Construction glossary, A to Z
A plain-language construction glossary from A to Z for procurement, steel framing, prefab and building envelope terms, with short entries linked to fuller explanations.
This glossary explains the terms that come up when you buy construction materials and prefab systems. Each entry is short and plain, and links to a fuller page. Definitions here are for understanding only; where your contract defines a term differently, the contract controls, and technical suitability is for the engineer of record and the local authority.
Procurement and documents
- Bill of quantities and bill of materials: itemised lists of work or components.
- Material takeoff: counting quantities from drawings.
- Request for information, request for quotation, request for proposal.
- Purchase order, change order.
- Submittal, shop drawing, as-built drawing.
- Specification, scope of work.
Schedule and delivery
- Lead time, long-lead item, critical path.
- Design freeze, value engineering, constructability.
- Landed cost, Incoterms.
- Factory acceptance inspection, punch list.
Offsite and prefab
- Design for manufacture and assembly.
- Offsite construction, prefabrication, panelization, volumetric modular construction.
Steel framing and structure
- Cold-formed steel, light-gauge steel, structural steel.
- Stud, track, joist, truss, bracing, deflection track.
- Load-bearing wall, non-load-bearing partition, shear wall.
- Galvanization, corrosion protection.
Envelope and performance
- Thermal bridge, thermal break, R-value, U-factor.
- Air barrier, water-resistive barrier, vapor retarder, rainscreen, flashing.
- Fire-resistance rating, acoustic rating.
Documents and data
- BIM object, CAD detail.
- Environmental product declaration, health product declaration, safety data sheet.
- Mill test report, certificate of conformity.
How to use these entries
Read terms in the order your project meets them: documents first, then schedule, system, envelope, and finally records. For the full buying process see the materials procurement guide for developers and the prefab terminology guide. For standards behind the terms, the bodies themselves, such as ISO, ASTM and CFSEI, publish the authoritative text. Keep your own list of terms that differ in your contract, and put it in your document library.
A
- Acoustic ratingAn acoustic rating describes how well a wall, floor or product blocks or absorbs sound, using standardized test metrics.
- AggregateAggregate is the granular material, such as sand, gravel or crushed stone, used in concrete, mortar, asphalt and as base under slabs and paving.
- Air barrierAn air barrier is a system of materials and joints that controls uncontrolled air movement through the building envelope.
- AllowanceAn allowance is an amount included in a contract price for an item that has not yet been chosen or priced, such as flooring or light fittings.
- Anchor boltAn anchor bolt is a threaded bolt set in concrete that fixes the building frame to the foundation.
- As-built drawingAn as-built drawing records the work as it was actually constructed, including changes made during the build, and is handed to the owner at completion.
B
- BackfillBackfill is the soil or gravel placed back against a foundation wall or into a trench after the structure or pipe is in place.
- Bill of materialsA bill of materials (BOM) is a structured list of every component, part and quantity needed to build one product or assembly, such as a wall panel or a module.
- Bill of quantitiesA bill of quantities (BoQ) is an itemised list of the work in a project, each item with a description and a measured quantity, used so bidders price the same scope.
- BIM objectA BIM object is a digital model of a building product that carries geometry plus data such as size, material and performance properties.
- BlockingBlocking is a short piece of lumber or steel fitted between studs or joists to stiffen the frame or give a fixing point.
- BracingBracing is a set of members or connections that stops a frame from racking or buckling, and carries lateral loads such as wind to the foundation.
C
- CAD detailA CAD detail is a drawing, usually 2D, that shows how parts of a construction assembly connect at a specific location.
- Certificate of conformityA certificate of conformity is a signed statement that a product or batch meets the stated standard or specification.
- Certificate of occupancyA certificate of occupancy is a document from the local building authority confirming that a building complies with the approved plans and code, and may be lawfully used.
- Change orderA change order is a written agreement that modifies a contract’s scope, price or time after signing, approved by the parties under the contract’s change procedure.
- Cold-formed steelCold-formed steel (CFS) is steel sheet shaped into structural members at room temperature, such as studs and tracks, used widely in framing walls, floors and roofs.
- ConstructabilityConstructability is how easily and efficiently a design can be built, and constructability review brings builders into design to find problems before they reach the site.
- ContingencyA contingency is a sum set aside in a project budget to cover unforeseen costs or risks that arise during design or construction.
- Corrosion protectionCorrosion protection is the set of coatings, materials and design details used to keep metal from degrading in its service environment.
- Critical pathThe critical path is the longest chain of dependent tasks in a schedule, so any delay to a task on it delays the whole project finish date.
- CuringCuring is the process of keeping fresh concrete moist and at a suitable temperature so it gains strength and durability as it hardens.
- Curtain wallA curtain wall is a non-structural exterior wall system, usually glass and metal, that hangs from the building frame and carries only its own weight and the wind load it receives.
D
- Damp-proof courseA damp-proof course is a waterproof layer built into a wall near the ground to stop moisture rising into the structure.
- Deflection trackDeflection track is a steel track with deep legs that lets a wall stay fixed to the floor while the structure above moves vertically.
- Design for manufacture and assemblyDesign for manufacture and assembly (DfMA) is a design approach that shapes a product so it is easy to make in a factory and quick to assemble on site.
- Design freezeA design freeze is the agreed point after which the design of a defined scope stops changing without formal approval, so ordering and fabrication can proceed safely.
E
- EasementAn easement is a legal right for someone to use part of another person's land for a limited purpose, such as a utility line or an access path.
- Environmental product declarationAn environmental product declaration, or EPD, is a verified report of a product's environmental impacts over its life cycle, based on a standard method.
F
- Factory acceptance inspectionA factory acceptance inspection is a check, done at the manufacturer before shipping, that the goods match the order and the quality requirements.
- FasciaA fascia is the board along the edge of the roof that closes the ends of the rafters and carries the gutter.
- Fire resistance ratingA fire resistance rating states how long a building element can contain fire or keep its function in a standard test, usually given in hours.
- FlashingFlashing is thin, water-shedding material installed at joints, openings and edges to direct water away from the structure.
- FootingA footing is the widened base under a wall or column that spreads the building load into the soil.
- FormworkFormwork is the temporary mold that holds wet concrete in shape until it has gained enough strength to stand alone.
G
- GalvanizationGalvanization is the process of coating steel with zinc so the zinc corrodes first and protects the steel underneath.
- General conditionsGeneral conditions are the standard terms of a construction contract that set how the parties behave, covering payment, changes, claims, insurance and disputes.
- GradingGrading is shaping the ground surface to a planned level and slope, so water drains away from buildings and the site works as designed.
- GroutGrout is a fluid cementitious or similar mix that fills gaps and voids, for example in masonry cells, under base plates or between tiles.
H
I
J
L
- Landed costLanded cost is the total cost of getting a product to your door: the price plus freight, insurance, duties, taxes and handling.
- Lead timeLead time is the elapsed time between placing an order or starting a task and receiving the result, which in construction drives when materials must be ordered.
- Lien waiverA lien waiver is a signed statement in which a contractor or supplier gives up the right to claim a lien on a property for the amount they have been paid.
- Light steel frame glossary: 25 termsTwenty-five terms for buyers of light steel framing, from G550 and AZ150 to purlins, shop drawings and mill certificates.
- Light-gauge steelLight-gauge steel is another name for thin steel sheet shaped into framing members, used interchangeably with cold-formed steel in most building contexts.
- LintelA lintel is a beam of steel, concrete or stone over an opening in masonry that carries the wall above.
- Liquidated damagesLiquidated damages are a pre-agreed sum a contractor pays for each day of delay beyond the contract completion date, instead of the owner proving actual loss.
- Load-bearing wallA load-bearing wall carries loads from floors, roofs or walls above down to the foundation, so altering it requires engineering review before any work.
- Long-lead itemA long-lead item is a material or component that takes so long to approve, make and deliver that it must be ordered early to avoid delaying the project.
M
- Material takeoffA material takeoff is the process of measuring drawings to count and total the materials a project needs, such as linear metres of track or sheets of board.
- Mill test reportA mill test report, or MTR, is a document from the steel producer certifying the chemical and mechanical properties of a specific heat or lot of material.
- Moment frameA moment frame is a structural frame whose beam-to-column joints are rigid, so the frame resists sideways loads by bending rather than by diagonal bracing or solid walls.
- MortarMortar is a workable paste of cement, sand and water, sometimes with lime, used to bed and bond masonry units such as bricks and blocks.
N
- Non-load-bearing partitionA non-load-bearing partition divides space but does not carry structural loads from above, though it may still need fire, acoustic and bracing design.
- Notice to proceedA notice to proceed is a written instruction from the owner telling the contractor to begin work or a defined phase of it.
O
P
- PanelizationPanelization is building flat wall, floor or roof panels in a factory, framed and sometimes sheathed, then shipping and joining them on site.
- ParapetA parapet is the low wall that extends above the roof edge on a flat or low-slope roof.
- Pay applicationA pay application is a contractor's periodic request for payment, showing the value of work done so far against the agreed schedule of values.
- PrefabricationPrefabrication is the manufacture of building parts or assemblies before delivery to site, so they can be installed rather than built piece by piece on location.
- Punch listA punch list is a record of small items that remain unfinished or defective near the end of a construction project and must be fixed before final acceptance.
- Purchase orderA purchase order (PO) is the buyer’s written commitment to buy specified goods or services at agreed terms, and it becomes a contract once the seller accepts.
R
- R-valueR-value measures a material's resistance to heat flow; a higher R-value means better insulating performance for that layer.
- RafterA rafter is a sloping roof framing member that runs from the ridge or a hip down to the wall.
- RainscreenA rainscreen is a wall system with cladding held off the backup wall by a drained and ventilated cavity, so water and moisture can escape.
- RebarRebar is the steel bar placed inside concrete so the finished element can resist pulling and bending forces that concrete alone handles poorly.
- Request for informationA request for information (RFI) is a formal written question sent during bidding or construction to clarify unclear, missing or conflicting project documents.
- Request for proposalA request for proposal (RFP) invites firms to propose how they would solve a problem, with approach, team, schedule and price, so the buyer can evaluate more than cost.
- Request for quotationA request for quotation (RFQ) asks suppliers or subcontractors to price a clearly defined item or scope, so the buyer can compare prices on equal terms.
- RetainageRetainage is a percentage of each payment to a contractor that the owner holds back until the work, or a stage of it, is complete.
- Ridge beamA ridge beam is the horizontal member at the top of the roof that the rafters lean against and, if structural, rest on.
S
- Safety data sheetA safety data sheet, or SDS, is a standard document describing a chemical product's hazards, safe handling, storage and emergency measures.
- Scope of workA scope of work defines exactly what work a party will perform, what is included and excluded, deliverables, standards and timing, so price and responsibility are clear.
- ScreedA screed is a thin leveling layer of cement-based material laid over a slab or insulation to give a flat finished floor surface.
- SetbackA setback is the minimum distance a building must be kept from a property line, road, water body or other boundary under local zoning rules.
- Shear wallA shear wall is a braced wall panel designed to resist lateral forces such as wind or earthquake in the plane of the wall.
- SheathingSheathing is the structural panel layer fixed over wall, roof or floor framing that stiffens it and gives a base for cladding.
- Shop drawingA shop drawing is a detailed fabrication or installation drawing prepared by a contractor, fabricator or supplier to show exactly how a component will be made and fitted.
- Sill plateThe sill plate is the horizontal timber bolted to the top of the foundation that the wall framing sits on.
- Slab-on-gradeA slab-on-grade is a concrete floor poured directly on prepared ground rather than over a crawl space or basement.
- SoffitA soffit is the underside of a roof overhang that closes the gap between the wall and the edge of the roof.
- SpecificationA specification is the written part of the construction documents that sets the required materials, standards, workmanship and testing, complementing the drawings.
- Stem wallA stem wall is the short concrete or masonry wall that rises from the footing to support the floor or wall framing above.
- Structural steelStructural steel is steel shaped and specified to carry significant loads in buildings, typically hot-rolled beams, columns and plates, fabricated and connected to a design.
- StudA stud is a vertical framing member in a wall, spaced along a track or plate, to which sheathing and boards are fixed; it may be timber or steel.
- SubfloorThe subfloor is the structural panel layer fixed to the floor joists that the finished floor is laid over.
- SubmittalA submittal is a package of product data, samples or calculations that a contractor sends to the design team for review before ordering or installing a specified item.
- Substantial completionSubstantial completion is the stage at which a project is complete enough for the owner to use it for its intended purpose, even if minor work remains.
T
- Thermal breakA thermal break is a low-conductivity element placed in an assembly to interrupt the path of heat through a more conductive material.
- Thermal bridgeA thermal bridge is a part of an assembly that conducts heat more easily than the material around it, creating a path for heat loss or gain.
- TrackTrack is the U-shaped cold-formed steel channel that runs along the floor and ceiling of a framed wall and holds the studs in place.
- TrussA truss is a triangulated frame of members that spans an opening, most often to carry a roof or floor with less material than a solid beam.
U
V
- Value engineeringValue engineering is a structured review of a design to find options that deliver the required function at lower cost or better value, without cutting required performance.
- Vapor retarderA vapor retarder is a layer that slows the diffusion of water vapor through a wall, floor or roof assembly.
- Volumetric modular constructionVolumetric modular construction builds complete three-dimensional units, often with finishes and services, in a factory and transports them to site to be stacked or placed.
W
Digital Oro International advertises on The Company Chronicle. This guide was written by our editorial team from public sources and general professional practice; it does not describe a guarantee, quote or offer from Digital Oro International. Confirm current terms, prices and availability with the operator before you decide.