Local Guide · Residential solar installers
Florida Utility Solar Rules: How Do FPL, Duke, TECO, JEA, OUC and the Co-ops Treat Rooftop Solar?
Your utility, not your installer, decides how your solar exports are credited, what you apply for, and how long approval takes. Here is every major Florida utility type, side by side, with the rules that apply to each.
In Florida, the rules depend on who sends your bill. FPL, Duke Energy Florida, Tampa Electric and Florida Public Utilities must follow PSC Rule 25-6.065: full net metering, no application fee for systems up to 10 kW, 12-month credit rollover and a year-end payout at a lower avoided-cost rate. City utilities and co-ops write their own rules. JEA credits exports at its fuel rate, and OUC cut credits for new customers after June 30, 2025.
Key facts
- Florida had 319,041 customer-sited solar PV interconnections across 52 utilities in the PSC's 2025 net metering report, about 3.15 million kW AC in total.
- Investor-owned utilities (FPL, Duke Energy Florida, Tampa Electric, FPUC) hold 254,916 of those solar interconnections; municipal utilities 31,405; rural electric co-ops 32,720.
- PSC Rule 25-6.065 bans application fees and required liability insurance for Tier 1 systems (up to 10 kW AC) at investor-owned utilities.
- Under Rule 25-6.065, unused kWh credits roll forward up to 12 months and are paid out at year end at the utility's COG-1 as-available energy rate, not the retail rate.
- An investor-owned utility must sign the interconnection agreement within 30 calendar days of a completed application and confirm receipt within 10 business days.
- Florida Statute 366.91(6) lets each city utility and co-op set its own net metering program, so their terms differ from the PSC rule.
- JEA credits energy sent to its grid at JEA's fuel rate, not the full retail rate.
- OUC customers interconnected on or after July 1, 2025 get the Community Solar Energy Rate for five years, then the Retail Levelized Fuel rate, with changes effective November 1, 2026.
- FPL charges every customer, solar or not, a $30 minimum base bill, according to its net metering FAQ.
- A 2022 bill to phase down net metering at investor-owned utilities (HB 741) passed the Legislature but was vetoed on April 27, 2022.
Why your utility matters more than your installer
Two Florida homes with the same roof, the same panels and the same sun can get very different value from solar. The difference is the utility. Your utility decides how each kilowatt-hour (kWh) you send to the grid is credited, what paperwork you file, whether you pay fees, and what happens to leftover credits at the end of the year.
Florida has three kinds of electric utilities, and the law treats them differently:
- Investor-owned utilities (IOUs). These are FPL, Duke Energy Florida, Tampa Electric (TECO) and Florida Public Utilities Company (FPUC). The Florida Public Service Commission (PSC) regulates them, and they must follow PSC Rule 25-6.065, the state net metering rule.
- Municipal utilities. These are city-owned systems such as JEA in Jacksonville, OUC in Orlando, Gainesville Regional Utilities (GRU), Lakeland Electric, the City of Tallahassee and Kissimmee Utility Authority (KUA). Each one writes its own rules.
- Rural electric cooperatives. These are member-owned utilities such as SECO Energy, Withlacoochee River Electric, Clay Electric, Lee County Electric Cooperative (LCEC) and Florida Keys Electric Cooperative. Each also writes its own rules.
The legal reason is Florida Statute 366.91. Subsection (5) told the investor-owned utilities to build a standard interconnection agreement and net metering program under PSC rules by January 1, 2009. Subsection (6) told every city utility and co-op that sells power at retail to build its own program by July 1, 2009, with the details set by its own governing board, not the PSC. So the PSC rule is the floor for about four out of five Florida solar homes, and everyone else needs to read their own utility's policy.
Net metering, in plain terms, means your meter runs both ways. Solar power you use at home cuts what you buy. Extra power you send out earns a credit. The big question is what that credit is worth. Under full retail net metering, a kWh you export is worth about the same as a kWh you buy. Under a fuel-rate or avoided-cost credit, it is worth only a fraction of that.
Florida utility comparison table
This table pulls together the rules we could confirm from each utility or the PSC. Interconnection counts are from the PSC's 2025 net metering report. Where a cell says "confirm," we could not load a current primary source, so call the utility before you sign a contract.
| Utility | Type | Solar PV hookups (PSC 2025) | How exports are credited | Fees for a typical home system |
|---|---|---|---|---|
| FPL (including FPL Northwest FL) | Investor-owned | 124,449 | kWh credit against future bills in the same calendar year; leftover kWh paid in December at FPL's average annual cost of generation | None for Tier 1 (up to 10 kW AC); $30 minimum base bill applies to all customers |
| Duke Energy Florida | Investor-owned | 97,362 | PSC Rule 25-6.065: credit rolls up to 12 months, year-end payout at COG-1 rate | None for Tier 1 under the rule; confirm Tier 2 and 3 fees and any minimum bill with Duke |
| Tampa Electric (TECO) | Investor-owned | 32,515 | Billed on net kWh; negative net kWh banked to next month; credit at retail energy rate | None for Tier 1 under the rule; basic service charge still applies |
| Florida Public Utilities (FPUC) | Investor-owned | 590 | PSC Rule 25-6.065 | None for Tier 1 under the rule |
| JEA (Jacksonville) | Municipal | 5,830 | Each exported kWh credited at JEA's fuel rate; extra credit accrues through the calendar year, remaining balance paid at year end | Confirm with JEA |
| OUC (Orlando) | Municipal | 5,895 | Before July 1, 2025: full retail through June 30, 2045. On or after: Community Solar Energy Rate through June 30, 2030, then Retail Levelized Fuel rate | Tier 1 (0 to 10 kW): no fee; Tier 2: $340; Tier 3: $1,300 |
| Kissimmee Utility Authority | Municipal | 4,304 | Monthly bill credit for exported energy; KUA does not store exports for later | No added monthly charge for PV customers; confirm application fees |
| Lakeland Electric | Municipal | 1,877 | Exports metered separately and credited at full retail rate (residential systems up to 10 kW) | No net metering fee listed |
| Gainesville Regional Utilities | Municipal | 1,714 | Confirm with GRU | Confirm with GRU |
| City of Tallahassee | Municipal | 1,472 | Confirm with the city; offers a separate solar net metering rate | Confirm with the city |
| Lee County Electric Cooperative | Co-op | 10,455 | Confirm with LCEC | Confirm with LCEC |
| SECO Energy (Sumter) | Co-op | 7,375 | Confirm with SECO | Confirm with SECO |
| Withlacoochee River Electric | Co-op | 6,024 | Confirm with WREC | Confirm with WREC |
| Clay Electric Cooperative | Co-op | 3,671 | Confirm with Clay Electric | Confirm with Clay Electric |
| Florida Keys Electric Cooperative | Co-op | 273 | Confirm with FKEC | Confirm with FKEC |
Why so many "confirm" cells for co-ops? Each co-op sets its terms by board policy, and many post them only inside tariff PDFs that change without notice. The safe move is to ask the co-op in writing for its current net metering or distributed generation policy and its interconnection agreement before you sign anything.
The PSC rule that governs FPL, Duke, TECO and FPUC
If an investor-owned utility serves you, Rule 25-6.065 of the Florida Administrative Code sets your rights. It was adopted in 2002 and last amended in April 2008. Here is what it says, in plain English.
System size tiers
The rule sorts systems into three tiers by their AC gross power rating. For inverter-based systems like solar, the AC rating is the DC nameplate (the panel total) times 0.85. So a 10 kW DC array counts as 8.5 kW AC.
| Tier | AC size | Application fee | Liability insurance |
|---|---|---|---|
| Tier 1 | Up to 10 kW | Not allowed | Cannot be required (utility may recommend it) |
| Tier 2 | Over 10 kW to 100 kW | Allowed | Up to $1 million may be required |
| Tier 3 | Over 100 kW to 2 MW | Allowed, plus a possible interconnection study | Up to $2 million may be required |
Most homes fall in Tier 1. That matters: a Tier 1 customer cannot be charged extra fees, including application fees, for interconnecting. The system's rating also may not exceed 90% of your utility distribution service rating, which is the capacity of the electric service to your house.
How credits work
- The utility must let you net meter and must install, at no added cost to you, a meter that measures the difference between power delivered to you and power you send back.
- If you send more than you use in a billing cycle, the extra is credited to the next month's energy use.
- Credits build up for no more than 12 months. At the end of each calendar year, the utility pays you for unused credits at an average annual rate based on its COG-1 as-available energy tariff. COG-1 is the utility's avoided-cost rate, roughly what it would have spent to make that power itself, and it is usually well below the retail rate.
- If you close your account, you are paid for unused credits at the same COG-1 rate.
- You still pay the customer charge and any demand charge every month, no matter how much you export.
- You keep any Renewable Energy Certificates (RECs) tied to the power your system makes.
Timelines and safety rules
- The utility must confirm it received a completed application within 10 business days.
- It must sign the Standard Interconnection Agreement within 30 calendar days of a completed application, or 90 days if a Tier 3 study is needed.
- Local code officials must inspect and approve the system before it runs in parallel with the grid, and you must notify the utility at least 10 days before placing it in service.
- The system needs a utility-interactive inverter that meets IEEE 1547, IEEE 1547.1 and UL 1741. That inverter shuts off automatically when the grid goes down, which protects line crews.
- The utility may require a lockable, visible-break manual disconnect switch next to the meter at your expense. Inverter-based Tier 1 systems are exempt unless the utility pays for the switch.
The rule also allows third-party arrangements. A system may be bought, leased, operated or maintained by a third party, as long as the deal does not include buying electricity at retail from that third party. In practice, that wording is why solar leases are common in Florida while contracts that sell you the power itself by the kWh are restricted. See our lease vs. PPA vs. ownership guide for the consumer risks of each.
One more piece of history: in 2022 the Legislature passed HB 741, which would have phased down IOU net metering credits starting January 1, 2024. The Governor vetoed it on April 27, 2022, so full retail net metering under Rule 25-6.065 remains in place. For more on how the rule works month to month, see our Florida net metering rule explainer.
FPL: rules for rooftop solar, including the former Gulf Power area
Florida Power & Light serves more Florida solar homes than any other utility, with 124,449 solar PV interconnections in the PSC's 2025 report. FPL's site has two regions, FPL and FPL Northwest FL. The Northwest region covers the area once served by Gulf Power. FPL's net metering pages and guidelines are posted for both regions, but we could not find a page that spells out any difference in solar rules between them, so ask FPL if you live in the Panhandle.
How to apply for net metering with FPL
- Apply before you install. FPL says you must apply to become a net metering customer before installing a rooftop system, and that FPL must preapprove the system first.
- Sign the Net Metering Agreement. After approval, you sign, and then you can install.
- Submit tier paperwork. You or your contractor complete the requirements for your tier and submit them through FPL's online application, which has separate entry points for customers and contractors.
- FPL reviews. It approves the application or sends it back for corrections. You get automated status emails.
- Meter swap. After approval, FPL installs a meter that measures both how much electricity flows and in which direction.
How FPL credits your exports
FPL tracks credits in kWh, not dollars. Excess energy is deducted from your monthly bill or credited toward a future bill within the same calendar year. Unused kWh left in your bank at the December meter read become a credit on your December bill, valued at FPL's average annual cost of electricity generation. FPL says that rate is recalculated each year under its tariff and PSC rules and moves mainly with natural gas prices.
Fees and minimum bill
- No application fee for Tier 1, consistent with the PSC rule.
- Tier 2 and Tier 3 applicants pay an application fee and must show liability insurance of $1 million (Tier 2) or $2 million (Tier 3). FPL's FAQ does not list the fee amount, so ask.
- FPL has a $30 minimum base bill that applies to all customers. It covers fixed costs such as poles, transformers and wires, even when your kWh bank wipes out your energy charges. So a solar home that exports a lot still pays at least that floor.
- Tier 2 and Tier 3 systems need a manual disconnect switch, and systems of 50 kW and up need three-phase (WYE) service.
Other FPL details worth knowing
- Net metering customers are not eligible for FPL's EVolution Home EV charging program.
- If you buy a home that already has solar, FPL's site lets you activate net metering as a new customer who "just moved in." An existing customer filing a new agreement for an unchanged system pays no new application fee.
- Agreements signed before October 1, 2008 were cancelled, and those customers had to sign new ones.
- FPL does not publish a fixed approval time. Under the PSC rule, it must sign the agreement within 30 days of a completed Tier 1 or Tier 2 application.
Miami homeowners are mostly FPL customers. See our Miami solar guide for county permit steps.
Duke Energy Florida
Duke Energy Florida had 97,362 solar PV interconnections in the PSC's 2025 report, second only to FPL. As an investor-owned utility, Duke must follow Rule 25-6.065, so the core terms are set by the PSC: no fees or required insurance for Tier 1, kWh credits that roll forward up to 12 months, a year-end payout at the COG-1 avoided-cost rate, and a signed interconnection agreement within 30 days of a completed application.
We could not load Duke Energy's Florida net metering page while preparing this guide, and third-party summaries disagree about Duke's minimum bill, Tier 2 and Tier 3 fees, and the month when credits are trued up. Do not rely on those summaries. Before you sign a solar contract, ask Duke for:
- Its current net metering tariff sheet and interconnection agreement for your tier.
- Whether a minimum monthly bill applies and how much it is.
- When unused credits are paid out and at what rate.
- Whether any rate plan you are on now (for example, a time-of-use or EV plan) is compatible with net metering.
Duke also offers a utility-scale subscription program called Clean Energy Connection. We could not confirm its current terms or enrollment status from Duke directly, so check Duke's site before comparing it to rooftop solar.
Orlando-area homes outside OUC territory may be Duke customers. Check the name on your bill and see our Orlando solar guide.
Tampa Electric (TECO)
Tampa Electric had 32,515 solar PV interconnections in the PSC's 2025 report. TECO explains its net metering clearly:
- After a certified installation, TECO interconnects the system and installs a bi-directional net meter.
- Your bill shows a "Total Used" column with kWh Delivered (power TECO sent you) and kWh Received (power your panels sent TECO).
- You are billed only for net usage: kWh delivered minus kWh received. If the number is negative, no kWh are billed that month, and the difference is banked for next month.
- TECO says the credit is based on your current retail energy rate.
- You still pay a basic service charge each month that covers the cost of serving your location.
TECO rules that catch people off guard
- Batteries are interconnected but not net metered. TECO will connect a home battery, but power the battery discharges is not credited the way solar exports are.
- Energy Planner customers must switch. TECO's Energy Planner time-of-use program does not support net metering. If you get a net meter, you must move to the standard residential rate.
TECO also points customers who cannot put panels on their own roof to its Sun Select community solar program. We could not load a current Sun Select program page, so confirm pricing and terms with TECO. TECO's own solar page cites an average price of $32,195 for a whole-home installation in West Central Florida, but it does not date that figure, so treat it as a rough marker and get your own itemized quotes. See our solar cost guide for dated cost studies and our Tampa solar guide for local steps.
JEA (Jacksonville): fuel-rate credits, not full net metering
JEA is the biggest exception in Northeast Florida. As a city-owned utility, it is not bound by the PSC rule's billing terms. Customers who connect solar fall under JEA's Distributed Generation (DG) Policy, which works like this:
- You buy power from JEA at the same rates as any other customer when your panels do not cover your use.
- Every kWh you send to JEA's grid earns an energy credit equal to that kWh times JEA's fuel rate. On JEA's DG bill, this is the "Residential PV Credit."
- Credits larger than your bill accrue through the calendar year. Any remaining balance is paid to you at year end under the DG Policy.
- All PV customers are placed on a PV billing rate and get a PV meter that records kWh flowing both ways.
- DG customers cannot be enrolled in JEA's MyWay program.
What this means for system design. Because an exported kWh is worth only the fuel portion of the price, solar in JEA territory pays best when you use the power yourself as it is produced. That usually argues for a system sized closer to your daytime use, not your annual total. JEA notes that adding a battery lets you store excess daytime solar instead of sending it to the grid, then use it later. That shift has real value under a fuel-rate credit.
Buying a home with solar in Jacksonville. JEA says a buyer must complete a short form and electronically sign an Interconnection Agreement through JEA's portal before the account moves to a PV rate and starts getting credits. Do this right after closing. See our guide to buying and selling homes with solar.
JEA publishes Technical Interconnection and Interoperability Requirements that your installer must follow, and runs a Solar Concierge program to answer questions before you buy. Its fuel rates are posted on its rates page. See our Jacksonville solar guide.
OUC (Orlando): the TruNet changes of 2025 and 2026
Orlando Utilities Commission changed its solar credit for new customers in 2025, and more changes took effect November 1, 2026. OUC's program is called TruNet Solar.
| When your system was connected or approved | Export credit |
|---|---|
| On or before June 30, 2025 | Full retail rate through June 30, 2045 (grandfathered) |
| On or after July 1, 2025 | Full retail during a temporary grace period through October 31, 2026; then the Community Solar Energy Rate through June 30, 2030; then the Retail Levelized Fuel rate |
Other OUC rules
- Solar bank retired. Starting November 1, 2026, OUC no longer keeps a kWh "solar bank." Excess energy is credited to your account right away in dollars, can reduce electric and water charges in the same billing period, and leftover dollar credits roll to the next bill. OUC did a final true-up of each bank before the switch.
- Grandfathering follows the account and the home. If you sell a home after June 30, 2025, the new owner is not grandfathered. Adding panels to a grandfathered system does not cost you the grandfathered rate. A surviving spouse can take over the account like any transfer.
- Battery rebate tradeoff. OUC offers an optional battery storage rebate, but to get it you must waive the TruNet full retail rate on exports. For a grandfathered customer, do the math carefully before giving that up.
- Fees by tier (AC rating). Tier 1, 0 to 10 kW: no fee. Tier 2, over 10 kW to 100 kW: $340. Tier 3, over 100 kW to 2 MW: $1,300. Tier 2 and 3 also need proof of insurance.
- Sizing. OUC says the system should not exceed the home's energy needs.
How to connect solar with OUC
- Get a free OUC home energy audit (OUC recommends it; it may shrink the system you need).
- Get quotes. OUC's web page recommends at least four; its 2025 solar guide said three. Using an OUC Preferred Contractor is not required.
- Your contractor pulls permits from the right jurisdiction (City of Orlando, Orange County, City of St. Cloud or Osceola County) and installs to OUC's Interconnection Requirements.
- After the permit inspection passes, the contractor submits the interconnection application through OUC's online portal. Mailed or emailed applications are not accepted.
- The application needs the passed inspection or certificate of completion, a signed itemized invoice with the battery priced separately, and an electrical one-line diagram, sealed by a licensed professional engineer where the system is engineer-certified.
- OUC reviews and, if approved, reconfigures your meter or swaps it for a bi-directional meter.
Other city utilities: Lakeland, KUA, GRU, Tallahassee and more
Florida has more than 30 municipal utilities that report solar hookups to the PSC. A few of the larger ones:
Lakeland Electric
Lakeland meters energy from a customer-owned generator separately and credits it back at the full retail rate. Net metering is open to residential systems up to 10 kW and commercial systems up to 500 kW. Lakeland lists no net metering fees. Customers sign a PV agreement and use a licensed solar installer, and it is the customer's job to make sure the system meets Lakeland's standards. Lakeland also has a separate optional Solar Price Plan with a demand charge of $6.08 per kW of peak-period demand and an energy rate of $0.0282 per kWh; that plan is not net metering, so compare both before choosing. Questions go to SolarRates@lakelandelectric.com.
Kissimmee Utility Authority (KUA)
- Excess solar flows back through the meter, and you get a monthly bill credit for it. KUA does not store your exports for use at night.
- There are no extra monthly charges for PV customers.
- KUA offers no solar rebates.
- Three documents must be submitted before installation: an Application, an Interconnection Agreement for your tier, and a Tri-Party Agreement. KUA will not start processing until all three are in.
- KUA sets the bidirectional meter after it approves the application and the city or county issues a final permit.
City of Tallahassee
Tallahassee offers solar net metering for customers with their own systems; confirm current terms with City of Tallahassee Utilities. The city also runs Tallahassee Solar, a community subscription where participants pay 5 cents per kWh for solar energy in place of the normal fuel charge, fixed until September 30, 2037. The city says that program is fully subscribed and enrollment is closed.
Gainesville Regional Utilities (GRU)
GRU had 1,714 solar PV interconnections in the PSC's 2025 report. GRU's net energy metering page did not load with readable terms when we checked, so we cannot state its current credit rate or fees. Ask GRU for its current net metering tariff and interconnection agreement.
Other municipal utilities
The PSC report also lists St. Cloud (5,707 solar hookups), Ocala Electric Utility (808), Keys Energy Services in Key West (716), Leesburg (408), Beaches Energy Services (358), Homestead (352), Lake Worth Beach (344), Bartow (345), New Smyrna Beach (304), Fort Pierce (253) and Winter Park (239), among others. Each one sets its own solar policy under Florida Statute 366.91(6). Read yours.
Electric co-ops: do Florida co-ops offer net metering?
Yes, every Florida co-op that sells power at retail was required by Florida Statute 366.91(6) to create a standard interconnection agreement and net metering program by July 1, 2009. The law leaves the details to each co-op's board, so the credit rate, fees and year-end rules can differ from the PSC rule and from each other.
The PSC's 2025 report shows how much solar each co-op has connected, and what it paid members for excess generation in the year:
| Co-op | Solar PV hookups | Paid to customers in the year |
|---|---|---|
| Lee County Electric Cooperative (LCEC) | 10,455 | $244,529 |
| Sumter Electric Cooperative (SECO Energy) | 7,375 | $3,427,881 |
| Withlacoochee River Electric Cooperative (WREC) | 6,024 | $131,942 |
| Clay Electric Cooperative | 3,671 | $129,255 |
| Peace River Electric Cooperative | 1,501 | $329,088 |
| Talquin Electric Cooperative | 1,058 | $601,174 |
| Choctawhatchee Electric (CHELCO) | 773 | $168,810 |
| Glades Electric Cooperative | 297 | $204,770 |
| Florida Keys Electric Cooperative | 273 | $291,440 |
Be careful with these dollar figures. A big payout does not mean a better rate. It depends on how the co-op handles credits. A co-op that pays for every exported kWh at a lower rate will show large payouts. One that nets exports against your usage first and pays only year-end leftovers will show small ones, even if its credit is worth more to you. Use the numbers to see how active solar is in your area, not to rank deals.
When you talk to your co-op, ask the questions in the checklist at the end of this guide. Co-op members also have a voice: the board that sets these policies is elected by members.
Utility solar subscriptions: SolarTogether, Clean Energy Connection, Sun Select
Several Florida utilities sell a share of large solar farms instead of panels on your roof. These are community solar subscriptions run by the utility. You pay a subscription charge and get bill credits tied to the farm's output. No equipment goes on your home, so renters and condo owners can join.
| Program | Utility | What we could confirm |
|---|---|---|
| SolarTogether | FPL | Marketed with no panel installation, zero upfront cost, no cancellation fees, and open to renters or owners. FPL's program page showed a "fully subscribed" notice and said it is no longer accepting new large commercial and industrial customers or waitlist requests from them; residential and small business customers are served first-come, first-served, with a waitlist when the program is sold out. |
| Clean Energy Connection | Duke Energy Florida | Exists as Duke's subscription program; we could not load current terms. Confirm with Duke. |
| Sun Select | Tampa Electric | TECO describes it as a community solar program for customers who cannot install rooftop solar. Confirm pricing and availability with TECO. |
| Tallahassee Solar | City of Tallahassee | 5 cents per kWh in place of the fuel charge, fixed until September 30, 2037; fully subscribed, enrollment closed. |
How to compare a subscription with rooftop solar: a subscription has no roof risk, no permits and no hurricane exposure for you, but you own nothing, you get no property tax or sales tax benefit, and the savings depend on the utility's formula. Read the subscription agreement's term, exit rules and how the credit is calculated. Our community solar guide covers the details.
Does my utility charge extra fees for solar customers?
At FPL, Duke, TECO and FPUC, Rule 25-6.065 bans extra fees for Tier 1 systems, including application fees, and bans required liability insurance for them. But solar customers still pay the same fixed charges as everyone else:
- The monthly customer or basic service charge always applies under the rule.
- FPL's $30 minimum base bill applies to all customers, so a solar home that offsets nearly all its energy will still pay about that much.
- Demand charges apply if you are on a rate that has them.
City utilities and co-ops can set their own fees. OUC charges $340 for Tier 2 and $1,300 for Tier 3 applications. Lakeland and KUA say they add no extra monthly charges for net metering. For any other utility, ask in writing: "What one-time and monthly charges apply to a 7 kW residential solar system, and do any rate plans become unavailable to me?"
Watch for rate-plan conflicts too. TECO's Energy Planner, JEA's MyWay and FPL's EVolution Home are all off-limits to net metering or DG customers, according to each utility.
Which Florida utility pays the most for excess solar?
Based on the rules we could confirm, here is how the credit for an exported kWh compares, from most to least generous:
- Full retail credit: Lakeland Electric (credited at full retail), OUC grandfathered customers through June 2045, and the investor-owned utilities for kWh that offset your own use within the year (FPL, Duke, TECO, FPUC).
- Avoided-cost payout on year-end leftovers: the investor-owned utilities pay for unused credits at their COG-1 or average generation cost, which is much lower than retail.
- Fuel-rate or similar credit on every exported kWh: JEA (fuel rate) and new OUC customers (Community Solar Energy Rate through June 2030, then Retail Levelized Fuel rate).
The practical lesson: at an IOU, size your system so it roughly matches your annual use. Year-end leftovers are worth far less than kWh you use. At JEA or as a new OUC customer, the value is in using solar power as it is made, so a smaller system, smart timing of big loads like pool pumps and laundry, or a battery can matter more. Our sizing guide and payback math guide walk through the numbers.
How do I find out which utility serves my address?
- Look at your bill. The utility's name is on it. If the bill comes from a city or a city-owned utility (for example OUC, JEA, KUA, GRU, Lakeland Electric or the City of Tallahassee), you are a municipal customer, and Rule 25-6.065's billing terms do not bind it.
- New home or no bill yet? Ask the seller, the builder or your real estate agent for a recent electric bill. Or call the utility you think serves the area and give them the address.
- Check the PSC list. The PSC's annual net metering report lists all 52 utilities with solar customers, by type. If yours is listed as municipal or co-op, its own policy applies, not Rule 25-6.065.
- Do not trust a salesperson's word. Some door-to-door pitches assume FPL-style net metering everywhere. If you are in JEA or OUC territory, that assumption can overstate savings a lot. See our door-to-door solar guide.
Where each utility publishes its interconnection agreement
- FPL: Net Metering Guidelines and FAQs, linked from fpl.com/clean-energy/net-metering, with separate customer and contractor application portals.
- Duke Energy Florida: Duke's Florida net metering pages on duke-energy.com; request the tariff sheet and agreement for your tier.
- Tampa Electric: Net metering and connection pages on tampaelectric.com, which link to PSC Rule 25-6.065 and include meter-reading guides and a sample bill.
- JEA: Distributed Generation page at jea.com/distgen, including Technical Interconnection and Interoperability Requirements and the interconnection portal.
- OUC: Solar solutions pages on ouc.com, including its Interconnection Requirements and an online contractor portal.
- KUA: Application, tier-based Interconnection Agreement and Tri-Party Agreement on kua.com.
- Lakeland Electric: PV agreement on lakelandelectric.com/solar.
- The rule itself: Rule 25-6.065 on flrules.org. The PSC's annual net metering reports are on floridapsc.com.
Ask your installer for a copy of the signed agreement and keep it with your warranty papers. You will need it if you sell the house or file an insurance claim.
Problems with a utility: where to go
If an investor-owned utility misses the rule's deadlines or charges a Tier 1 fee, start with the utility's net metering team in writing. If that fails, you can file a complaint with the Florida PSC at floridapsc.com, which regulates FPL, Duke, TECO and FPUC. The PSC does not set rates or solar terms for city utilities or co-ops, so complaints about JEA, OUC or a co-op go to that utility's management, its governing board or, for co-ops, the member-elected board. Complaints about a solar seller or installer go to other agencies; see our solar complaints guide and Florida solar contractor license guide. This is general information, not legal advice.
How to choose a provider
- Find the utility name on your electric bill and decide which rulebook applies: PSC Rule 25-6.065 (FPL, Duke, TECO, FPUC) or your city utility or co-op policy.
- Download your last 12 months of usage from the utility so quotes are sized to real numbers.
- Ask the utility in writing how exported kWh are credited, what happens to year-end leftovers, and the exact rate.
- Ask what one-time fees and monthly charges apply to your system size, and whether any minimum bill applies.
- Check whether your current rate plan (time-of-use, EV, prepaid) becomes unavailable with net metering.
- Confirm your system's AC rating (DC times 0.85 at IOUs) and which tier it falls in.
- Make sure the installer's savings estimate uses your utility's actual credit, not FPL-style net metering, if you are a JEA, OUC or co-op customer.
- For FPL, make sure the net metering application is approved before installation starts.
- Get a copy of the signed interconnection agreement and the final permit inspection.
- Do not turn the system on until the utility gives permission and swaps or reprograms the meter.
- If you buy a home with solar, re-apply or sign a new agreement with the utility right after closing.
- Compare any utility subscription (SolarTogether, Sun Select) on term, exit rules and credit formula before choosing it over rooftop solar.
Related residential solar installers guides
- How Does Net Metering Work in Florida? PSC Rule 25-6.065, Credits, True-Up and Tiers
- Is Solar Worth It in Florida in 2026? Savings, Net Metering and Hurricane Reality
- Community Solar in Texas and Florida: How Utility Subscription Programs Work
- What Is Solar Permission to Operate, and How Long Does Interconnection Take?
- Solar Permits in Florida: Miami-Dade, Tampa, Orlando, Jacksonville and Statewide Rules
- What Size Solar System Do I Need? How Many Panels for a Texas or Florida Home
- Why Do I Still Have an Electric Bill With Solar, and How Do I Read It in Texas and Florida?
- Selling or Buying a Home With Solar Panels: Owned, Leased and PPA Systems
Residential solar installers by state and city
Questions people ask
Does FPL still have full net metering in 2026?
Yes. FPL follows PSC Rule 25-6.065, which gives full net metering for kWh that offset your own use within the year. Excess kWh carry forward and any left at the December meter read are paid at FPL's average annual cost of generation, which is lower than retail. A 2022 bill to phase down IOU net metering was vetoed, so the rule stands. FPL's $30 minimum base bill applies to all customers, including solar customers.
How long does FPL take to approve solar?
FPL does not publish a fixed time, and it sends automated status emails as your application moves. Under PSC Rule 25-6.065, an investor-owned utility must confirm receipt of a completed application within 10 business days and sign the interconnection agreement within 30 calendar days, or 90 days for a Tier 3 system that needs a study. Incomplete applications reset the clock, so make sure your installer files every required document.
Does JEA have net metering for new solar customers?
Not full retail net metering. Under JEA's Distributed Generation Policy, you pay standard rates for power you buy and get a credit at JEA's fuel rate for each kWh you send to the grid. Credits beyond your bill accrue through the calendar year and the balance is paid at year end. Because exports are worth only the fuel rate, using solar power as it is produced, or storing it in a battery, is worth more in Jacksonville.
What is OUC's solar policy now?
OUC's TruNet Solar program pays full retail through June 30, 2045 only for systems connected or approved by June 30, 2025. Later customers got full retail during a grace period through October 31, 2026, and now get the Community Solar Energy Rate through June 30, 2030, then the Retail Levelized Fuel rate. Since November 1, 2026, excess energy is credited in dollars right away instead of going into a solar bank.
Do Florida electric co-ops offer net metering?
Yes. Florida Statute 366.91(6) required each co-op that sells power at retail to create a standard interconnection agreement and net metering program by July 1, 2009. Each co-op's board sets the terms, so the credit rate, fees and year-end rules differ from the PSC rule and from co-op to co-op. Ask your co-op for its current net metering policy and interconnection agreement in writing before you sign a solar contract.
Can my utility charge me an application fee for solar?
An investor-owned utility (FPL, Duke, TECO, FPUC) cannot charge any extra fee, including an application fee, for a Tier 1 system up to 10 kW AC, and cannot require liability insurance for it. Larger systems can face fees and insurance requirements of up to $1 million (Tier 2) or $2 million (Tier 3). City utilities and co-ops set their own fees; OUC, for example, charges nothing for Tier 1, $340 for Tier 2 and $1,300 for Tier 3.
What happens to my credits if I move out?
At an investor-owned utility, Rule 25-6.065 says a customer leaving the system is paid for unused credits at the COG-1 as-available rate. City utilities and co-ops have their own rules. At OUC, the agreement stays on file for the home, but a new owner after June 30, 2025 does not keep a grandfathered rate. At JEA, the buyer must sign a new interconnection agreement to be placed on the PV rate.
Are home batteries net metered in Florida?
Not always. Tampa Electric says batteries are interconnected but not net metered. OUC offers a battery rebate only if you give up the full retail export rate. JEA says a battery can store excess solar instead of sending it to the grid. Ask your utility how it treats battery discharge, and whether adding a battery changes your rate or agreement, before you buy one.
Is a utility solar subscription better than rooftop panels?
It depends on your situation. A subscription like FPL SolarTogether needs no roof, no permits and no upfront cost, and it works for renters. But you own nothing, the savings depend on the utility's credit formula, and you do not get the property tax or sales tax benefits that owned rooftop systems can. Some programs are fully subscribed or use a waitlist, so check availability first.
Who do I complain to if my utility delays my solar hookup?
Start with your utility's net metering or distributed generation office in writing, and keep records of dates. If you are an FPL, Duke, TECO or FPUC customer and the utility misses PSC rule deadlines, you can file a complaint with the Florida Public Service Commission at floridapsc.com. The PSC does not oversee solar terms at city utilities or co-ops; take those issues to the utility's management or governing board.
Sources
- Florida Administrative Code Rule 25-6.065 (rule page)
- Florida Administrative Code Rule 25-6.065 (rule text)
- Florida Statutes s. 366.91
- Florida PSC: 2025 Net Metering Report
- Florida Senate: HB 741 (2022) final bill analysis
- FPL: Net Metering
- FPL: Net Metering FAQ
- FPL: SolarTogether
- Tampa Electric: Solar incentives and net metering
- Tampa Electric: Customer-owned generation and net metering
- JEA: Distributed Generation
- JEA: Distributed Generation Bill Breakdown
- OUC: How to apply for solar for your home (TruNet Solar)
- OUC: Rooftop Solar guide (April 2025)
- Kissimmee Utility Authority: Solar
- Lakeland Electric: Solar
- City of Tallahassee: Tallahassee Solar
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.