How Do Texas Solar Buyback Plans Work Without Net Metering?

Texas has no statewide net metering. If you live in Houston, Dallas-Fort Worth or another retail choice area, the value of your exported solar power comes down to your electricity plan. Here is how buyback works, how to read the plan label, and what to do when your bill does not drop.

Texas does not have statewide net metering. In retail choice areas such as Houston and Dallas-Fort Worth, state law (Utilities Code 39.916(j)) says you sell surplus solar power to the retail electric provider that serves you, at a value you and the provider agree on. That value may be a bill credit at a set rate, a credit tied to wholesale prices, or nothing at all. City utilities like Austin Energy and CPS Energy and electric co-ops set their own rules.

Key facts

  • Utilities Code 39.916(j): in customer choice areas, a solar owner must sell surplus power to the retail electric provider serving their load at an agreed value, which may be based on the energy clearing price or a credit carried over to later bills.
  • Utilities Code 39.914 is about net metering for public schools, not homes. The home solar section is 39.916.
  • PUCT rule 16 TAC 25.475 requires every plan's Electricity Facts Label to answer: "Does the REP purchase excess distributed renewable generation?"
  • Under 16 TAC 25.474 and 25.475, residential customers can rescind a switch to a new provider within three federal business days without fee.
  • Month-to-month plans may not carry a termination fee, and no early termination fee may be charged if you move and give a forwarding address (16 TAC 25.475).
  • The PUCT says the buyback rate is part of your contract with your electric provider and is usually lower than the retail price you pay.
  • An ERCOT-posted utility matrix (2022) listed up to 30 days from application to permission to operate, plus 30 to 60 days to update the meter's load profile, for AEP Texas, CenterPoint, Oncor and TNMP.
  • Oncor says export data reaches retail providers in the first full billing cycle (30 to 60 days) after the meter is set.
  • PUCT Office of Consumer Assistance: 1-888-782-8477.

Does Texas have net metering?

Not in the way most states do. Net metering means every kWh you send to the grid cancels out one kWh you buy, at the same price. Florida's investor-owned utilities must offer that under a state rule. Texas has no such statewide rule for homes.

Instead, Texas law splits the question by market:

  • Retail choice areas (most of Houston, Dallas-Fort Worth, Corpus Christi and other areas served by CenterPoint, Oncor, AEP Texas and TNMP): Utilities Code 39.916(j) says the solar owner "must sell the owner's surplus electricity produced to the retail electric provider that serves the distributed renewable generation owner's load at a value agreed to" between the two. The law gives examples: a value based on the wholesale clearing price at the time of day the power hits the grid, or a credit applied to your account that can carry over until used.
  • City-owned utilities and electric cooperatives set their own rules. The PUCT does not regulate their buyback rates.
  • Regulated utilities outside retail choice set buyback under their own tariffs. The PUCT tells customers in these areas to contact the utility for its rate.

Section 39.916(h) also lets an electric utility or REP contract with you so that surplus power is sold to the grid and its net value is credited to you. That is permission, not a requirement. No Texas statute forces a retail provider to pay full retail for exports.

A note on a common error: some websites cite Utilities Code 39.914 as the Texas net metering law. That section covers net metering for public school districts' solar. The home solar provisions are in 39.916.

The two companies on your bill: REP and TDU

In retail choice areas, two companies handle your electricity:

CompanyWhat it doesRole in solar
Retail electric provider (REP)Sells you electricity under a plan you choose; sends the billDecides whether and how much it pays for exports, under the plan's terms
Transmission and distribution utility (TDU or TDSP): CenterPoint (Houston), Oncor (Dallas-Fort Worth), AEP Texas, TNMPOwns the poles, wires and meter; restores outagesApproves interconnection, reprograms or swaps the meter, measures exports and sends that data to your REP

You cannot pick your TDU; it depends on where you live. You can pick your REP. That is why, in Texas, choosing a plan is part of choosing solar.

The TDU charges a delivery fee that the REP passes through to you. Under PUCT rules, a fixed rate plan's price can still change to reflect actual changes in TDU charges. Your solar does not change who owns the wires, so delivery charges remain part of your bill.

Common types of Texas solar buyback plans

Retail providers design their own solar terms. Plans come and go, so we describe the common structures rather than list offers. Always confirm the current terms in the plan's documents.

StructureHow exports are valuedWhat to watch
No buybackExports earn nothingOnly self-used solar saves money. Common on standard plans
Credit at the full energy rate (often called one-for-one or "net metering style")Each exported kWh credited at the plan's energy chargeDelivery charges often not offset; monthly caps; credits that expire
Credit at a fixed lower rateEach exported kWh credited at a set number of centsCompare that rate to the plan's import price
Wholesale-indexedExports valued at a real-time or day-ahead wholesale priceMidday solar prices are often low; value can swing widely
Capped creditCredits up to a limit, such as your monthly usageExcess beyond the cap may be lost
Battery or virtual power plant plansPay or credit for letting the provider use your battery during grid stressControl rules, reserve levels, contract length

Two plans with the same headline export rate can differ a lot. One might pay on all exports; another might cap credits at your monthly usage, let them expire, or charge a higher import price that wipes out the gain.

We could not load live plan listings from the state's Power to Choose site for this guide, so we do not quote specific rates here. Check powertochoose.org and providers' own plan documents for current offers.

How to read an Electricity Facts Label for solar terms

Every plan in the retail choice market must have an Electricity Facts Label (EFL), a standard disclosure set by PUCT rule 16 TAC 25.475. Along with the Terms of Service and Your Rights as a Customer document, it is part of your contract.

The EFL disclosure chart must answer these questions. Here is what each means for a solar owner:

  1. "Does the REP purchase excess distributed renewable generation?" This is the solar line. If it says no, exports earn nothing on that plan.
  2. Contract term. How long the terms are locked.
  3. "Do I have a termination fee or any fees associated with terminating service?" Know this before you switch to or away from a solar plan.
  4. "Can my price change during contract period?" On a fixed rate product, the price can change only for actual changes in TDU charges, ERCOT or Texas Regional Entity fees, or new laws. On an indexed or variable product, it can move more.
  5. "What other fees may I be charged?" Look for base charges, minimum usage fees or solar program fees.
  6. Average price at 500, 1,000 and 2,000 kWh. These assume normal usage. With solar, your net usage may be far lower, so these averages may not fit you. Price your own months by hand.

The EFL may refer you to the Terms of Service for buyback details. Ask the provider in writing for answers to the questions in the next section, and keep copies.

Questions to ask any provider before you sign a solar plan

  1. What rate do you pay per exported kWh, and is it fixed for the contract term?
  2. Is the credit applied to the energy charge only, or also to delivery and base charges?
  3. Is there a monthly cap? Are credits limited to the amount of power I buy?
  4. Do unused credits carry over? For how long? Do they expire when the contract ends or when I switch?
  5. Is the credit ever paid in cash, or only as a bill credit?
  6. Is there a minimum usage fee or a monthly base charge? How much?
  7. Do I need a solar system of a certain size or a battery to qualify?
  8. What happens to the buyback rate when the contract renews?
  9. Is there an early termination fee? How much?
  10. How do you get my export data, and how long until credits appear?

Buyback credit vs cash payment: what is the difference?

Most Texas solar plans pay with bill credits, not checks. A credit reduces what you owe. If credits exceed your bill, the plan decides what happens: carry them forward, cap them, or let them lapse.

The statute anticipates this. Section 39.916(j) describes "a credit applied to an account during a billing period that may be carried over to subsequent billing periods until the credit has been redeemed." Whether your plan actually carries credits forward, and for how long, is a contract term.

Compare to the city utilities:

  • Austin Energy: credits all solar production at the Value of Solar rate (12.89 cents per kWh from October 2026). Excess credit rolls over month to month and does not expire, but has no cash value and ends if the account closes.
  • CPS Energy (San Antonio): bills on net monthly usage. Leftover net excess is credited at a low rate (the Solar Billing Facts example shows $0.0165 per kWh October to May and $0.0202 per kWh June to September) applied to the next bill, not exceeding it.

Self-consumption vs export: where the money really is

Solar power you use the moment it is made saves the full price of a kWh you would have bought, including any per-kWh delivery charge. Solar power you export is worth only what your plan pays.

Example (illustration only): your plan charges 16 cents per kWh all-in for power you buy and credits exports at 6 cents. Your panels make 1,000 kWh in a month. You use 500 kWh of it directly and export 500 kWh.

  • Self-used: 500 x 16 cents = $80 saved.
  • Exported: 500 x 6 cents = $30 credit.
  • Total value: $110, not the $160 you would get if all 1,000 kWh were worth 16 cents.

This is why, in Texas retail choice areas:

  • An oversized system can be a poor buy. The extra kWh are mostly exported at a low value.
  • Running dishwashers, pool pumps, laundry and EV charging during sunny hours raises the value of your solar.
  • A battery may make sense when exports are worth little, because it shifts midday power to evening. Weigh its cost; EnergySage reported battery prices around $1,130 per kWh of capacity in the first half of 2026.

See system sizing and home battery sizing.

Worked comparison: pricing three plans with your own numbers

The only reliable way to compare solar plans is with your own import and export numbers. Here is how, using a made-up Houston home. All plan rates below are illustrations, not real offers, and we leave out fixed monthly charges, which you would add for each plan.

The home has an 8 kW system. PVWatts estimates a 1 kW south-facing array in Houston makes about 140 kWh in July and 86 kWh in December, so the system makes roughly 1,120 kWh in July and 688 kWh in December. We assume the home uses 1,800 kWh in July and 1,100 kWh in December, and uses 55% of its solar directly in July and 70% in December (in December the panels make less power compared with what the home uses, so a bigger share of it is used on the spot). Your Smart Meter Texas data shows your real split.

MonthSolar madeUsed directlyExportedBought from grid
July1,120 kWh616 kWh504 kWh1,184 kWh
December688 kWh482 kWh206 kWh618 kWh

Now three plans:

  • Plan A: 15 cents per kWh bought, no buyback.
  • Plan B: 17 cents per kWh bought, exports credited at 8 cents.
  • Plan C: 16 cents per kWh bought, exports credited at 16 cents, credits capped at what you buy that month.
PlanJuly energy costDecember energy cost
A1,184 x $0.15 = $177.60618 x $0.15 = $92.70
B$201.28 minus 504 x $0.08 ($40.32) = $160.96$105.06 minus $16.48 = $88.58
C$189.44 minus $80.64 = $108.80$98.88 minus $32.96 = $65.92

Plan A has the lowest headline price, yet costs the most for this solar home. Plan B looks expensive at 17 cents but wins over A because of its buyback. Plan C wins in both months. Then add each plan's base charge, any minimum usage fee and TDU charges, and repeat for all 12 months. A spreadsheet with your Smart Meter Texas monthly totals takes about 20 minutes and can be worth hundreds of dollars a year.

Why didn't my bill go down much after solar?

This is one of the most common complaints from new Texas solar owners. The usual causes:

  1. The meter was not updated yet. After the TDU gives permission to operate, it reprograms or replaces your meter and updates your account's load profile. An ERCOT-posted matrix from the four main TDUs listed up to 30 days from application to permission to operate, then 30 to 60 days to update the load profile. Oncor says export data reaches REPs in the first full billing cycle (30 to 60 days) after the meter set. Until then, exports may not be credited.
  2. Your plan has no buyback, or a low one. Check the EFL solar line.
  3. Fixed charges did not change. TDU fixed charges and REP base charges stay. Some plans add a minimum usage fee that can be triggered when solar cuts your net usage.
  4. Usage tier effects. Some plans price power differently at different usage levels. Solar can push your net usage into a costlier band.
  5. Production is lower than promised. Compare your monitoring app to the proposal and to a PVWatts run for your roof. See low production troubleshooting.
  6. The sales pitch assumed full net metering. If you were told "Texas has net metering" and your plan does not credit exports one-for-one, the savings estimate was wrong from the start.

If a retail provider will not fix a billing error, file with the PUCT (see below). If a solar seller misrepresented savings, see our solar complaints guide.

Smart Meter Texas, ESI IDs and the meter

ESI ID: your Electric Service Identifier, the unique number for your meter location in the retail choice market. It is printed on your bill. You need it to switch plans, sign up with Smart Meter Texas or check your solar interconnection status.

Meter: you need a meter that records both power delivered to you and power you send back. The TDU handles this. Per the ERCOT-posted matrix, CenterPoint and Oncor typically reprogram the existing smart meter (sometimes replace it), while AEP Texas and TNMP exchange it. Utilities Code 39.916(f) says the utility must make the needed metering available, and the owner pays only the differential cost unless it is provided free.

Smart Meter Texas (smartmetertexas.com): the state's portal for smart meter data in retail choice areas. Once your meter is updated, surplus generation appears there within a few days, according to the TDU matrix. Download your interval data to see exactly when you export and when you buy. That data is the best tool for choosing a buyback plan, because it shows how much of your solar you use yourself.

Switching plans after you install solar

You can generally switch retail providers in a choice area at any time, but the rules on fees matter:

  • Rescission: when you switch, you have three federal business days after receiving the terms of service to rescind without fee or penalty (16 TAC 25.474 and 25.475).
  • Termination fees: a fixed-term contract may carry an early termination fee, disclosed on the EFL. Month-to-month contracts may not carry one.
  • Near expiration: the rule requires your expiration notice to state that no termination penalty applies in the 14 days before the stated expiration date.
  • Moving: no early termination fee may be charged when you move, if you give a forwarding address and, if asked, reasonable evidence you no longer live there.

Before switching, ask the new provider how it handles credits from your old plan (usually they do not transfer) and how long before it receives your export data.

Can you be on a fixed rate plan with solar? Yes, if the plan offers buyback or you accept no buyback. Fixed rate refers to the price you pay for power; the export credit terms are separate and should be confirmed.

What if my provider changes its buyback terms?

During a fixed-term contract, the terms in your contract documents govern. A fixed rate product's price may change only for actual changes in TDU charges, ERCOT or Texas Regional Entity fees, or new laws, under 16 TAC 25.475. Ask whether the buyback rate is part of what is locked for the term.

At renewal, providers can offer different terms. The rule requires a written notice of contract expiration describing renewal offers and how to keep service. When you get that notice, compare the new export terms to other plans before you let it renew.

Plan for this risk when deciding to go solar. Your panels may last 25 years or more; your plan may last 12 months. Run your savings math with a modest export rate, not the best one on the market today.

Virtual power plant and battery plans

A virtual power plant (VPP) is a group of home batteries or smart devices that a provider or utility can call on when the grid is stressed. In exchange, you get a credit or payment. Austin Energy runs a Power Partner program that it says expands its virtual power plant.

Before enrolling, ask how often the battery can be discharged, how much reserve it keeps for your own outages, how payments work, and how long you are committed. See ERCOT, batteries and virtual power plants.

Getting connected: the steps in a retail choice area

  1. Sign the solar contract. Under Occupations Code chapter 1806, it must commit the retailer or contractor to get permits and utility interconnection approval. You have five business days to cancel without penalty.
  2. Interconnection application. The customer is responsible for notifying the TDU but may authorize the installer to do it, per the ERCOT-posted matrix. Oncor says the installer files the application, Oncor reviews and studies it, prepares an interconnection agreement, then grants permission to operate.
  3. Permit and inspection. City or county inspection as required.
  4. Permission to operate (PTO). Do not turn the system on before PTO.
  5. Meter update and load profile change.
  6. Pick a buyback plan with a REP, ideally lined up before PTO so you do not export for free.

Oncor notes the overall timeframe can range from a few days to several months. Utilities Code 39.916(e) bars utilities and REPs from requiring extra liability insurance for compliant systems. See interconnection and PTO.

Buying a home that already has solar

The interconnection agreement does not simply follow the house. Per the ERCOT-posted TDU matrix, AEP Texas, Oncor and TNMP monitor move-in transactions and send the new customer a revised interconnection agreement to sign. CenterPoint says it is the customer's responsibility to give at least 14 days' written notice of a change in ownership for distributed generation locations. You will also need your own buyback plan, since your predecessor's REP contract ends. See selling or buying a home with solar.

Buyback at a glance across Texas

Where you liveWho sets export valueCurrent approach (check for updates)Where to confirm
Houston, Dallas-Fort Worth and other retail choice areasYour REP, by contract (Utilities Code 39.916(j))Varies by plan, from no buyback to credits near the energy rateThe plan's EFL and Terms of Service; powertochoose.org
AustinAustin EnergyValue of Solar: all production credited at 12.89 cents per kWh (FY2027 to FY2029)austinenergy.com
San AntonioCPS EnergyMonthly netting; leftover excess credited at a low per-kWh ratecpsenergy.com Solar Billing Facts
Co-op territoryCo-op boardSet by each co-op's distributed generation policyYour co-op, in writing
Regulated areas outside retail choiceUtility tariffSet by the utility's approved tariffYour utility, as the PUCT advises

If a salesperson tells you "Texas has net metering" without naming your plan or utility and its exact terms, treat the savings estimate with suspicion and ask for those terms in writing.

How to file a complaint

  • Billing or plan problems with a retail provider or TDU: PUCT Office of Consumer Assistance, 1-888-782-8477, or the Submit a Complaint page in the PUCT Consumer Help hub (puc.texas.gov/consumer-help). Contact the provider first and keep records.
  • Solar sales or contract problems (contracts on or after September 1, 2025): Texas Department of Licensing and Regulation.
  • Older solar sales problems: Texas Attorney General Consumer Protection Division.
  • City utility or co-op issues: the utility or co-op itself; the PUCT does not regulate their buyback rates.

How to choose a provider

  • Find your ESI ID on your bill and create a Smart Meter Texas account.
  • Check the EFL line on buying excess distributed renewable generation for your current plan.
  • Ask providers the ten written questions above.
  • Compare plans using your own monthly import and export numbers, not the 500/1,000/2,000 kWh averages.
  • Line up a buyback plan before permission to operate.
  • Do not turn the system on before PTO.
  • Confirm exports appear in Smart Meter Texas and on your bill within two billing cycles.
  • Note your contract end date and compare plans before renewal.
  • Use the three-business-day rescission window if a new plan's documents differ from what you were told.

Related residential solar installers guides

Residential solar installers by state and city

Questions people ask

Is one-for-one net metering available from any Texas retail provider?

Some retail providers have offered plans that credit exported kWh at the same energy rate you pay, sometimes with caps or other limits. These are business choices, not legal requirements, and offerings change. Read the EFL and Terms of Service to see whether credits apply to delivery charges, whether there is a monthly cap and whether credits expire.

Do solar buyback credits expire in Texas?

It depends on the plan. State law allows a credit that carries over until redeemed, but each provider sets its own rules. Some carry credits forward, some cap them at your bill, and some forfeit unused credits when you switch or the contract ends. Austin Energy's credits roll over and do not expire but end if the account closes.

Does solar reduce my TDU delivery charge?

Solar you use directly reduces the kWh the grid delivers, so it lowers any per-kWh delivery charges on that power. Exported kWh usually do not erase delivery charges unless your plan's terms say credits apply to them. Fixed monthly TDU charges remain no matter how much you produce. Check how your plan bills delivery.

Can I switch electricity plans after installing solar?

Yes. In retail choice areas you can switch providers, subject to any early termination fee in your current contract. Month-to-month plans may not charge one, and no fee applies in the last 14 days before a stated expiration date. After switching, you have three federal business days to rescind. Unused credits usually stay with the old provider.

What is a real-time wholesale buyback plan?

A plan that values each exported kWh at the wholesale price of electricity in ERCOT when you export it. Utilities Code 39.916(j) names this as one option. Wholesale prices can spike during grid stress but are often low on sunny afternoons when solar output is high, so total value can be modest and hard to predict.

Do I need a special meter for buyback?

You need a meter that measures both delivered and exported power. The TDU handles it after interconnection approval: CenterPoint and Oncor typically reprogram the existing smart meter, while AEP Texas and TNMP exchange it, according to an ERCOT-posted matrix. Utilities Code 39.916(f) says the owner pays only the differential cost unless metering is provided free.

Do I have to register with the PUCT to sell solar power?

Not if your system is sized so its estimated annual production is no more than your estimated annual use. Utilities Code 39.916(k) says such a customer is not an electric utility or retail provider and does not need to register with or be certified by the PUCT. Larger systems may raise different questions; ask the PUCT.

What happens if I export without a buyback plan?

If your plan does not buy excess distributed generation, the power still flows to the grid and your neighbors use it, but you get no credit. That is why lining up a buyback plan before permission to operate matters. Sizing the system to your daytime use also limits how much you export for little or no value.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration