New ebook: Before You Borrow, how lenders decide and how to get your business loan approved. Get it for $7.99 →
New ebookHow to Research Like a Wall Street AnalystFind original sources, analyze trends, build your own insightsGet it now →
Markets
Real businesses. Bigger perspective. · Wed, Nov 18, 2026News. Tools. Scores. Games. Free.The Morning Chronicle
Donate BTCOpen dDashboard

Construction glossary

Request for information

A request for information (RFI) is a formal written question sent during bidding or construction to clarify unclear, missing or conflicting project documents.

A request for information (RFI) is a formal written question sent during bidding or construction to clarify unclear, missing or conflicting project documents.

What request for information means

An RFI is a written, logged question raised by a contractor, subcontractor or supplier when the drawings or specification are unclear, incomplete or contradict each other. The design team answers in writing, and the answer becomes part of the project record.

RFIs are numbered, dated and tracked so that nothing is decided in a hallway conversation.

A plain example

A fabricator finds a wall on the architectural sheet that does not appear on the structural sheet. It submits an RFI with a marked-up sketch asking which governs. The designer replies in writing, possibly issuing a revised drawing. If the reply adds cost or time, it can trigger a change order.

Why it matters

Good RFIs protect the schedule and the paper trail. Vague questions slow answers; unanswered RFIs can become delay claims. Reviewers often look at RFI counts and response times as a signal of document quality.

Common confusion

An RFI is not a request for quotation (a price request) or a request for proposal (a solution and price request). Nor is it a substitute for a submittal, which presents product data for approval.

Practical checklist

Keep your RFI process light but disciplined, so answers arrive in time to be useful.

  • Number each RFI and record the date sent, the date needed and the date answered.
  • Attach a sketch or marked-up drawing so the question is unambiguous.
  • Cite the drawing and specification references that appear to conflict.
  • Say what you plan to do if no answer arrives by the needed date, without treating silence as approval.
  • Close the loop by updating drawings or issuing a change instruction when the reply alters the documents.

Related terms

Questions people ask

Who answers an RFI?

Normally the architect or engineer of record, or whoever the contract names as the design authority.

Does an RFI response change the contract?

Not automatically. If it alters scope, cost or time, follow the contract’s change procedure.

What makes a good RFI?

One clear question, the drawing and specification references, a proposed solution if possible, and a needed-by date.

Sources and further reading

Sponsored

Have a project outline or drawings?

Organize your scope, then contact Digital Oro through its official channel. Availability, engineering, pricing and delivery terms need project-specific confirmation.

Text Digital Oro on WhatsApp Explore Digital Oro →

+52 1 984 452 3553 · the WhatsApp number Digital Oro lists publicly

Text Digital Oro

Digital Oro International advertises on The Company Chronicle. This guide was written by our editorial team from public sources and general professional practice; it does not describe a guarantee, quote or offer from Digital Oro International. Confirm current terms, prices and availability with the operator before you decide.

The Morning Chronicle

A short daily market brief in your inbox each morning: the stories that matter, today's economic calendar, and what traders are watching. No spam, unsubscribe any time.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration