Local Guide · Hurricane shutters and impact windows

Impact Window and Shutter Contracts: What Must Be in Writing, and Do You Have 3 Days to Cancel?

A plain-English guide to the contract terms that protect you on an impact window or hurricane shutter job, plus the Florida, Texas and federal rules that let you cancel some sales within three business days.

In Florida and Texas, if a seller solicits you at home and you sign there, you can usually cancel until midnight of the third business day after signing (Fla. Stat. 501.025; Tex. Bus. & Com. Code 601.051). Cancel in writing and keep proof. A good impact window or shutter contract also lists the product approval numbers, design pressures, permit duties, payment schedule, completion date, stucco and paint repair, lien releases and the warranty.

Key facts

  • Florida: a home solicitation sale over $25 can be canceled until midnight of the third business day after signing; a mailed notice counts when it is postmarked (Fla. Stat. 501.021, 501.025).
  • Florida business days exclude Sundays and federal holidays, so Saturday counts (Fla. Stat. 501.021(2)).
  • Texas: a consumer may cancel a home solicitation transaction over $25 until midnight of the third business day after signing; the merchant must refund within 10 business days (Tex. Bus. & Com. Code 601.051, 601.154).
  • The FTC Cooling-Off Rule covers sales of $25 or more at your home and $130 or more at temporary locations, but not sales needed to meet an emergency (FTC consumer guidance, updated September 2025).
  • Florida residential contracts over $2,500 must include the Florida Homeowners' Construction Recovery Fund notice (Fla. Stat. 489.1425) and, for homes of up to four units, a construction lien law warning (Fla. Stat. 713.015).
  • A Florida contractor who takes more than 10 percent of the price up front must apply for permits within 30 days and start work within 90 days after permits issue (Fla. Stat. 489.126).
  • Texas residential contractors must give a 'Know Your Rights' disclosure before the contract is signed and a list of subcontractors and suppliers before work starts (Tex. Prop. Code 53.255, 53.256).
  • Texas owners must hold back 10 percent of the contract price during the work and for 30 days after it is done (Tex. Prop. Code 53.101).

Do you really have 3 days to cancel an impact window or shutter contract?

Often yes, but not always. The three-day right to cancel comes from laws about home solicitation sales, which means a sale where the seller pitches you somewhere other than its own store or showroom and you sign there. The classic example is a salesperson who knocks on your door, measures your windows at the kitchen table and asks you to sign that night.

Three separate rules can apply to the same sale:

RuleWho it coversDeadlineKey exclusions
Florida, Fla. Stat. 501.021 to 501.055Consumer sales over $25 solicited away from the seller's fixed business locationMidnight of the 3rd business day after you signSales that result from your own request for specific goods or services; sales at fairs or similar exhibits
Texas, Tex. Bus. & Com. Code ch. 601Goods or services over $25 solicited and agreed to away from the merchant's place of businessMidnight of the 3rd business day after you signSales negotiated at the merchant's fixed business location; insurance sales regulated by TDI; certain charge-account sales
Federal FTC Cooling-Off Rule (16 CFR Part 429)Sales of $25 or more at your home, $130 or more at temporary locations such as hotel rooms or fairgroundsMidnight of the 3rd business day after the saleSales needed to meet an emergency; sales made fully online, by mail or by phone; repair visits you requested (extras added on are still covered)

The state laws and the federal rule work side by side. If more than one applies, you can rely on whichever gives you more protection.

When the right usually does not apply

  • You went to the showroom and signed there. Both state laws exclude sales made at the seller's fixed business location.
  • You called and asked for a specific product. Florida's definition leaves out a sale that "results from a request for specific goods or services" by the buyer. If you phoned a shutter company and asked for accordion shutters on four windows, a court could treat that as your request. Ask the seller in writing whether it will honor a three-day cancellation anyway.
  • True emergency repairs. The FTC rule does not cover sales needed to meet an emergency. A board-up after a broken window is different from a full impact window replacement sold weeks later.

Even when no cooling-off law applies, the written contract can give you a cancellation window. Ask for one before you sign.

How to count the three business days

The deadline is midnight of the third business day after the day you sign. The day you sign does not count.

Florida law defines a business day as any calendar day except Sunday or a federal holiday (Fla. Stat. 501.021(2)). The FTC also counts Saturday as a business day and skips Sundays and federal holidays.

You sign onBusiness day 1Business day 2Business day 3 (deadline at midnight)
MondayTuesdayWednesdayThursday
ThursdayFridaySaturdayMonday (Sunday skipped)
Friday before a Monday federal holidaySaturdayTuesday (Sunday and the holiday skipped)Wednesday

Texas chapter 601 uses the same "third business day" deadline. If you are close to the line, do not gamble on how a day is counted. Send your notice early.

How to send a cancellation notice that holds up

Florida law says you cancel by giving written notice in person, by telegram or by mail to the address in the agreement, and a mailed notice is effective when it is postmarked (Fla. Stat. 501.025). The notice does not need any special form. Any writing that shows you do not want to be bound is enough.

Texas requires the seller to attach a completed Notice of Cancellation form, in duplicate, to your contract or receipt (Tex. Bus. & Com. Code 601.053). The FTC tells buyers to sign and date one copy of the cancellation form, mail it so it is postmarked before the deadline, and use certified mail so you get a receipt.

  1. Find the seller's address on the contract. Send the notice there, not to the salesperson's cell phone.
  2. Write one or two sentences: "I am canceling the contract dated [date] for [product] at [address]. Please refund my payment." Sign and date it.
  3. If the seller gave you a cancellation form, fill in and sign that too.
  4. Mail it by certified mail, return receipt requested, before midnight of the third business day. Keep the receipt.
  5. Send a copy by email as well, so there is a time-stamped record. Email alone may not meet the statute's methods, so do not rely on it by itself.
  6. Keep copies of everything, including photos of the envelope.

What the seller must do after you cancel

In Texas, within 10 business days after a valid cancellation the merchant must refund all payments and return any trade-in, and tell you whether it will pick up any goods it delivered (Tex. Bus. & Com. Code 601.154). A merchant is not entitled to pay for services performed under a canceled transaction (601.101). Under the FTC rule the seller has 10 days to refund your money and cancel any check you signed. Florida's required contract language says that if you cancel, the seller may not keep all or part of any cash down payment (Fla. Stat. 501.031).

What must the seller put in the contract about your right to cancel?

Florida. Every home solicitation sale must be in writing. The agreement must show the date you actually signed and carry a statement under the caption "BUYER'S RIGHT TO CANCEL" that you may cancel by written notice delivered or postmarked before midnight of the third business day, and that the seller may not keep any cash down payment if you cancel (Fla. Stat. 501.031).

Texas. The merchant must hand you a complete copy of the contract or receipt when you sign. It must be in the same language as the sales pitch (a pitch in Spanish means a contract in Spanish), show the date, the merchant's name and address, and a cancellation statement in at least 10-point bold type next to your signature line (Tex. Bus. & Com. Code 601.052). A contract may not include a waiver of these rights (601.151), and the merchant may not fail to tell you orally about the right to cancel or misrepresent it (601.152). A merchant that violates the chapter is liable for your actual damages, reasonable attorney's fees and court costs (601.202).

If your contract is missing these notices, that is a red flag about the seller, and it may affect how long you have to cancel. Talk to a consumer attorney or the Attorney General's consumer office before assuming you are locked in.

What should an impact window or shutter contract include?

The cancellation law protects you for three days. The contract protects you for the whole job and the years after. For openings, a few details matter more than on most remodeling jobs, because the product, the installation method and the paperwork decide whether you pass inspection and earn an insurance discount.

Contract itemWhat good looks likeWhy it matters
Licensed party and numbersCompany legal name, address, state license number (Florida) and the qualifier's nameLets you check the license and file a claim later
Opening scheduleEvery opening listed by location, size and product type (impact window, impact door, accordion shutter, panel, roll-down)Prevents "we never agreed to the back slider" disputes
Product approval numbersThe Florida Product Approval (FL) number or Miami-Dade Notice of Acceptance (NOA) number for each product, or the Texas product evaluation or test reportInspectors and wind mitigation inspectors check these; see how to look up an NOA
Design pressure and impact ratingPositive and negative design pressure for each unit, large or small missile, and the glass typeYour home's required pressures vary by opening; see design pressure ratings
Permits and inspectionsContractor pulls the permit, schedules inspections, and the final payment is tied to the passed final inspectionAn unpermitted job can fail a sale, an insurance inspection or a grant
Texas windstorm certificateIn TDI catastrophe areas, who files the WPI-1 notice and who arranges the inspection that leads to the WPI-8TWIA coverage depends on it; see WPI-8 certification
Price breakdownPrice per opening, permit fees, engineering, disposal, and any extra charge for rotted bucks or framingHidden "change orders" are the most common fight
Payment scheduleSmall deposit, progress payments that match delivered work, final payment after final inspectionKeeps your money matched to the work done
Lead time and datesEstimated product order date, delivery window, start date and completion date, and what happens if they slipImpact products are often made to order
Finish workWho repairs stucco, drywall, trim and paint, and to what standardReplacing a window in a block wall often cracks stucco
Cleanup and disposalOld windows and debris hauled awayAvoids a pile in your driveway
WarrantySeparate written manufacturer warranty and installer workmanship warranty, with lengths and what voids themLeaks are usually installation problems, not product defects
Lien protectionReleases of lien from the contractor and any supplier who sends you a notice before each paymentProtects you from paying twice
Grant or insurance paperworkIf you use My Safe Florida Home, who handles program documents and the final inspectionThe program has strict timelines; see My Safe Florida Home

Example: a vague line versus a clear one

Vague: "Install hurricane windows, whole house, per code." Clear: "Furnish and install 11 impact single-hung windows and 1 impact sliding glass door as listed on Schedule A, each with its Florida Product Approval number, rated for the design pressures shown on the permit drawings. Contractor obtains permit and final inspection. Includes stucco patch and paint touch-up within 6 inches of each opening, color-matched."

What payment schedule is reasonable?

No state sets one schedule for every job, but both states put limits on large up-front payments, and local officials give clear advice.

  • Florida deposit rule. If a contractor takes more than 10 percent of the contract price as the first payment on residential work, it must apply for the permits within 30 days and start the work within 90 days after the permits are issued, unless it has just cause or you agreed in writing to a longer period (Fla. Stat. 489.126). If it does not, you send a written demand by certified mail, return receipt requested. If the contractor still fails to act or refund within 30 days, the law lets a court infer it had no just cause. Misusing the money can be a crime, graded by amount, from a first-degree misdemeanor under $1,000 up to a first-degree felony at $200,000 or more.
  • Miami-Dade guidance. The county warns that up-front payments should cover only part of the work, progress payments should roughly match work done, and you should not make the final payment until you have proof of the final inspection. It also warns against paying cash, paying an individual instead of the company, or making a check payable to "cash."
  • Texas disaster rule. For reconstruction after a declared natural disaster, Texas Business and Commerce Code chapter 58 requires a written contract and bars the contractor from requiring any payment before work begins, or partial payments larger than the work done. The contract must carry a bold notice saying so. The rule does not apply to contractors that have kept a physical business address in your county or an adjacent county for at least a year.
  • Texas windstorm. TDI advises coastal owners not to make the final payment until the contractor finishes all work and TDI issues the WPI-8 certificate for it.

Many impact window jobs need a deposit because the windows are made to order. A sensible pattern is a modest deposit, a payment when the product is delivered to your home (you can see it), and the balance after the final inspection passes. Pay by check or card to the company's legal name.

Florida contract notices: Recovery Fund, lien law and Notice of Commencement

Florida Homeowners' Construction Recovery Fund notice

Every Florida contract to repair, improve or build residential property must contain a written statement about the Florida Homeowners' Construction Recovery Fund, unless all labor and materials total $2,500 or less (Fla. Stat. 489.1425). The statement says payment, up to a limited amount, may be available if you lose money because a licensed contractor violated certain Florida laws, and it gives the Construction Industry Licensing Board's contact details. A contractor can be fined up to $500 for a first violation and $1,000 for each later one. The fund only helps with licensed contractors, which is another reason to hire one. See how to file a complaint and a recovery fund claim.

Construction lien law warning

Any direct contract over $2,500 for work on a home of up to four units must include a capitalized, bold warning in at least 12-point type, signed and dated by you, explaining that unpaid workers and suppliers can claim a lien on your property even if you paid your contractor in full (Fla. Stat. 713.015). The warning tells you to require a written release of lien from anyone who sent you a "Notice to Owner" before you make each payment.

Notice to Owner

A supplier or subcontractor you never hired, such as the window distributor, may mail you a Notice to Owner. That is not a bill and not a lien. It is a warning that they are on the job and expect payment. Under Fla. Stat. 713.06 they must serve it within 45 days after starting work and before your final payment. Keep every one you receive. Before each payment, ask the contractor for a release from each of those parties.

Notice of Commencement

Before work starts, the owner (or the contractor as your agent) must record a Notice of Commencement with the county clerk and post a copy at the job site (Fla. Stat. 713.13). Improvements with a direct contract price of $2,500 or less are exempt from most of the lien law (713.02(5)). For permits, the building department may require a copy of the recorded notice before the first inspection when the direct contract is greater than $5,000 (713.135). The notice usually expires one year after recording unless it states a different date, and Florida's form warns that payments made after it expires can count as improper payments that leave you paying twice.

Final contractor's affidavit

Before final payment, ask for the contractor's final affidavit listing anyone not yet paid, along with final lien releases. This is your best protection against a surprise lien after the job.

Texas contract rules: disclosures, retainage and lien waivers

Texas has no state license for window or shutter installers (see Texas contractor rules), so the contract and the Property Code do most of the protecting.

  • Disclosure statement. Before you sign a residential construction contract, the original contractor must give you a "Know Your Rights and Responsibilities Under the Law" disclosure (Tex. Prop. Code 53.255). It explains that you do not have to sign your property over to the contractor and urges you to check references.
  • Subcontractor and supplier list. Before work starts, the contractor must give you a written list of each subcontractor and supplier, with names, addresses and phone numbers, and update it within 15 days of any change (53.256).
  • Retainage. During the work and for 30 days after it is complete, the owner must hold back 10 percent of the contract price, or of the value of the work done (53.101). Those reserved funds secure payment to workers and suppliers. Do not release that last 10 percent until the 30 days have passed and you have the lien waivers.
  • Homestead. To fix a lien on your homestead, the contract must be in writing and signed before work starts, signed by both spouses if you are married, and filed with the county clerk (53.254).
  • Lien waivers. A waiver and release only works if it substantially follows one of the statutory forms in section 53.284 and is signed by the claimant (53.281). No one may require an unconditional waiver for a payment the claimant has not actually received (53.283).
  • Insurance deductible notice. If the contract is $1,000 or more and will be paid from property insurance, it must include a 12-point bold notice that you must pay your deductible; a seller who waives, absorbs or rebates it commits a Class B misdemeanor (Tex. Bus. & Com. Code 27.02).

What about cancellation after a hurricane?

After a storm the rules shift, and many articles get this wrong.

  • Florida's 10-day roof rule is for roofs only. Fla. Stat. 489.147(6) lets an owner cancel a roof repair or replacement contract signed within 180 days of a declared emergency. That section is written for roof work. It does not expressly cover shutters or windows, so do not count on it for an opening protection contract. The general three-day home solicitation right in 501.025 may still apply.
  • Emergency board-ups. The FTC rule does not cover sales needed to meet an emergency. If a crew boards your broken slider the morning after a storm, do not expect a cooling-off right on that work. Sign only for the emergency step, and sign the permanent replacement later, after you compare bids.
  • Texas out-of-town contractors. For disaster reconstruction, chapter 58 bars any payment before work starts unless the contractor has had a local physical address for a year. TDI calls this out in its scam warnings.
  • Price gouging. After a Florida emergency declaration, unconscionable prices for essential materials and services are unlawful (Fla. Stat. 501.160). In Texas, charging exorbitant prices for building materials during a declared disaster is a deceptive trade practice (Tex. Bus. & Com. Code 17.46(b)(27)).

For more on post-storm sellers, see storm chaser scams.

Insurance-paid jobs: clauses to refuse

If your insurer is paying for storm-damaged windows, watch for contract language that hands the claim to the contractor.

  • TDI warns not to sign contracts that say "Homeowner agrees to the listed repairs for the value of insurance proceeds," because the contractor then gets every penny of the payment.
  • In Texas a contractor may not act as a public adjuster on property it is repairing, even with a power of attorney (Tex. Ins. Code 4102.163).
  • In Florida, contractors may not adjust claims or offer to handle them unless licensed as a public adjuster (Fla. Stat. 626.854), though they may suggest you check coverage with your insurer.
  • Never sign a contract with blank spaces. TDI says shady contractors fill them in later.

If a claim is involved, read window damage claims and repairs before signing anything.

Warranties: product versus workmanship

Impact windows and shutters usually come with two different warranties. The manufacturer warranty covers defects in the product, such as a failed glass seal or a broken track. The workmanship warranty comes from the installer and covers leaks, bad anchoring, poor sealing and finish work. Neither law nor code sets their length, so get both in writing and attach them to the contract.

Ask what voids each one. Common conditions include using the wrong sealant, painting over vinyl, failing to clean shutter tracks, or a non-authorized installer. Ask whether the warranty transfers if you sell the house, and who you call first if a window leaks: the installer or the manufacturer.

Keep the product approval documents and installation instructions with your warranty papers. Florida's code requires shutters to carry a permanent label with the approval holder and approval number, which helps when you file a warranty claim years later.

If something goes wrong after you sign

  1. Put it in writing. Send the contractor a dated letter describing the problem and what you want. Use certified mail.
  2. Florida delays. If no permit or work has happened after a large deposit, use the 489.126 demand letter described above.
  3. Florida defects. Before suing over a construction defect, Florida's chapter 558 requires written notice to the contractor at least 60 days before filing (120 days for an association representing more than 20 parcels), and gives the contractor a chance to inspect and offer a repair (Fla. Stat. 558.004).
  4. Texas defects. The Residential Construction Liability Act requires written notice by certified mail at least 60 days before filing suit over a construction defect, with the evidence you have (Tex. Prop. Code 27.004). A Texas DTPA suit for damages also requires 60 days' written notice (Tex. Bus. & Com. Code 17.505).
  5. Complaints. File with the licensing agency, the county or the Attorney General. See complaints against window and shutter contractors.

This page is general information, not legal advice. For a large contract, a lien or a dispute, talk to a Florida or Texas attorney who handles construction or consumer cases.

How to choose a provider

  • Write down the date and place you signed; if it was your home, count three business days and note the deadline.
  • Confirm the contract carries the cancellation notice (Florida 'BUYER'S RIGHT TO CANCEL' or the Texas Notice of Cancellation form).
  • Check the contractor's license (Florida DBPR or county) before paying anything.
  • Make sure every opening is listed with its product approval number, design pressure and missile rating.
  • Confirm in writing who pulls the permit and that final payment waits for the passed final inspection (and the WPI-8 in Texas catastrophe areas).
  • Keep the deposit small; in Florida, note the 30-day permit and 90-day start clock if it is over 10 percent.
  • Get the stucco, drywall, paint and cleanup scope in writing.
  • Florida: look for the Recovery Fund notice and the lien law warning; record or confirm the Notice of Commencement.
  • Texas: get the 53.255 disclosure and the subcontractor list; hold back 10 percent retainage for 30 days after completion.
  • Collect lien releases from the contractor and every supplier who sent a Notice to Owner before each payment.
  • Get the manufacturer and workmanship warranties attached to the contract.
  • Pay by check or card to the company's legal name, never in cash.

Related hurricane shutters and impact windows guides

Hurricane shutters and impact windows by state and city

Questions people ask

Can I cancel an impact window contract I signed at home in Florida?

Usually, yes. If the sale was solicited and signed somewhere other than the seller's business location and costs more than $25, Fla. Stat. 501.025 lets you cancel until midnight of the third business day after you sign. Give written notice in person or by mail to the address on the contract. A mailed notice counts when it is postmarked. An exception exists for a sale that resulted from your own request for specific goods or services, so if you called the company and asked for a product, check with an attorney or the Attorney General's office.

Does Texas have a 3-day right to cancel home solicitation sales?

Yes. Texas Business and Commerce Code 601.051 lets a consumer cancel a home solicitation transaction for goods or services over $25 until midnight of the third business day after signing. The merchant must give you a contract in the language of the sales pitch with a bold cancellation notice, plus a Notice of Cancellation form in duplicate. After a valid cancellation the merchant has 10 business days to refund all payments. Sales negotiated at the merchant's fixed business location are not covered.

Does the FTC Cooling-Off Rule apply to hurricane window sales?

It can. The FTC rule covers sales of $25 or more made at your home and $130 or more at temporary locations, such as a booth at a home show held in a hotel or fairground. It does not cover sales needed to meet an emergency, sales made fully online or by phone, or a repair visit you requested (though extra items sold during that visit are covered). The deadline is midnight of the third business day, and Saturday counts as a business day.

Is Saturday a business day for the 3-day cancellation?

Yes, in Florida and under the FTC rule. Florida defines a business day as any calendar day except Sunday or a federal holiday, and the FTC says the same. So if you sign on a Thursday, your days are Friday, Saturday and Monday, and the deadline is midnight Monday. Texas uses the term third business day without the same definition in the section, so cancel early rather than relying on a weekend count.

Can a contractor keep my deposit if I cancel within 3 days?

No. Florida's required notice says that if you cancel, the seller may not keep all or part of any cash down payment. In Texas, the merchant must refund all payments within 10 business days and is not entitled to compensation for services performed under a canceled transaction. Under the FTC rule, the seller has 10 days to refund your money. Keep your certified mail receipt in case you need to prove when you canceled.

Does Florida's 10-day hurricane cancellation rule cover windows and shutters?

Not by its terms. Fla. Stat. 489.147(6) lets owners cancel roof repair or replacement contracts signed within 180 days after a declared emergency, within 10 days or by the official start date, whichever comes first. The section is written for roofing. For window and shutter contracts, rely on the general three-day home solicitation right if it applies, or on a cancellation clause you negotiate into the contract.

What is a Notice of Commencement and do I need one for impact windows?

It is a form recorded with the county clerk before work starts on a Florida property, listing the owner, contractor, property and surety. It sets the timeline for lien rights. Improvements of $2,500 or less are exempt from most of the lien law. Building departments may require a copy of the recorded notice before the first inspection when the contract is over $5,000. Most whole-house impact window jobs need one. It usually expires one year after recording.

What is a lien release and why does it matter?

A lien release, or waiver, is a signed paper from a contractor, subcontractor or supplier saying they have been paid and give up lien rights for that amount. In both Florida and Texas, people who supplied your job can claim a lien on your home if your contractor does not pay them, even if you paid in full. Collect releases before each payment, especially from any supplier who mailed you a Florida Notice to Owner. Texas releases must follow the statutory forms in Property Code 53.284.

Should my contract list the NOA or Florida Product Approval numbers?

Yes. The building inspector, your wind mitigation inspector and, in Texas, the windstorm inspector will check that each installed product matches an approval and is rated for your home's design pressures. Listing the Florida Product Approval or Miami-Dade NOA number for each unit, plus its design pressure and missile rating, lets you confirm you are getting what you paid for and makes it harder for the installer to swap in a lower-rated product.

Who pays for stucco and paint repair after impact window installation?

Whoever the contract says. Neither Florida nor Texas law assigns it. Removing old windows from concrete block walls often cracks stucco around the opening, so make the contract say who patches stucco and drywall, who paints, how far around the opening, and whether colors will be matched. If the contract is silent, expect a dispute or an extra charge.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration