Local Guide · Roofing
What's Under Your Shingles: Decking, Underlayment, Secondary Water Barrier and Ventilation Explained
A plain-English guide to the roof layers in your estimate: deck replacement, plywood vs OSB, Florida renailing and secondary water barrier rules, underlayment types, the 1/150 ventilation rule, solar fans and spray foam warranties.
Under the roof covering sit the deck (plywood, OSB or boards), the underlayment (felt, synthetic or peel-and-stick) and, on Florida re-roofs, a required secondary water barrier and deck renailing to a code table. Vented attics need net free vent area of 1/150 of the attic floor, or 1/300 when vents are balanced high and low. These hidden layers drive wind performance, insurance credits and warranty coverage, so get each in writing.
Key facts
- Florida requires deck renailing and a secondary water barrier when a wood-deck home's roof covering is removed and replaced (FBC-EB 706.7; s. 553.844).
- Florida supplemental deck nails must be ring-shank, 0.113-inch shank, at least 2-3/8 inches long; staple- or 6d-fastened decks get nails at 6 inches on center.
- IBHS found 8d ring-shank nails with tighter spacing can double roof deck uplift resistance.
- Florida SWR options include a full ASTM D1970 membrane, 3-3/4-inch tape over deck joints, or two layers of approved underlayment.
- The IRC requires attic vent area of 1/150 of attic floor area, or 1/300 with 40-50% of vents high and the rest low.
- The IRC requires at least 1 inch of space between insulation and roof sheathing at eave vents.
- A GAF shingle warranty excludes damage from inadequate ventilation.
- An FSEC test found solar attic fans cut a Florida home's AC energy about 6%; earlier studies found powered fans often used more than they saved.
- Plywood and OSB are both code-approved wood structural panels if graded to DOC PS 1 or PS 2.
The layers under your roof, in plain English
A roof is a system. From the inside out, a typical Texas or Florida pitched roof has:
- Framing: rafters or trusses.
- Deck (sheathing): plywood, OSB or older wood boards nailed to the framing.
- Secondary water barrier or deck tape (required on Florida re-roofs): a layer meant to keep water out if the roof covering blows off.
- Underlayment: felt, synthetic sheet or self-adhered membrane over the deck.
- Drip edge and flashings: metal at edges, valleys, walls and penetrations.
- Roof covering: shingles, tile, metal or membrane.
- Ventilation: intake vents low (usually soffits) and exhaust vents high (ridge or roof vents), or an unvented, insulated attic designed to code.
Most of these items show up as separate lines in a roofing estimate. They are also where many cheaper bids cut corners. This guide explains each one so you can compare quotes. See also how to read a roofing estimate.
Rafters, trusses and roof-to-wall connections
The deck is only as strong as what it is nailed to. Most Texas and Florida homes built in recent decades have trusses: factory-built triangles with angled web pieces, which leave little usable attic space. Older homes and custom homes often have rafters, single sloped boards built on site, which leave open attic space.
Never cut a truss without an engineer
The International Residential Code (Section R802.10) requires truss design drawings to be approved before installation and says truss members shall not be cut, notched, drilled, spliced or otherwise altered without the approval of a registered design professional. That matters during roof work: a crew adding a new vent, attic fan, skylight or solar conduit should not cut a truss web or chord to make room. If you see a cut truss in the attic, ask for an engineer's repair detail.
Holding the roof to the walls
The IRC (Section R802.11) requires roof assemblies to resist uplift, with an exception only where the uplift force per rafter or truss is small (200 pounds or less under the code's table). In hurricane country that usually means metal straps or clips tying each truss or rafter to the wall. Florida adds a re-roof rule: for site-built single-family homes in the wind-borne debris region insured or valued at $300,000 or more, a roof replacement must also improve roof-to-wall connections at gable ends or corners if that can be done for no more than 15% of the cost of the re-roof (s. 553.844). My Safe Florida Home can also fund roof-to-wall connection work when an inspection recommends it and the program is funded. The wind mitigation form records the connection type, so ask the roofer to photograph any straps or clips installed.
In Texas, there is no statewide re-roof rule for roof-to-wall connections, but homes in the TWIA area must meet the windstorm building code for the work that is done. See the TWIA WPI-8 guide.
What is roof decking and when does it need replacing?
Decking (also called sheathing) is the structural layer the roofing is nailed to. In homes built in recent decades it is usually 4-by-8 sheets of plywood or OSB. Older homes often have solid wood boards or "spaced" boards with gaps, originally installed for wood shingles.
When decking needs replacing
- Rot or soft spots from long-term leaks, often at eaves, valleys and around chimneys.
- Delaminated or swollen panels that won't hold nails.
- Spaced board sheathing under a new asphalt shingle roof. The IRC and Florida code require asphalt shingles to be fastened to solidly sheathed decks. In the HVHZ, spaced sheathing must be replaced or filled in to create solid sheathing, and it is approved only for wood shakes and shingles.
- Too-thin sheathing for the new roof. IBHS's FORTIFIED checklist calls for at least 15/32-inch sheathing for new clay or concrete tile, and for metal it says to follow the manufacturer's thickness requirement.
How bids handle it
Nobody can see the deck until the old roof is off. Good contracts include a unit price per sheet (and per linear foot for board decking) for replacement, a promise to photograph damaged areas before replacing them, and a cap or a requirement for your approval above a set number of sheets. Watch for bids that include "up to X sheets" and charge high prices after that.
Permits
Austin exempts from building permits roof decking replacement up to 128 square feet. Dallas's residential roofing permit covers coverings and decking only; structural rafter or joist repairs need an alteration permit. Florida re-roofs require a permit, and work under $7,500 may be exempt only in limited cases under a 2026 law, which excludes structural work, so ask your building official whether deck work counts.
Plywood vs OSB for roof decking
Both are code-approved. The IRC treats both as "wood structural panels," which must meet DOC PS 1 or PS 2 (or the Canadian standards), carry a grade mark showing grade, bond classification and performance category, and be installed within the allowable spans for the framing spacing. Panels exposed to weather during construction must be at least Exposure 1 rated.
| Point | Plywood | OSB |
|---|---|---|
| What it is | Thin wood veneers glued in cross layers | Wood strands pressed with resin |
| Cost | Usually higher | Usually lower |
| Wetting | Tends to dry out and recover more readily | Edges can swell if they stay wet; many products are edge-sealed |
| Code status | Approved wood structural panel | Approved wood structural panel |
| Radiant barrier option | Available | Foil-faced OSB is common; PNNL's Building America guidance says to install it foil side down |
What matters more than the type: correct thickness for the rafter spacing and roof covering, the grade stamp, gaps between panels as the maker specifies, and nailing. If your contract says "replace decking as needed," it should state the panel type and thickness.
The Florida deck renailing requirement
When a roof covering is removed and replaced on an existing Florida home with a wood deck, the Florida Existing Building Code (Section 706.7.1) requires the deck attachment to meet a renailing table. This is one of the most valuable parts of a Florida re-roof, because deck attachment is a wind mitigation feature and IBHS found that 8d ring-shank nails at tighter spacing can double a deck's uplift resistance. State law (s. 553.844, Florida Statutes) directs this mitigation for site-built single-family homes.
The 2023 (8th Edition) rules
- Existing nails count as 8d only if at least 0.113 inch in diameter and 2-1/4 inches long.
- Supplemental nails must be ASTM F1667 RSRS-01 ring-shank nails: 0.113-inch shank, rings at least 0.010 inch over the shank, 16 to 20 rings per inch, a 0.280-inch full round head, ring shank at least 1-1/2 inches from the tip, and at least 2-3/8 inches long.
- Plank or board decks up to 12 inches wide are sufficient with at least two 8d nails at each framing member. If not, nails are added until two clipped-head, round-head or ring-shank 8d nails are at each member.
- A tested two-part closed-cell urethane adhesive sprayed at the sheathing-to-framing joint is an alternative if testing shows at least 200 psf uplift resistance.
- Exception: homes originally permitted under the Florida Building Code (the statewide code) are not required to comply with this mitigation section.
| Existing fasteners | Existing spacing | Supplemental spacing required (any design wind speed) |
|---|---|---|
| Staples or 6d nails | Any | Add nails at 6 inches on center at panel edges and intermediate framing |
| 8d nails (any head or shank) | 6 inches on center or less | None needed |
| 8d nails (any head or shank) | More than 6 inches on center | Bring spacing to 6 inches on center using existing plus new nails |
9th Edition (2026) status
We did not find changes to these renailing provisions in the 9th Edition summaries we reviewed from FRSA, Miami-Dade and Greenberg Traurig. Confirm with your building department, because the code in effect on your permit application date governs.
How to make sure it happens
In the HVHZ, the code says the building official is not required to inspect sheathing renailing. Ask your roofer to photograph the nail package and spacing in several spots, as IBHS requires for FORTIFIED documentation, and keep the photos for your wind mitigation inspection. My Safe Florida Home can fund improving roof-deck attachment when an inspection recommends it and the program is funded (see MSFH).
Texas: there is no statewide renailing mandate for re-roofs. FORTIFIED Roof, a voluntary standard, requires 8d ring-shank nails at 6 inches on center. Ask for it in coastal and hail-prone areas, and see the TWIA WPI-8 guide for coastal certification.
What is secondary water resistance, and is it required in Florida?
Secondary water resistance (SWR, or secondary water barrier) is a layer or tape that keeps rain out of the house if wind strips off shingles, tiles or panels. IBHS says each inch of rain on an exposed deck can let in the equivalent of 9 bathtubs of water.
Florida: yes, on re-roofs
When a roof covering is removed and replaced on a home with a wood deck, Florida requires a secondary water barrier installed under the underlayment rules for steep-slope roofs. Under the 8th Edition, the options for shingles, metal and similar coverings are:
- Full peel-and-stick: the entire deck covered with self-adhering polymer-modified bitumen underlayment meeting ASTM D1970 (not permitted under wood shingles or shakes).
- Taped seams: a strip at least 3-3/4 inches wide of ASTM D1970 membrane or AAMA 711 Level 3 flashing tape over every deck joint, with approved underlayment over the whole roof.
- Two layers of underlayment: ASTM D226 Type II, ASTM D4869 Type III or IV, or ASTM D8257, lapped half a sheet plus 1 to 2 inches, end laps of 6 inches offset by 6 feet, fastened with ring or deformed shank cap nails (caps at least 1 inch) at 12 inches on center in the field and 6 inches at laps. Metal caps are required where the ultimate design wind speed is 170 mph or more.
Exceptions: roofs under 2:12 with a continuous roof system, and clay and concrete tile systems installed to code, are deemed to comply. SWR also counts on your wind mitigation form. The revised form OIR-B1-1802 (Rev. 04/26) changed the SWR section, and Citizens said the new form would not change the credits it was applying at the time.
Texas: recommended, not required statewide
TDI's windstorm guidance for coastal construction recommends a secondary water barrier, such as self-adhering tape or modified bitumen strips over deck joints, with 30-pound felt underlayment. FORTIFIED Roof requires a sealed deck everywhere it is used.
Underlayment types: felt, synthetic and self-adhered
| Type | Standard on the label | Pros | Cautions |
|---|---|---|---|
| Asphalt-saturated felt ("15 lb" or "30 lb") | ASTM D226 Type I or II; ASTM D4869 | Low cost, familiar, required for some methods (FORTIFIED's two-layer method needs #30 felt, not synthetic) | Tears more easily, wrinkles when wet, heavier |
| Synthetic sheet | Often ASTM D8257 or ICC evaluation as equivalent to D226 Type II | Light, strong, walkable, holds up to short exposure | Must be labeled to the required standard; D8257 not allowed under wood shingles or shakes in Florida |
| Self-adhered ("peel and stick," ice and water) | ASTM D1970 | Seals around nails, can serve as Florida SWR, strong at valleys and eaves | Higher cost; manufacturers emphasize adequate attic ventilation when it covers the whole deck; FORTIFIED recommends #15 felt as a bond break under shingles |
Florida's code requires underlayments meeting ASTM D226, D1970, D4869, D6757 or D8257 to be labeled with the standard and type. Ask to see the label. On tile roofs, the underlayment is a tested part of the tile system and needs its own approval and uplift rating (see the tile guide).
On low slopes, rules change: the IRC requires double underlayment for asphalt shingles on slopes from 2:12 up to 4:12, and shingles are not allowed below 2:12.
How roof pitch changes the layers
Roof pitch, written as inches of rise per 12 inches of run (for example, 4:12), decides which coverings are allowed and how much underlayment they need. These are the minimums in the 2021 IRC as published for Texas. Florida's codes and your product's instructions can be stricter, so confirm with the permit and the product approval.
| Roof covering | Lowest slope allowed | Extra underlayment rule |
|---|---|---|
| Asphalt shingles | 2:12 | Double underlayment from 2:12 up to 4:12 |
| Clay and concrete tile | 2-1/2:12 | Double underlayment from 2-1/2:12 up to 4:12 |
| Standing-seam metal | 1/4:12 | Per the panel maker |
| Lapped metal panels, no lap sealant | 3:12 | Lapped panels with applied sealant: 1/2:12 |
| Built-up and modified bitumen | 1/4:12 (coal-tar built-up: 1/8:12) | Not applicable: the membrane is the waterproofing |
Two practical points follow. First, a low-pitched porch or back slope may need a different material than the main roof, so check that the bid treats each slope correctly. Second, if your shingle roof is close to 2:12, leaks are often caused by too little underlayment rather than bad shingles. Roofs under 2:12 need a membrane system: see flat and low-slope roofs.
Drip edge and flashing: the metal at edges, walls and valleys
Drip edge is the bent metal strip along the eaves (bottom edges) and rakes (sloped side edges) of a roof. It protects the edge of the deck, directs water into the gutter, and, in hurricanes, helps keep wind from getting under the first row of shingles. Flashing is metal or membrane that seals the joints where the roof meets something else.
Drip edge: code minimum vs. high-wind best practice
| Item | IRC minimum for shingle roofs (R905.2.8.5) | IBHS high-wind best practice |
|---|---|---|
| Where | Eaves and rake edges | All eaves and gable rake edges |
| Material | Per the code and the shingle maker | At least 26-gauge galvanized metal |
| Overlap at joints | At least 2 inches | At least 3 inches |
| Extends below the sheathing | At least 1/4 inch | 1/2 inch |
| Fastening to the deck | No more than 12 inches apart | No more than 4 inches apart, staggered |
| Underlayment | Over the drip edge at eaves, under it at rakes | Rakes: drip edge over the underlayment; eaves: follow the sealed-deck method used |
IBHS also recommends sealing the drip edge, underlayment and starter strip together at the eaves, either with a self-adhering starter strip or an 8-inch band of compatible flashing cement no more than 1/8 inch thick, and keeping starter strips and shingles from hanging more than 1/4 inch past the drip edge. FORTIFIED Roof calls for a wider drip edge with a fully adhered starter strip.
Flashing: where water gets in
- Where it is required. The IRC (R903.2.1) requires flashing at wall and roof intersections, wherever the roof changes slope or direction, and around roof openings. Florida's 2026 code changes list flashing at roof edges, penetrations, changes of roof covering type, wall and roof intersections, gutters and slope changes.
- Walls. Base flashing against a sidewall must be continuous or step flashing, at least 4 inches high and 4 inches wide, and must send water onto the roof or into the gutter (R905.2.8.3).
- Valleys. Valley linings go in before shingles, following the shingle maker's instructions (R905.2.8.2). Open metal valleys and closed shingle valleys are both allowed.
- Pipes, vents and chimneys follow the shingle maker's printed instructions (R905.2.8.4). Rubber pipe boots dry out and crack in Texas and Florida sun and are a common leak source on roofs that are otherwise fine.
Reusing old flashing saves a little money and often causes the first leak on a new roof. Your contract should say whether drip edge, step flashing, valley metal and pipe boots are new. See gutters, soffit, fascia and roof edges.
How much attic ventilation do I need? The 1/150 and 1/300 rules
For vented attics, the International Residential Code (Section R806) and Florida's Residential Code set the same basic rules:
- Cross ventilation is required for each separate attic space, with openings protected against rain and pests. Openings must be 1/16 to 1/4 inch, or screened if larger.
- 1/150 rule: the net free vent area must be at least 1/150 of the attic floor area.
- 1/300 option: you may use 1/300 if 40% to 50% of the vent area is in the upper part of the attic (no more than 3 feet below the ridge) and the rest is in the bottom third. The 2021 IRC adds a vapor retarder condition that applies only in Climate Zones 6 to 8, not in Texas or Florida.
- Clearance: insulation and blocking must not block airflow at eave vents, with at least 1 inch of space between insulation and the roof deck at the vent.
Worked example
| Attic floor area | 1/150 rule | 1/300 rule (balanced) |
|---|---|---|
| 1,800 sq ft | 12 sq ft = 1,728 sq in of net free area | 6 sq ft = 864 sq in: about 346 to 432 sq in high, the rest low |
Net free area is printed on vent packaging and in spec sheets (for example, ridge vent per linear foot, soffit vent per piece). Ask your roofer to show the math. In hot, humid climates, intake is often the weak point: painted-over or blocked soffits and insulation stuffed against the eaves.
Why it matters for your warranty
A GAF shingle warranty we reviewed excludes damage from "inadequate ventilation." Other makers have similar clauses. Poor ventilation can also cause moisture problems in humid Florida and Gulf Coast attics.
Ridge vent vs off-ridge vs turbine vents
| Exhaust type | How it works | Notes |
|---|---|---|
| Ridge vent | Continuous vent along the ridge under cap shingles or metal | Even exhaust along the roof; needs enough ridge length and matching soffit intake; must be a wind- and rain-tested product in hurricane areas |
| Off-ridge (box or "can") vents | Individual vents near the ridge | Used where ridge is short or hips dominate; each is a penetration that needs flashing |
| Turbine vents | Wind-spun vents | Moving parts; must be secured and rated for wind in hurricane areas |
| Powered or solar fans | Fans pull air out | See below |
FORTIFIED Roof requires attic vents that resist wind and rain. Practical tips:
- Install every vent to its maker's instructions; the IRC requires it.
- Avoid mixing different exhaust types on one attic unless the vent maker allows it. One exhaust vent can draw air in through another instead of from the soffits, leaving parts of the attic stagnant.
- Exhaust without enough intake does little. Balance comes first.
- Gable vents, when combined with ridge vents, can short-circuit airflow. Ask your roofer how the system is designed.
Should I add solar attic fans?
Probably not for energy savings alone. An FSEC study summarized by the Air Infiltration and Ventilation Centre tested two solar-powered attic fans on a Cocoa, Florida home with R-19 ceiling insulation and a radiant barrier. Peak attic air temperature dropped about 22°F on average, and air conditioner energy use fell about 6% (2.8 kWh a day), with estimated annual savings around 460 kWh. The fans cost about $300 each plus about $150 per unit to install at the time. The same summary notes that earlier studies found powered attic fans usually did not produce net energy savings unless the attic was uninsulated, because fan motors can use more energy than they save.
Other ways to lower attic heat that tested well in Florida: a reflective roof, which cut cooling energy 18% to 26% in FSEC's Fort Myers homes, and a radiant barrier, which PNNL says can cut cooling costs 8% to 12% in hot climates. See cool roofs and energy.
Why does my attic have mold after a new roof?
Common causes:
- Intake blocked or removed during the job, or new exhaust vents added without intake.
- Bathroom, kitchen or dryer vents dumping moist air into the attic instead of outdoors.
- Leaky air ducts in the attic sweating in humid weather.
- A full self-adhered membrane that stops the deck from drying outward. Manufacturers stress adequate ventilation with full-deck membranes.
- An unvented attic built wrong: foam that does not meet code or the foam maker's instructions can lead to condensation, mold and deck deterioration, as a GAF technical director explained in JLC.
- Wet materials sealed in during a rainy installation.
What to do: photograph the mold, check that soffit vents are open and that exhaust fans vent outside, and ask the roofer to verify the ventilation math. For significant growth, hire a mold assessor or licensed contractor and find the moisture source before cleaning. Report it to the roofer promptly if you think the roofing work caused it.
Is spray foam in the attic bad for my roof warranty?
It depends on the shingle maker and whether the attic meets code. The IRC permits unvented attics (Section R806.5) when the attic is fully inside the building's thermal envelope, Class I vapor retarders are not installed on the ceiling side, insulation meets the code's options (such as air-impermeable foam applied directly to the underside of the deck), and, for wood shingles or shakes, a 1/4-inch vented airspace is provided above the underlayment.
Warranty positions vary. A GAF technical director told JLC that GAF's shingle warranty remains valid over a deck insulated with spray foam, but damage caused by the foam or by lack of ventilation is not covered, and he advised checking with any other shingle maker before installing. Our review of GAF's warranty confirms the "inadequate ventilation" exclusion. Other makers' terms differ and have changed over time.
Before you foam: get the shingle maker's written position for your exact product, confirm the foam design meets R806.5, and keep the insulation contractor's documentation. FSEC's Florida tests found a sealed attic with roof-deck insulation cut cooling energy 6% to 11% compared with a standard vented attic with dark shingles.
How to choose a provider
- Ask for a per-sheet decking replacement price and photos of damaged decking.
- Confirm panel type and thickness for any replacement decking.
- In Florida, confirm deck renailing to the code table and ask for photos of the nail pattern.
- Confirm the secondary water barrier method (full membrane, taped seams or two-layer underlayment).
- Check the underlayment label for its ASTM standard.
- Ask for the ventilation math: attic area, required net free area, intake and exhaust.
- Confirm new drip edge, step flashing, valley metal and pipe boots are in the scope.
- Make sure no truss is cut for vents, fans or solar without an engineer.
- Confirm soffit intake is open and insulation baffles are in place.
- Make sure bath, kitchen and dryer fans vent outdoors.
- Get the shingle maker's written position before spray-foaming the roof deck.
- Keep all photos and documents for your wind mitigation inspection.
Related roofing guides
- How to Compare Roofing Quotes Apples-to-Apples (With a Line-Item Checklist)
- Florida Wind Mitigation Inspection: How Do Roof Credits Work, Question by Question?
- Florida Building Code for Roofs: HVHZ, Miami-Dade NOAs, and the 2026 9th Edition Changes
- Asphalt Shingle Roofs: Which Type, How Long They Last, and What Warranties Pay
- Cool Roofs and Energy Bills in the South: Do Reflective Roofs Pay Off?
- My Safe Florida Home: Can a Grant Pay for Your New Roof?
- Do You Need a WPI-8 Windstorm Certificate to Replace a Roof on the Texas Coast?
- Roof Replacement Day by Day: What Happens, How Long, and How to Prepare
Roofing by state and city
Questions people ask
What is roof decking and when does it need replacing?
Decking is the plywood, OSB or wood boards that the roof covering is nailed to. It needs replacing when it is rotted, soft, delaminated or too thin, or when spaced boards sit under a roof that requires solid sheathing, such as asphalt shingles. Contracts should list a per-sheet price for replacement and promise photos of damaged areas.
Plywood vs OSB for roof decking?
Both are code-approved wood structural panels when they meet DOC PS 1 or PS 2 and carry a grade stamp. Plywood usually costs more and tends to recover better from wetting. OSB costs less, and edges can swell if they stay wet. Correct thickness, the grade stamp, panel gaps and nailing matter more than the type.
What is synthetic underlayment?
It is a woven or spun plastic sheet used under shingles and metal in place of asphalt felt. It is lighter, stronger and safer to walk on. In Florida it must be labeled to a recognized standard, such as ASTM D8257, and it is not allowed under wood shingles or shakes. Some FORTIFIED methods require #30 felt instead.
What is secondary water resistance and is it required in Florida?
It is a barrier that keeps rain out if the roof covering blows off, such as peel-and-stick membrane over the whole deck, taped deck seams, or two layers of approved underlayment. Florida requires it when a wood-deck home's roof covering is removed and replaced. Low-slope continuous roofs and code-compliant tile systems are deemed to comply.
How much attic ventilation do I need?
Codes require net free vent area of at least 1/150 of the attic floor area, or 1/300 if 40% to 50% of the vents are high, within 3 feet of the ridge, and the rest are in the lower third. An 1,800 square foot attic needs 1,728 square inches under the 1/150 rule. Keep at least 1 inch of airspace at eave vents.
Should I add solar attic fans?
For energy savings alone, usually not. An FSEC test in Florida found about a 6% drop in air conditioning energy, and earlier studies found powered attic fans often used more energy than they saved unless the attic was uninsulated. Reflective roofing, radiant barriers, sealed ducts and good passive ventilation are usually better first steps.
Is spray foam in the attic bad for my roof warranty?
Not necessarily, but it depends on the shingle maker. GAF has said its warranty stays valid over spray-foamed decks, while damage caused by the foam or poor ventilation is excluded. The attic must meet the code's unvented attic rules. Get the shingle maker's written position for your product before installing foam.
What is the Florida deck renailing requirement?
When a Florida home's roof covering is removed and replaced, the deck must meet a renailing table. Decks fastened with staples or 6d nails get added ring-shank nails at 6 inches on center at edges and intermediate framing; 8d nails spaced wider than 6 inches are supplemented to 6 inches. Homes originally permitted under the Florida Building Code are exempt.
Is drip edge required on a new roof?
For asphalt shingle roofs, yes. The International Residential Code requires drip edge at eaves and rake edges, lapped at least 2 inches at joints, extending at least 1/4 inch below the sheathing and fastened at no more than 12 inches apart. IBHS's high-wind best practice goes further: at least 26-gauge galvanized metal, 3-inch laps, and fasteners about every 4 inches. Ask whether your bid includes new drip edge, because reusing bent or rusted metal weakens the roof edge.
Can a roofer cut a truss to add a vent or attic fan?
Not without an engineer. The IRC says truss members shall not be cut, notched, drilled, spliced or otherwise altered unless a registered design professional approves it. Vents, fans, skylights and solar conduit should be placed between trusses. If a truss was already cut, ask for a repair detail from a licensed engineer before the new roof goes on.
Sources
- 2023 Florida Existing Building Code Chapter 7 (UpCodes)
- FRSA: New 2023 FBC 8th Edition is now in effect
- FRSA: Changes in the 2026 9th Edition FBC
- Greenberg Traurig: new FBC edition takes effect Dec. 31, 2026
- Miami-Dade: 9th Edition FBC roofing underlayment
- 2023 Florida Building Code, Building, Chapter 15 (UpCodes)
- 2023 Florida Residential Code Chapter 8 (UpCodes)
- 2021 IRC Chapter 8 Roof-Ceiling Construction, Texas (UpCodes)
- 2021 IRC Chapter 9 Roof Assemblies, Texas (UpCodes)
- Fla. Stat. s. 553.844
- Fla. Stat. s. 553.79 (permit exemption under $7,500)
- Fla. Stat. s. 215.5586 (My Safe Florida Home)
- IBHS FORTIFIED Roof
- IBHS FORTIFIED re-roofing checklist
- TDI windstorm FAQ for builders
- Citizens: uniform mitigation form changes (Mar. 2026)
- Florida Administrative Register: OIR-B1-1802 (Rev. 04/26)
- GAF Shingle and Accessory Limited Warranty (retailer copy)
- JLC: Unvented roofs and shingle warranties
- AIVC: Attic fans, just blowing hot air? (FSEC study summary)
- FSEC: Impact of roofing systems on cooling energy in Florida
- PNNL Building America: radiant barrier performance brief
- Austin: work exempt from building permits
- Dallas Building Inspection guide
- IBHS, Commercial Roofs Best Practices Guide (steep-slope wood deck section)
- FRSA: Additional 2026 FBC changes (flashing)
This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.


