Can You Put Solar on a Tile, Metal, Flat or Shingle Roof? Plus Solar Shingles Explained

How solar attaches to every common Texas and Florida roof, what Florida's 2026 code and high-wind counties require, how to avoid tile breakage and leaks, and when solar shingles make sense.

Solar works on tile, metal, flat and shingle roofs, but the mounting method changes. Standing-seam metal is easiest because clamps grip the seams without holes. Shingle roofs use flashed mounts lagged into rafters. Tile needs hooks or replacement flashings and careful handling to avoid broken tiles and leaks. Flat roofs use attached anchors or ballast, and Florida's high-wind counties favor attachment to the structure. Solar shingles in Florida must now be listed to UL 7103.

Key facts

  • Palm Beach County's code board (July 2023) said only rooftop PV attachments into trusses or rafters with lag screws had been validated for its design wind loads.
  • UL 2703, the main racking standard, excludes roof attachments, so attachments need their own Florida-approved evaluation report.
  • The Florida Building Code, Residential (2023) requires clay and concrete tile to follow the manufacturer or the FRSA/TRI High Wind Tile Installation Manual, Seventh Edition.
  • Florida's 2026 Building Code requires BIPV roof coverings to be listed to UL 7103 and renamed photovoltaic shingles BIPV roofing systems.
  • Florida's 2026 code added R905.17.5, requiring PV panel flashing to follow the roofing chapter and manufacturer instructions.
  • Fasteners within 3,000 feet of a saltwater coastline must meet new Section R332 under Florida's 2026 residential code.
  • Florida's 2023 residential code requires rooftop PV systems to carry a fire classification under UL 1703 and UL 2703.
  • Texas Property Code 202.010 includes solar roof tiles in its HOA protections; 202.011 protects solar shingles that match the subdivision.
  • The U.S. DOE says panels perform best on south-facing roofs sloped 15 to 40 degrees.

Which roof types work for solar? A quick comparison

Solar can go on almost any sound roof in Texas and Florida. What changes from roof to roof is how the racking attaches, how much the install costs, and how much risk there is of leaks or broken roofing. Here is the overview before we go roof by roof.

Roof typeCommon inHow panels attachMain riskInstaller skill needed
Asphalt shingleMost Texas suburbs, much of North FloridaFlashed mounts lagged into rafters or trussesLeaks if flashing is poor; roof may wear out before panelsStandard
Concrete tileSouth and Central Florida, newer Texas homesTile hooks or flashed standoffs, with tiles cut, replaced or swapped for flashingBroken tiles, water behind tilesHigh
Clay tileOlder Florida homes, Spanish-style homesSame as concrete tile, with more careClay is more brittle; replacements can be hard to matchHighest
Standing-seam metalCoastal and rural homes, newer buildsClamps on the raised seams, often with no roof holesWrong clamp or dissimilar metals causing corrosionModerate
Exposed-fastener metal (corrugated, R-panel)Barns, ranch homes, shopsBrackets fastened through the panel ribs into framing, with sealingLeaks at fasteners if not sealed rightModerate
Flat or low-slope (TPO, modified bitumen, built-up)Miami condos and older Florida homes, additions, commercialAttached anchors flashed into the membrane, or weighted ballastMembrane damage, ponding, wind upliftHigh; engineering usually needed
Solar shingles or BIPV roofingNew roofs, high-end buildsThe solar product is the roof coveringProduct approval, repair access, costSpecialist

"BIPV" means building-integrated photovoltaics: products that act as the roof (or wall) and also make electricity, as opposed to panels mounted above an existing roof.

The single most important point on every roof type: in high-wind areas, the racking must attach to the structure, not just the roof deck. Palm Beach County's Building Code Advisory Board said in a July 2023 advisory that only attachments directly into trusses or rafters with lag screws had been validated to resist the county's design wind loads, and that no "deck or sheathing only" system had produced enough load data.

Can solar panels go on a tile roof?

Yes. Tile roofs are common in Miami, Tampa, Orlando and newer Texas subdivisions, and installers put solar on them every day. But tile is the roof type where installer skill matters most, because tile is brittle and the water barrier is the underlayment beneath the tiles, not the tiles themselves.

First, know whether your tile is clay or concrete

The Florida Building Code treats them as separate products: clay roof tile must meet ASTM C1167 and concrete roof tile must meet ASTM C1492. Many "Spanish tile" roofs are actually concrete. Clay is usually more fragile and harder to match, which can raise the price of a solar install. Look at a broken edge or ask your roofer; it changes the quote.

The three main ways to mount on tile

  1. Tile hooks. A metal hook is screwed into a rafter or truss under the tile. The tile above is notched or ground so the hook arm passes through, and a flashing or sealant layer protects the underlayment. Lower cost, but depends heavily on careful flashing.
  2. Tile replacement flashing (sometimes called a "flashed tile" or "comp-out"). The installer removes a tile at each mount, attaches a flashed standoff to the structure through the underlayment, and replaces the tile with a metal or composite flashing piece shaped like the tile, with the post coming through a sealed boot. More labor, but it gives a true flashed penetration.
  3. Standoffs with a flashed base on the deck. Tiles are removed in the mount area, a post is attached to the structure, the base is flashed into the underlayment, and tiles are cut to fit around the post.

Ask the installer which method they use, ask for a photo of a finished mount from a past job, and ask what flashing product they use and whether it is listed for this use. Palm Beach County's expedited permit checklist requires the anchor-to-roof flashing or sealing method and products to be identified and listed for that use.

What the Florida code says about tile installation

The Florida Building Code, Residential (8th Edition, 2023), section R905.3, says clay and concrete tile must be installed per the manufacturer's instructions or the FRSA/TRI Florida High Wind Concrete and Clay Roof Tile Installation Manual, Seventh Edition. That manual, from the Florida Roofing and Sheet Metal Contractors Association and the Tile Roofing Institute, governs how the tiles and underlayment go back down. We could not confirm from a primary source whether the current manual contains a dedicated section on solar mount flashing, so we do not claim it does. In practice, the replaced or cut tiles around each mount still need to be reattached to that manual or the tile manufacturer's instructions, and Miami-Dade requires each tile system to have its own lab-tested approval (a Notice of Acceptance, or NOA) in the High Velocity Hurricane Zone.

The 2026 Florida Building Code (9th Edition, effective for permit applications submitted on or after December 31, 2026) added Section R905.17.5, requiring flashing for photovoltaic panels and modules to comply with the roofing chapter and the manufacturer's installation instructions.

Do solar installers break roof tiles?

Often, a few. Walking on tile cracks it, and cutting tiles to fit mounts produces waste. A careful crew will break fewer, and a good contract plans for breakage instead of pretending it will not happen.

Questions to settle before you sign

  • Who supplies replacement tiles? Ask the installer to confirm your tile profile and color and to have spares on site. If your tile is discontinued, ask whether they will pull matching tiles from a hidden area, such as under the array, and use the closest match where it will show.
  • Is broken tile replacement included in the price? Get it in writing.
  • Who walks the roof? Ask whether the crew uses walk pads or steps only on the lower third of tiles where they are supported.
  • What happens if a leak appears later? Ask for the roof penetration warranty in writing, how long it lasts, and who you call. See solar warranties.
  • Will this affect my roof warranty? Palm Beach County's expedited checklist requires the contractor to certify that the homeowner was advised of the impact a rooftop install might have on existing warranties. In Texas, an HOA may prohibit a solar install that voids material warranties under Property Code 202.010(d)(7).

After the install, take photos from a ladder or drone of the area around the array. Broken tiles above and beside the array can let wind-driven rain reach the underlayment.

How tile roof mounts are flashed to stop leaks

On a tile roof, the tiles shed most water, but the underlayment beneath is the real waterproof layer. Every mount passes through it. The leak-proofing job is to make each penetration through the underlayment watertight and to direct water that gets past the tiles back on top of the tiles or down the underlayment.

A sound tile mount usually has:

  1. A structural fastener into a rafter or truss, not just the deck. In Florida's high-wind counties this is what has been validated.
  2. A flashing at the underlayment, sealed with a compatible product, so water running down the underlayment flows around the post.
  3. A tile-level flashing or a cleanly cut tile with a seal, so the hook or post exits without a gap that funnels water.
  4. Re-secured surrounding tiles, attached as required by the tile installation manual or tile manufacturer.

Ask your installer to include a mount detail in the permit drawings. Palm Beach County's expedited permit requires an engineered attachment detail showing every component in the wind load path, from panel bracket to rail to roof attachment to structure. Miami-Dade lists "connections that do not meet HVHZ wind load requirements" among common plan rejections.

If your tile roof is near the end of its life

Tile itself can last a long time, but the underlayment beneath often wears out first. If your underlayment is near replacement age, replacing it before solar avoids paying to remove and reinstall the array later. See roof condition and re-roofing before solar and panel removal and reinstall.

Is a metal roof best for solar?

A standing-seam metal roof is often called the easiest roof for solar, and for good reason. The raised seams give a place to clamp racking without drilling through the roof.

Standing-seam metal

  • Clamps instead of holes. Seam clamps grip the vertical seams with set screws. No penetration means no penetration leak risk.
  • Clamp must match the seam profile. Seams come in different shapes and heights. The clamp must be tested for your seam and your wind speed. In Florida, confirm the clamp's evaluation report covers the design wind pressure.
  • Load path. When panels are clamped to seams, the roof panel and its clips are now holding the array against wind. The roof's own attachment to the deck must be adequate for that added uplift. That is an engineering question, not a sales one.

Exposed-fastener metal (corrugated or R-panel)

These roofs, common on Texas ranch houses, barns and shops, have screws visible on the surface and no tall seams. Racking uses brackets fastened through the high ribs into purlins or rafters, with gaskets or sealant. It is still simpler than tile, but each fastener is a penetration that must be sealed.

Corrosion near the coast

Salt air corrodes metal hardware, and mixing metals (for example, steel fasteners on an aluminum roof) can speed corrosion. The 2026 Florida Building Code added a requirement that fasteners and connectors within 3,000 feet of a saltwater coastline meet new Section R332. If you live near the Gulf or Atlantic in Galveston, Corpus Christi, Miami Beach, St. Petersburg or Jacksonville Beach, ask the installer what materials their clamps, rails and bolts are made of and whether they are compatible with your roof metal.

Metal roof lifespan vs panel lifespan

The U.S. Department of Energy says roofs last anywhere from 20 to 50 years depending on materials, and solar panels about 25 to 30 years. A newer metal roof is more likely to outlast the array than an older shingle roof, which is one reason metal and solar pair well. Florida also requires metal roof panels to be made under the manufacturer's product approval and a third-party audited quality program (FBC R905.10).

Solar on asphalt shingle roofs

Asphalt shingle is the most common roof in Texas and much of North Florida, and the most common one for solar. Installers use mounts with a metal flashing that slides under the shingle course above, a lag screw into a rafter or truss, and sealant. Done right, this is a well-proven detail.

  • Roof age is the main issue. If your shingles are more than halfway through their life, the roof may need replacing before the panels do. Removing and reinstalling an array costs real money. The U.S. Department of Energy notes that doing roof replacement and solar together can save money compared with doing them separately, and that panels last about 25 to 30 years, similar to many roofs.
  • Hail in North Texas. If you are in Dallas-Fort Worth or the hail belt, consider impact-rated shingles if you re-roof first, and choose panels tested to UL 61730 for hail. See hail and solar panels.
  • Windstorm certification on the Texas coast. If your home is insured through TWIA, the Texas Department of Insurance has noted that many owners install solar on TWIA-insured structures and that when a re-roof and solar share one scope, only one engineer or inspector may file the windstorm certification application. Coordinate the roofer and solar installer before work starts.
  • Florida flashing rule. The 2026 Florida Building Code's new R905.17.5 requires PV panel flashing to follow the roofing chapter and manufacturer instructions.

Can solar go on a flat roof in Florida?

Yes. Flat and low-slope roofs are common on older Miami and Tampa homes, additions, townhomes and small commercial buildings. Panels are usually tilted up on frames so they face the sun and shed rain.

Ballast vs attached anchors in hurricane zones

BallastedMechanically attached
How it worksConcrete blocks hold the racking down by weightAnchors fastened to the structure and flashed into the roof membrane
Roof holesNone or fewYes, each one flashed
Weight addedHigh; roof structure must carry itLower
Wind performanceWeight needed rises sharply with design wind speedEasier to show a continuous load path
Typical fitLower wind zones, strong concrete roofsHigh wind zones, wood-framed roofs

In Florida's high-wind counties, attached systems are generally easier to permit. Palm Beach County's board said only attachments into structural members had been validated to resist its design wind loads, and that site-specific engineering showing a continuous load path to the foundation may be acceptable to the building official. A ballast-only design in a 170 mph zone would need that kind of engineering. In Miami-Dade's High Velocity Hurricane Zone, signed and sealed plans are required and roof pressure zones are a common reason plans are rejected.

Wind is harder on flat-roof arrays because tilted panels act like wings. The ASCE 7-16 wind standard, used by the Florida Building Code since the 7th Edition (2020), added wind load methods specifically for rooftop solar panels, based on panel length, tilt, height above the roof, parapets and pressure equalization.

Other flat-roof issues

  • Membrane protection. Racking feet need pads so they do not wear through the membrane.
  • Drainage. Racking must not block drains or scuppers or create ponding.
  • Roof replacement timing. Flat roof membranes often have shorter lives than tile or metal. Replace an aging membrane before solar.
  • Edge setbacks. Palm Beach County's expedited permit requires a 3-foot setback from all roof edges and caps the gap under modules at 12 inches.
  • Lower tilt, lower production. Low tilt can reduce production a little in our latitudes compared with an ideal tilt. Model your exact tilt in PVWatts.

What are solar shingles and are they worth it?

Solar shingles, solar roof tiles and other BIPV roofing products replace part or all of your roof covering with products that make electricity. They look sleeker than panels on racks. They usually cost more per watt and can be harder to repair.

New code rules in Florida

The Florida Building Code, Residential, 9th Edition (2026), made several changes:

  • Listing: New language in R324.3.1 requires BIPV roof coverings and BIPV roof assemblies to be listed and labeled to UL 7103.
  • Name change: "Photovoltaic shingles" are now called "BIPV roofing systems" (R324.5.1).
  • Flashing: New R905.16.8 requires BIPV roofing flashing to follow the roofing chapter and manufacturer instructions.
  • Drip edge: New R905.16.8.1 requires drip edge on BIPV roofs with slopes of 2:12 and greater, fastened at most 4 inches on center, installed over the underlayment.

Do solar shingles meet Florida hurricane codes?

Some products do and some do not, and it depends on the specific product and your county. Two checks will tell you:

  1. Florida Product Approval. Search the Florida Building Commission's Product Approval database at floridabuilding.org by product name or FL number, and read the approved uses and limits, including design wind pressure and roof slope.
  2. Miami-Dade NOA if you are in Miami-Dade or Broward, the High Velocity Hurricane Zone. Products there generally need a Miami-Dade Notice of Acceptance.

Ask the seller for both documents before you sign, and confirm that the approval covers your roof slope and wind zone. If the seller cannot produce them, do not buy.

Texas rules

Texas Property Code 202.010 defines solar energy device to include a solar roof tile, so the HOA protections apply. Section 202.011 also bars an HOA from prohibiting shingles designed to provide solar generation if, when installed, they resemble the shingles used in the subdivision, are at least as durable and of equal or better quality, and match the look of surrounding properties.

Are they worth it?

They can make sense if you need a new roof anyway, care strongly about looks, and have confirmed product approvals and a local service network. For most homeowners, a standard roof plus standard panels costs less per kWh and is easier to repair after a storm. Note that the federal 25D credit, which the IRS said applied to solar shingles and solar roof tiles (but not to ordinary roofing), ended for systems whose installation is completed after December 31, 2025.

Are solar roofs and panels fire rated?

Yes. Rooftop systems and BIPV products carry fire classifications.

  • Rack-mounted panels: The Florida Building Code, Residential (2023), section R902.4, says rooftop-mounted PV panel systems on or above the roof covering must be tested, listed and identified with a fire classification under UL 1703 and UL 2703. Class A, B or C systems must be used where law requires them or where the roof edge is less than 3 feet from a lot line, which matters for tight Miami and Tampa lots and townhomes.
  • BIPV: Florida's 2026 code requires BIPV roof coverings to be listed to UL 7103.
  • Rapid shutdown: NEC 690.12 requires PV conductors on buildings to be controllable by rapid shutdown so firefighters can reduce voltage. For one- and two-family homes, the shutdown switch must be outside at a readily accessible spot.

Ask for the fire classification of the panel and racking combination listed on the spec sheets. The rating applies to the tested combination, not to the panel alone.

What roof pitch, direction and color work best?

Pitch and direction

The U.S. Department of Energy says panels perform best on south-facing roofs with a slope between 15 and 40 degrees. Nationally, Berkeley Lab data show most systems face south (56 percent in 2023) and many face west (23 percent). West-facing panels produce more in late afternoon, which can be useful on some time-based rate plans.

The law gives you some room on direction:

  • Florida: s. 163.04 lets an HOA or condo association pick the roof location only within an orientation to the south or within 45 degrees east or west of due south, and only if that does not impair effective operation.
  • Texas: An HOA may designate the roof area, unless an alternate spot increases estimated annual production by more than 10 percent as modeled by a publicly available NREL tool such as PVWatts (the lab is now the National Laboratory of the Rockies) (Property Code 202.010(d)(5)(B)). The HOA may also require panels to conform to the roof slope with the top edge parallel to the roofline, and frames, brackets and visible wiring to be silver, bronze or black.

Roof color

We found no primary study measuring how roof color changes residential panel output in Texas or Florida, so we will not give a number. The bigger factors are direction, tilt, shade and airflow under the panels. A light-colored or "cool" roof keeps the attic cooler, which helps with air conditioning, and panels shade the roof under them. Pick your roof color for the house and let the solar design follow.

Before you sign: a roof-by-roof checklist for your installer

RoofAsk the installer
TileClay or concrete? Which mount method? Who supplies replacement tiles? Mount detail photo? Penetration warranty length?
MetalClamp model tested for my seam profile and wind speed? Material compatibility? Is the roof attachment adequate for added uplift?
ShingleHow old is my roof? Flashing product? Should I re-roof first? Windstorm certificate coordination (Texas coast)?
FlatBallasted or attached? Engineering showing load path? Membrane protection and drains? Does the roof warranty survive?
BIPVUL 7103 listing? Florida Product Approval FL number? Miami-Dade NOA if HVHZ? Who repairs it after a storm?

Also verify the contractor's license: Florida solar contractors are certified (CV) or registered (RV) through DBPR's Construction Industry Licensing Board, and Texas installs must go through a TDLR-licensed electrical contractor. See Florida solar contractor licenses and Texas installer licensing.

How to choose a provider

  • Identify your roof type, and for tile, whether it is clay or concrete.
  • Have a licensed roofer estimate remaining roof or underlayment life.
  • Re-roof first if the roof will not outlast the panels.
  • Ask each installer which mount method they use and for a photo of a finished mount.
  • Confirm attachments go into rafters or trusses, with a Florida evaluation report where required.
  • Get broken-tile replacement and spare tiles written into the contract.
  • Get the roof penetration warranty length in writing.
  • Check roof warranty terms with your roofer before install.
  • For BIPV, get the UL 7103 listing, Florida Product Approval and, in Miami-Dade or Broward, the NOA.
  • Near salt water, confirm hardware materials and compatibility.
  • On the Texas coast, coordinate windstorm certification between roofer and installer.
  • Photograph the roof around the array after installation.

Related residential solar installers guides

Residential solar installers by state and city

Questions people ask

Will solar panels void my roof warranty?

They can, depending on the roof manufacturer's and roofer's warranty terms. Ask your roofer before installing, and ask the solar installer whether they offer a roof penetration warranty. Palm Beach County's expedited permit requires the contractor to certify that the homeowner was told how a rooftop install might affect existing warranties. In Texas, an HOA may prohibit a solar install that voids material warranties under Property Code 202.010(d)(7).

Is it cheaper to put solar on a metal roof?

Often, for standing-seam metal. Seam clamps attach without drilling, which saves labor and avoids flashing at each mount. Exposed-fastener metal roofs still need sealed fasteners but are usually simpler than tile. The savings depend on the clamp hardware, the engineering needed for your wind zone and whether your roof's own attachment can handle the added uplift. Compare itemized quotes rather than assuming.

Should I replace my tile roof's underlayment before going solar?

If it is near the end of its life, yes. On a tile roof, the underlayment under the tiles is the waterproof layer, and it often wears out before the tiles. Replacing it after solar means removing and reinstalling the array. Ask a licensed roofer to inspect it and estimate remaining life, and coordinate the roofer and solar installer so the mounts are flashed into the new underlayment.

What is UL 7103?

UL 7103 is the safety standard for building-integrated photovoltaic roof coverings, the products that serve as the roof and make electricity, such as solar shingles. Florida's 2026 Building Code (9th Edition) requires BIPV roof coverings and roof assemblies to be listed and labeled to UL 7103. Ask the seller for the listing and for the product's Florida Product Approval.

How do I check if a solar roof product is approved in Florida?

Search the Florida Building Commission's Product Approval database at floridabuilding.org by product name, manufacturer or FL number. Read the approved uses, design pressure limits and slope limits. In Miami-Dade and Broward, the High Velocity Hurricane Zone, also ask for a Miami-Dade Notice of Acceptance. If the seller cannot show an approval that covers your roof slope and wind zone, the product may not pass permitting.

Can solar go on a roof that faces east or west?

Yes. East and west roofs produce less per panel than south roofs but are often still worthwhile, and west roofs produce more in late afternoon. Model your exact roof in the free PVWatts tool. In Florida an HOA may only steer you to a roof spot within 45 degrees of south. In Texas an HOA's designated spot can be overridden if your preferred spot produces more than 10 percent more energy as modeled by an NREL tool.

Do panels on a flat roof need to be tilted?

Usually they are tilted somewhat so they face the sun and shed rain and debris. Higher tilt catches more wind, so on a flat roof in a hurricane zone the tilt is a trade-off between production and wind load. The ASCE 7-16 standard used by the Florida Building Code has specific wind load methods for rooftop panels that account for tilt and height above the roof. Your engineer will set the tilt.

Do solar installers need roofing licenses in Florida?

A Florida solar contractor's license covers installing PV systems, and s. 489.113(3)(f) says a solar contractor need not subcontract minor roofing, electrical, mechanical or plumbing work if it is within the license scope and pertains only to residential solar installation, as defined by board rule. Larger roofing work, such as a re-roof, generally needs a licensed roofing contractor. Ask who is doing the roof work and under which license.

Are solar tiles covered by Texas HOA protections?

Yes. Texas Property Code 202.010 defines a solar energy device to include a solar roof tile, so the same HOA limits apply as for panels. Section 202.011 also bars HOAs from prohibiting shingles designed to provide solar generation if they resemble the subdivision's shingles, are at least as durable, are of equal or better quality and match the look of nearby homes.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration