New ebook: Before You Borrow, how lenders decide and how to get your business loan approved. Get it for $7.99 →
New ebookHow to Research Like a Wall Street AnalystFind original sources, analyze trends, build your own insightsGet it now →
Markets
Real businesses. Bigger perspective. · Thu, Nov 19, 2026News. Tools. Scores. Games. Free.The Morning Chronicle
Donate BTCOpen dDashboard

Local Guide · Plumbing

Can a Plumber Put a Lien on Your Home? Mechanic's Liens in Texas and Florida

How plumbing liens work under Texas Property Code Chapter 53 and Florida Statutes Chapter 713: homestead rules, Notices to Owner and Commencement, deadlines, lien waivers, and how to remove an invalid lien.

Yes, a plumber who is not paid can lien your property if it follows state law, but the rules are strict. In Texas, a lien on a homestead needs a written contract signed before work, by both spouses if married, and filed with the county clerk. In Florida, jobs of $2,500 or less are exempt from most of the lien law, unlicensed contractors have no lien rights, and a claim of lien must be recorded within 90 days of final work and lasts one year unless enforced.

Key facts

  • A Texas homestead lien requires a pre-work written contract signed by both spouses and filed with the county clerk (Tex. Prop. Code 53.254).
  • Texas owners must reserve 10 percent of the contract price during the work and for 30 days after completion (Tex. Prop. Code 53.101).
  • On Texas residential projects, an original contractor's lien affidavit is due by the 15th day of the 3rd month after its work ends (Tex. Prop. Code 53.052).
  • Texas lien waivers are unenforceable unless they substantially follow one of four statutory forms (Tex. Prop. Code 53.281, 53.284).
  • Florida improvements with a direct contract price of $2,500 or less are exempt from most of the construction lien law (Fla. Stat. 713.02(5)).
  • Unlicensed Florida contractors and subcontractors have no lien rights (Fla. Stat. 713.02(7)).
  • A Florida Notice to Owner must be served within 45 days after first furnishing labor or materials (Fla. Stat. 713.06).
  • A Florida claim of lien must be recorded within 90 days of final furnishing and lasts 1 year unless enforcement is filed (Fla. Stat. 713.08, 713.22).
  • Florida lien rights cannot be waived in advance (Fla. Stat. 713.20(2)).

Can a plumber put a lien on my house?

Yes, in both Texas and Florida a plumber who improves your property and is not paid can, in the right circumstances, record a lien against it. A lien is a legal claim recorded in the county property records that says, in effect, "this property secures a debt owed to me." It does not take your house on the day it is filed. But it clouds your title, can block a sale, and if the plumber later sues to foreclose and wins, a court can order the property sold to pay the debt.

The details are strict, and they protect homeowners more than most people realize:

  • Texas mechanic's liens are governed by Chapter 53 of the Property Code. A lien on a homestead is only valid if there was a written contract signed before the work began, signed by both spouses if the owner is married, and filed with the county clerk (Prop. Code 53.254). Most emergency plumbing calls never meet that standard, which is why many Texas service plumbers cannot lien a homestead at all.
  • Florida construction liens are governed by Part I of Chapter 713 of the Florida Statutes. Any improvement with a direct contract price of $2,500 or less is exempt from almost all of the lien law except the direct contractor's own lien rights (713.02(5)), and an unlicensed contractor or subcontractor has no lien rights at all (713.02(7)).

Both states also let subcontractors and suppliers you never hired claim a lien, which is why "I paid my contractor in full" is not always a complete defense. The rest of this guide explains when that can happen, the deadlines each side must meet, and how to remove a lien that should not be there. It is written for both homeowners and plumbing companies, since the same rules decide both sides' rights.

This is general information, not legal advice. Lien law is technical and deadlines are unforgiving. If a lien has been filed on your property, or you are a plumber deciding whether to file one, talk to a construction or real estate attorney licensed in your state.

Lien terms in plain English

TermTexas usageFlorida usageWhat it means
Original / direct contractor"Original contractor" (53.001)"Contractor" in privity with the ownerThe company you hired directly, such as a remodeler or the plumbing company you called
Sub or supplier"Claimant other than an original contractor" or derivative claimant"Lienor not in privity"A subcontractor plumber or a supply house hired by your contractor, not by you
The lien filingLien affidavit filed with the county clerkClaim of lien recorded with the clerk of courtThe document that actually creates a recorded lien
Early warning to ownerNotice of claim for unpaid labor or materials (53.056)Notice to Owner (713.06)A notice from a sub or supplier telling you they are on your job and may lien if unpaid
Start-of-project noticeNone statewide for residential ownersNotice of Commencement (713.13)Florida owner's recorded notice that a project is starting; drives who must be paid and when
HoldbackStatutory retainage: 10 percent for 30 days (53.101)No statutory retainage requirement for ownersMoney the owner holds back to cover subs and suppliers
Waiver / releaseStatutory conditional and unconditional forms (53.284)Waiver and release forms for progress and final payment (713.20)A signed paper saying the lien right is given up for amounts paid
HomesteadConstitutionally protected; special lien contract rules (53.254)Chapter 713 has no separate homestead contract rule; ask an attorney how Florida's constitutional homestead protection applies to your factsYour primary residence

Texas: who can file a mechanic's lien for plumbing work?

Property Code 53.021 gives a lien to a person who, under a contract with the owner or the owner's agent, contractor or subcontractor, labors or furnishes labor or materials for the construction or repair of an improvement, or specially fabricates material for it. "Improvement" is defined broadly to include buildings, fixtures, utilities and wells (53.001). Plumbing repairs, repipes, water heater installs, sewer line replacements and new construction rough-ins can all qualify.

Texas sorts projects into residential construction projects and everything else, and many deadlines are shorter for residential work. It also treats homesteads very differently from rental houses, commercial buildings and second homes.

Homestead rules: the biggest protection for Texas homeowners

To fix a lien on a homestead (53.254):

  1. The plumber (or the original contractor) and the owner must sign a written contract setting out the terms.
  2. The contract must be signed before the labor is performed or the materials are furnished.
  3. If the owner is married, both spouses must sign, even if only one is on the deed.
  4. The contract must be filed with the county clerk where the homestead is located.
  5. The lien affidavit must carry, at the top in at least 10-point bold, the notice: "NOTICE: THIS IS NOT A LIEN. THIS IS ONLY AN AFFIDAVIT CLAIMING A LIEN."
  6. For subs and suppliers, the notice sent to the owner must include a specific statutory statement explaining the 10 percent reservation and withholding rules.

If the original contractor signed a compliant contract, it benefits everyone who works under that contractor (53.254(d)), so a plumbing sub on a remodel can rely on the general contractor's homestead contract.

Example. Your water heater fails in Dallas on a Sunday. A plumber replaces it on a work order you signed on a tablet, your spouse never signed, and nothing was filed with the county clerk. If you refuse to pay, the plumber can sue you for the debt, but under 53.254 it is very unlikely to have a valid lien on your homestead. Compare a $28,000 whole-house repipe where you and your spouse signed a written contract weeks before the work and the contractor filed it with the county clerk: that contractor likely does have lien rights if it meets the other deadlines.

The homestead rules apply to your primary residence. A rental house, vacation home or commercial building does not get them, so a plumber can lien those properties without a spousal-signature contract if it follows the other Chapter 53 steps.

Texas deadlines for plumbers and owners

Texas rewrote much of Chapter 53 in House Bill 2237, effective January 1, 2022, replacing a more complicated system of multiple notices. Guides written before 2022 often describe the old rules. The current deadlines are:

StepResidential construction projectOther projectsSection
Sub or supplier sends notice of claim for unpaid labor or materials to owner and original contractorBy the 15th day of the 2nd month after the month the labor or materials were providedBy the 15th day of the 3rd month53.056
Sub notice of claim for unpaid retainageBy the earlier of 30 days after the sub's contract or the original contract is completed, terminated or abandonedSame53.057
Original contractor files lien affidavitBy the 15th day of the 3rd month after the month its work was completed, terminated or abandonedBy the 15th day of the 4th month53.052(a)
Sub or supplier files lien affidavitBy the 15th day of the 3rd month after the month it last provided labor or materialsBy the 15th day of the 4th month53.052(b),(c)
Copy of filed affidavit sent to owner (and original contractor, if filer is a sub)Within 5 days after filingSame53.055
Suit to foreclose the lienBy the first anniversary of the last day the affidavit could have been filed; extendable to the second anniversary of filing by a recorded written agreement with the ownerSame53.158

How the "15th day of the month" rule works. Count months, not days. If a plumbing subcontractor last worked on a residential remodel on May 9, its notice of claim to the owner is due by July 15 (the 15th day of the second month after May), and its lien affidavit by August 15 (the 15th day of the third month after May).

The statutory notice form starts with "WARNING: This notice is provided to preserve lien rights" and says the owner's property "may be subject to a lien if sufficient funds are not withheld from future payments to the original contractor to cover this debt." If you receive one, do not ignore it. It is the trigger for your duty to withhold.

Texas: can a plumbing subcontractor lien my house if I paid the general contractor?

Sometimes, but Texas limits how much you can lose if you follow two rules: keep the 10 percent retainage and withhold after you get a notice.

Rule 1: the 10 percent retainage

During the work and for 30 days after the original contract is completed, the owner must reserve 10 percent of the contract price, or 10 percent of the value of the work done (53.101). Those reserved funds secure payment to the subs and suppliers who worked on the job (53.102).

Rule 2: withhold after a notice of claim

Once you receive a proper notice of claim from a sub or supplier, you are authorized to withhold enough from future payments to your contractor to cover it. Except for any retainage you failed to keep, you are not liable for amounts you paid the original contractor before you were authorized to withhold (53.084(a)). If you keep paying the contractor after getting the notice, and the sub later perfects its lien and wins a judgment, you and your property can be liable for those later payments, on top of the retainage (53.084(b)).

Example

You sign a $40,000 kitchen and bath remodel. The plumbing sub's share is $9,000. You pay the general contractor in installments but keep $4,000 (10 percent) until 30 days after completion. Two weeks before the end, you get a notice of claim from the plumbing sub for $6,500. If you stop paying the contractor and hold enough to cover the claim, your exposure is generally limited to the $4,000 retainage plus any amounts you still owed when the notice arrived. If you had paid the full $40,000 on completion day without retainage, you could be on the hook for up to $4,000 in retainage you should have kept, even though you already paid it once.

This is why the homestead notice statement in 53.254(g) tells owners that if they reserve the 10 percent and withhold after a written notice of claim, a sub's lien "will not be a valid lien on your property," and "except for the required 10 percent reservation, you are not liable to a subcontractor or supplier for any amount paid to your contractor before you received written notice of the claim."

Tools that help

  • Disclosure statement. Before you sign a residential construction contract, the original contractor must give you a "KNOW YOUR RIGHTS AND RESPONSIBILITIES UNDER THE LAW" disclosure (53.255).
  • List of subs and suppliers. On residential projects, the original contractor must give you, before work starts, a written list of the subs and suppliers it intends to use, and update it within 15 days of changes, unless you sign a specific waiver (53.256). Do not waive it.
  • Bills-paid affidavit. Anyone who furnishes labor or materials must, if you request it as a condition of payment, give you an affidavit stating whether its subs and suppliers have been paid in full, and if not, who is owed how much (53.085). A false affidavit is a misdemeanor.

Texas lien waivers and releases: what to ask your plumber for

Since January 1, 2012, a waiver and release of lien rights in Texas is unenforceable unless it substantially follows one of four statutory forms and is signed by the claimant, and, for a conditional release, there is evidence the payment was actually made (53.281, 53.284). The four forms are:

FormUse it whenEffect
Conditional Waiver and Release on Progress PaymentYou are paying a draw by check or transfer that has not clearedReleases lien rights for that progress payment only once the payment clears
Unconditional Waiver and Release on Progress PaymentThe progress payment has been received in good fundsReleases lien rights for that progress payment immediately
Conditional Waiver and Release on Final PaymentYou are making the final payment and it has not clearedReleases all lien rights for the job once payment clears
Unconditional Waiver and Release on Final PaymentFinal payment received in good fundsReleases all lien rights for the job

Two rules protect plumbers. No one may require a claimant to sign an unconditional waiver for a payment the claimant has not actually received in good and sufficient funds (53.283). And a statement waiving lien rights is not enforceable unless it follows a statutory form, the claimant has been paid in full, or it appears in a written original contract or subcontract for a single-family house, townhouse or duplex and was made before labor or materials were provided (53.282). That last exception does not apply to suppliers who furnish only materials.

Practical tip for owners. On any plumbing job big enough to involve subs or suppliers, ask for a conditional waiver from the plumbing contractor, and from each sub or supplier who has sent you a notice, every time you pay. Collect the unconditional version once the payment clears. Keep them with your closing papers. When you sell, the buyer's title company may ask for them.

How do I remove a plumber's lien in Texas?

Property Code 53.157 lists the ways a Texas lien affidavit is discharged of record:

  1. A recorded lien release signed by the claimant, usually after payment or settlement.
  2. Expiration: the claimant does not sue to foreclose within the 53.158 deadline (generally one year after the last day the affidavit could have been filed, or up to two years by recorded agreement). Even then, you may need to record proof or get a court order to clean up title.
  3. A court judgment discharging the lien, recorded with the county clerk.
  4. A bond to indemnify against the lien filed under Subchapter H, which moves the claim off your property and onto the bond.
  5. A payment bond filed under Subchapter I on projects that have one.
  6. A summary motion to remove under 53.160, followed by recording the court's removal order if the claimant does not post a bond or deposit within 30 days (53.161).

The summary motion: a fast lane for invalid liens

In a suit to foreclose or to declare a lien invalid, an owner can file a verified motion to remove the lien on limited grounds (53.160(b)), including that:

  • the required notice of claim was not timely sent;
  • the lien affidavit was not filed on time or does not comply with the content rules;
  • notice of the filed affidavit was not sent to the owner within 5 days;
  • the owner kept the 10 percent retainage and paid it out properly before the lien was perfected and before receiving notice;
  • all funds subject to the notices have been deposited into the court registry;
  • on a homestead, there was no written contract executed and filed under 53.254, or the affidavit or notice lacked the required homestead language; or
  • the claimant signed a valid lien waiver or release.

The hearing cannot happen until at least 30 days after the claimant answers or appears, and the claimant is entitled to expedited discovery on those issues. If the court orders removal, it sets a bond amount the claimant must post within 30 days to keep the lien alive (53.161).

Attorney's fees and fraudulent liens

In lien foreclosure suits and suits to declare a lien invalid, the court awards costs and reasonable attorney's fees "as are equitable and just," but on a residential construction contract the court is not required to order the property owner to pay them (53.156). A person who files a lien they know is fraudulent can face liability under Civil Practice and Remedies Code 12.002; 53.282(b) describes the specific steps an owner must take (a written explanation, evidence of a contractual waiver and a request for release) before a lien rendered unenforceable by a pre-work waiver triggers that liability, with the claimant given 14 days to release it.

First step for any owner: send the claimant a written request for a release that explains exactly why the lien is invalid (for example, "This is my homestead and no written contract was signed by my wife or filed with the county clerk"). Many improper liens are released at that stage.

Florida: when can a plumber record a construction lien?

Florida's Construction Lien Law (Chapter 713, Part I) gives lien rights to contractors, subcontractors, sub-subcontractors, suppliers and laborers who improve real property and comply with the statute. Three thresholds decide whether it even applies to your plumbing job:

  • $2,500 or less: an improvement with a direct contract price of $2,500 or less is exempt from all of Part I except 713.05, the direct contractor's own lien (713.02(5)). On a small repair, the plumber you hired may have lien rights, but the Notice of Commencement and Notice to Owner machinery generally does not apply.
  • Unlicensed: no lien exists in favor of any contractor, subcontractor or sub-subcontractor who is unlicensed under 489.128 (713.02(7)).
  • Over $2,500 on a home of up to four units: the direct contract must contain the statutory lien-law warning in at least 12-point capitalized bold type, on the front page or a separate page signed and dated by the owner (713.015). It begins "ACCORDING TO FLORIDA'S CONSTRUCTION LIEN LAW..." and tells you to require written releases from anyone who has sent you a Notice to Owner.

Florida also prohibits advance waivers. A right to claim a lien may not be waived in advance, and any advance waiver is unenforceable (713.20(2)). A clause in a plumbing contract saying "contractor waives all lien rights" before work starts will not hold up in Florida.

Do I need a Notice of Commencement for a repipe in Florida?

Usually yes. Except for improvements exempt under the $2,500 rule, an owner (or the owner's authorized agent) must record a Notice of Commencement (NOC) with the clerk of court before actually starting the improvement, and post a certified copy, or a notarized statement that it has been filed along with a copy, at the job site (713.13(1)(a)). A typical whole-house repipe, sewer line replacement or tankless water heater conversion costs well over $2,500, so it needs one.

What goes in it

The legal description and address of the property, a general description of the work, the owner's name, address and interest, the contractor's name and address, any payment bond surety, an optional person designated to receive notices, and an expiration date. Unless a different date is stated, the NOC expires one year after recording (713.13(1)(c), (d)).

How it connects to your permit

  • Every Florida permit card must carry the warning: "YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE SITE OF THE IMPROVEMENT BEFORE THE FIRST INSPECTION" (713.135(1)(a)).
  • If the direct contract is greater than $5,000, the applicant must file a copy of the recorded NOC with the permitting office before the first inspection, or inspections after the first cannot be approved (713.135(1)(e)).
  • The permit office cannot require a recorded NOC to issue the permit (713.135(1)(f)).
  • Those permit-office NOC requirements do not apply to a direct contract to repair or replace an existing heating or air-conditioning system under $15,000. That carve-out is for HVAC, not plumbing; a water heater or repipe does not fall under it.

Why it matters to you

The NOC tells subs and suppliers where to send their Notices to Owner, and it sets up the "proper payment" rules that protect you. Payments made after the NOC expires are improper payments that "can result in your paying twice." On long projects, make sure the NOC is extended before it expires. Many plumbers prepare the NOC for the owner to sign; you still need to sign it before a notary, and you should keep the recorded copy.

What is a Notice to Owner in Florida, and what do I do when I get one?

A Notice to Owner (NTO) is a notice from a subcontractor, sub-subcontractor or supplier you did not hire directly. Under 713.06(2)(a), every lienor not in privity with the owner, except laborers, must serve it as a condition of having a lien. It must be served before starting, or no later than 45 days after starting, to furnish labor, services or materials, and in any event before the owner's final payment after the contractor has furnished its final payment affidavit. Failing to serve it, or serving it late, is a complete defense to the lien.

The statutory form begins with a capitalized warning that Florida's law "ALLOWS SOME UNPAID CONTRACTORS, SUBCONTRACTORS, AND MATERIAL SUPPLIERS TO FILE LIENS AGAINST YOUR PROPERTY EVEN IF YOU HAVE MADE PAYMENT IN FULL" and that to avoid paying twice "YOU MUST OBTAIN A WRITTEN RELEASE FROM US EVERY TIME YOU PAY YOUR CONTRACTOR."

An NTO is not a lien, not a cloud on title, and not an accusation that anyone is unpaid. Supply houses send them routinely on every job. It does change how you should pay:

  1. Keep a list of everyone who sends you an NTO.
  2. Before each payment to your contractor, ask for a written lien waiver and release from each NTO sender, covering work through that date, in the forms provided by 713.20(4) and (5).
  3. If a waiver is missing, you can pay the sub or supplier directly or issue a joint check to the contractor and that lienor, and deduct it from what you owe the contractor (713.06(3)).
  4. Before the final payment, require the contractor's sworn final payment affidavit.

The owner owes nothing to a lienor (other than laborers) who has not served a notice at the time a payment is made (713.06(3)(c)1.). That is the core protection: pay correctly against the NTOs you have received, and late senders are out of luck.

Florida's final payment affidavit and the 90-day lien deadline

Contractor's final payment affidavit

When final payment comes due, the contractor you hired must give you a sworn Contractor's Final Payment Affidavit stating that all lienors who timely served a Notice to Owner have been paid in full, or listing anyone unpaid and the amount (713.06(3)(d)1.). The contractor must deliver it at least 5 days before filing any lawsuit to enforce its own lien, and has no lien or right of action against you while in default for not giving it. If the affidavit lists unpaid bills, you may, after giving the contractor at least 10 days' written notice, pay those bills directly and deduct them.

A contractor who signs a false statement that subcontracted work and materials have been paid, causing an owner financial loss, can also be disciplined under 489.129(1)(k), and that violation is one of the grounds for the Florida Homeowners' Construction Recovery Fund.

Claim of lien deadlines

StepFlorida deadlineSection
Notice to Owner (subs and suppliers)Before or within 45 days after first furnishing713.06(2)(a)
Record claim of lienNo later than 90 days after the lienor's final furnishing of labor, services or materials713.08(5)
Serve claim of lien on ownerBefore recording or within 15 days after; late service makes the lien voidable to the extent it prejudiced someone713.08(4)(c)
Contractor's final payment affidavitAt least 5 days before suing to enforce713.06(3)(d)
Lien lasts1 year from recording unless a foreclosure action is filed713.22(1)
Owner's Notice of Contest of LienShortens the lienor's time to sue to 60 days from service713.22(2)
Order to show causeLienor must show cause within 20 days after service of summons why the lien should not be enforced or cancelled713.21(4)

"Final furnishing" means the last day the lienor actually did contract work or delivered materials, not a warranty callback or a trip to fix a punch-list item. Courts have long scrutinized late visits made to extend the deadline.

How long does a plumbing lien last, and how do I remove one in Florida?

A Florida construction lien lasts one year after the claim of lien is recorded (or one year after an amended claim showing a later final furnishing date), unless the lienor files a lawsuit to enforce it within that time (713.22(1)). The recorded claim of lien itself warns that it "MAY REMAIN VALID FOR ONE YEAR FROM THE DATE OF RECORDING."

Ways to discharge it (713.21 and 713.22):

  1. Satisfaction or release signed by the lienor, notarized and recorded, citing the official records reference of the lien. This is what you should get when you settle.
  2. Notice of Contest of Lien. You or your attorney record and serve this notice; the lienor then has only 60 days from service to sue, or the lien is extinguished.
  3. Order to show cause. Any interested party can file a complaint in circuit court; the clerk issues a summons requiring the lienor to show cause within 20 days why the lien should not be enforced or cancelled. If the lienor does not, the court orders it cancelled.
  4. Running out of time: no action filed within one year.
  5. A final judgment recorded with the clerk.
  6. Transfer to security. Chapter 713 also lets an owner move a lien off the property by posting a bond or cash deposit with the clerk, which is common when a sale cannot wait. Ask a lawyer or the clerk about the amount required.

Fraudulent liens and fees

A lien is fraudulent if the lienor willfully exaggerated the amount, willfully included work not performed or materials not furnished, or prepared it with such willful and gross negligence that it amounts to willful exaggeration. A fraudulent lien is unenforceable, and the owner can sue for damages (713.31). A minor mistake or a good-faith dispute over the amount is not enough. In actions to enforce a lien, the prevailing party recovers reasonable attorney's fees (713.29), which cuts both ways: owners who fight a valid lien and lose may pay the plumber's lawyer.

When your contractor took your money and did not pay the plumber

If a contractor receives payment for improving real property, it must apply that money to amounts then due for labor and materials on that job. Knowingly and intentionally failing to do so is misapplication of construction funds, a felony in Florida (713.345): third degree under $1,000, second degree from $1,000 to under $100,000, and first degree at $100,000 or more. Report it to local law enforcement and DBPR. It is also a recovery fund ground.

Texas vs Florida plumbing liens at a glance

QuestionTexas (Prop. Code ch. 53)Florida (Fla. Stat. ch. 713, Part I)
Small jobs exempt?No dollar exemption; homestead rules often block liens on service callsDirect contracts of $2,500 or less exempt from most of the law
Homestead special ruleWritten contract before work, both spouses sign, filed with county clerkNo equivalent spousal-signature contract rule for construction liens
Unlicensed contractorLicensing affects discipline; lien rights depend on Chapter 53 complianceNo lien rights for unlicensed contractors and subs
Owner start noticeNone statewideNotice of Commencement required on most improvements over $2,500
Sub's early noticeNotice of claim by 15th day of 2nd month (residential)Notice to Owner within 45 days of first furnishing
Owner holdback10 percent for 30 days after completionNo statutory retainage; protection comes from proper payments and releases
Lien filing deadline15th day of 3rd month (residential) after completion or last work90 days after final furnishing
Time to sue on lien1 year after last day to file affidavit (extendable to 2 years by agreement)1 year after recording; 60 days after a Notice of Contest
Advance waiversAllowed only in pre-work single-family contracts and subcontracts (not material-only suppliers), or by statutory formNot allowed
Waiver formsFour mandatory statutory formsStatutory forms for progress and final payment; others enforceable on their terms
Attorney's feesEquitable and just; residential owner not required to payPrevailing party recovers fees

For plumbing companies: how to protect your lien rights

If you run a plumbing business, lien rights are your security on larger jobs. They also disappear quickly if you miss a step. A practical system:

In Texas

  • Homestead jobs: for any repipe, sewer replacement, remodel rough-in or other large residential job, use a written contract signed before work starts, by both spouses if the owner is married, and file it with the county clerk. Without that, you are usually an unsecured creditor on a homestead.
  • Know whether you are the original contractor or a sub. Subs must send the 53.056 notice of claim by the 15th day of the second month (residential). Calendar it the day each invoice goes unpaid.
  • Retainage: if your subcontract has retainage, send the 53.057 notice within 30 days after completion or termination.
  • File and send on time: affidavit by the 15th day of the third month (residential), copy to the owner within 5 days.
  • Use only statutory waiver forms, and never sign an unconditional waiver before your payment clears.
  • Required disclosures: your proposals and invoices must show the RMP's name and license number and TSBPE's contact information (Occ. Code 1301.302; 22 TAC 367.10).

In Florida

  • Stay licensed. An unlicensed contractor has no lien, and its contracts are unenforceable by it (489.128; 713.02(7)).
  • Contract notice: include the 713.015 lien warning in every residential direct contract over $2,500, and the Homeowners' Construction Recovery Fund notice required by 489.1425.
  • Notice of Commencement: help the owner record and post it, and file a copy with the permit office before the first inspection on jobs over $5,000.
  • As a sub or supplier: serve your Notice to Owner within 45 days of first furnishing, and on the contractor too where required.
  • Final payment affidavit: if you are the direct contractor, deliver it at least 5 days before any suit.
  • Record within 90 days of final furnishing and serve the owner within 15 days of recording.
  • Do not exaggerate. Willful exaggeration makes a lien fraudulent and exposes you to damages, plus the owner's attorney's fees if you lose.
  • Pay your own subs and suppliers. A new section, 489.1295, requires licensed contractors to pay subs and suppliers within 45 days after receiving payment for their work (or per contract terms) unless there is a bona fide dispute. Liens recorded against your customer for supplies you were paid for, and not removed within 75 days, are grounds for discipline (489.129(1)(g)).

For more on running the business side, see starting a plumbing business.

Real-world scenarios

Scenario 1: Emergency slab leak repair in Orlando, $1,900

A plumber reroutes a hot water line after a slab leak. The direct contract price is under $2,500, so Chapter 713 is mostly inapplicable: no Notice of Commencement, no Notice to Owner rules. The plumber you hired keeps its own lien rights under 713.05 if licensed. If you dispute the bill, expect a demand and possibly a small lien; resolving the bill directly or in small claims is usually cheaper than fighting it.

Scenario 2: $14,500 PEX repipe in Tampa

Over $2,500, so the contract needs the 713.015 warning and the recovery fund notice. The owner should record a Notice of Commencement before work starts, and because the contract exceeds $5,000, a copy goes to the permit office before the first inspection. If the supply house sends a Notice to Owner, the owner should get its release (or pay it by joint check) before paying the plumber. At the end, the owner asks for the final payment affidavit and a final waiver from the plumber and any NTO sender.

Scenario 3: Sewer line replacement on a Houston homestead, no spouse signature

The husband signs a $12,000 contract; the wife does not; nothing is filed with the Harris County clerk. If the owners refuse to pay, the plumber can sue on the contract, but a lien affidavit on the homestead is open to a summary motion to remove under 53.160(b)(6). The owners should still pay what they fairly owe; avoiding a lien is not the same as avoiding the debt.

Scenario 4: Plumbing sub on a San Antonio remodel

The homeowner pays the general contractor in full on completion. The plumbing sub, unpaid, sends a proper notice of claim and files a lien. Because the owner did not keep the 10 percent retainage for 30 days, the owner may be liable up to that retainage amount. Had the owner retained 10 percent and withheld after the notice, the owner's exposure would be limited to the reserved funds.

Scenario 5: Rental duplex in Jacksonville, unlicensed "plumber"

An unlicensed handyman replaces drain lines and records a claim of lien when the landlord refuses to pay. Under 713.02(7), no lien exists in favor of an unlicensed contractor, and under 489.128 the contract is unenforceable by him. The landlord should consult a lawyer about an order to show cause or a Notice of Contest, and report unlicensed activity to DBPR.

Liens when you sell your home

Title companies search the county records before a closing. A recorded lien affidavit or claim of lien, even an invalid one, will usually have to be paid, released, bonded off or removed by court order before the title company will insure the sale.

  • Texas: a buyer can request, before closing, a written affidavit from the seller stating that the seller has paid all contractors, laborers and suppliers in full for improvements through a stated date, or listing who is owed (Prop. Code 53.085(b)). A false statement is a misdemeanor.
  • Florida: title searches also look for open Notices of Commencement and open or expired permits. An expired NOC from a finished repipe is usually cleared with a recorded termination or by showing it has lapsed, but ask the title company early.
  • If a lien is disputed and the closing cannot wait, bonding or transferring the lien to security moves the dispute off the property so the sale can close.

Keep a folder for every major plumbing job: the contract, permit, final inspection, Notices to Owner received, every waiver and release, and proof of payment. It is the fastest way to clear a lien question at closing. Our selling a house guide covers plumbing disclosures and repairs in more depth.

What can a plumber do if it has no lien rights?

Losing lien rights does not erase the debt. A plumber who missed a Texas homestead requirement, a Florida deadline, or who worked on a Florida job of $2,500 or less as a sub, still has ordinary collection tools:

  • Sue on the contract or invoice in Texas justice court (civil cases up to $20,000) or Florida county court. A signed work order, text messages approving the work, and photos are usually enough to prove an agreement.
  • Get a judgment and then a judgment lien. A recorded judgment can become a lien on non-exempt property under each state's judgment laws. Homestead exemptions limit what a creditor can reach, especially in Texas and Florida, which both protect homesteads strongly from general creditors.
  • Use collections that follow federal and state debt collection rules.
  • In Florida only, consider who else owes. If a general contractor took the owner's money and did not pay the plumbing sub, the contractor may face discipline for liens or nonpayment (489.129(1)(g), 489.1295), and a misapplication of funds case under 713.345.

For homeowners, the lesson runs the other way: a plumber's lack of lien rights is a defense to the lien, not a reason not to pay for work that was properly done. Courts and licensing boards look poorly on owners who use technicalities to avoid paying a fair bill.

Payment bonds: the lien alternative on bigger jobs

On large projects, especially commercial buildouts and some high-end residential work, the owner can require the contractor to furnish a payment bond, a surety's promise to pay subs and suppliers if the contractor does not.

  • Florida: if the owner and contractor agree that the contractor will furnish a payment bond under 713.23, then once the owner receives it, the owner is exempt from the other provisions of Part I as to that direct contract, although the bonded contractor keeps its own lien rights. The bond secures liens that later accrue. The surety's name and bond amount go on the Notice of Commencement, with a copy of the bond attached.
  • Texas: Chapter 53 recognizes payment bonds on private projects (Subchapter I) and bonds to indemnify against a specific lien (Subchapter H). Filing a compliant bond is one of the listed ways to discharge a lien of record (53.157).

For a typical home plumbing job, a payment bond is rarely worth the premium. For a restaurant buildout or a multi-unit repipe, ask your attorney or the general contractor whether bonding makes sense. See our commercial plumbing guide for tenant improvement planning.

Should I ask my plumber for a lien waiver?

On a routine service call paid in full on the spot, a paid invoice marked "paid in full" is normally enough. On any job where you pay in stages, where subs or suppliers are involved, or where the price is large, yes.

JobTexasFlorida
Service call or small repair, paid by card on completionPaid invoice; lien risk on a homestead is low without a filed written contractPaid invoice; jobs of $2,500 or less are exempt from most of Ch. 713
Water heater or fixture replacement $2,500 to $5,000Paid invoice plus final waiver if subs or suppliers sent noticesFinal waiver from the plumber; releases from any NTO senders
Repipe, sewer replacement, remodel plumbingConditional then unconditional statutory waivers at each draw; keep 10 percent retainage 30 days; bills-paid affidavit at the endRecord NOC; releases from plumber and NTO senders at each draw; final payment affidavit; final waivers

A waiver is not an admission that the work was good. Waivers cover lien rights for amounts paid; your warranty and complaint rights remain. If the work is defective, document it and pursue it separately. See plumber complaints and disputes.

How to choose a provider

  • Find out whether the property is a homestead (Texas) or whether the job is over $2,500 (Florida).
  • Texas homestead projects: sign a written contract before work, both spouses, and have it filed with the county clerk.
  • Texas: keep 10 percent of the contract price until 30 days after completion.
  • Texas residential: ask for the list of subcontractors and suppliers and do not waive it.
  • Florida jobs over $2,500: check the contract for the lien-law warning and the recovery fund notice.
  • Florida: record and post a Notice of Commencement before work begins, and track its expiration date.
  • Keep every notice of claim (Texas) or Notice to Owner (Florida) you receive.
  • Collect a conditional waiver with each payment and an unconditional waiver after it clears.
  • Get a bills-paid affidavit (Texas) or contractor's final payment affidavit (Florida) before final payment.
  • If a lien is filed, calendar the deadlines and request a written release explaining why it is invalid.
  • Talk to a construction or real estate attorney before contesting a lien, because fee rules can shift costs.
  • Store the contract, permit, final inspection, notices, waivers and payment proof for your eventual sale.

Related plumbing guides

Plumbing by state and city

Questions people ask

Can a plumber put a lien on my house without a contract?

In Texas, not on your homestead: a homestead lien requires a written contract signed before work, by both spouses if married, and filed with the county clerk. On non-homestead property, a written contract is not strictly required, but the plumber must meet Chapter 53's notice and filing deadlines. In Florida, the plumber you hired directly can have a lien for an oral contract, but jobs of $2,500 or less are exempt from most of the lien law and unlicensed contractors have no lien rights.

Can a plumbing subcontractor lien my house if I paid the general contractor?

Yes, in both states, if the sub follows the notice rules. In Texas, your risk is generally limited to the 10 percent retainage you must hold for 30 days after completion plus amounts you pay the contractor after receiving the sub's notice of claim. In Florida, if the sub served a timely Notice to Owner and you paid without getting its release, you may have to pay again. Getting releases at each payment prevents this.

What is a Notice to Owner in Florida?

It is a notice that a subcontractor or supplier you did not hire directly must serve within 45 days of first furnishing labor or materials to preserve its lien rights under Fla. Stat. 713.06. It is not a lien and does not mean anyone is unpaid. It tells you to collect a written lien release from that company each time you pay your contractor, or to pay it by joint check.

How long does a plumbing lien last?

In Florida, a claim of lien expires one year after recording unless the lienor files a foreclosure suit, and an owner can shorten that to 60 days with a recorded Notice of Contest of Lien. In Texas, the claimant must sue to foreclose by the first anniversary of the last day the lien affidavit could have been filed, extendable to the second anniversary of filing only by a recorded written agreement with the owner.

What are the Texas homestead lien rules for contractors?

Under Property Code 53.254, the contractor and owner must sign a written contract before any labor or materials are provided, both spouses must sign if the owner is married, and the contract must be filed with the county clerk. The lien affidavit must state at the top that it is not a lien, only an affidavit claiming one, and subs' notices must include a statutory explanation of the 10 percent reservation.

Do I need a Notice of Commencement for a repipe in Florida?

Almost always. A Notice of Commencement is required for improvements other than those with a direct contract price of $2,500 or less, and must be recorded and posted before work starts. Because most repipes exceed $5,000, a copy must also be filed with the permitting office before the first inspection, or later inspections cannot be approved. The HVAC carve-out for repairs under $15,000 does not cover plumbing.

What is a lien waiver and should I ask my plumber for one?

A lien waiver and release is a signed document in which the plumber gives up lien rights for amounts it has been paid. Texas requires one of four statutory forms (conditional or unconditional, progress or final). Florida provides progress and final payment forms and bars advance waivers. For staged payments, large jobs, or jobs with subs and suppliers, ask for a waiver with every payment.

What is the difference between a conditional and an unconditional waiver?

A conditional waiver releases lien rights only once your payment actually clears, so it is the right form when you hand over a check or start a transfer. An unconditional waiver is effective immediately and should only be signed after the money is received. In Texas, no one may require a plumber to sign an unconditional waiver for a payment not yet received in good funds.

How do I remove a plumber's lien that I think is invalid?

Start with a written request for a release explaining why the lien is invalid. In Texas, you can file a summary motion to remove under Property Code 53.160 on grounds such as missed notices or a homestead without a filed written contract, or bond around the lien. In Florida, you can record a Notice of Contest of Lien, file for an order to show cause, or transfer the lien to a bond. Talk to an attorney about fee exposure first.

Can a plumber file a lien for more than I owe?

Not legally. In Florida, a lien with a willfully exaggerated amount, or one that includes work not performed, is fraudulent and unenforceable, and the owner can sue for damages. A good-faith dispute or minor error does not count. In Texas, knowingly filing a fraudulent lien can create liability under Civil Practice and Remedies Code 12.002. Document what was actually done and paid.

What should a plumber do first when a customer will not pay?

Send a clear written demand with the invoice and a deadline, then calendar the lien deadlines immediately. In Texas, check whether the property is a homestead and whether you have a filed written contract; if you are a sub, send the notice of claim by the 15th day of the second month for residential work. In Florida, confirm you served any required Notice to Owner and record within 90 days of final furnishing.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration