Local Guide · Roofing

Roofing Contract Checklist: What Must Be in Writing in Texas and Florida

The scope, payment, warranty and protection terms every roof contract should have, plus the notices Texas and Florida law require, with the statute behind each one and what happens if it is missing.

A good roofing contract names the exact materials, scope, price, payment schedule, start and finish dates, permit responsibility, decking unit price, cleanup, insurance, and written warranties. It must also carry state notices. Florida contracts over $2,500 need the Construction Lien Law and Recovery Fund notices, plus roof-specific notices under s. 489.147. Texas insurance-paid contracts of $1,000 or more need the deductible notice, and homestead jobs need a written, signed and recorded contract to support a lien.

Key facts

  • Florida residential contracts over $2,500 must include the Florida Homeowners' Construction Recovery Fund notice (Fla. Stat. 489.1425).
  • Florida direct contracts over $2,500 for 1-4 unit homes must include the Construction Lien Law notice in at least 12-point capitalized bold type, signed and dated by the owner (Fla. Stat. 713.015).
  • Florida roof contracts must include a notice of the ban on inspection and claim inducements; if it is missing, the owner may void the contract within 10 days (Fla. Stat. 489.147(5)).
  • Florida roof contracts must include a 14-point bold statement advising the owner to contact the insurer before signing if the work relates to a claim (Fla. Stat. 489.147(7)).
  • A Florida contractor taking more than 10% up front on residential work must apply for permits within 30 days and start within 90 days after permits issue, unless the owner agrees in writing otherwise (Fla. Stat. 489.126).
  • Texas contracts reasonably expected to be paid from a property insurance claim, priced at $1,000 or more, must contain a 12-point bold deductible notice (Tex. Bus. & Com. Code 27.02).
  • To fix a lien on a Texas homestead, the contract must be written, signed before work begins, signed by both spouses if married, and filed with the county clerk (Tex. Prop. Code 53.254).
  • Texas residential construction contracts subject to Prop. Code ch. 27 must include a 10-point bold Chapter 27 notice; if missing, the owner may recover a $500 civil penalty (Tex. Prop. Code 27.007).
  • Texas owners must retain 10% of the contract price during the work and for 30 days after completion (Tex. Prop. Code 53.101).

Why your roof contract matters more than the estimate

The estimate tells you what the roofer plans to do. The contract decides what you can enforce. If something is not in the contract, it is hard to prove it was promised. And in Texas and Florida, the contract is also where the law requires specific warnings that protect you from liens, deductible schemes and high-pressure sales.

Use this page as a checklist before you sign. Bring it to the table, and do not sign a contract with blank spaces. TDI, the FTC and Florida's consumer advocate all give that warning.

This is general information, not legal advice. For large jobs, HOA projects or anything unusual, have an attorney review the contract.

Part 1: what every roofing contract should include

Parties and licensing

  • The contractor's legal business name, address, phone and email. In Florida, the license number must appear on the contract.
  • Your name and the property address. In Texas, if the home is your homestead and you are married, both spouses should sign (see Part 3).
  • The name of the job supervisor.

Scope of work

  • Full tear-off down to the deck, with the number of layers to be removed.
  • Deck inspection and the price per sheet for any replacement, with your approval required before extra sheets (see 'rotten wood' below).
  • Florida: secondary water barrier method and deck re-nailing method required by state law for site-built single-family reroofs.
  • Underlayment brand and type; where self-adhered membrane goes.
  • Drip edge, starter, valleys, step flashing, counterflashing, chimney and skylight flashing, pipe boots and vents: new or reused, and which.
  • Ventilation plan.
  • Gutters: remove and reset, replace, or excluded.
  • Texas coast: TDI windstorm inspection for TWIA eligibility, if applicable.

Materials

  • Manufacturer, product line, color, and wind and impact ratings for the field shingles or tile.
  • Manufacturer hip and ridge and starter products if a warranty depends on them.
  • No 'or equal' substitutions without your written approval.

Price and payment

  • Total price, and what is excluded.
  • Deposit amount and what it pays for.
  • Progress and final payment triggers, tied to milestones (materials delivered, dry-in, final inspection passed).
  • Unit prices for hidden conditions (decking, fascia, extra layers).
  • Texas: the 10% statutory retainage you hold for 30 days after completion.
  • Lien paperwork before final payment: Florida final payment affidavit and releases; Texas final bills-paid affidavit.

Schedule

  • Start window and expected completion date, with weather delays defined.
  • What happens if the contractor stops working (Florida presumes abandonment after 90 days without just cause for licensing discipline).

Permits and inspections

  • The contractor pulls the permit in its own name and schedules inspections.
  • Final payment after the final inspection passes.

Site protection and cleanup

  • Protection for landscaping, pool, A/C units, windows, driveway and attic contents.
  • Daily cleanup and a magnetic nail sweep at the end of the job.
  • Contractor is responsible for damage it causes.

Insurance

  • Contractor maintains general liability (and workers' comp where required) for the whole job; certificate attached.

Warranties

  • Exact manufacturer warranty name, who registers it, and by when you get the registration.
  • Workmanship warranty length and what it covers, in the contract itself.

Changes and disputes

  • Change orders in writing, signed, with price, before the work.
  • How disputes are handled (see Part 4).
  • Cancellation terms and any required cancellation notice.

Part 2: Florida-required notices and rules

Florida stacks several mandatory notices onto residential roof contracts. Check for each one.

RequirementWhen it appliesWhat it says or doesIf it's missing
Construction Lien Law notice (s. 713.015)Direct contracts over $2,500 for improvements to 1-4 unit residential propertyIn at least 12-point, capitalized, bold type, signed and dated by the owner. It warns that unpaid subcontractors and suppliers can lien your home even if you paid the contractor in full, and advises requiring lien releases from anyone who served a Notice to Owner before each payment.Ask for it before signing. It protects you more than the contractor.
Recovery Fund notice (s. 489.1425)Residential repair or improvement contracts unless labor and materials total $2,500 or lessStates that payment, up to a limited amount, may be available from the Florida Homeowners' Construction Recovery Fund if you lose money due to specified violations by a licensed contractor, followed by the Construction Industry Licensing Board's address and phoneThe board may fine the contractor up to $500 for a first violation and $1,000 for later ones
Inducement-ban notice (s. 489.147(5))Every contract to repair or replace a residential roofNotice that the contractor may not offer gifts, cash, gift cards, coupons, deductible waivers or other things of value for an inspection or a claimYou may void the contract within 10 days after signing
Contact-your-insurer statement (s. 489.147(7))Every contract to repair or replace a residential roofIn bold, at least 14-point, on the signature page: if the work relates to an insurance claim, contact your insurer to verify coverage, deductibles and policy terms before signingA violation subject to discipline and fines
Emergency cancellation notice (s. 489.147(6))Contracts signed during a Governor-declared emergency for the areaIn bold, at least 14-point, right before your signature: you may cancel without penalty within 10 days or by the official start date, whichever is first, if signed within 180 days of the declared eventThe cancellation right exists anyway for qualifying contracts
Itemized estimate (s. 489.147(2)(e))Repair agreements tied to a property insurance claimContractor must give a good-faith itemized estimate of services and materialsViolation subject to fines up to $10,000
License number (s. 489.119)Every bid, proposal, contract and advertisementThe contractor's certification or registration numberNotice of noncompliance and fines
Chapter 558 notice (s. 558.005)Written contracts between owner and contractor after Oct. 1, 2009, unless both opt out'Any claims for construction defects are subject to the notice and cure provisions of Chapter 558, Florida Statutes.'No penalty; the notice is for awareness
Buyer's right to cancel (s. 501.031)Home solicitation sales (sold at your home)Caption 'BUYER'S RIGHT TO CANCEL' with the statutory 3-business-day textThe cancellation right under s. 501.025 still applies

Florida deposit and start rules (s. 489.126)

If the contractor receives more than 10% of the contract price as an initial payment on residential work, it must apply for permits within 30 days of payment and start work within 90 days after the permits issue, unless you agree in writing to longer periods or the contractor has just cause. A contractor who has received more money than the value of work performed may not stop work for any 90-day period (or a period you agree to in the contract). Misapplying a deposit is a crime: a misdemeanor under $1,000 and a felony from $1,000 up, and intent to repay is not a defense.

Write the start and permit dates into the contract. If you agree to a longer timeline, make sure it is a deliberate choice.

Florida payments to subcontractors

Since 2026, a Florida licensed contractor must pay its subcontractors and suppliers within 45 days after receiving payment for their work (or per contract terms), unless the amount is genuinely disputed. That is a contractor duty, but it lowers your lien risk. Your contract can require proof.

Notice of Commencement

For jobs over $2,500, Florida owners must record a Notice of Commencement and post it at the job site before the first inspection. Many roofers prepare it for your signature. It expires 1 year after recording unless it states another date. Payments after it expires can be 'improper payments' that leave you exposed to paying twice. See roofing liens.

Part 3: Texas-required notices and rules

RequirementWhen it appliesWhat it says or doesIf it's missing
Deductible notice (Bus. & Com. Code 27.02)Contracts for goods or services reasonably expected to be paid wholly or partly from a property insurance claim, priced at $1,000 or moreIn at least 12-point bold: Texas law requires the insured to pay any applicable deductible, and it is a violation for the seller to knowingly allow or help the insured avoid paying itThe underlying deductible rules still apply; a seller who waives or rebates it commits a Class B misdemeanor
Homestead lien formalities (Prop. Code 53.254)Work on your homestead where the contractor wants lien rightsWritten contract setting out the terms, signed before work or materials begin, signed by both spouses if married, and filed with the county clerkThe contractor may not be able to fix a valid lien on your homestead
Homestead improvement warning (Prop. Code 41.007)Contracts for improvements to a homestead described in 41.001(b)(3)In at least 10-point bold: 'IMPORTANT NOTICE: You and your contractor are responsible for meeting the terms and conditions of this contract. If you sign this contract and you fail to meet the terms and conditions of this contract, you may lose your legal ownership rights in your home. KNOW YOUR RIGHTS AND DUTIES UNDER THE LAW.'A violation is actionable under the DTPA
Arbitration clause formatting (Prop. Code 41.007)Same homestead improvement contracts with binding arbitrationThe arbitration clause must be in at least 10-point boldNot enforceable against the owner
'Know Your Rights' disclosure (Prop. Code 53.255)Residential construction contracts, delivered before you signA statutory overview of your rights, risks and lien law, including that you do not have to convey your property to the contractorAsk for it before signing
Subcontractor and supplier list (Prop. Code 53.256)Residential construction contracts (with limited exceptions)List of subs and suppliers before construction begins, updated within 15 days of changesAsk for it; it lets you track lien risk
Chapter 27 notice (Prop. Code 27.007)Written residential construction and repair contracts covered by the Residential Construction Liability ActIn 10-point bold: the contract is subject to Chapter 27, and you must give written notice by certified mail at least 60 days before suing over a construction defectYou may recover a $500 civil penalty from the contractor
Home solicitation cancellation form (Bus. & Com. Code 601.052-.053)Door-to-door sales over $25Complete copy of the contract plus a detachable notice of cancellation form, in duplicate, in 10-point boldThe 3-business-day right to cancel still applies
Final bills-paid affidavit (Prop. Code 53.259)Final payment under a residential construction contractContractor's sworn statement that everyone has been paid, or listing who is owedFalse statements are a misdemeanor, and the signer is personally liable

Texas retainage (Prop. Code 53.101)

Texas owners must reserve 10% of the contract price, or 10% of the value of work done, during the work and for 30 days after the work is completed. This is your shield if a subcontractor or supplier later claims it was not paid. Put it in the payment schedule so there is no argument at the end.

No contractor adjusting

Texas contractors may not act as public adjusters on property they may repair, even with a power of attorney (Insurance Code 4102.163). A contract clause that lets the roofer 'negotiate your claim' or 'act as your representative with the insurer' is a red flag.

For more on Texas rules, see Texas roofing laws on deductibles and contracts.

What payment schedule is normal for a roof replacement?

There is no single legal schedule in either state, but a common, protective structure looks like this:

PaymentTriggerWhy
DepositContract signed or materials orderedCovers material ordering. Keep it modest. Florida's consumer advocate says advance payment should never exceed 50%.
Progress paymentMaterials delivered and roof dried inYou can see real progress on the roof.
Final paymentFinal inspection passed, cleanup done, lien paperwork receivedLeverage to get the punch list and paperwork done.
Texas retainage30 days after completionRequired by Prop. Code 53.101.

For insurance jobs, coordinate with the insurer's payment timing. Many replacement-cost policies pay actual cash value first and the rest after work is done. In Florida, the insurer must initially pay at least actual cash value less the deductible and pay the rest as work is performed.

Pay by check or card, not cash. The FTC advises against wire transfers, gift cards, payment apps and crypto.

Should a roofing contract list the shingle brand and color?

Yes. A contract that says 'architectural shingles' lets the roofer install any brand or line. List:

  • Manufacturer (for example, the brand name)
  • Product line
  • Color name
  • Wind classification (such as ASTM D7158 Class H or D3161 Class F) and impact rating (UL 2218 Class 4), if those matter to your insurer or warranty
  • Matching starter, hip and ridge and underlayment products if your warranty requires them

In Texas, impact-resistant roofing credits depend on the product being labeled with its UL 2218 class, and the roofer fills out TDI Form PC068 after installation. Put 'contractor will complete TDI Form PC068' in the contract if you are installing Class 4 shingles. See best roofing materials for Texas and for Florida.

What is a change order, and what happens if the roofer finds rotten wood?

A change order is a signed written amendment that changes the scope or price. On roofs, the most common change is rotten decking found after tear-off.

Protect yourself with three contract terms:

  1. Unit price: a fixed price per sheet of decking (state the material and thickness), per linear foot of fascia, and per extra layer removed.
  2. Photo approval: the roofer photographs damaged areas and gets your approval (text or email is fine) before replacing more than a stated number of sheets.
  3. Cap: any change over a set dollar amount needs a signed change order before the work proceeds.

If insurance is paying, tell the adjuster about hidden damage quickly and send photos. In Florida, the roofing contractor's licensed scope includes repair or replacement of wood roof sheathing or fascia as needed during roof repair or replacement, so a roofer can legally do this work.

Does my contract need a start and completion date?

It should. A start window and a target completion date give you something to enforce. In Florida, s. 489.126 adds a legal deadline if you paid more than 10% up front: permit application within 30 days and work starting within 90 days after the permit issues, unless you agreed otherwise in writing. Florida licensing rules also presume a project abandoned after 90 days if the contractor stops without just cause or without proper notice.

Weather delays are real, especially during hurricane season and Texas hail season. Define them: 'Completion within X working days of start, excluding days with measurable rain or wind above Y.' Vague 'acts of God' language with no limit leaves you with no deadline at all.

Who is responsible if the roofer damages my driveway or landscaping?

Put it in writing: 'Contractor is responsible for repairing or paying for damage to the property, landscaping, driveway, pool, A/C equipment, gutters, windows and interiors caused by its work, employees, subcontractors or equipment.' Then confirm general liability insurance is in force for the job.

Also address:

  • Where the dumpster and material delivery will go, and plywood under the dumpster to protect the driveway.
  • Interior damage from leaks during the job if the roof is left open.
  • Nails left in the yard, and who pays for tire damage.

Part 4: dispute and legal clauses to read closely

  • Arbitration: in Texas homestead improvement contracts, an arbitration clause must be in at least 10-point bold to be enforceable against you. In Florida, Chapter 558's notice-and-repair process controls over a conflicting arbitration clause.
  • Pre-suit notices: Texas Chapter 27 requires written notice by certified mail at least 60 days before suing over a construction defect, and the contract should say so. Florida Chapter 558 requires a written notice of claim at least 60 days before suit. These are not traps, but you need to know them. See our roofer dispute guide.
  • Waivers: Texas says an attempted waiver of Chapter 27 is void. Florida says lien rights cannot be waived in advance. Be cautious of any clause that asks you to waive rights.
  • Attorney's fees: some contracts give fees only to the contractor. Ask for mutual language.
  • Cancellation fees: check the amount and when it applies. Statutory cooling-off and Florida post-emergency rights override fee clauses.
  • Insurance language: any clause that assigns your claim benefits (void in Florida for policies issued on or after Jan. 1, 2023), directs payment to the contractor, or lets the contractor deal with your insurer without you. See contingency agreements.
  • Conveyance: Texas law says a contractor may not require you to convey your property to it as a condition of a residential construction contract.

For HOA boards, landlords and new roofers

  • HOA and condo boards: attach the specification, require NRCA ProCertified installers or foremen if you want that standard, name the association on the certificate of insurance, and define who signs Notices of Commencement and lien paperwork. Florida's Chapter 558 has longer timelines for associations representing more than 20 parcels. See HOA and condo roof responsibility.
  • Landlords: add tenant notice, access hours and interior protection. Florida's owner-builder exemption does not cover property offered for sale or lease, so hire a licensed roofer. See landlord roof guide.
  • New roofers: the notices in Parts 2 and 3 are your obligations. Missing Florida roof notices can let customers void contracts, and missing Texas Chapter 27 notices carry a $500 penalty. See how to start a roofing company in Texas and Florida.

How to choose a provider

  • Contractor's legal name, address and (Florida) license number on the contract.
  • Full scope: tear-off, decking unit price, underlayment, flashing, ventilation, drip edge.
  • Exact manufacturer, product line and color; no 'or equal' without your approval.
  • Total price, deposit, milestone payments and Texas 10% retainage.
  • Start window and completion date with defined weather delays.
  • Contractor pulls the permit; final payment after final inspection passes.
  • Cleanup, nail sweep and damage responsibility in writing.
  • Certificate of insurance attached.
  • Written manufacturer and workmanship warranties with registration deadline.
  • Florida: lien notice, Recovery Fund notice, 489.147 notices and Chapter 558 notice present.
  • Texas: deductible notice on insurance jobs, homestead formalities, Chapter 27 notice, Know Your Rights disclosure.
  • Change orders must be written and signed before extra work.
  • No blank spaces; get a full signed copy.

Related roofing guides

Roofing by state and city

Questions people ask

What should be in a roofing contract?

At minimum: the contractor's legal name and license or registration, the property, full scope of work, exact materials, total price, deposit and payment schedule, unit prices for hidden damage, start and completion dates, permit responsibility, cleanup and damage terms, proof of insurance, written warranties, change order rules and dispute terms. Texas and Florida also require specific notices depending on price and whether insurance is paying.

Do Florida roofing contracts need a Construction Industries Recovery Fund notice?

Yes, for residential work unless labor and materials total $2,500 or less. The notice explains that payment, up to a limited amount, may be available from the Florida Homeowners' Construction Recovery Fund if you lose money due to specified violations by a licensed contractor, followed by the licensing board's contact information. The fund can pay up to $100,000 per claim on roofing contracts signed on or after July 1, 2024.

What lien-related language should be in a Florida roofing contract?

For direct contracts over $2,500 on 1-4 unit homes, the Construction Lien Law notice in at least 12-point capitalized bold type, signed and dated by you. It warns that unpaid subs and suppliers can lien your home even if you paid in full. Add your own terms requiring lien releases from anyone who served a Notice to Owner before each payment, and the contractor's final payment affidavit before final payment.

What disclosures are required in Texas roofing contracts with insurance?

If the contract is reasonably expected to be paid from a property insurance claim and the price is $1,000 or more, it must contain the 12-point bold notice that Texas law requires the insured to pay the deductible. Residential contracts also call for the Chapter 27 construction-defect notice and, before signing, the 'Know Your Rights and Responsibilities' disclosure.

Why do both spouses have to sign a Texas roofing contract?

Texas homestead protections are strong. To fix a lien on a homestead, the contractor needs a written contract signed before work begins, signed by both spouses if the owner is married, and filed with the county clerk. Without those steps, the roofer may not be able to place a valid lien on your home, which is why careful roofers ask both spouses to sign.

Can I cancel a roofing contract after signing?

Possibly. Door-to-door sales over $25 can be cancelled until midnight of the third business day under federal, Texas and Florida law. In Florida, contracts signed within 180 days of a declared emergency can be cancelled within 10 days or by the official start date, and contracts missing the inducement-ban notice can be voided within 10 days. Otherwise, the contract's own cancellation terms apply.

Is a verbal agreement with a roofer enforceable?

Verbal agreements can be hard to prove and may not satisfy statutes that require written notices or written contracts. In Texas, a homestead lien requires a written contract. In Florida, many protections depend on notices that must be in the written contract. Always get a full, signed written contract and keep a copy.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration