How Much Does It Cost to Remove and Reinstall Solar Panels, and Who Can Do It in Texas and Florida?

What a detach-and-reset job costs, who is legally allowed to do it in Texas and Florida, the permits and utility steps that follow, and how to keep a roof job, an insurance claim or a panel swap from turning into a production or warranty problem.

Fixr's January 2025 cost guide puts solar removal and reinstallation at $200 to $300 per panel, or $2,800 to $4,800 for a typical 14 to 16 panel system, not counting the roof itself. In Florida the work falls under a solar, electrical or other ch. 489 contractor license. In Texas the electrical disconnect and reconnect must go through a TDLR-licensed electrical contractor. Expect a permit, an inspection and a utility notice before the system is turned back on.

Key facts

  • Fixr (updated January 31, 2025): $200 to $300 per panel to remove and reinstall; $2,800 to $4,800 for 14 to 16 panels on a 1,500 sq. ft. roof, national average about $3,800, roof not included.
  • Fixr estimates 1 to 2 days to take panels down and 2 to 3 days to put them back after the new roof is on.
  • Florida Statute 489.105(3)(o) defines a solar contractor's work to include the alteration, repair, relocation and replacement of solar panels, and other ch. 489 contractors can do solar work within their own license scope.
  • Unlicensed contracting in Florida is a first-degree misdemeanor, and a third-degree felony for a repeat offense or during a declared state of emergency (Fla. Stat. 489.127).
  • TDLR says anyone who performs non-exempt electrical work in Texas must be licensed and work through a licensed electrical contractor (Occupations Code ch. 1305).
  • Florida Rule 25-6.065(5) says customer-owned generation must be inspected and approved by local code officials before it runs in parallel with the grid, and the customer must give the utility at least 10 days' notice.
  • FPL's net metering FAQ says that if panels were added or removed, the system must be inspected by the local building authority and the final permit uploaded.
  • TDI (April 2023): when a TWIA-insured home has a re-roof plus solar panel removal and reinstallation, only one engineer or inspector may file the windstorm application, and it must describe both parts of the work.
  • Texas moved to the 2026 National Electrical Code on September 1, 2026 (16 TAC 73.100), so reinstall inspections there are done under the newer code.

How much does it cost to remove and reinstall solar panels?

Most quotes are priced per panel. That one price covers shutting the system down, unplugging and taking off the panels and racking, storing them, putting them back after the roof work, reconnecting the wiring and passing inspection. The best-documented national figures come from cost guides, not from Texas or Florida agencies. No state agency publishes removal and reinstall (often written R&R or detach-and-reset) prices.

Source and datePer panelExample system
Fixr, updated January 31, 2025$200 to $30014 to 16 panels: $2,800 to $4,800 (average about $3,800)
Fixr, same guide, by size$200 to $30020 panels: $4,000 to $6,000. 30 panels: $6,000 to $9,000
HomeGuide figure, as cited by SolarInsure$200 to $50020-panel, 8 kW system: $4,000 to $10,000

Fixr also gives the edges of the range. Taking 15 panels down with no reinstall can cost about $1,500. At the top end, a full job with panel removal, a complete roof replacement and reinstall can reach about $18,000. That top number includes the roof itself.

These are national figures. No Texas- or Florida-specific R&R price survey from a public agency exists. Florida wind-load engineering and Texas permit and windstorm paperwork can add cost, so treat the national range as a floor for a complex roof, not a ceiling.

A quick estimate for your home

Count your panels. You can find the number in your monitoring app, on the permit or on the original contract. Multiply by $200 and by $300 to get a starting range. A 24-panel system works out to about $4,800 to $7,200. Then add for the factors below and get at least two written quotes, as the Texas Department of Insurance advises after any storm.

What makes a removal and reinstall cost more?

  • Roof type. Concrete and clay tile is common in South Florida and parts of Texas. It breaks easily when crews walk on it and when they reach the attachment points. Ask who pays for broken tiles and whether replacement tiles in your color are still made.
  • Pitch and height. Fixr notes that steep roofs and hard-to-reach arrays take more labor and sometimes extra crew.
  • System size. More panels means more labor. Per-panel pricing hides this, so ask for the total.
  • Parts that cannot be reused. Flashing, sealant, worn connectors, end clamps and roof attachments often get replaced. Some reinstall quotes include small parts. Fixr says some do, and repairs to damaged panels are extra.
  • Code upgrades. If the building department treats the reinstall as new work, it may require current rapid shutdown, labeling or wind-attachment details. In Miami-Dade's High Velocity Hurricane Zone, common plan rejections include roof pressure zones not shown correctly and racking not rated for the zone it sits in.
  • Engineering. Palm Beach County's expedited solar permit checklist requires a mounting system engineered to 170 mph design wind speed, with an engineered detail for every part of the load path. Sealed drawings cost money.
  • Storage and transport. If panels are stored off site, ask about the fee and the insurance. Fixr estimates about $50 per panel extra to move panels to a different home.
  • Batteries and other equipment. Most quotes cover rooftop equipment only. If the inverter, battery or main panel has to move for the roof work, that is separate.

Who is allowed to remove and reinstall solar panels in Florida?

Florida licenses solar work at the state level. Under Fla. Stat. 489.105(3)(o), a solar contractor installs, alters, repairs, maintains, relocates or replaces solar panels for PV systems, pool heating and solar water heating. That covers detach-and-reset. The same section says a contractor already certified or registered under ch. 489 does not have to become a solar contractor to do solar work that is within its own license scope. A Florida electrical contractor is licensed separately, under part II of ch. 489.

A roofer is a different license. A Florida roofing contractor's scope covers roofing, waterproofing, skylights and roof-deck attachments. It does not list solar panels or electrical work. So on a typical re-roof, the roofer handles the roof and a solar or electrical contractor handles the array. Some firms hold both licenses. Ask to see each one.

  • Check any license on the DBPR lookup at myfloridalicense.com. Solar contractors show as CV (certified, statewide) or RV (registered, local).
  • Unlicensed contracting is a first-degree misdemeanor in Florida. It becomes a third-degree felony for repeat offenders or when done during a Governor-declared state of emergency, which matters after hurricanes (Fla. Stat. 489.127). Local code boards can also fine up to $2,500 per day per violation.
  • A solar contractor may do minor electrical, roofing or plumbing work that comes with installing residential solar equipment, if it is within the license scope (Fla. Stat. 489.113(3)(f)). That lets one contractor reflash the attachment points during a reinstall.

More detail: Florida solar contractor license.

Who is allowed to remove and reinstall solar panels in Texas?

Texas has no separate solar installer license. The part that is regulated is the electrical work. TDLR says anyone who performs or offers to perform non-exempt electrical work must be licensed and must work through a licensed electrical contractor, under the Texas Electrical Safety and Licensing Act (Occupations Code ch. 1305). Disconnecting a PV system, taking apart the wiring and reconnecting it is electrical work.

In practice, many Texas jobs split the work. A crew lifts panels and racking off the roof, and a licensed electrician de-energizes the system before they start and reconnects and tests it at the end. Ask the company for the electrical contractor's name and TDLR license number, then check it on TDLR's license search.

The new Residential Solar Retailer Regulatory Act (Occupations Code ch. 1806, registration required since September 1, 2026) covers people who sell or lease residential solar systems. A pure R&R service contract is not a sale of a solar system, so registration may not apply. If the company is also selling you new panels, a battery or a bigger system as part of the job, the ch. 1806 contract rules and 5-business-day cancellation right can come into play. See Texas solar installer licensing and solar contract cancellation rights.

Windstorm certification on the Texas coast

If your home is insured for wind and hail by the Texas Windstorm Insurance Association (TWIA), roof work needs windstorm inspection and certification. TDI's April 2023 bulletin says that when a project combines a full or partial re-roof with solar panel removal and reinstallation, one or more inspectors may inspect the work, but only one engineer or inspector may file the application to TDI for the whole scope. The application must describe it as, for example, an entire re-roof with solar panel removal and re-installation. Ask your roofer and solar contractor who will file it before work starts. TDI's windstorm intake team takes questions at 800-248-6032, option 3.

Do I need a permit to remove and reinstall solar panels?

Usually, yes, though each city or county decides. Removing panels and putting them back changes structural attachments, roof penetrations and electrical connections, and most building departments want to inspect all three. Ask the contractor to pull the permit in its own name. That puts the code duty on the license holder.

Florida

  • Rule 25-6.065(5) requires customer-owned generation to be inspected and approved by local code officials before it runs in parallel with the grid.
  • The Florida Building Code 9th Edition (2026, effective for permit applications submitted on or after December 31, 2026) added flashing requirements for PV panels and modules (R905.17.5). A reinstall on a new roof should follow both the code and the panel and racking maker's instructions.
  • In the High Velocity Hurricane Zone (Miami-Dade and Broward), the county's plan reviewers commonly reject PV plans for wrong roof pressure zones, racking not rated for its zone and connections that do not meet HVHZ Chapter 16 wind loads.
  • Palm Beach County's building code advisory board said in July 2023 that only attachments into roof structural members (trusses or rafters) with lag screws had been validated against the county's design wind loads, and mounting parts should have a Florida-approved evaluation report.

Texas

  • Cities set their own permit rules. Houston, Dallas, San Antonio and Austin each run their own building and electrical inspection programs. Call the permit office with the address before you sign.
  • Since September 1, 2026, Texas uses the 2026 NEC for electrical work. If your inspector treats the reinstall as new work, rapid shutdown and labeling may have to meet the newer code. Rapid shutdown, under NEC 690.12, drops the voltage on rooftop wiring so firefighters can work safely. It was first required in the 2014 NEC and has been tightened since.
  • Unincorporated county areas often have no building permit, but the utility still has its own rules (next section).

Permit guides: Texas solar permits and Florida solar permits.

Will my utility need to re-approve the system after a reinstall?

Tell the utility before the system goes back on, even if nothing changed. What it requires depends on whether the system changed.

SituationWhat to expect
Same panels, same inverter, same sizeUsually a notice plus proof of a passed inspection. Florida's rule requires at least 10 days' notice before equipment is placed in service.
Panels added, removed or swappedFPL says that if you added or removed panels, the local building authority must inspect the work and you upload the final permit. A bigger system can move you into a new tier (Florida Tier 1 is up to 10 kW AC).
New inverter or batteryTreat it as a modified system. The interconnection rules require inverters certified to UL 1741 and IEEE 1547 standards.

Florida. Investor-owned utilities follow Rule 25-6.065. City utilities (JEA, OUC) and co-ops have their own policies under Fla. Stat. 366.91. OUC only takes applications through its online portal, after a passed permit inspection. If you are an OUC customer on the old full-retail TruNet rate, ask whether a modified system keeps that rate before you change anything. See Florida utility solar programs.

Texas. In competitive areas, the wires utility (Oncor, CenterPoint, AEP Texas, TNMP) handles interconnection, and your retail electric provider handles buyback credits. Oncor reviews applications, may study the system, signs an interconnection agreement and then gives permission to operate. The timing can range from a few days to several months. Austin Energy, CPS Energy and co-ops set their own rules. See solar interconnection and permission to operate.

Do not turn the system back on before you have the green light. Under Texas Utilities Code 39.916, utilities must interconnect compliant systems. That protection assumes you followed the process.

How long does removal and reinstallation take?

Fixr estimates 1 to 2 days to disconnect and remove the panels and 2 to 3 days to put them back once the new roof is on. The calendar is longer than the labor:

  1. Quotes and scheduling: one to several weeks, longer after a big storm.
  2. Permit: a few days to several weeks, depending on the city and whether sealed engineering is needed.
  3. Removal: 1 to 2 days.
  4. Roof work: often a few days, plus any roof or windstorm inspection.
  5. Reinstall: 2 to 3 days.
  6. Final inspection and utility sign-off: days to weeks.

Plan on several weeks with no solar output. If you pay full retail for grid power, a 10 kW system in Houston or Tampa makes roughly 1,200 to 1,300 kWh a month on average, based on PVWatts estimates of about 1,421 kWh (Houston) and 1,568 kWh (Tampa) per kW per year. That output is what you lose while the system is down. Schedule roof work in winter when output is lower, if the roof can wait.

What happens step by step during a removal and reinstall?

  1. Before photos and a production snapshot. Screenshot your monitoring app with a week of normal output. You will need it to prove the system works the same afterward.
  2. Shutdown. The electrician uses the rapid shutdown switch and opens the AC and DC disconnects. On hot, sunny days, panels still make DC voltage, so connectors must be handled with care.
  3. Labeling. Each panel and string is marked so it goes back in the same electrical layout. If you have panel-level monitoring, the map in the app should still match.
  4. Removal and storage. Panels, clamps, rails and attachments come off. The roof penetrations are left for the roofer.
  5. Roofing. The roofer replaces the roof and leaves the attachment points marked or reflashed per the plan.
  6. Reinstall. New flashing and attachments go into rafters or trusses per the engineered detail, then the racking, panels and wiring.
  7. Testing. Each string is checked for voltage and polarity. The system is restarted and checked against the before snapshot.
  8. Inspection and utility notice. The system stays off until the inspector and utility sign off.

How should panels be stored during roofing?

Most damage during an R&R happens on the ground, not on the roof. Ask the contractor to put the storage plan in writing.

  • Store panels on edge or flat on padding, never stacked loose. Glass can crack with uneven weight, and microcracks may not show until production drops.
  • Keep them out of the roofing drop zone. Falling shingles, tile pieces and tools are the usual cause of damage.
  • Cover the connectors. Open connectors collect water and grit. Caps or tape keep them clean.
  • Secure them for weather. In Florida's summer storm season and Texas spring hail season, a stack of panels in the yard can blow over. Off-site storage may be safer.
  • Insurance. Ask whose insurance covers panels while they are off the roof and in storage. Get it in writing.

Does removing solar panels void the warranty?

It can, depending on who does it and how. Solar equipment usually carries three kinds of warranty: a product warranty on the panels, a performance warranty on output, and a workmanship warranty from the original installer, often covering roof leaks at attachment points. Read solar warranties before you hire anyone.

  • Workmanship and roof-leak warranty. This is the one most often lost. If another company drills new holes, the original installer may deny later leak claims. Ask the original installer first. Many offer R&R themselves to keep the warranty alive.
  • Panel and inverter product warranty. Makers usually require installation by a qualified installer per their manual. Keep records showing the reinstall followed the manual.
  • New roof warranty. Roofers may not warrant penetrations made by someone else. Get the roofer and solar contractor to agree, in writing, who warrants the flashing at each attachment.

Texas Utilities Code 39.916 conditions interconnection on a system having a warranty of at least five years against breakdown or undue degradation, so keep copies of every warranty document for your utility file too.

What if my original installer is out of business?

Solar installers do go out of business. If yours did:

  1. Collect your paperwork. Find the contract, permit, as-built drawings, panel and inverter model numbers and serial numbers, and the interconnection agreement. The building department and the utility often have copies.
  2. Contact the manufacturers directly. Product warranties belong to the panel and inverter makers, not the installer. Most have a homeowner claims process.
  3. Hire a licensed contractor for R&R. In Florida, a licensed solar or electrical contractor. In Texas, the job must run through a licensed electrical contractor. Ask if they have worked with your inverter and racking brand.
  4. Check monitoring access. Some monitoring accounts are tied to the installer. Ask the inverter maker to move the system to your account.
  5. If you lease or have a PPA. The leasing company owns the system. It must approve and often arrange the R&R. Do not let anyone touch a leased system without written approval. See lease vs. PPA vs. ownership.

Can damaged solar panels be repaired?

A panel with broken front glass, burn marks, a bubbled back sheet or a cracked frame is replaced, not repaired. Many other problems are fixable:

ProblemUsually
Loose or burned connector, chewed wire (rodents, squirrels)Repairable: replace connectors and wire, add critter guard
Failed microinverter or optimizerReplace the unit, often under the maker's warranty
String inverter faultRepair or replace the inverter
Leak at an attachmentReflash the attachment, which may need the panels above lifted
Cracked glass, hail impact, hot spotsReplace the panel
Bent rails or pulled-out attachments after windReplace racking parts and re-engineer the attachment

Hail is the big damage risk in Texas. Insurance Journal reported in May 2025 that hail made up under 2% of solar insurance claims from 2018 to 2023 but more than half of insured solar damage dollars. The SEIA recommends panels tested to UL 61730 for hail, typically rated for 1-inch hail at about 50 mph. See solar panels and hail damage and hurricane wind ratings. For a system that makes less than it should, start with low production troubleshooting.

Can I replace a few panels with a different model?

Often, yes, but only after the electrical numbers are checked. Panels from five or ten years ago may no longer be made, and today's panels are usually larger and more powerful. Mixing them can cause problems.

String inverter systems

Panels wired in a series string act like a chain. The weakest panel limits the current of the whole string. A new panel with a higher rating will be held back to the old panels' level. A new panel with a different voltage can push the string out of the inverter's operating window. The electrician needs to compare each panel's open-circuit voltage, maximum power voltage and current against the string and the inverter's limits, including cold-morning voltage.

Microinverters and optimizers

Panel-level electronics make mixing easier, because each panel works on its own. The new panel's wattage and voltage must still fit within what the microinverter or optimizer accepts. Connector types must match exactly. Mixing connector brands that only look alike can cause overheating.

Size, racking and listings

  • A bigger panel may not fit the old rail spacing or clamp range, and Florida wind engineering is based on panel dimensions.
  • Some rapid shutdown setups are listed as a complete system (the UL 3741 PV hazard control standard added in the 2020 NEC). Swapping a component can break the listing.
  • In Florida, a change of panel model or system size may need a new permit, and FPL says added or removed panels need an inspection and a final permit uploaded.

Ask for a short written compatibility note from the contractor that names the old and new panel models and confirms they fit the string, the inverter limits and the racking. See solar panel types and string inverters vs. microinverters.

Who pays for removal and reinstall in an insurance claim?

This is general information, not legal advice. Your policy wording controls.

If a covered storm damages the roof and the roof must be replaced, the cost to take the panels down and put them back is often part of the roof claim, because the roof cannot be replaced without it. If the panels themselves are damaged, they may be covered as part of the dwelling or as other structures. The insurer decides based on the policy.

  • Get R&R listed on the estimate. If your adjuster's estimate lists the roof but not "detach and reset solar," ask in writing for it to be added, with a licensed solar contractor's quote attached.
  • Keep your deductible in mind. In Texas, it is illegal to waive a homeowners deductible, and TDI says your insurer may ask for proof you paid it. In Florida, contractors that advertise roof claims must disclose that you pay the deductible and that waiving deductibles or filing false claims is a third-degree felony (Fla. Stat. 489.147).
  • Document everything. TDI advises photos and video of damage, saving receipts and keeping a list of everyone you talk to at the insurer. Call TDI at 800-252-3439 with questions.
  • Tell your insurer you have solar. Insurance Journal notes many carriers extend homeowners coverage to solar equipment, but only if they know about it. For leased or PPA systems, the leasing company usually insures the equipment.
  • Dispute help. In Texas, start with TDI. In either state, for a large disputed claim, consider a licensed public adjuster or an attorney.

More: solar and homeowners insurance.

Should I replace my roof before installing solar?

If the roof is near the end of its life, yes. Miami-Dade's PV permitting workshop tells owners to compare the roof's remaining life with the PV system's expected life, which it puts at more than 20 years, and strongly recommends replacing the roof first if the panels will outlast it. Fixr notes many roofs need replacement in 10 to 20 years or more, and an asphalt shingle roof over 20 years old may be due whether or not you see damage.

One R&R often costs about as much as a modest roof repair. Doing the roof first avoids it. See roof condition and re-roofing before solar.

Can I take my solar panels with me when I move?

You can, but it rarely pays off. Fixr estimates about $50 per panel in transport on top of R&R, putting a 14 to 16 panel move at about $3,500 to $5,600. You also need a new permit, new engineering for the new roof and a new utility application. Under the old federal 25D credit, used equipment never qualified, and that credit has ended for systems installed after 2025. If you plan to take the panels, the sales contract for your house must say so. Fixr notes panels are otherwise treated as part of the property. See selling a home with solar.

What if I want to remove solar panels for good?

Removing a system permanently still needs a licensed electrician, and in most places a permit to close up the electrical work. Tell the utility so it can change the meter and close your net metering or buyback agreement. Roof penetrations must be sealed or the roof repaired. If you have a lease or PPA, removal is governed by the contract and the system owner must agree. For what happens to old panels, see solar panel recycling and end of life.

How to choose a provider

  • Count your panels and write down the panel, inverter and racking models.
  • Screenshot a week of normal production from your monitoring app.
  • Call your original installer first to protect the workmanship and roof-leak warranty.
  • If you lease or have a PPA, get written approval from the system owner before anyone touches it.
  • Get at least two written quotes that list per-panel price, total, parts, storage and who pays for broken tiles.
  • Verify licenses: DBPR in Florida (solar, electrical or other ch. 489 license); TDLR electrical contractor in Texas.
  • Confirm who pulls the permit and, on the Texas coast, who files the TDI windstorm application.
  • Agree in writing which contractor warrants the flashing at each attachment.
  • If any panel is being swapped, get a written compatibility note on the string, inverter and racking.
  • If storm damage is involved, ask your adjuster to add detach-and-reset solar to the estimate.
  • Keep the system off until the final inspection passes and the utility confirms.
  • Compare post-reinstall production to your before snapshot for the first two weeks.

Related residential solar installers guides

Residential solar installers by state and city

Questions people ask

How much does it cost to remove and reinstall solar panels?

Fixr's guide, updated January 31, 2025, puts the national cost at $200 to $300 per panel, or $2,800 to $4,800 for a typical 14 to 16 panel system. A HomeGuide figure cited by SolarInsure runs higher, at $200 to $500 per panel. Tile roofs, steep pitches, sealed wind engineering in Florida and replacement parts push quotes up. The roof itself is extra. Get at least two written quotes that show the total, not only the per-panel price.

Can my roofer remove my solar panels?

Only if the roofer also holds the right license. In Florida, solar work falls under a solar contractor license or another ch. 489 license that covers it, such as electrical. A roofing license covers roofing, not solar panels or wiring. In Texas, the disconnect and reconnect is electrical work that must go through a TDLR-licensed electrical contractor. Many roofers hire a solar or electrical subcontractor. Ask to see the license of whoever touches the wiring.

Do I need a permit to reinstall solar panels?

In most Texas and Florida cities, yes. Florida's Rule 25-6.065 requires local code officials to inspect and approve customer-owned generation before it runs with the grid, and FPL asks for a final permit when panels are added or removed. Texas cities set their own rules. Houston, Dallas, San Antonio and Austin run their own inspection programs. Ask the contractor to pull the permit in its own name.

Will removing solar panels void my warranty?

It can. The workmanship and roof-leak warranty from your original installer is the one most often lost when another company drills new holes. Panel and inverter product warranties usually require installation per the maker's manual by a qualified installer. Ask the original installer first, keep records of the reinstall and get the roofer and solar contractor to agree in writing who warrants the flashing.

How long will my solar be off during a roof replacement?

Fixr estimates 1 to 2 days to remove panels and 2 to 3 days to reinstall them. Add the roof work, permit time and the final inspection and utility sign-off, and many homeowners go several weeks without solar. A 10 kW system in Houston or Tampa produces roughly 1,200 to 1,300 kWh a month on average based on PVWatts estimates, so plan for a higher bill during the gap.

Does homeowners insurance pay to remove and reinstall solar panels?

Often, when a covered loss like hail or wind requires a new roof, because the roof cannot be replaced without detaching the panels. It depends on your policy. Ask your adjuster in writing to add detach-and-reset solar to the estimate and attach a licensed contractor's quote. You still pay your deductible. Waiving it is illegal in Texas, and Florida treats waived deductibles and false claims as a third-degree felony.

Can I mix new solar panels with my old ones?

Sometimes. On a string inverter, the weakest panel limits the whole string, and a panel with a different voltage can push the string outside the inverter's range. Microinverters and optimizers make mixing easier, but the new panel must still fit their limits and use matching connectors. A bigger panel may not fit your racking or Florida wind engineering. Get a written compatibility check from the electrician.

My solar company went out of business. Who can reinstall my panels?

Any properly licensed contractor: a solar or electrical contractor in Florida, or a crew working through a TDLR-licensed electrical contractor in Texas. Gather your permit, drawings and equipment serial numbers first; the building department and utility may have copies. Panel and inverter warranties belong to the manufacturers, so you can still file claims directly. If you lease, the leasing company must approve the work.

Do I have to tell my utility before reinstalling solar?

Yes. Florida's rule requires at least 10 days' notice before customer-owned generation is placed in service, after a passed inspection. FPL wants the final permit if panels were added or removed. In Texas, the wires utility in competitive areas, or Austin Energy, CPS Energy or your co-op, must approve changes. Do not switch the system back on until the utility confirms.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration