New ebook: Before You Borrow, how lenders decide and how to get your business loan approved. Get it for $7.99 →
New ebookHow to Research Like a Wall Street AnalystFind original sources, analyze trends, build your own insightsGet it now →
Markets
Real businesses. Bigger perspective. · Fri, Nov 20, 2026News. Tools. Scores. Games. Free.The Morning Chronicle
Donate BTCOpen dDashboard

Local Guide · AC and heating

Commercial Rooftop Units (RTUs): Repair, Replacement and Maintenance for Small Businesses

A plain-English guide for Texas and Florida business owners and property managers: how long rooftop units last, what drives replacement cost, cranes and curb adapters, efficiency and refrigerant rules, licensing limits, wind tie-downs, permits and maintenance contracts.

Commercial rooftop units are packaged heating and cooling systems that sit on the roof. Many businesses plan replacement in the mid-teens of years, but condition, maintenance and coastal exposure matter more than age alone. Replace instead of repair when a major part fails on an old unit, repairs keep repeating, or the unit cannot keep up. Replacement involves a crane, a permit, often a curb adapter, roof work, and in Florida wind-rated anchoring. Check your lease before you pay.

Key facts

  • A Texas Class B AC contractor license covers systems of up to 25 tons cooling or 1.5 million Btu/hr heating; larger systems need a Class A license (Tex. Occ. Code §1302.253).
  • A Florida Class B AC contractor is limited to 25 tons cooling and 500,000 Btu heating per system (Fla. Stat. §489.105(3)(g)).
  • Since Jan. 1, 2023, DOE requires small air-cooled commercial package ACs (65,000 to 135,000 Btu/h, electric or no heat) to meet at least 14.8 IEER; the metric changes to IVEC (14.3) on Jan. 1, 2029.
  • Three-phase commercial package units under 65,000 Btu/h are rated in SEER2; single-package ACs must meet 13.4 SEER2 under DOE rules effective Jan. 1, 2025.
  • New light commercial AC and heat pump systems must use refrigerant with a GWP of 700 or less from Jan. 1, 2025, but EPA's May 2026 rule removed the installation deadline for equipment made before 2025.
  • The Florida Mechanical Code requires exposed rooftop equipment and supports to resist wind pressures under the Florida Building Code (FMC 301.15).
  • Florida requires a permanent means of access when rooftop equipment is more than 16 feet above grade; portable ladders do not qualify (FMC 306.5).
  • EPA's Section 608 leak repair rules apply to appliances with a full charge of 50 pounds or more of ozone-depleting refrigerant.
  • The IRS says the Section 179D energy efficient commercial buildings deduction was terminated for property whose construction begins after June 30, 2026.
  • Houston requires a mechanical permit and inspection for new or replacement commercial AC installations.

What is a rooftop unit, and why do small businesses have so many?

A rooftop unit (RTU) is a packaged system: compressor, condenser coil, evaporator coil, blower and usually heat (gas, electric or heat pump) all in one cabinet set on a roof curb. Ducts drop through the roof into the space below. Strip centers, restaurants, offices, clinics, gyms and warehouses across Houston, Dallas, San Antonio, Austin, Miami, Tampa, Orlando and Jacksonville rely on them because they keep mechanical equipment off the floor, serve one tenant space each, and can be replaced without entering the building much.

Sizes are stated in tons (a ton is 12,000 Btu per hour of cooling), and many small-business units fall under the 25-ton line that matters for contractor licensing. A typical retail bay may have one or two units; a restaurant often has several plus a separate make-up air unit for the kitchen hood. See restaurant and retail HVAC and package units vs. split systems.

How long do rooftop AC units last?

There is no single legal or engineering lifespan for an RTU. Equipment life depends on hours of operation, maintenance, corrosion, how hard the unit works, and parts availability. For reference, Trane says properly installed and maintained residential air conditioners are expected to last about 15 years. Commercial owners commonly plan RTU replacement in a similar range, but we did not find a current, independent, dated study of RTU service life in Texas or Florida climates, so treat any single number as a planning guess, not a promise.

Factors that shorten life in Texas and Florida:

  • Run hours. A Houston or Miami RTU may run cooling much of the year, far more than a northern unit.
  • Salt air. Units near the Gulf or Atlantic coast corrode faster: coils, cabinets, fasteners and electrical connections. Coated coils and stainless hardware help. See coastal corrosion.
  • Kitchen grease and dust on coils near exhaust fans.
  • Skipped filter changes and coil cleaning.
  • Roof ponding and poor curb seals that rust the base pan.
  • Oversizing that causes short cycling.

Better questions than "how old is it": What has failed in the last three years? What is the coil condition? Does the unit hold temperature on the hottest afternoons? Are parts still available? Does it use an older refrigerant that is getting expensive?

How much does it cost to replace a commercial rooftop unit?

We do not publish a dollar range for RTU replacement here because we could not find a current, named and dated independent cost study for Texas or Florida that meets our sourcing standard. Prices move with tonnage, efficiency, heat type, refrigerant, crane access and roof work. Get at least two written bids that break out these line items:

Line itemWhat drives it
EquipmentTonnage, efficiency (IEER or SEER2), heat type (gas, electric, heat pump), economizer, coil coatings, controls
CraneCrane size, reach, street or parking lot closure, after-hours lift
Curb adapterNeeded when the new unit's footprint differs from the old curb
RoofingFlashing, sealing, and possibly a roofer to protect the roof warranty
ElectricalDisconnect, wiring, breaker changes for different amp draw
Gas pipingReconnecting or modifying gas lines (license scope matters in Florida)
DuctworkTransitions, return and supply connections, balancing
Permits and engineeringMechanical permit, structural or wind-load review in Florida
ControlsThermostats, building automation integration
Removal and recoveryRefrigerant recovery, disposal
Startup and testingCommissioning, air balance

Ask each bidder for the equipment model numbers and AHRI or DOE-certified ratings so you can compare like for like. See how to compare HVAC quotes.

Is RTU repair or replacement better for my business?

Use a short decision test.

Lean toward repair when

  • The unit is mid-life, the failed part is a contactor, capacitor, motor, belt or control board, and the cabinet and coils are sound.
  • You are leaving the space within a year or two and the lease does not require replacement.
  • The unit has a reasonable repair history and holds temperature.

Lean toward replacement when

  • A compressor or coil fails on an older unit, especially with an older, costly refrigerant.
  • The base pan or cabinet is rusting through, or the roof curb leaks.
  • Repairs keep repeating and downtime is costing sales.
  • The space has changed (a new restaurant kitchen, more people, more equipment) and the unit is now undersized.
  • Efficiency is far below today's standards and the unit runs most of the year.

Refrigerant matters for the math. Under EPA's Technology Transitions rule, new light commercial AC and heat pump systems must use refrigerant with a GWP of 700 or less starting January 1, 2025. EPA's May 2026 rule removed the deadline to install equipment made before 2025, and replacement parts for existing R-410A systems are still allowed. EPA also acknowledged that R-410A for servicing older systems is likely to rise in price as the HFC phasedown continues, with HFC production and imports dropping to 30% of baseline in 2029. A 15-year-old R-410A RTU with a leaking coil is a stronger replacement candidate than it was a few years ago.

Who is responsible for HVAC in a commercial lease (NNN)?

It depends on your lease, not on state law. In many triple net (NNN) retail leases in Texas and Florida strip centers, the tenant pays for HVAC maintenance and repair, and sometimes replacement, for units serving its space. Gross and modified gross leases more often leave replacement with the landlord. Many leases split it: tenant handles maintenance and repairs up to a dollar cap, landlord handles replacement or costs above the cap.

Before you approve an RTU replacement, read the HVAC, repair, maintenance, capital expenditure and surrender clauses, and send the landlord written notice. Our full guide: who pays for HVAC in a commercial lease.

What is a crane lift for RTU replacement?

Most RTUs are too heavy to carry up a ladder, so a crane lifts the old unit off and sets the new one on the curb. What to plan for:

  • Scheduling. Lifts often happen early morning or on a closed day to keep customers and cars out of the lift zone.
  • Permits for the lift. Some cities require a right-of-way or street-use permit when the crane sits on a public street or sidewalk. Ask your contractor to check with the city.
  • Site access. Clear parking spaces, notify neighboring tenants, and confirm the landlord approves.
  • Weather. Wind and lightning delay lifts. In Florida summer, afternoon storms are common, so morning lifts are typical.
  • Insurance. Confirm the crane company and HVAC contractor carry liability coverage, and ask to be named on certificates. TDLR's minimum general liability for Class A contractors is $300,000 per occurrence; larger jobs often require more by contract.

Good planning keeps a typical single-unit swap to a short shutdown, but the space will be without cooling for part of the day. Plan for staff and customers in summer heat.

What is a curb adapter, and what about roof penetrations?

The roof curb is the raised frame the RTU sits on, with openings for supply and return ducts. When the new unit's footprint or duct openings do not match the old curb, the contractor installs a curb adapter, a sheet-metal transition that fits the old curb on the bottom and the new unit on top. It avoids cutting a new hole in the roof.

Things to ask:

  • Is the adapter factory-made for this unit and old curb, or field-built? Either can work; ask how it will be sealed and insulated.
  • Does the adapter raise the unit height? Check that the new height still meets wind, access and clearance rules.
  • How will condensate drain, and where? The Florida Mechanical Code requires condensate to go to an approved place of disposal at a minimum 1% slope, sized by tonnage (for example, 3/4 inch up to 20 tons, 1 inch over 20 to 40 tons), and not cause a nuisance.
  • Who flashes and seals the roof? If your roof is under a manufacturer warranty, the roofing contractor may need to do or approve the work, or the warranty may be affected.
  • Is the curb itself rotted or rusted? Replacing the curb is a bigger roofing job.

Florida wind loads, roof access and hurricanes

Florida has rules most Texas sites do not face in the same way.

  • Wind resistance. Mechanical equipment, appliances and supports exposed to wind must be designed and installed to resist wind pressures determined under the Florida Building Code, Building (FMC 301.15). The code says exposed equipment fastened to a roof or ground using rated stands, platforms, curbs, slabs or walls in compliance with the code is deemed to comply with the wind requirements of the 2007 Florida Building Code, as amended. In practice, expect your permit to require documented anchoring or tie-downs, and in high-velocity hurricane zones such as Miami-Dade, product approvals for some components. Ask your contractor what your jurisdiction requires.
  • Roof access. When rooftop equipment is more than 16 feet above grade, a permanent interior or exterior means of access is required; it cannot rely on portable ladders, and it cannot require climbing over obstructions more than 30 inches high or walking roofs steeper than 4 in 12 (FMC 306.5). Many older buildings lack compliant access, and a replacement permit can trigger the upgrade.
  • Flood zones. The Florida Mechanical Code has flood-hazard rules (FMC 301.16), which mainly affect ground-mounted equipment in coastal zones.
  • Storm prep. Before a hurricane, check that panels and access doors are secured and fasteners are tight. After a storm, inspect for shifted units, torn flashing and water entry before restarting. See hurricane prep for AC.

Texas Gulf Coast cities adopt their own building and wind provisions through local codes. Houston and coastal counties should ask the contractor and building official what anchoring is required.

Can a Class B contractor work on my commercial RTU?

It depends on system size.

TexasFlorida
Class AAny size (§1302.253)Unlimited (§489.105(3)(f))
Class BUp to 25 tons cooling or 1.5 million Btu/hr heating per systemUp to 25 tons cooling and 500,000 Btu heating per system
Endorsement or scopeEnvironmental Air Conditioning endorsement for comfort cooling; Commercial Refrigeration endorsement for walk-ins and process cooling (§1302.254)AC contractors may disconnect and reconnect gas appliances during changeouts but may not run gas fuel lines inside buildings; mechanical contractors can (§489.105(3))

Most small commercial RTUs are under 25 tons, so a Class B contractor can usually handle them. Florida's Class B heating cap (500,000 Btu) is much lower than Texas's (1.5 million Btu/hr), which can matter for large gas-heat RTUs. A walk-in cooler or freezer at a restaurant needs a contractor with the right refrigeration scope. Verify on TDLR or DBPR. See TDLR license guide and Florida CILB guide.

Do commercial RTUs need permits?

Yes, a replacement almost always needs a mechanical permit. Houston requires a mechanical permit and inspection for new or replacement commercial and residential AC installations, and a mechanical inspector must approve the work before the project is finalized. Miami-Dade requires a building permit application with the mechanical category and a mechanical fee sheet, and offers online permitting for stand-alone mechanical permits. Expect electrical and sometimes structural or roofing permits too.

Texas cities may not charge a city registration fee to TDLR-licensed AC contractors since September 1, 2021, though they may still charge permit fees (§1302.304). TDLR's sanctions schedule lists failing to obtain a permit as a violation.

Energy code: commercial replacements must meet the energy code your jurisdiction enforces. DOE's Building Energy Codes Program lists Florida's commercial code as the 2021 IECC and ASHRAE 90.1-2019 (with state amendments, effective December 31, 2023) and Texas's statewide commercial code as the 2015 IECC and ASHRAE 90.1-2013 (effective November 1, 2016). Many Texas cities adopt newer editions locally. See HVAC permits in Texas and Florida.

What are economizers and are they required?

An economizer is a set of dampers and controls that brings in outside air for "free cooling" when it is cool and dry enough outside. In mild, dry climates it saves a lot of energy. In hot, humid places like Miami, Tampa and Houston, useful economizer hours are fewer, and a damper that sticks open can let humid air pour in, raising humidity and energy use.

Whether your replacement must include one depends on the energy code edition, climate zone, unit size and building type. Model energy codes generally exempt or limit economizer requirements in the hottest, most humid climate zones, but we could not confirm the exact current thresholds for every Texas and Florida jurisdiction. Ask your mechanical designer or contractor to cite the code section their design follows, and confirm with your building department.

If you have an economizer, maintain it: check damper movement, linkage, actuator and sensor each service visit. A failed economizer is one of the most common hidden problems on older RTUs.

What is ASHRAE 90.1, and does it affect my replacement?

ASHRAE Standard 90.1 is the national model energy standard for commercial buildings. States and cities adopt it, directly or through the International Energy Conservation Code (IECC), as their commercial energy code. It sets requirements for equipment efficiency, controls, economizers, duct insulation and more.

For an RTU replacement, the main effects are minimum efficiency, control requirements and any economizer rules in your adopted edition. Federal DOE standards set the floor for equipment efficiency: since January 1, 2023, small air-cooled commercial package air conditioners from 65,000 to under 135,000 Btu/h with electric or no heat must meet at least 14.8 IEER (14.6 with other heating). Units from 135,000 to under 240,000 Btu/h need at least 14.2 IEER (14.0 with other heating). On January 1, 2029, the federal metric changes to IVEC, with a 14.3 minimum for the smallest category with electric or no heat. Three-phase units under 65,000 Btu/h are rated in SEER2 instead.

How often should commercial HVAC be serviced, and what does a PM contract include?

Frequency depends on run hours and environment. A restaurant RTU near a grease exhaust or a gym unit running long hours needs more frequent filter and coil attention than an office. Many owners schedule seasonal visits, with filter changes in between, but there is no single legal schedule for private buildings. Your lease may set one; many NNN leases require a written preventive maintenance (PM) contract and copies of service reports.

What a solid PM contract includes

  • Scope by unit: list each RTU by tag, model and serial.
  • Visit frequency and what happens at each visit.
  • Filters: type, MERV rating, how often.
  • Coils: condenser and evaporator cleaning frequency and method.
  • Belts, motors and bearings: inspection and replacement terms.
  • Electrical: tighten connections, check contactors and capacitors, measure amp draw.
  • Refrigerant circuit: check operating pressures and temperatures; leak checks; note whether refrigerant is included or extra.
  • Condensate: clear drains and traps, treat pans.
  • Heat section: burners, heat exchanger, gas pressure and combustion checks for gas RTUs.
  • Economizer and controls: damper operation, sensors, thermostat schedules.
  • Roof: curb, panels, screws, report roof damage near units.
  • Reports: written service report with readings after each visit.
  • Response times and after-hours rates for emergencies.
  • What is excluded: compressors, coils, major parts, crane work.

Refrigerant compliance: EPA's leak repair requirements apply to appliances with a full charge of 50 pounds or more of ozone-depleting refrigerant. Most small RTUs fall below that, but check larger units. Anyone opening the refrigerant circuit must hold EPA Section 608 certification.

Ventilation and indoor air quality

Most RTUs also bring in a set amount of outside air for ventilation. Mechanical codes require minimum outdoor air for occupied commercial spaces based on use and occupancy. The Florida Mechanical Code, for example, sets ventilation rates in its Chapter 4 tables and adds specific exhaust rules for some uses, such as continuous exhaust at nail salon stations when occupied.

In humid Texas and Florida climates, outdoor air adds a big moisture load. If an RTU is oversized or its outdoor air damper is set wrong, the space can feel cool but clammy. EPA recommends keeping indoor relative humidity below 60%, ideally 30% to 50%, to limit mold. Signs of trouble: musty smells, condensation on supply grilles, damp ceiling tiles. Ask your contractor to check outdoor air settings during service. See humidity and mold.

Is Section 179 or 179D available for commercial HVAC?

This is a general note, not tax advice. Talk to your CPA before relying on any deduction.

  • Section 179D (Energy Efficient Commercial Buildings Deduction) covers qualifying energy-efficient property installed as part of a commercial building's interior lighting, heating, cooling, ventilation and hot water systems, or envelope. The IRS says the deduction was terminated for property whose construction begins after June 30, 2026; the rules still apply to property whose construction began on or before that date. For 2026, the IRS lists a base deduction of $0.59 to $1.19 per square foot, or $2.97 to $5.94 with prevailing wage and apprenticeship requirements, for qualifying savings. Most single-RTU replacements do not produce the building-wide savings 179D requires, so ask your CPA whether it applies.
  • Section 179 and depreciation. HVAC equipment for commercial property may be eligible for expensing or depreciation rules that change often. We did not verify the current-year limits for this page; confirm with your CPA.
  • Repair or capital improvement. Whether a job is deducted as a repair or capitalized as an improvement depends on IRS tangible property rules. A full RTU replacement is usually treated differently from a motor or compressor repair.

Utility programs may also offer commercial rebates for high-efficiency RTUs. Check with your electric utility: Oncor, CenterPoint Energy, CPS Energy, Austin Energy, FPL, Duke Energy Florida, TECO or JEA.

How do I keep my restaurant kitchen cool?

Kitchens are the hardest space to cool because the hood exhausts large volumes of conditioned air, and that air must be replaced. The Florida Mechanical Code requires makeup air approximately equal to the exhaust air whenever commercial kitchen exhaust runs, and limits the temperature difference between makeup air and the conditioned space to 10°F unless the HVAC system can handle the added load (FMC 508.1, 508.1.1). Common fixes include tempered makeup air, correctly balanced hood exhaust, and sealing building leaks. Our full guide: restaurant and retail HVAC.

How to choose a provider

  • Tag each RTU with model, serial, tonnage, refrigerant and install year.
  • Read the lease HVAC, repair, replacement and maintenance clauses before approving work.
  • Notify the landlord in writing before any replacement.
  • Verify the contractor's license class covers the unit's tonnage and heat output.
  • Get bids that break out equipment, crane, curb adapter, roofing, electrical, permits and startup.
  • Ask for DOE-certified efficiency ratings (IEER or SEER2) on each bid.
  • Confirm who handles crane and right-of-way permits and when the lift happens.
  • Confirm roof warranty requirements with your roofer.
  • In Florida, confirm wind anchoring and roof access requirements for the permit.
  • Check economizer requirements and operation with your designer.
  • Sign a written PM contract with listed tasks, visit frequency and reports.
  • Ask your CPA about repair versus capital treatment and any 179D eligibility.

Related ac and heating guides

AC and heating by state and city

Questions people ask

What is a package unit versus a rooftop unit?

A package unit holds all the main components in one cabinet. A rooftop unit is a package unit designed to sit on a roof curb with ducts through the roof. Some homes and small buildings in Florida use ground-mounted package units beside the building instead. The service and replacement steps are similar, though rooftop units add the crane, curb and roof considerations covered above.

How do I find the age of my RTU?

Look for the data plate on the unit cabinet. It lists the model and serial number, and the serial number usually encodes the manufacture date. Each manufacturer uses its own code, so search the brand's serial number guide or ask your service contractor. Also look for the original permit in your city's records, which can show the install date and contractor.

Can I replace an RTU with a different brand?

Usually yes. The new unit needs to fit the curb or use a curb adapter, match the electrical service or include upgrades, meet current DOE efficiency and energy code rules, and pass permitting. Brand changes often require a curb adapter. Ask for the new unit's weight too, since a heavier unit may need a structural check of the roof.

Why does my RTU keep freezing up?

Common causes are low airflow (dirty filters, a slipping belt, a weak blower motor or closed dampers), low refrigerant from a leak, or running in cooling when the outdoor temperature is too low for the unit's controls. A frozen coil can damage the compressor. Shut the cooling off, run the fan to thaw, replace filters, and call for service. Ask the technician for readings and the cause, not just a refrigerant top-off.

Can my landlord's PM contractor work on my unit?

If your lease makes you responsible for the HVAC, you can usually choose your own licensed contractor, but some leases require you to use the landlord's approved vendor or require landlord approval for replacements. Read the lease and get any approval in writing. If you must use the landlord's vendor, ask for itemized invoices and service reports.

Do RTUs need refrigerant leak checks?

EPA's mandatory leak repair rules apply only to appliances with a full charge of 50 pounds or more of ozone-depleting refrigerant, which excludes most small RTUs. Leak checks are still smart maintenance, because a leaking unit loses capacity and refrigerant is costly. Anyone who attaches gauges or adds or removes refrigerant must be EPA Section 608 certified, and intentionally venting refrigerant is illegal.

How long does an RTU replacement take?

A single like-for-like RTU swap with a crane is often planned around one working day or less, with the space without cooling for part of it. Add time for curb adapters, roofing, electrical changes, gas work, controls and inspections. Order lead times for some equipment can add weeks before the lift, so plan replacements before peak summer when possible.

What should I do if my RTU fails on a 100-degree day?

Call your service contractor and ask for an emergency visit. Check simple items first: thermostat settings, breakers and the disconnect, and filters. Protect staff and customers; CDC advises finding air-conditioned space during dangerous heat. Ask about a temporary portable unit or spot cooler if the repair will take days. Document the outage for any lease or insurance claim.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration