Local Guide · Hurricane shutters and impact windows

What Happens During Impact Window Installation? Bucks, Anchors, Stucco and Inspections Step by Step

From measuring to the final inspection, here is what an impact window job involves in Florida and Texas, what a window buck is, how units are anchored to concrete block, what can go wrong, and what the inspector checks.

Impact window installation runs in stages: field measuring, product approval checks and permit, a wait while units are made, then removal of old windows, repair or replacement of the wood bucks around each opening, setting and anchoring each unit exactly as its product approval shows, sealing, and finish repair to stucco and drywall. Inspectors then check that the approved product went in with the right anchors. On the Texas coast, a TDI inspector must see the work during installation for a WPI-8.

Key facts

  • Florida requires window and door assemblies to be anchored per the manufacturer's published recommendations to achieve the specified design pressure; substitute anchors must perform equally or better (FBC 1710.2).
  • Where a wood buck is less than 1-1/2 inches thick, Florida requires anchors to go directly into the masonry or concrete; bucks 1-1/2 inches or thicker must be fastened to transfer load to the substrate and fully support the frame (FBC 1710.3).
  • Exterior windows and doors in Florida must carry a permanent label, marking or etching that traces to the manufacturer and product (FBC 1709.5.1).
  • Sealed drawings are not required to replace windows and doors on an existing one- or two-family home if units are the same size in the same opening, meet current design pressures and the instructions are submitted with the permit (FBC 107.1.1).
  • Since January 26, 2026, window and door installations in Florida threshold buildings need a threshold inspection by a state-certified special inspector and an engineer's inspection plan, per Miami-Dade.
  • TDI windstorm inspectors must inspect during construction; TDI does not charge for its inspectors and aims to inspect within 48 hours of the request date, excluding weekends and holidays.
  • Owners or builders should file TDI Form WPI-1 before construction begins on work that will need a WPI-8.
  • Jacksonville requires a recorded Notice of Commencement before the first inspection when improvements exceed $5,000.

The impact window process, start to finish

Every company runs its schedule a little differently, but most residential jobs in Miami, Tampa, Orlando, Jacksonville, Corpus Christi or Galveston follow these stages.

StageWhat happensWho does it
1. Consultation and quoteOpenings counted, styles chosen, rough sizes and design pressures estimatedContractor and owner
2. Field measureEach opening measured precisely; condition of bucks, sills and stucco notedContractor's measurer
3. Approvals and permitFL# or Miami-Dade NOA matched to each opening; permit application filed with elevations, square footage and design pressures; WPI-1 filed on the Texas coastContractor (or owner-builder)
4. ManufacturingUnits built to your sizesManufacturer
5. Notice of CommencementRecorded where required (Florida) before inspectionsOwner signs
6. Installation daysOld units out, bucks repaired, new units set, anchored and sealedInstall crew
7. InspectionsLocal building inspection(s); TDI or engineer inspection during work on the Texas coastBuilding department, TDI
8. Finish workStucco patch, interior trim, drywall, paint, cleanupContractor
9. Final paperworkFinal inspection approval, approvals packet, WPI-8 in Texas, warranty registrationContractor and owner

The longest stage is usually the wait between signing and installation, which covers manufacturing and permit review. Installation itself is much shorter. Ask your contractor for both estimates in writing.

How long does impact window installation take?

There are two different answers.

  • Contract to install: often weeks to months, depending on manufacturer lead times, permit review times in your city, and demand after storms. We found no reliable published statewide figure, so get your contractor's current estimate and ask what could delay it.
  • Installation days: depends on how many openings, their size, how many crews, the condition of the bucks, and whether stucco and drywall repair are done the same week. A crew typically works opening by opening so the house is never left wide open overnight.

Large sliding glass doors, mulled window groups (units joined side by side), second-floor work and condo buildings take longer. Condo jobs in threshold buildings add a special inspector and an engineer's inspection plan.

For timing around storm season, see lead times and hurricane season.

What is a window buck?

In much of Florida, homes are built with concrete block (CBS) walls. Windows are not fastened straight into the block. Instead, a buck is a frame of wood (usually pressure-treated), or sometimes another material, attached around the inside of the masonry opening. The window is then set into or against the buck.

The buck does three jobs: it gives the window a flat, square surface to sit against, it carries wind loads from the window into the wall, and it gives room for shims and sealant.

What the code says

Florida Building Code section 1710.3 sets two cases:

  • Buck thinner than 1-1/2 inches: the window must be anchored through its frame, or by jamb clips or a subframe, with anchors fastened directly into the masonry or concrete. The buck is basically a spacer.
  • Buck 1-1/2 inches or thicker: the buck itself must be securely fastened to transfer load to the masonry or concrete and must fully support the window frame. The window can then be anchored into the secured buck per the manufacturer's instructions.

Unless the product was tested otherwise, bucks must fully support the frame, and shims must be made of materials that can carry the loads. Miami-Dade requires wood buck calculations for threshold-building permits when bucks are 1-1/2 inches or thicker.

Buck repair

Older bucks often rot from years of leaks. When the old window comes out, the installer can see whether the buck is sound. If it is soft or split, it should be replaced before the new window goes in, because a strong window anchored into weak wood is a weak window. Ask for a written unit price for buck replacement in your contract so there are no surprises, and ask for photos.

How are impact windows anchored to concrete block?

Impact windows are tested as a whole system: glass, frame, hardware and the exact anchors used to mount them. TDI notes impact windows are tested as a unit, including attachment hardware and installation method. Florida's HVHZ missile test requires that fasteners used in testing match the size and spacing used in the field (FBC 1626.2.2).

That is why the product approval matters on install day. It includes installation drawings showing:

  • The anchor type (for example, concrete screws of a certain diameter), embedment depth and edge distance.
  • Anchor spacing along each side of the frame, and how spacing changes with design pressure.
  • Whether anchors go through the frame, through a flange, or through clips.
  • Which substrates are allowed: concrete, masonry block, wood framing, steel.
  • Shim and buck requirements.

FBC 1710.2 says assemblies must be anchored per the manufacturer's published recommendations to reach the design pressure. If the wall material is not covered, a substitute anchoring system must perform equal or better as shown by engineering. On wood-frame walls, FBC 1710.4 allows anchoring through the frame, clips, subframe or flange per the instructions.

Example. If the approval drawing shows anchors at a set spacing for your design pressure and the crew puts in fewer, the window may not meet its rating. Ask your contractor to leave the approval drawings on site, and look at a few openings before the trim covers the anchors.

Full-frame vs. insert replacement

Full-frame replacementInsert (pocket) replacement
What it meansThe entire old window, including frame, comes out down to the buck or rough openingA new window is set inside the old frame, which stays
Can bucks be checked and replaced?YesUsually not
Glass areaSame as or close to the originalSmaller, because the old frame remains
Stucco and interior disturbanceMoreLess
Fit with impact product approvalsCommon for impact work in masonry homesOnly if the approval allows mounting into an existing frame

For impact windows in Florida's concrete-block homes, full-frame removal is common because the anchors must reach the substrate named in the approval. Insert installs can be appropriate for some products and walls, but only when the approval and instructions cover that method. Ask the contractor which method each opening uses and show you where the approval allows it.

Also check bedroom escape windows. Florida's existing building code lets a replacement escape window be the manufacturer's largest standard size that fits the existing frame or opening, even if it is smaller than new-construction rules (FBC Existing Building 505.3). An insert window shrinks the opening, so confirm it still works for escape.

What sealants and waterproofing are used?

Water leaks are the most common complaint after window jobs. The seal around an impact window is part of keeping water out, and in many approvals part of the tested assembly.

  • Sealant between frame and buck or substrate: follow the manufacturer's instructions for type and location.
  • Perimeter seal on the outside: a continuous sealant joint between the frame and stucco, with backer rod in wider gaps.
  • Weep holes and drainage paths in sliding doors and some windows must stay open. Sealing them shut traps water.
  • Sill pans or flashing may be required by instructions, particularly in wood-frame walls.

Florida's water infiltration testing applies to windows and doors labeled to AAMA/WDMA/CSA 101/I.S.2/A440 or TAS 202 (FBC 1709.5.1). The installation is what keeps that tested performance in the wall. Ask your installer which sealant they use and whether it matches the instructions.

Will installation damage my stucco or drywall?

Some disturbance is normal with full-frame replacement. Removing old frames can crack stucco around the edges, and interior returns, sills and drywall may need patching.

  • Ask what the quote includes: stucco patch only, patch and texture match, or patch, texture and paint.
  • Ask whether interior trim and window sills are reused or replaced, and who paints.
  • Paint rarely matches exactly on old walls. Agree in advance whether the contractor paints the whole wall face or just the patch.
  • Stucco needs time to cure before painting; ask about the schedule.

Write the finish level into the contract. "Patch stucco" and "patch, texture and paint to match" are very different jobs.

How should I prepare my home?

  • Clear a path 3 to 4 feet wide inside each window and door. Move furniture, plants and decor.
  • Take down blinds, curtains, rods and anything mounted on the window wall. Ask if the crew will reinstall blinds.
  • Clear outside along the walls: patio furniture, grills, potted plants. Trim shrubs that block access.
  • Protect valuables and electronics from dust. Cover furniture you cannot move.
  • Plan for pets and children to be away from open openings and tools.
  • Turn off alarm sensors on windows and ask how they will be reinstalled or replaced.
  • Know your HOA or condo rules. Florida HOAs and condo boards must adopt hurricane protection specifications and may not deny conforming installations (s. 720.3035(6), s. 718.113(5)). Get approval before the install date if your community requires it.
  • Remove existing shutters or ask whether the crew will. Old shutter tracks and anchors may need patching.

Do I need to be home during installation?

It helps to be there at the start and end of each day. An adult should be available to:

  • Walk the job with the lead installer at the start and confirm which unit goes in which opening.
  • Approve any change, such as unexpected buck replacement, in writing.
  • Let inspectors in. Some inspections need access to the inside.
  • Check the house is closed and secure at the end of the day.

If you cannot be there, agree on who has the key, how the crew will secure the house, and how you will approve changes by text or email.

Florida: permits and inspections, including the HVHZ

Window and door replacement needs a permit in Florida counties and cities, including Miami-Dade, Broward, Hillsborough (Tampa), Orange (Orlando) and Duval (Jacksonville).

What Miami-Dade asks for

  • A permit application (category 82 and/or 83 for windows, mullions and glass doors) with the total square footage replaced.
  • An elevation drawing of each affected wall showing which units are replaced.
  • The current NOA or Florida approval for each product, with the required positive and negative design pressure of each unit and the glass type selected.
  • For threshold buildings (more than three stories, more than 50 feet tall, or large assembly occupancies): wind calculations for all openings, wood buck calculations for bucks 1-1/2 inches or thicker, a threshold affidavit, a special inspector form covering buck and fastener installation, and a threshold inspection plan.

Miami-Dade and Broward are the High-Velocity Hurricane Zone, with the strictest testing rules. Make sure products are approved for HVHZ use. See HVHZ requirements.

Sealed drawings for homes

For an existing one- or two-family home or townhouse, FBC 107.1.1 says sealed drawings are not required if units are installed per the manufacturer's instructions for the wind zone, meet the current FBC Residential design pressures, are the same size in the same opening, and the instructions are submitted with the permit.

Notice of Commencement

Florida lien law uses a recorded Notice of Commencement on larger jobs. Jacksonville, for example, requires one when improvements exceed $5,000, recorded before the first inspection and posted on site. Check your county's threshold.

Other code items

  • Replacement windows and doors must meet FBC Chapter 16 (FBC Existing Building 707.4). See replacement code rules.
  • Some operable window replacements need window fall prevention devices meeting ASTM F2090, depending on sill height (FBC Existing Building 702.4).

Texas: TDI inspections during installation for a WPI-8

In TDI's catastrophe-area counties (the first tier of Gulf counties plus La Porte, Morgan's Point, Pasadena, Seabrook and Shoreacres east of Highway 146), window, entry door and garage door replacement needs a windstorm Certificate of Compliance (WPI-8) for TWIA coverage.

  1. Before work starts: file Form WPI-1, Application for Certificate of Compliance.
  2. During installation: TDI inspectors inspect during construction, not before or after. Ask your contractor to schedule the inspection while anchors and attachments are visible. TDI aims to inspect within 48 hours of the requested date, excluding weekends and holidays, and does not charge for its inspectors. TDI field offices are in Beaumont, La Marque, Angleton and Corpus Christi (800-248-6032).
  3. Codes: since April 1, 2026, WPI-8 work must be certified to the 2024 IRC or IBC.
  4. Missed the inspection? A Texas-licensed engineer can inspect after completion for a WPI-8-E. TDI says post-construction inspections can be more invasive and more expensive.
  5. Paperwork deadline: TDI may not issue a certificate for ongoing work if it does not get completed forms and fees within six months after the final inspection (Ins. Code 2210.2515(e)).

Houston, Dallas, San Antonio and Austin follow their own city permit and inspection processes. See WPI-8 for windows.

What is the final inspection checking?

Each building department sets its own inspection steps. In general, an inspector looking at impact window work checks that:

  • The product matches the permit. The units are the approved products, sizes and design pressures listed on the permit. Labels tracing to the manufacturer and product are present (FBC 1709.5.1).
  • Anchoring follows the approval. Anchor type, spacing, embedment and edge distance match the installation drawings (FBC 1710.2).
  • Bucks are sound and fastened as FBC 1710.3 requires.
  • Instructions are on site. Florida requires shutter installation instructions to be available to inspectors on the job site (FBC 1709.9.4), and many departments expect the same for windows.
  • Escape openings work in bedrooms.
  • Safety glazing is used where the code requires it.

Your own walk-through

  • Open, close and lock every operable unit.
  • Check sealant is continuous inside and out, and weep holes are open.
  • Look for labels on the glass or frame. Take photos for your wind mitigation inspection.
  • Get the final inspection result, product approvals for every unit, and warranty papers. Citizens recommends giving NOA letters to your wind mitigation inspector so features earn discounts.

What if the window doesn't fit the opening?

Custom units occasionally arrive wrong, or an opening turns out to be out of square once the old frame comes out.

  • Small gaps are handled with shims and buck adjustments allowed by the instructions.
  • Too large or too small by more than the instructions allow: the unit should be remade, not forced. Cutting the block, adding unapproved filler, or skipping anchors to make it fit can void the rating.
  • Changing the opening size can change the permit, and on a one- or two-family home can remove the FBC 107.1.1 "same size, same opening" path that avoids sealed drawings.

Ask the contractor how the opening will be protected while a replacement unit is made, especially in storm season.

Can installation happen during hurricane season?

Yes. The Atlantic hurricane season runs June 1 to November 30, with the peak from mid-August to late October, according to the Florida Climate Center. Contractors in Florida and Texas install all year. During the season, ask:

  • Will you stop removing old windows if a storm watch is issued, and how will you secure open openings?
  • Do you have temporary panels or plywood ready for any opening left open?
  • What happens to my delivery and install dates if a storm hits the region?
  • Will my existing shutters stay usable on the openings not yet replaced?

FLASH explains that a hurricane watch means hurricane conditions are possible in the area, and a warning means they are expected. Agree on a plan for both.

How to choose a provider

  • Confirm the FL# or NOA (or Texas TDI evaluation) and design pressure for each opening before ordering.
  • Get a written unit price for buck replacement and the finish level for stucco and drywall.
  • Make sure the permit is issued, and in Texas WPI-1 is filed, before work starts.
  • Record a Notice of Commencement if your Florida county requires it.
  • Clear 3 to 4 feet inside and outside each opening and remove window coverings.
  • Ask that approval drawings and installation instructions stay on site.
  • Look at anchors and bucks before trim covers them; take photos.
  • In coastal Texas, confirm the TDI inspection is scheduled during installation.
  • Test every unit at the walk-through; check labels, sealant and weep holes.
  • Collect the final inspection, approvals packet, WPI-8 (Texas) and warranty papers.
  • Schedule a new wind mitigation inspection after the job.

Related hurricane shutters and impact windows guides

Hurricane shutters and impact windows by state and city

Questions people ask

Is a building permit always required for impact windows?

In Florida and coastal Texas, window and door replacement generally needs a permit, and on the Texas coast a WPI-8 for TWIA coverage. Some cities waive permits only for listed items after a declared disaster. Tampa, for example, does not list windows among its post-hurricane waivers. Check with your building department before work starts.

Can my existing shutters stay up after impact windows go in?

You can usually remove old shutters once all openings have impact windows. TDI says having both shutters and impact windows is not necessary. Patch the old shutter anchor holes and tracks so water does not get in. If only some openings are replaced, keep protection for the rest until they are done.

What does the inspector look for on the anchors?

The inspector compares the anchors with the product approval drawings: anchor type and size, spacing, embedment into the substrate, and edge distance. Florida requires anchoring per the manufacturer's published recommendations to reach the design pressure, and substitute anchors must perform as well or better.

Do impact windows need special sealant?

They need the sealant and installation details named in the manufacturer's instructions, which may be part of how the product was tested. The perimeter joint should be continuous, weep holes must stay open, and flashing or sill pans may be required in wood-frame walls.

Can I install impact windows myself?

Florida lets owners act as owner-builders on their own home for their own use under s. 489.103, with a permit and inspections. You must follow the product approval exactly. In coastal Texas you still need the WPI-1 and an inspection during installation. Large units are heavy, and mistakes can void ratings and affect insurance.

Who pays for rotten bucks found during installation?

It depends on your contract. Because bucks are hidden until the old window is out, many contracts set a unit price for buck replacement. If yours does not, agree on the price in writing before the crew replaces them. Do not let the crew skip replacing soft bucks to stay on budget.

How do I know the right windows went in the right openings?

Each unit has a label tracing to the manufacturer and product. Compare labels and sizes with the permit and quote worksheet, opening by opening. Take photos of the labels; your wind mitigation inspector and any future buyer will want them.

Will installers work in the rain?

Crews usually avoid removing windows in heavy rain and plan around storms, because wet bucks and walls make sealing harder. Ask how they protect open openings if weather changes mid-day, whether they carry temporary covers, and what happens to your schedule during a tropical storm or hurricane watch.

Sources

This guide was written by our editorial team from the public sources listed above. It is general information, not legal advice; confirm licensing and terms directly with any provider.

New ebook from The Company ChronicleHow to Research Like a Wall Street AnalystFind original sources, analyze trends, and build your own insights. 36 pages with worksheets.Get the ebook · $29Instant PDF download

Business Spotlight

Want us to publish your business?

Our team writes and publishes articles about your business on The Company Chronicle every month, with a link to your website. Plans from $30 a month, cancel anytime.

Publish with us

The Chronicle directory

What are you into?

The Chronicle, coast to coast

Every corner has a story.

The full Chronicle illustration