the panels under standard test conditions. Twenty 400-watt panels equal 8.0 kW DC.
  • kW AC is the maximum the inverter or microinverters can deliver to your home and the grid. It is usually lower than the DC size.

The ratio between them (the DC-to-AC ratio) is a design choice. Installers often put more DC panel capacity on a roof than the inverter's AC rating, because panels rarely hit their full nameplate output in real heat. If the ratio is too high, the inverter "clips" output on the sunniest hours and you lose some energy. Ask the installer to state the ratio and the expected clipping loss.

Why it matters for your paperwork

Utilities and rules often use AC size. Florida's interconnection rule (PSC Rule 25-6.065) calculates the AC rating of an inverter-based system by multiplying the installed DC nameplate capacity by 0.85. That AC rating decides your tier: Tier 1 covers systems up to 10 kW, Tier 2 above 10 kW up to 100 kW, and Tier 3 above 100 kW up to 2 MW. Tier 1 customers cannot be charged extra fees or required to carry liability insurance by an investor-owned utility. A proposal that lands just over 10 kW AC in Florida could move you into Tier 2, where a utility may require up to $1 million in liability insurance. Ask whether a slightly smaller design would keep you in Tier 1.

Price comparisons should use DC watts, because cost-per-watt benchmarks are usually stated that way. Ask each installer to state its price per DC watt so you compare like with like.

How do I check a solar production estimate with PVWatts?

PVWatts is a free calculator from the national laboratory formerly called NREL, now the National Laboratory of the Rockies. Many installer design tools use similar weather data. You can use it to test whether a proposal's production number is reasonable. It takes about ten minutes.

  1. Go to pvwatts.nlr.gov and enter your address.
  2. Enter the DC system size from the proposal.
  3. Choose the module type. "Standard" fits most panels. "Premium" is meant for higher-efficiency panels.
  4. Enter the tilt of each roof face (in degrees) and the azimuth, which is the compass direction it faces: 180 is south, 90 is east, 270 is west.
  5. Enter system losses. The default is 14%. If your proposal's shade report shows extra shading, losses should be higher.
  6. If your array has panels on several roof faces, run each face separately and add the results.
  7. Compare the annual kWh to the proposal's year-one number.

If the proposal is more than about 10% higher than your PVWatts result with the same inputs, ask the installer to explain. Good reasons include high-efficiency panels, microinverters on a partly shaded roof, or a more detailed shade model. A bad reason is "our software is better" with no details.

Reference yields for Texas and Florida cities

PVWatts version 8 results for a 1 kW DC system with a 20-degree tilt, facing due south, standard panels and the default 14% losses:

CitykWh per year per kW DCCapacity factor
Houston1,42116.2%
Dallas1,50617.2%
San Antonio1,49717.1%
Austin1,48316.9%
Miami1,55217.7%
Tampa1,56817.9%
Orlando1,54417.6%
Jacksonville1,45516.6%

These are model outputs for a typical weather year, not measured results. East- and west-facing roofs, steeper or flatter tilts and shade all lower the number.

A worked example

Suppose a Houston proposal shows an 8.0 kW DC south-facing system producing 13,500 kWh in year one. PVWatts at the reference settings gives about 8.0 x 1,421 = 11,368 kWh. The proposal is about 19% higher. Before you rely on it, ask what tilt, azimuth and loss assumptions produced 13,500 kWh. If the installer used losses of 5% on a roof with a tree to the southwest, the estimate is likely too optimistic, and so is every savings number built on it.

What is a realistic year-one production for my system?

A realistic year-one number is close to what PVWatts gives for your actual roof, using your actual tilt, direction and shade. For a south-facing, unshaded roof in these cities, that is roughly 1,420 to 1,570 kWh per kW DC per year (see the table above). A roof split between east and west faces will typically produce less per kW than a south face.

After year one, output declines a little each year as panels age. The panel's spec sheet and power warranty state the expected degradation rate. Check that the proposal's 20- or 25-year production total uses the degradation rate from the spec sheet for the exact panel quoted, not a lower generic figure.

Weather also varies from year to year, so your real output will be above the estimate in some years and below it in others. Judge the system over a full year, not a month. If a full year comes in well below the estimate, see our low production troubleshooting guide.

What does 'offset' mean on a solar proposal?

Offset is the share of your yearly electricity use the system is expected to produce. If you used 14,000 kWh over the last 12 months and the system is estimated to make 11,200 kWh, the offset is 80%.

Three things to check:

  • Is it based on your real usage? Give the installer 12 months of bills or your smart meter data. In Texas competitive areas, your usage history is available through Smart Meter Texas.
  • Does offset equal bill savings? No. A 100% offset does not mean a $0 bill. Texas's PUC consumer guide says you still use grid power at night and may owe monthly base charges. In Florida, net-metered customers still pay the customer charge and any demand charge (Rule 25-6.065).
  • Is a high offset worth it where you live? Energy you export is often worth less than energy you use at home. In Florida investor-owned utility territory, excess credits roll forward up to 12 months, then unused credits are paid at the utility's lower as-available (COG-1) rate at year end. Oversizing well past 100% rarely pays. In Texas competitive areas, what you earn for exports depends on your retail electric provider plan, so a high offset is only as good as your buyback rate.

Our system sizing guide explains how to pick a target offset for your utility.

Why does one quote have more panels but less production?

This happens often, and it is not always a red flag. Common reasons:

  • Different panel wattage. Twenty-four 350-watt panels (8.4 kW) and twenty 420-watt panels (8.4 kW) are the same size. Count kW DC, not panels.
  • Different roof faces. One design may put panels on the east or north face to fit more, which produces less per panel.
  • Different shade assumptions. One company may have measured shade on site while another assumed none.
  • Different loss assumptions. A design using 8% losses will look better on paper than one using 14%, even with identical equipment.
  • Inverter clipping. A high DC-to-AC ratio can cut peak output.
  • Different weather data or software. Ask which tool and dataset was used.

Ask both installers for their production report showing per-roof-face kW, tilt, azimuth, shade and losses. Then run both through PVWatts with the same inputs. The equipment and layout that produce more energy at the same price are the better value, whatever the panel count.

Shade analysis: TSRF and solar access explained

Shade is the biggest reason real production falls short of the estimate. A good proposal includes a shade report, and you should ask for it if it is missing.

  • Solar access is the percentage of sunlight that reaches a spot after shading from trees, chimneys, neighboring buildings and other obstructions.
  • TSRF (total solar resource fraction) combines solar access with the effect of the roof's tilt and direction compared to an ideal orientation for your location. A lower TSRF means less energy from that spot.

There is no single legal minimum, but installers and some utility programs set their own thresholds for where panels are worth placing. Ask the installer what threshold it uses and to show the TSRF or solar access value for each roof face in the design.

How shade is measured

  • On-site tools such as a handheld sun-path device or a drone scan during the site survey.
  • Remote tools using aerial imagery and 3D models. These are fast but can miss new tree growth or small obstructions.

In Texas and Florida, live oaks, pines and palms can add a lot of shade in a few years. Ask whether the shade report accounts for tree growth, and whether trimming is part of the plan. Our guide to roof orientation, shade and trees has more.

What is a site survey and when does it happen?

A site survey is a visit, usually after you sign but before final design, where the installer checks your roof, attic and electrical system. Some companies do it before the final quote. Either way, ask what happens if the survey finds a problem.

A full survey checks:

  • Roof condition, age and material, and whether it needs repair first. DOE suggests asking who is responsible if the roof is damaged or a leak develops.
  • Rafter or truss size and spacing, which decides where mounts go. In Houston, the permit requires a Texas professional engineer's sealed letter or plans showing the existing structure can carry the system.
  • Main electrical panel size and whether it can accept the solar connection, or whether a panel upgrade is needed.
  • Shade measurements on each roof face.
  • Location for the inverter, disconnects and any battery.

Your contract should say that if the survey finds a need for extra work (roof repair, panel upgrade, structural reinforcement), you get a written change order with the price before any work starts, and that you can cancel without penalty if you do not accept it. See the change order section below.

Equipment details: spec sheets and listings

Every piece of equipment in the quote should have a model number. Ask for the manufacturer's spec sheet for each, and check that the listings and ratings below appear on it.

EquipmentStandards and listings to look forWhy
Panels (modules)UL 61730 or the older UL 1703 safety listing; power rating; temperature coefficient; degradation rateHouston's permit guide requires panels listed to UL 1703 and spec sheets showing listing by a recognized testing lab. SEIA recommends UL 61730 hail testing, typically rated for 1-inch hail at about 50 mph.
Inverter or microinvertersUL 1741 (utility-interactive); IEEE 1547Oncor defines a certified system as inverter-based and certified to UL 1741 Utility Interactive. Florida's rule requires agreements to follow IEEE 1547 and UL 1741, with an inverter that shuts off when the grid goes down.
Rapid shutdown equipmentMeets NEC 690.12; may reference UL 3741 for PV hazard controlRequired on homes so firefighters can de-energize roof wiring. The switch must be outside the house at a readily accessible spot.
RackingUL 2703 for bonding and groundingPalm Beach County's building advisory board notes UL 2703 does not cover roof attachments, so ask for separate attachment approvals.
Roof attachments (Florida)Florida product approval, Miami-Dade NOA or ICC-ES evaluation report, rated for your wind zoneMiami-Dade reviewers often reject plans where modules and racking are not rated for the wind pressure zones they sit in.
BatteryListing to the applicable safety standard; usable kWh; power rating; warranty throughputSee our battery guide.

Florida's Solar Energy Standards Act

Florida Statute 377.705 says solar energy systems manufactured or sold in Florida must meet standards set by the Florida Solar Energy Center (FSEC) and display approved performance test results, unless certified by a Florida-licensed engineer using the Florida Building Code. The statute's definition of a solar energy system is written mainly around water and space heating, though it also mentions other applications that would normally use electricity. We could not confirm from the statute text how FSEC applies this to rooftop PV panels today. Ask the installer whether the quoted equipment carries FSEC approval or engineer certification, and get the answer in writing. For solar water and pool heaters, FSEC certification is the long-standing norm.

Savings projections: the assumptions to audit

Savings numbers stack several assumptions. Change one, and the result changes a lot. Ask the installer to list each assumption, then check it.

AssumptionWhat to look for
Year-one productionMatches your PVWatts check
Your current electricity rateUses your actual all-in rate from your bill, not a statewide average
Rate escalationA yearly increase in electricity prices. Higher assumptions make savings look bigger. Ask to see the projection at 0% and at the assumed rate.
Export valueWhat you earn for power sent to the grid (see Texas and Florida details below)
Fixed chargesMonthly customer or base charges you still pay
DegradationMatches the panel spec sheet
IncentivesNo federal 25D credit for a system you buy and install in 2026
Maintenance and inverter replacementWhether any future replacement costs are included

Texas: export value depends on who serves you

In Texas competitive areas (most of Houston, Dallas and other areas served by Oncor, CenterPoint, AEP Texas or TNMP), there is no statewide net metering. Utilities Code 39.916(j) says you sell surplus power to your retail electric provider at a value you agree on, which may be based on the energy clearing price or a bill credit. The PUC's consumer guide says the buyback rate is part of your plan contract and is usually lower than the retail price you pay. A proposal that values every exported kWh at your full retail rate is likely overstating savings unless you have a plan that pays that.

City-owned utilities set their own terms. Austin Energy credits all solar production at its Value of Solar rate, 12.89 cents per kWh for fiscal years 2027 to 2029, while billing all use at standard rates. San Antonio's CPS Energy and electric cooperatives set their own buyback rules too. See our Texas buyback guide.

Florida: retail net metering for investor-owned utilities, other rules elsewhere

For FPL, Duke Energy Florida, Tampa Electric and Florida Public Utilities, Rule 25-6.065 credits excess energy against next month's use, carries credits up to 12 months, and pays unused credits at year end at the lower COG-1 rate. City utilities and co-ops set their own programs. JEA in Jacksonville credits exports at its fuel rate, not the retail rate. OUC in Orlando changed its program for customers interconnected on or after July 1, 2025, with exports credited at a Community Solar Energy Rate for five years and then at a fuel-based rate. A proposal for an OUC or JEA home that assumes full retail credit for exports is out of date. See our Florida net metering guide.

The 25D tax credit

The IRS says the 30% Residential Clean Energy Credit is not available for systems whose installation is completed after December 31, 2025. A proposal that includes it for a 2026 purchase is wrong. Leases and power purchase agreements are different, because the system owner, not you, claims any business credits. See our 25D status guide.

What is a production guarantee?

A production guarantee is a written promise that the system will produce at least a stated amount of energy over a period, often each year or over several years. If it falls short, the company pays you for the missing kWh at a stated rate, or fixes the system.

Production guarantees are most common in leases and power purchase agreements, where the company owns the system. Some installers offer them on purchased systems too. Before you value one, read the terms:

  • What is guaranteed? Is it 100% of the estimate or a lower share, such as 90% or 95%?
  • Over what period? Some measure each year; others average over several years so a bad year can be offset by a good one.
  • What is excluded? Weather, new shade, roof work, grid outages and your own changes are often excluded.
  • How is a shortfall paid? At what price per kWh, and do you have to file a claim?
  • Who stands behind it? A guarantee from a company that closes is worth nothing. Ask whether it is backed by insurance.

A guarantee is not a substitute for a realistic estimate. A company can promise 90% of an inflated number and still leave you below what you were told.

Is monitoring included?

Monitoring shows how much your system produces, usually through an app from the inverter or microinverter maker. It is the only way to know quickly if something breaks. Confirm in writing:

  • Whether monitoring hardware and service are included, and for how long.
  • Whether it shows each panel or only the whole system. Panel-level data makes problems easier to find.
  • Whether the account is in your name, so you keep access if the installer closes.
  • Whether it requires your home Wi-Fi or a cellular connection, and who pays for that connection.

In Texas competitive areas, your smart meter also records what you export. Oncor says surplus data goes to your retail electric provider starting with the first full billing cycle (30 to 60 days) after the meter is reprogrammed.

What permits and fees should be included?

A complete quote includes, or clearly lists, every fee needed to get from signing to permission to operate.

  • Building and electrical permits. In Houston, for example, the city's solar panel permit lists a fee of $91.06 plus a $33.56 administrative fee, and a plan review fee of 25% of the permit fee, with valuation-based review possible depending on scope. Other cities differ.
  • Engineering. Houston requires a Texas professional engineer's sealed structural letter. Miami-Dade requires signed and sealed plans by a design professional. Engineering may be in the price or billed separately.
  • Utility interconnection. Florida investor-owned utilities may not charge Tier 1 customers extra fees, including application fees. Texas rules bar pre-interconnection study fees for pre-certified systems up to 500 kW that meet certain feeder limits (PUC rule 25.211).
  • HOA review fees, if your association charges them.
  • Windstorm certification in Texas coastal areas insured by TWIA, through the Texas Department of Insurance.

Ask: "Is there any fee I might be billed later that is not in this price?" Get the answer in writing. See our permit guides for Texas and Florida.

What the contract should say about timelines and change orders

Proposals often promise speed. Contracts often say very little about it. Before signing, make sure the contract covers:

  • Milestones: site survey, permit submission, installation, inspection, utility application and permission to operate, with target dates or windows.
  • What happens if a deadline slips: your right to cancel and get money back if work does not start in a stated time.
  • Who is responsible for delays caused by the permit office, HOA or utility.
  • Change orders: any change to price, equipment or scope must be in a written change order you sign before the work. Watch for clauses that let the company substitute "equivalent or better" equipment without your approval.
  • Equipment substitution: if a substitution is allowed, it should require your written consent and at least the same warranty and rated output.

Texas and Florida rules that help

Texas Property Code 53.255 requires contractors to give homeowners a disclosure statement before a residential construction contract is signed. It tells owners to get a written agreement that includes a description of the work, the required or estimated time for completion, the cost or how it will be set, and the payment method, and to make sure any promise or warranty is written into the agreement. Texas solar contracts must also include the five-business-day right to cancel and the last date to cancel (Occ. Code 1806.156).

In Florida, if a contractor takes more than 10% of the price up front, it must apply for permits within 30 days and begin work within 90 days after the permits are issued, unless there is just cause or you agreed in writing to a longer time (Statute 489.126). Florida home solicitation sales also come with a three-business-day cancellation right.

A line-by-line review checklist for two or three proposals

Put each proposal in its own column and fill in the same rows. Gaps tell you which questions to ask.

RowProposal AProposal BProposal C
kW DC / kW AC
Panel model and wattage
Inverter type and model
Roof faces used (direction, tilt)
Shade / TSRF per face
Loss assumption
Year-one kWh (proposal)
Year-one kWh (your PVWatts check)
Total price
Price per DC watt
Adders (panel upgrade, roof, battery)
Export value assumed
Rate escalation assumed
Workmanship warranty (years)
Production guarantee
Monitoring
Permit/interconnection fees included
Licensed contractor named

For price context: EnergySage marketplace data put average installed prices at $2.26 per watt in Texas and $2.12 per watt in Florida as of November 2026, and the national median quote at $2.57 per watt in the first half of 2026. Berkeley Lab's Tracking the Sun reports higher medians because it tracks prices actually paid with more add-ons included. Use these as a sanity check, not a target.

How to choose a provider

  • Confirm each proposal lists kW DC, kW AC and the exact model of every component.
  • Ask for the production report with tilt, azimuth, shade and loss assumptions for each roof face.
  • Re-run each proposal in PVWatts (pvwatts.nlr.gov) using the same inputs.
  • Ask for a shade report with TSRF or solar access values per roof face.
  • Check offset against your actual 12 months of usage.
  • Audit the savings projection: your real rate, export value for your utility or plan, fixed charges, rate escalation and no 25D credit for 2026 purchases.
  • Download spec sheets and confirm UL listings (UL 61730 or 1703 panels, UL 1741 inverters, UL 2703 racking).
  • In Florida, ask about wind-zone-rated attachments and FSEC or engineer certification.
  • Confirm permit, engineering and interconnection fees are included or listed.
  • Read the warranty and production guarantee terms, including who backs them.
  • Make sure the contract has milestones, change order rules and equipment substitution limits.
  • Note the last date to cancel (five business days in Texas for solar contracts; three in Florida for home solicitation sales).

Related residential solar installers guides

Residential solar installers by state and city

Questions people ask

How do I compare solar quotes?

Compare them by price per DC watt (total price divided by kW DC times 1,000), then by expected year-one production, equipment quality and warranties. Re-run each production estimate in PVWatts using the same tilt, direction and losses so the numbers are comparable. Check that each quote includes permits, engineering and interconnection fees, and that savings use the real export value for your Texas plan or Florida utility. The lowest price is not the best value if it produces less energy or has weaker warranty backing.

How accurate are solar production estimates?

A good estimate based on your real roof, shade and a standard model is usually a reasonable guide for an average year, but real output varies with the weather from year to year. Estimates go wrong when shade is ignored, losses are set too low, or the wrong tilt or direction is used. Check the estimate in PVWatts. If the proposal is more than about 10% above your check with the same inputs, ask the installer to explain why in writing.

What losses should I use in PVWatts?

PVWatts uses 14% total system losses as its default, which covers things like wiring, dirt, panel mismatch and inverter conversion. If the shade report shows meaningful shading on a roof face, add that shading loss on top. A proposal that assumes losses far below the default should explain why, for example panel-level electronics on a partly shaded roof. Using the same loss value across all proposals keeps the comparison fair.

Is a bigger system always better?

No. Value depends on what your extra kWh are worth. In Florida investor-owned utility areas, credits roll up to 12 months and leftovers are paid at a lower avoided-cost rate at year end, so oversizing far past your use rarely pays. In Texas competitive areas, exports earn whatever your retail plan pays, often less than retail. Size the system to your actual usage and roof, then check the export value assumptions for your plan or utility.

What is TSRF on a solar proposal?

TSRF stands for total solar resource fraction. It combines how much sunlight reaches a spot after shade (solar access) with how the roof's tilt and direction compare with an ideal orientation for your location. It is shown as a percentage. Higher is better. Ask the installer for the TSRF of each roof face where panels are placed and what minimum value the company uses when deciding where panels are worth installing.

Should a solar quote include a battery?

Only if you want one and it is priced separately so you can compare. EnergySage reported battery prices around $1,130 per kWh in the first half of 2026. A battery affects backup power and, with some utilities, how your exports are credited; OUC, for example, requires customers to give up its full retail export rate to get its battery rebate. Ask for the quote both with and without the battery.

Why did my installer change the equipment after I signed?

Supply changes are common, but your contract should require written consent for any substitution and equal or better rated output and warranty. If the contract lets the company swap equipment freely, ask for a change before signing. If a swap happens anyway, ask for the new spec sheets and an updated production estimate. In Texas, the equipment description and costs must be disclosed in writing under Business and Commerce Code 115.003.

Do Texas solar sellers have to put savings claims in writing?

Yes. Texas Business and Commerce Code 115.003 requires sellers and lessors to disclose in writing any representations about the system's expected operational and financial performance, along with equipment, costs, fees and warranties. TDLR's guidance under the 2025 solar retailer law adds that all costs to the customer must be itemized on the consumer disclosure form. If a seller's verbal promises do not appear in writing, treat them as not promised.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration